JPH089918B2 - Construction method of steel tower supported chimney - Google Patents
Construction method of steel tower supported chimneyInfo
- Publication number
- JPH089918B2 JPH089918B2 JP126386A JP126386A JPH089918B2 JP H089918 B2 JPH089918 B2 JP H089918B2 JP 126386 A JP126386 A JP 126386A JP 126386 A JP126386 A JP 126386A JP H089918 B2 JPH089918 B2 JP H089918B2
- Authority
- JP
- Japan
- Prior art keywords
- steel tower
- tower
- erected
- erection
- hoisting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 229910000831 Steel Inorganic materials 0.000 title claims description 24
- 239000010959 steel Substances 0.000 title claims description 24
- 238000010276 construction Methods 0.000 title description 5
- 238000000034 method Methods 0.000 claims description 13
- 238000009434 installation Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【発明の詳細な説明】 (産業上の利用分野) 本発明は鉄塔支持型煙突の架設方法に係るものであ
る。DETAILED DESCRIPTION OF THE INVENTION (Industrial field of application) The present invention relates to a method for constructing a steel tower supported chimney.
(従来の技術) 従来、この種の架設工法においては、トラツククレン
で架設できる高さまで鉄塔部分をトラツククレンで架設
し、それ以上の高い部分は、ジヤツキアツプ工法、サイ
ドタワー工法、エレクター工法等で鉄塔部分及び筒身部
分を架設していた。(Prior art) Conventionally, in this type of erection method, the tower part is erected with the track crane to a height where it can be erected with the track crane, and the higher part is the tower tower method, the side tower method, the erector method, etc. The part and the barrel part were installed.
第8図乃至第10図は前記各工法のうちエレクター工法
を示すもので、トラツククレン(a)によつて架設可能
な高さHまで鉄塔(b)を架設して(第8図参照)第9
図に示すようにエレクター(c)を設置し、同エレクタ
ーによつてトラツククレンで架設できない上方の鉄塔部
分を架設する。8 to 10 show the erector construction method among the above construction methods, in which the steel tower (b) is erected up to a height H which can be erected by the truck crane (a) (see FIG. 8). 9
As shown in the figure, the erector (c) is installed, and the upper tower portion that cannot be erected by the truck crane is erected by the erector.
次いで鉄塔頂部に吊上げ用ワイヤー(d)を装架し、
筒身ブロツク(e)を順次鉄塔の下側に挿入して上位の
筒身ブロツクと溶接して吊上げ、筒身(f)の架設を行
なう。(第10図参照) (発明が解決しようとする問題点) 前記エレクター工法ではエレクター、またジヤツキア
ツプ工法ではジヤツキアツプ装置、サイドタワー工法で
はタワークレンという特殊な装置が必要となり、このた
め、これらの架設機材の手配が困難な地域がでてくる。Next, attach the lifting wire (d) to the top of the tower,
The cylinder blocks (e) are sequentially inserted into the lower side of the steel tower, welded to the upper cylinder blocks and lifted, and the cylinder body (f) is erected. (Refer to FIG. 10) (Problems to be solved by the invention) A special device called an erector is required in the erector method, a jackup device is used in the jackup method, and a tawer crane is used in the side tower method. There are areas where it is difficult to arrange.
また前記各架設工法とも、鉄塔の立上げはトラツクク
レンで行ない、初期にトラツククレンを利用し、その
後、特殊な架設法を適用するため、トラツククレン以外
の装置が必要となり、架設コストがトラツククレンだけ
で架設した場合より高くなる。In addition, in each of the above-mentioned construction methods, the tower is built up with a truck crane, the truck crane is used in the initial stage, and then a special construction method is applied, so a device other than the truck crane is required. It will be higher than if installed alone.
(問題点を解決するための手段) 本発明はこのような問題点を解決するために提案され
たもので、トラツククレンで低層鉄塔部を架設し、次い
で同鉄塔部の頂部より筒身の吊上げ架設を行つて筒身全
体の吊上げが完了したのち、同筒身頂部に取付けた架設
用リングを利用して上層鉄塔部の部材を吊上げ架設する
ことを特徴とする鉄塔支持型煙突の架設方法に係るもの
である。(Means for Solving Problems) The present invention has been proposed in order to solve such problems, in which a low-rise steel tower part is erected by truck crane, and then a tubular body is lifted from the top of the steel tower part. After completing the hoisting and hoisting of the entire barrel, the member for the upper steel tower is hoisted and erected using the erection ring attached to the top of the same barrel. It is related.
(作 用) 本発明においては前記したように、トラツククレンに
よつて低層鉄塔部を架設し、同鉄塔部の頂部より筒身の
吊上げ、架設を行ない、かくして筒身全体の吊上げが完
了すると、筒身頂部に取付けられた架設用リングを利用
し、同リングによつて上層鉄塔部の部材を吊上げて前記
低層鉄塔部の上部に順次継接していき、鉄塔支持型煙突
を架設するものである。(Operation) In the present invention, as described above, the low-rise steel tower part is erected by the truck crane, and the tubular body is hung and erected from the top of the steel tower part, and when the hoisting of the entire tubular body is completed, Utilizing a erection ring attached to the top of the barrel, the members of the upper tower tower are hoisted by the ring and successively joined to the upper part of the lower tower tower to erection a tower-supporting chimney. .
(実施例) 以下本発明を1筒8層の鉄塔支持型煙突の架設方法に
適用した図示の実施例について説明する。(Embodiment) An embodiment will be described below in which the present invention is applied to a method for constructing an eight-column steel tower-supporting chimney.
トラツククレン(1)によつて架設可能な範囲Hの手
前の高さまで低層鉄塔部分(2)を架設する。(第1図
参照) 次いで同鉄塔部分(2)の頂部に吊上げ用ワイヤ
(3)を仕込み筒身ブロツク(4)を吊上げる。(第2
図参照) 次いで第3図に示す如く鉄塔部分(2)の下端部より
新らたな筒身ブロツク(4)を挿入して、上位の筒身ブ
ロツクに溶接して前記筒身ブロツク(4)が継接された
筒身(5)を吊上げ、かくして筒身ブロツクの継接と筒
身の吊上げとを繰返して筒身(5)を完全に架設する。
(第4図参照) 次いで同筒身(5)の頂部に取付けられた架設用リン
グ(6)を利用して、これに鉄塔部材架設用の架構
(7)を組み、同架構(7)から吊上げ用ワイヤ(8)
を仕込み、上層鉄塔部材(9)を吊上げて前記鉄塔部
(2)上に継接していき、(第5図参照)以下前記同様
の作業を反覆して第6図及び第7図に示すように鉄塔支
持型煙突を架設する。The low-rise tower part (2) is erected to a height before the range H in which it can be erected by the truck crane (1). (See FIG. 1) Next, a hoisting wire (3) is charged at the top of the steel tower portion (2), and a cylindrical block (4) is hoisted. (Second
Then, as shown in FIG. 3, a new cylinder block (4) is inserted from the lower end of the steel tower part (2), and is welded to the upper cylinder block to make the cylinder block (4). The tube body (5) to which the joint is connected is lifted, and thus the connection of the cylinder block and the lifting of the cylinder body are repeated to completely erect the cylinder body (5).
(Refer to FIG. 4) Next, using the erection ring (6) attached to the top of the tubular body (5), the frame (7) for erection of the steel tower member is assembled to this, and from the same frame (7) Lifting wire (8)
, The upper layer steel tower member (9) is lifted and spliced on the steel tower part (2) (see FIG. 5), and thereafter, the same operation as above is repeated, as shown in FIGS. 6 and 7. A steel tower-supporting chimney will be erected on.
(発明の効果) このように本発明の方法によれば、トラツククレンで
低層鉄塔部を架設し、次いで同鉄塔部の頂部より筒身の
吊上げ架設を行つて筒身全体の吊上げが完了したのち、
同筒身頂部に取付けた架設用リングを利用して上層鉄塔
部の部材を吊上げ架設するものであるからトラツククレ
ンの他には架設工事に一般的に使用される吊上げ用ワイ
ヤとウインチのみを用いて、エレクタ等の特殊な架設機
材を用いることなく、小型のトラツククレンで高層の鉄
塔支持型煙突の架設が可能となり、更にまた筒身頂部に
ミストキヤツチヤが筒身の吊上げ架設時に、鉄塔の下側
の広い部分を通過できるので、架設が容易となる等の効
果を有する。(Effects of the Invention) According to the method of the present invention, the low-rise steel tower section is erected by truck crane, and then the tubular body is hung from the top of the steel tower section to complete the hoisting of the entire tubular body. ,
Since the member for the upper layer tower is hoisted and erected using the hoisting ring attached to the top of the same cylinder, only the hoisting wire and winch that are commonly used in the erection work are used in addition to the truck crane. Therefore, it is possible to construct a high-rise tower-supporting chimney with a small truck crane without the use of special erection equipment such as an erector.In addition, when a mist-catcher is hung on the top of the barrel, the steel tower Since it can pass through a wide area on the lower side, it has the effect of facilitating installation.
以上本発明を実施例について説明したが、本発明は勿
論このような実施例にだけ局限されるものではなく、本
発明の精神を逸脱しない範囲内で種種の設計の改変を施
しうるものである。Although the present invention has been described with reference to the embodiments, the present invention is of course not limited to such embodiments, and various design modifications can be made without departing from the spirit of the present invention. .
第1図乃至第7図は本発明に係る鉄塔支持型煙突の架設
方法の一実施例の工程を示す正面図、第8図乃至第10図
は従来のエレクター工法の工程を示す正面図である。 (1)……トラツククレン、(2)……低層鉄塔部分 (4)……筒身ブロツク、(5)……筒身 (6)……架設用リング1 to 7 are front views showing steps of an embodiment of a method of constructing a steel tower supported chimney according to the present invention, and FIGS. 8 to 10 are front views showing steps of a conventional erector method. . (1) …… Truck crane, (2) …… Low-rise tower part (4) …… Cylinder block, (5) …… Cylinder (6) …… Installation ring
Claims (1)
いで同鉄塔部の頂部より筒身の吊上げ架設を行つて筒身
全体の吊上げが完了したのち、同筒身頂部に取付けた架
設用リングを利用して上層鉄塔部の部材を吊上げ架設す
ることを特徴とする鉄塔支持型煙突の架設方法。1. A low-rise steel tower part is erected by a truck crane, and then a hoisting and erection of the tubular body is performed from the top of the steel tower part, and after the hoisting of the entire tubular body is completed, an erection ring attached to the top of the tubular body. A method of constructing a steel tower-supporting chimney, which comprises hoisting and erection of a member of an upper-layer steel tower section by utilizing the above.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP126386A JPH089918B2 (en) | 1986-01-09 | 1986-01-09 | Construction method of steel tower supported chimney |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP126386A JPH089918B2 (en) | 1986-01-09 | 1986-01-09 | Construction method of steel tower supported chimney |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS62160378A JPS62160378A (en) | 1987-07-16 |
| JPH089918B2 true JPH089918B2 (en) | 1996-01-31 |
Family
ID=11496562
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP126386A Expired - Lifetime JPH089918B2 (en) | 1986-01-09 | 1986-01-09 | Construction method of steel tower supported chimney |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH089918B2 (en) |
-
1986
- 1986-01-09 JP JP126386A patent/JPH089918B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPS62160378A (en) | 1987-07-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH089918B2 (en) | Construction method of steel tower supported chimney | |
| JP2002309511A (en) | Main girder structure of truss bridge and method of erecting main girder | |
| JPH04161566A (en) | Constructing apparatus for large space building | |
| JPH089917B2 (en) | Construction method of steel tower supported chimney | |
| JP2858891B2 (en) | Construction method of large span dome roof | |
| JPH0759845B2 (en) | Scaffold connection device for concrete column forming device | |
| JPS62164973A (en) | Method for temporarily constructing iron tower support type chimney | |
| JPS62111003A (en) | Bridge temporary construction vehicle | |
| JPS5928713B2 (en) | How to build a steel tower | |
| JPH0718743A (en) | Construction method for large span domelike roof | |
| JPH0959924A (en) | Slab formwork method | |
| JP2876991B2 (en) | Steel frame method for high-rise buildings | |
| JP2994205B2 (en) | Structural assembly method | |
| JP2634271B2 (en) | Jack-up method and device | |
| JPH06127889A (en) | Crane flexible climbing method | |
| JPH07305536A (en) | All weather type parallel building method of towerlike structure | |
| JPH06185120A (en) | Construction method for upper structure of roof, etc. | |
| JPS63171968A (en) | Method of erection constriction of prefabricated type concrete chimney | |
| JPH0321777A (en) | How to build a steel column | |
| JPH1037527A (en) | Method for constructing inner and outer cylinder of chimney simultaneously | |
| JPS61102972A (en) | Construction method of column bases for elevated water tanks, etc. | |
| JPH084113A (en) | How to construct a steel beam | |
| JPS626056A (en) | Rising and falling stand for constructing high structure | |
| JPS58195652A (en) | Hanging-up construction of roof enclosure | |
| JPS6349470Y2 (en) |