JP2519005B2 - Job schedule simulation device - Google Patents
Job schedule simulation deviceInfo
- Publication number
- JP2519005B2 JP2519005B2 JP4315508A JP31550892A JP2519005B2 JP 2519005 B2 JP2519005 B2 JP 2519005B2 JP 4315508 A JP4315508 A JP 4315508A JP 31550892 A JP31550892 A JP 31550892A JP 2519005 B2 JP2519005 B2 JP 2519005B2
- Authority
- JP
- Japan
- Prior art keywords
- job
- multiplicity
- schedule
- information
- pseudo
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Stored Programmes (AREA)
- Debugging And Monitoring (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、ジョブスケジュールシ
ミュレーション装置に関し、特にジョブの運用管理支援
装置に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a job schedule simulation device, and more particularly to a job operation management support device.
【0002】[0002]
【従来の技術】従来のジョブの運用管理支援装置として
は、非常に多数のジョブの運用を管理するために、すべ
ての運用ケースに対する異常発生確率を求め、ジョブ起
動の運用を支援する方式がある。例えば、特開平3−1
05524号、「計算機システムの運用方式設計支援シ
ステム」を参照することができる。2. Description of the Related Art As a conventional job operation management support apparatus, there is a method for managing the operation of a very large number of jobs, obtaining a probability of occurrence of an abnormality for all operation cases, and supporting the operation of job activation. . For example, Japanese Patent Laid-Open No. 3-1
No. 05524, “Computer System Operation Method Design Support System”.
【0003】図4は計算機システムの運用方式設計支援
システムのブロック図であり、実行制御部17は、端末
装置21からのジョブフロー編集要求を受けると編集部
18を起動し、編集部18はシステムで実行されるジョ
ブ群の実行順序を規定するジョブブローとして編集結果
をジョブフローテーブル13に格納する。FIG. 4 is a block diagram of an operation method design support system for a computer system. The execution control unit 17 activates the editing unit 18 upon receiving a job flow editing request from the terminal device 21, and the editing unit 18 executes the system. The edited result is stored in the job flow table 13 as a job blow that defines the execution order of the job group executed in (1).
【0004】次にシミュレーション部19を起動し、シ
ミュレーション部19はジョブフローテーブル13を参
照して、入力されたジョブフローの全ての運用ケースに
対する異常発生確率と実行時間を算出して運用ケース管
理テーブル14と運用ケーステーブル15に格納する。
運用ケーステーブル15は運用ケース毎に存在し、上の
運用ケース毎の情報が格納される。Next, the simulation unit 19 is started up, and the simulation unit 19 refers to the job flow table 13 to calculate anomaly occurrence probabilities and execution times for all operation cases of the input job flow to calculate an operation case management table. 14 and the operation case table 15.
The operation case table 15 exists for each operation case and stores information for each operation case above.
【0005】分析部20は運用ケース管理テーブル14
と運用ケーステーブル群15を参照して分析を行い、そ
の結果を運用ケース管理テーブル14と運用ケーステー
ブル群15に格納し、運用ケース管理テーブル14と運
用ケーステーブル群15に格納されているシミュレーシ
ョン結果として[運用ケース番号:1、2、3…、異常
終了ジョブ番号:( )、(1)、(1、4)…、実行
時間(分):45、55、70…、異常発生確率:0.
656、0.066、0.007…、]等を一覧表とし
て端末装置21に表示したり、分析結果としての確率、
実行時間変更処理後の[―実行時間(分):55、6
5、80…、異常発生確率:0.510、0.051、
0.005…、]等を表示する。The analysis unit 20 uses the operation case management table 14
And the operation case table group 15 for analysis, the results are stored in the operation case management table 14 and the operation case table group 15, and the simulation results stored in the operation case management table 14 and the operation case table group 15 [Operation case number: 1, 2, 3 ..., Abnormal end job number: (), (1), (1, 4) ..., Execution time (minutes): 45, 55, 70 ..., Abnormality occurrence probability: 0 .
, 656, 0.066, 0.007 ..., etc. as a list on the terminal device 21 or a probability as an analysis result,
[-Execution time (min): 55, 6 after execution time change processing]
5, 80 ..., Abnormality occurrence probability: 0.510, 0.051,
0.005 ...,], etc. are displayed.
【0006】[0006]
【発明が解決しようとする課題】この従来のジョブの運
用管理支援システムでは、各ジョブに対する異常発生確
率によって、ジョブの運用をシミュレートしているた
め、同時に多数のジョブが起動される場合のジョブ個々
の資源の利用度が考慮されていなかった。また、実際の
ジョブ起動がMT等の装置台数や多重度によって制限さ
れることが、異常発生確率では表現できないという問題
点があった。In this conventional job operation management support system, job operation is simulated by the probability of occurrence of an abnormality for each job. Utilization of individual resources was not taken into consideration. Further, there is a problem that the fact that the actual job activation is limited by the number of devices such as MTs and the multiplicity cannot be expressed by the abnormality occurrence probability.
【0007】本発明は上述の問題点に鑑みて、MT等の
装置台数や多重度も考慮して管理する疑似ジョブ起動方
式により、ジョブスケジュールの評価、MT等の装置と
多重度の評価およびそれらの逐次確認が行えるジョブス
ケジュールシミュレーション装置を提供することを目的
とする。In view of the above problems, the present invention evaluates a job schedule, evaluates a device such as MT and the degree of multiplicity, and implements them by a pseudo job starting method that manages the number of devices such as MT and the degree of multiplicity. It is an object of the present invention to provide a job schedule simulation device capable of sequentially confirming the above.
【0008】[0008]
【課題を解決するための手段】本発明は、ジョブのスケ
ジュールのシミュレーションを行う装置であって、ジョ
ブが使用するMTなどの装置の使用予定を管理する手段
と、ジョブの実行時間中の多重度を管理する手段と、ス
ケジュールされたジョブ情報が格納されたスケジュール
ファイルから次に起動すべきジョブ情報を読み出す手段
と、読み出された対象ジョブの多重度に関する情報を前
記多重度管理手段から、前記対象ジョブが使用するMT
などの装置の使用予定に関する情報を前記MT管理装置
からそれぞれ問い合わせ、その問い合わせ結果に基づい
て対象ジョブを実際に起動した場合に、ジョブの多重度
及びジョブが使用する装置に関して余裕があるかどうか
を確認する手段とを備えたことを特徴としている。The present invention is a job scheduling system.
A device for simulating joules,
Means for managing the usage schedule of MT and other devices used by
And a means for managing the multiplicity during the execution time of a job,
Schedule that stores scheduled job information
A means to read the job information to be started next from a file
And the information on the read multiplicity of the target job.
The MT used by the target job from the multiplicity management means.
Information about the usage schedule of the device such as the MT management device
Each inquiries, based on the inquiry result
When the target job is actually started by
And whether there is enough room for the device used by the job
And a means for confirming .
【0009】[0009]
【作用】上記構成によれば、疑似ジョブ起動装置は、ス
ケジュールファイルからジョブ選択装置が選択した対象
ジョブが使用するMT等の装置の予定をMT管理装置か
らの通知により取り込み、対象ジョブの実行対象時間中
の多重度を多重度制御装置からの通知により取り込み、
経過時間計測装置で対象ジョブのスケジュールファイル
に在る前回実績経過時間を圧縮して計り実行時間を短縮
操作して疑似ジョブ起動を行う。According to the above configuration, the pseudo job activation device fetches the schedule of the device such as MT used by the target job selected by the job selection device from the schedule file by the notification from the MT management device, and executes the target job. Take in the multiplicity during the time by notification from the multiplicity control device,
The elapsed time measuring device compresses the previous actual elapsed time in the schedule file of the target job to measure and reduce the execution time, and starts the pseudo job.
【0010】この対象ジョブの進行状況はビジュアルに
表示装置に表示されるので、対象ジョブのスケジュール
結果を実際にジョブを起動しない疑似ジョブ起動方式に
よって、評価、確認することができる。Since the progress status of the target job is visually displayed on the display device, the schedule result of the target job can be evaluated and confirmed by a pseudo job starting method that does not actually start the job.
【0011】[0011]
【実施例】以下、本発明の一実施例について図面を参照
して説明する。図1は本発明の一実施例のブロック図で
ある。図1において、ジョブスケジュール装置1はジョ
ブのスケジュールを行なう装置で結果はスケジュールフ
ァイル9に格納される。スケジュールファイル9はスケ
ジュールされたジョブの情報を格納するファイルであ
る。ジョブの情報とは、前回実績経過時間、使用MT情
報、ジョブ状態、後続ジョブ情報があげられる。ジョブ
スケジュールシミュレーション装置2は表示装置3、M
T管理装置4、多重度制御装置5、経過時間計測装置
6、疑似ジョブ起動装置7、ジョブ選択装置8に分ける
ことができる。ジョブ選択装置8は次に起動すべきジョ
ブをスケジュールファイル9から読み出す。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. FIG. 1 is a block diagram of an embodiment of the present invention. In FIG. 1, a job schedule device 1 is a device for scheduling a job, and the result is stored in a schedule file 9. The schedule file 9 is a file that stores information about scheduled jobs. The job information includes previous actual elapsed time, used MT information, job status, and succeeding job information. The job schedule simulation device 2 is a display device 3, M
It can be divided into a T management device 4, a multiplicity control device 5, an elapsed time measuring device 6, a pseudo job starting device 7, and a job selecting device 8. The job selection device 8 reads the next job to be started from the schedule file 9.
【0012】疑似ジョブ起動装置7は、ジョブ選択装置
8で選ばれた対象ジョブを疑似的に起動し、そのジョブ
が使用するMT装置(磁気テープ記憶装置)などの装置
や多重度について余裕度を確認する装置である。多重度
制御装置5はシステムで定義された多重度、即ち、コン
ピュータシステムで複数のジョブを並列に実行する場合
の最大のジョブの並列実行数と現在使用中の多重度を管
理する装置であり、後述するように多重度に空きがある
かどうかを疑似ジョブ起動装置7に通知する。MT管理
装置4はシステムの全MT装置の台数とジョブが使用す
るMT装置の台数を管理し、MT装置の使用状況を疑似
ジョブ起動装置7に通知する。経過時間測定装置6は疑
似ジョブ起動装置7から通知されたジョブの前回実績経
過時間(前回の実行時間)を所定の比率で圧縮して測定
し、その時間を終了したらジョブの実行の終了を疑似ジ
ョブ起動装置7に通知する。表示装置3は、後述するよ
うにジョブの起動の進行状況、及びMT装置、多重度の
状況をビジュアルに表示する機能を有する。The pseudo job starting device 7 pseudo starts the target job selected by the job selecting device 8 and
Devices such as MT devices (magnetic tape storage devices) used by
This is a device for checking the margin with respect to the multiplicity. The multiplicity control unit 5 has a multiplicity defined by the system, that is,
When executing multiple jobs in parallel on a computer system
Is a device that manages the maximum number of parallel executions of jobs and the multiplicity currently in use . As described later, there is an empty multiplicity.
Whether or not it is notified to the pseudo job starting device 7. The MT management device 4 is used by the number of all MT devices in the system and jobs.
It manages the number of MT devices to be used and notifies the pseudo job starting device 7 of the usage status of the MT devices. The elapsed time measuring device 6 measures the previous actual elapsed time (previous execution time) of the job notified from the pseudo job starting device 7 by compressing it at a predetermined ratio.
Then, when the time is finished , the pseudo job starting device 7 is notified of the end of the job execution . The display device 3 will be described later.
As described above , it has a function of visually displaying the progress status of job activation, MT device, and multiplicity status.
【0013】次に、動作を説明する。まず、スケジュー
ルファイル9にジョブスケジュール装置1からスケジュ
ールされたジョブ情報が格納される。これは、例えばコ
ンピュータシステムの1日分のスケジュールのジョブの
情報である。ジョブ選択装置8は、スケジュールファイ
ル9の中から最初に起動すべきジョブ情報を選択して読
み出し、疑似ジョブ起動装置7へ送信する。疑似ジョブ
起動装置7では、読み出された対象ジョブについて多重
度制御装置5に多重度に関する情報、つまり対象ジョブ
をスケジュールで決められた所定の時間において起動し
たとした場合に多重度に空きがあるかどうかを問い合わ
せる。多重度制御装置5から多重度に空きがあると通知
を受けると、疑似ジョブ起動装置7ではMT管理装置4
に対象ジョブが使用するMT装置の使用台数を通知し、
対象ジョブの実行時間においてMT装置に空きがあるか
どうかを問い合わせる。MT装置に空きがあり、MT装
置の使用許可の通知を受けると、疑似ジョブ起動装置7
は対象ジョブを疑似的に実行中とし、対象ジョブの前回
実績経過時間(スケジュールファイル9に格納されてい
る)を経過時間測定装置6に通知する。経過時間測定装
置6では前述のように通知された前回実績経過時間を圧
縮して測定し、その時間を終了したら疑似ジョブ起動装
置7にジョブの終了を通知する。終了の通知を受ける
と、疑似ジョブ起動装置7はそのジョブは正常に終了し
たと判断し、スケジュールファイル9に結果を格納す
る。以下、スケジュールファイル9内のスケジュールジ
ョブが終了するまでジョブ情報を読み出し、同様の処理
を繰り返し行うことにより、ジョブのスケジュールのシ
ミュレーションを行う。その間のジョブの実行状態の変
化、MT装置や多重度の使用状況は、逐次表示装置3に
よる表示で確認することができる。Next, the operation will be described. First, schedule <br/> Lumpur job information from the job schedule system 1 is stored in the schedule file 9. This is
Of a job scheduled for one day on the computer system
Information. The job selection device 8 selects the job information to be started first from the schedule file 9 and reads it.
It is projected and transmitted to the pseudo job activation device 7. In the pseudo job starting device 7, the read target job is multiplexed.
Information regarding the multiplicity to the degree control device 5, that is, the target job
Will be started at the prescribed time determined by the schedule.
If so, inquire whether there is a vacancy in the multiplicity . Notification from the multiplicity control device 5 that there is an empty multiplicity
When the pseudo job starting device 7 receives the MT management device 4
Notify the number of MT devices used by the target job to
Is there any available MT device at the execution time of the target job?
Inquire about. There is a vacancy in the MT device,
When receiving the notification of permission to use the storage device, the pseudo job starting device 7
Indicates that the target job is being pseudo-executed, and the previous
Actual elapsed time (stored in schedule file 9
To the elapsed time measuring device 6. Elapsed time measuring device
In step 6, the previous actual elapsed time notified as described above is suppressed.
Reduce and measure, and when that time ends, pseudo job start device
The end of the job is notified to the storage unit 7. Get notified of termination
When the pseudo job activation device 7 finishes the job normally,
Then , the result is stored in the schedule file 9. Below is the schedule file in schedule file 9.
Job information is read until the job is completed, and the same processing is performed.
By repeating the procedure,
Perform a simulation. During the meantime, the change in the execution state of the job, the usage status of the MT device and the multiplicity are displayed on the sequential display device 3 .
It can be confirmed by the display .
【0014】図2は表示装置3の表示例である。表示画
面(A)10はあるタイミングでの表示画面で、MT装
置の使用状況、多重度情報、ジョブの状態が表示してあ
る。図3に示す表示画面(B)11は図2に示す画面
(A)10から時間が経過した後の表示画面である。表
示画面(A)10ではMT使用台数が3で全台数8であ
り、多重度は実行数が1、定義数15からともに余裕が
あるためジョブの起動に支障はないが、表示画面(B)
11ではMT使用台数が8/8でMAXに達しているた
め、このままではこれ以上MTを使用するジョブの起動
はできないことが読み取れる。これは、ジョブのスケジ
ュールの組み方に問題があるためで、スケジュールの変
更を促していることを示す。FIG. 2 is a display example of the display device 3. The display screen (A) 10 is a display screen at a certain timing, and the usage status of the MT device, multiplicity information, and job status are displayed. The display screen (B) 11 shown in FIG. 3 is a display screen after a lapse of time from the screen (A) 10 shown in FIG. In the display screen (A) 10, the number of MTs used is 3 and the total number is 8, and the number of executions of the multiplicity is 1, and there is a margin from the defined number of 15 so that there is no problem in starting the job, but the display screen (B)
In 11, since the number of MTs used has reached MAX at 8/8, it can be read that a job using MTs cannot be started any more as it is. This indicates that there is a problem with the way the job schedule is set, and it is urged to change the schedule.
【0015】このように本実施例においては、従来例の
場合がジョブフローのシミュレーション結果と、分析に
よる調整結果を表示出力するものでシステムの資源構
成、利用度や多重度が考慮されていないため、限定され
たシステム構成内で有効な手法であるのに比較し、本実
施例の場合は、MT装置等のシステム資源構成も取り込
み実行の多重度の評価も行って、疑似ジョブ起動装置7
による疑似ジョブ起動方式により評価、確認するのでス
ケジュールファイル9に格納するジョブの前回実績経過
時間を短縮する操作が可能となり、その間のジョブの状
態の変化(正常、異常等)、MT等の資源多重度の使用
状況を逐次表示装置で確認しながら処理できるので、シ
ステム資源構成によって限定されることなく広範なシス
テムについて応用、評価が可能である。As described above, in this embodiment, in the case of the conventional example, the job flow simulation result and the adjustment result by analysis are displayed and output, and the system resource configuration, utilization and multiplicity are not taken into consideration. In comparison with the effective method within the limited system configuration, in the case of the present embodiment, the pseudo job activation device 7 is also evaluated by evaluating the system resource configuration of the MT device and the like and the multiplicity of execution.
Since the evaluation and confirmation are performed by the pseudo job starting method according to, it is possible to reduce the previous actual elapsed time of the job stored in the schedule file 9, the change of the job state (normal, abnormal, etc.) during that period, and a large amount of resources such as MT. Since it is possible to perform processing while confirming the severe usage status on the display device, it is possible to apply and evaluate a wide range of systems without being limited by the system resource configuration.
【0016】[0016]
【発明の効果】以上詳細に説明したように本発明は、実
際にジョブを起動する前に、コンピュータシステムにお
けるジョブの多重度、及びジョブが使用するMT装置な
どのシステムの資源に関して余裕があるかどうかを確認
することが可能となり、システムの資源構成によって限
定されることなく、広範囲なシステムにおいても使用で
きるという効果がある。As described in detail above, the present invention is practical.
Before launching a job,
Job multiplicity and the MT device used by the job.
Check which system resources are available
It is possible that the
Can be used in a wide range of systems
There is an effect that you can .
【図1】本発明の一実施例によるジョブスケジュールシ
ミュレーション装置のブロック図である。FIG. 1 is a block diagram of a job schedule simulation apparatus according to an exemplary embodiment of the present invention.
【図2】図1に示す表示装置における表示画面の1例を
示す図である。FIG. 2 is a diagram showing an example of a display screen on the display device shown in FIG.
【図3】図2に示す表示画面の時間経過後の画面を示す
図である。FIG. 3 is a diagram showing a screen of the display screen shown in FIG. 2 after a lapse of time.
【図4】従来の計算機システムの運用方式設計支援シス
テムのブロック図である。FIG. 4 is a block diagram of a conventional operation system design support system for a computer system.
1 ジョブスケジュール装置 2 ジョブスケジュールシミュレーション装置 3 表示装置 4 MT管理装置 5 多重度制御装置 6 経過時間計測装置 7 疑似ジョブ起動装置 8 ジョブ選択装置 9 スケジュールファイル 1 Job Schedule Device 2 Job Schedule Simulation Device 3 Display Device 4 MT Management Device 5 Multiplicity Control Device 6 Elapsed Time Measurement Device 7 Pseudo Job Activation Device 8 Job Selection Device 9 Schedule File
Claims (1)
ンを行うシミュレーション装置であって、ジョブが使用
するMTなどの装置の使用予定を管理する手段と、ジョ
ブの実行時間中の多重度を管理する手段と、スケジュー
ルされたジョブ情報が格納されたスケジュールファイル
から次に起動すべきジョブ情報を読み出す手段と、読み
出された対象ジョブの多重度に関する情報を前記多重度
管理手段から、前記対象ジョブが使用するMTなどの装
置の使用予定に関する情報を前記MT管理手段からそれ
ぞれ問い合わせ、その問い合わせ結果に基づいて対象ジ
ョブを実際に起動した場合に、ジョブの多重度及びジョ
ブが使用する装置に関して余裕があるかどうかを確認す
る手段とを備えたことを特徴とするジョブスケジュール
シミュレーション装置。1. A simulation of a job schedule
It is a simulation device that performs
Means for managing the usage schedule of devices such as MT
Means for managing the multiplicity during the execution of
Schedule file that stores the job information
Means to read the job information to be started next from the
Information on the multiplicity of the target job issued is the multiplicity.
From the management means, a device such as MT used by the target job is
Information about the usage schedule of the device from the MT management means.
Inquires about each one and target
When the job is actually started, the job multiplicity and job
Check if there is enough room for the equipment
Job scheduling simulation apparatus characterized by comprising a means that.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP4315508A JP2519005B2 (en) | 1992-11-02 | 1992-11-02 | Job schedule simulation device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP4315508A JP2519005B2 (en) | 1992-11-02 | 1992-11-02 | Job schedule simulation device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH06149597A JPH06149597A (en) | 1994-05-27 |
| JP2519005B2 true JP2519005B2 (en) | 1996-07-31 |
Family
ID=18066200
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP4315508A Expired - Fee Related JP2519005B2 (en) | 1992-11-02 | 1992-11-02 | Job schedule simulation device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2519005B2 (en) |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0830468A (en) * | 1994-07-13 | 1996-02-02 | Nec Corp | Job schedule planning system |
| JP3501385B2 (en) * | 1995-04-13 | 2004-03-02 | 株式会社日立製作所 | Job execution order determination method |
| US6889243B1 (en) | 1995-04-13 | 2005-05-03 | Hitachi, Ltd. | Job scheduling analysis method and system using historical job execution data |
| JP4722896B2 (en) * | 2007-09-26 | 2011-07-13 | みずほ情報総研株式会社 | Job operation management system, job operation management method, and job operation management program |
| JP5133775B2 (en) * | 2008-05-19 | 2013-01-30 | 株式会社野村総合研究所 | Job management device |
| JP2013061874A (en) * | 2011-09-14 | 2013-04-04 | Hitachi Solutions Ltd | Job simulation method |
| JP5989194B1 (en) * | 2015-07-03 | 2016-09-07 | 株式会社大和総研 | Test management system and program |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2538679B2 (en) * | 1989-08-22 | 1996-09-25 | 日本電気株式会社 | Job execution time prediction display method |
-
1992
- 1992-11-02 JP JP4315508A patent/JP2519005B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH06149597A (en) | 1994-05-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7080105B2 (en) | System and method for data backup | |
| CA1175573A (en) | Method and apparatus for measurements of channel operation | |
| CN113190443A (en) | Test method, test device, computer equipment and storage medium | |
| JP2519005B2 (en) | Job schedule simulation device | |
| US20020184000A1 (en) | Method of managing workflow in a computer-based system | |
| CN114827589A (en) | Shooting device drive test method and device and storage medium | |
| US7797598B1 (en) | Dynamic timer for testbench interface synchronization | |
| HK1248900A1 (en) | Data analysis apparatus and data analysis method | |
| US20050177546A1 (en) | Storage system | |
| US20220382610A1 (en) | Systems and methods for margin based diagnostic tools for priority preemptive schedulers | |
| JP3389745B2 (en) | Apparatus and method for measuring program performance | |
| KR101396047B1 (en) | Method for scheduling job with a regular expression and electronic device using the same | |
| JP3207564B2 (en) | Event recording method and device | |
| JPH03237852A (en) | Automatic test system for exchange software | |
| US8332737B2 (en) | Instrument control system and methods | |
| JP2006018735A (en) | Coding standard compliance status monitoring system | |
| JP2885923B2 (en) | System test support method | |
| JP2564909B2 (en) | Data maintenance method | |
| CN120723617B (en) | Performance analysis method, device, storage medium and program product for application program | |
| JP4192380B2 (en) | PLC simulator apparatus, simulation program, and recording medium on which the program is recorded | |
| JPH0991250A (en) | Network system and network system performance evaluation method | |
| JP2002108656A (en) | Program operation verifying system | |
| CN108228418A (en) | A kind of method, server-side and the system of determining server-side processing progress | |
| JP2001216281A (en) | Job monitoring or analysis condition setting method | |
| JPS62233855A (en) | Monitor system for waiting time of program processing |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |