Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0722737B2 - Pipe inner surface lining repair method - Google Patents
[go: Go Back, main page]

JPH0722737B2 - Pipe inner surface lining repair method - Google Patents

Pipe inner surface lining repair method

Info

Publication number
JPH0722737B2
JPH0722737B2 JP1339839A JP33983989A JPH0722737B2 JP H0722737 B2 JPH0722737 B2 JP H0722737B2 JP 1339839 A JP1339839 A JP 1339839A JP 33983989 A JP33983989 A JP 33983989A JP H0722737 B2 JPH0722737 B2 JP H0722737B2
Authority
JP
Japan
Prior art keywords
resin
pipe
lining
plug
branch pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1339839A
Other languages
Japanese (ja)
Other versions
JPH03196877A (en
Inventor
秋生 森永
功 斎藤
宣勝 池
正人 篠崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Gas Co Ltd
Original Assignee
Tokyo Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Gas Co Ltd filed Critical Tokyo Gas Co Ltd
Priority to JP1339839A priority Critical patent/JPH0722737B2/en
Publication of JPH03196877A publication Critical patent/JPH03196877A/en
Publication of JPH0722737B2 publication Critical patent/JPH0722737B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Pipe Accessories (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention 【産業上の利用分野】[Industrial applications]

本発明は、地下に敷設されているガス管,水道管などの
既設配管を埋設状態のままライニング補修する際の補修
工法に関するものである。
The present invention relates to a repairing method for repairing a lining of an existing pipe, such as a gas pipe or a water pipe laid underground, in a buried state.

【従来の技術】[Prior art]

一般に、ガス配管,水道配管などの地下に敷設されてい
る既設配管は、経年によって管に腐蝕孔や継手部の弛み
が生じて漏洩が起る恐れがあることから、その漏洩予
防,保全のため更生修理として埋設状態のまま管内面を
樹脂でライニングする補修が行なわれている。 このような補修工法として、例えば特開昭63-65983号公
報に記載のように、既設配管の一端開口部より液状樹脂
を管内に充満するようにプラグ状に導入し、その樹脂プ
ラグの前後の管内に圧力差を生起させて樹脂プラグを他
方の開口側へ流動進行させ、この進行により管内面に所
要膜厚のライニングを施工する補修工法が提唱されてい
る。 上述の先行技術では、開放された既設配管の一端にラン
チャを接続し、そのランチャに接続された樹脂タンクか
らライニング用の樹脂を充填してランチャ内に樹脂プラ
グを形成し、これをランチャの自由端側から供給した加
圧気体で既設配管内へと供給している。そして既設配管
内で加圧気体による圧力で樹脂プラグが流動進行して、
樹脂がライニングにより消費されて吹き抜けを起すと、
再び樹脂タンクからランチャを介して樹脂プラグの導入
回数を繰り返し、ライニング領域を延長して所定長さに
わたる既設配管の管内面全長に樹脂のライニングを施工
できるようにしている。
In general, existing pipes laid underground such as gas pipes and water pipes may leak due to corrosion holes and loosening of joints with the passage of time. As a rehabilitation repair, the inner surface of the pipe is repaired by lining it with resin while it is buried. As such a repairing method, for example, as described in JP-A-63-65983, liquid resin is introduced into the pipe from one end opening portion of the existing pipe so as to fill the pipe, and before and after the resin plug. A repairing method has been proposed in which a pressure difference is generated in the pipe to cause the resin plug to flow toward the other opening side, and by this progress, a lining having a required film thickness is applied to the inner surface of the pipe. In the above-mentioned prior art, a launcher is connected to one end of an open existing pipe, a resin for lining is filled from a resin tank connected to the launcher to form a resin plug in the launcher, and the launcher is free to use. The pressurized gas supplied from the end side is supplied into the existing pipe. Then, the resin plug flows in the existing pipe under the pressure of the pressurized gas,
When the resin is consumed by the lining and blows through,
The number of times of introducing the resin plug from the resin tank through the launcher is repeated again to extend the lining region so that the resin lining can be applied to the entire length of the inner surface of the existing pipe over a predetermined length.

【発明が解決しようとする課題】[Problems to be Solved by the Invention]

ここで問題になるのは、既設配管に対して1回に導入し
得る樹脂プラグの量には実質的な制限があることであ
る。 これはライニングに用いられる樹脂粘度,チクソトロピ
ー性,ライニングの膜厚,加圧気体の圧力値の限界など
で定まる。しかも次回からの導入で既設配管内にもたら
された樹脂プラグはライン圧が終了した位置まで送る
間、ライニングの時と同じ樹脂速度を維持しなければな
らない。このため最初の樹脂ライニングに要する時間は
t1であっても、次回はt1+t1=2t1,3回目はt1+t1+t1=3t
1・・・のように、導入回数が増す毎に、所要時間を等
差級数的に増大させるので、結局のところ、所要の補修
区間のライニング完成までに要する時間Tは、T=(n2
+n)/2・t1となる。(但し、nはこの間におけるライ
ニング樹脂の導入回数である) 本発明は、上記事情にもとづいてなされたもので、予定
された補修区間の両端開口部から同時に従来ライニング
を実施することで、実質的に作業時間を、開口部の片側
から実施する従来の方式に比較して、ほぼ4分の1に低
減できるようにした管内面のライニング補修工法を提供
しようとするものである。
The problem here is that the amount of resin plug that can be introduced into the existing pipe at one time is substantially limited. This is determined by the viscosity of the resin used for lining, thixotropy, the thickness of the lining, and the pressure value of the pressurized gas. Moreover, the resin plug introduced into the existing pipe by the introduction from the next time has to maintain the same resin speed as that at the time of lining while sending it to the position where the line pressure is completed. Therefore, the time required for the first resin lining is
Even at t 1 , the next time is t 1 + t 1 = 2t 1 and the third time is t 1 + t 1 + t 1 = 3t
As 1 ..., each introduction number increases, since increasing the time required arithmetically, after all, the time T required until the lining completion of the required repair intervals, T = (n 2
+ N) / 2 · t 1 . (However, n is the number of times the lining resin is introduced during this period.) The present invention has been made based on the above-mentioned circumstances, and by performing the conventional lining simultaneously from both end openings of the planned repair section, Moreover, it is an object of the present invention to provide a lining repairing method for the inner surface of the pipe, which can reduce the working time to about 1/4 as compared with the conventional method in which the working time is performed from one side of the opening.

【課題を解決するための手段】[Means for Solving the Problems]

この目的を達成するため本発明では、ライニング対象の
既設配管の一端開口部と他端開口部のそれぞれを作業入
口として、両開口部より管内に導入される樹脂プラグを
圧力差により補修区間の管路中間に向けて流動進行させ
ると共に、上記両開口部の中間位置の既設配管に、作業
出口となる導出通路を設け、中間位置の導出通路から樹
脂プラグの吹き抜けを起した管内空気,余剰樹脂,加圧
気体等を排出するように施工することを特徴とするもの
である。
In order to achieve this object, in the present invention, the one end opening and the other end opening of the existing pipe to be lined are used as working inlets, and the resin plugs introduced into the pipe from both openings are repaired by a pressure difference pipe. In addition to allowing the fluid to flow toward the middle of the passage, an outlet passage serving as a work outlet is provided in the existing pipe at the intermediate position between the openings, and the air inside the pipe that has caused the resin plug to blow out from the outlet passage at the intermediate position, excess resin, It is characterized in that it is constructed so as to discharge pressurized gas and the like.

【作用】[Action]

上記の補修工法によれば、既設配管の両端開口部から樹
脂プラグを導入する時に、補修区間の管内空気は中間点
の導出用通路を介して外部に取出され、従来のライニン
グの場合と同様に中間の導出用通路を介して樹脂プラグ
の吹き抜けが実現できる。 この場合の実質的な作業時間は、従来の一方通行的に行
う補修工法の作業時間に比して略4分の1に短縮でき、
ライニング補修作業が大巾に能率化される。
According to the above repair method, when the resin plug is introduced from the openings at both ends of the existing pipe, the air in the pipe in the repair section is taken out through the discharge passage at the intermediate point, and as in the case of the conventional lining. Blow-through of the resin plug can be realized through the intermediate lead-out passage. In this case, the substantial working time can be shortened to about 1/4 of the working time of the conventional one-way repair method,
The lining repair work is greatly streamlined.

【実施例】【Example】

以下、本発明の一実施例を図面を参照して具体的に説明
する。 図において、符号1は、本発明の補修工法において使用
される樹脂供給装置であり、2は上記樹脂供給装置1よ
り既設配管の補修個所へ供給したライニング樹脂を加圧
気体で流動させる時に用いる加圧気体供給装置である。 上記樹脂供給装置1は、樹脂注入器3と、上記樹脂注入
器3の底部に連通する供給管4と、上記供給管4に電磁
開閉弁5を介して連通するランチャ6とを具備してお
り、上記電磁開閉弁5が開放されている時、上記樹脂注
入器3内のライニング樹脂を上記ランチャ6に供給充填
し、上記ランチャ6内に樹脂プラグEを形成するのであ
る。上記樹脂注入器3にはプランジャ3aが設けてあり、
また頂部には後述のような手段で加圧気体が供給される
ようになっていて、樹脂の押出しができるようにしてあ
る。 ランチャ6に充填されるライニング用樹脂は、例えば主
剤と硬化剤とを調合した常温2液硬化型の樹脂であり、
このうち主剤は不飽和ポリエステル樹脂,ビニルエステ
ル樹脂,エポキシ樹脂,ウレタン樹脂などを主成分とし
た組成物でありこれに顔料,揺変剤などを添加してチク
ソトロピー性を有している(例えば250,000〜300,000cp
sでTI値が6)。 一方、前記した加圧気体供給装置2は、コンプレッサ
7、エアタンク8,流量調整弁9,10および上記ランチャ6
の端に接続される気体供給管11に電磁開閉弁12を取付け
たもので、各流量調整弁9,10に対応して流量計13,14お
よび圧力計15,16を具備している。更に要すれば、三方
切換弁17を上記コンプレッサ7の出口側に設けて加圧気
体を管路18へ分岐できるようにしてあり、上記管路18お
よび流量調整弁19を介して上述の樹脂注入器3の頂部に
連通させている。 上記流量計13,14、圧力計15,16からの出力情報を受けて
所要のプログラムに従って演算を行い、上記流量調整弁
9,10を調節制御するコントロールユニット20が、上記加
圧気体供給装置2に設けてある。 上記コントロールユニット20では、流量調整弁19の開度
調節と電磁開閉弁5の開放時間からランチャ6への充填
樹脂量を演算し、メモリに記憶すると共に電磁開閉弁5
の開放時間、その後の時々刻々の流量計13,14および圧
力計15,16の出力情報とから予め定めた膜厚での樹脂ラ
イニングを達成するための樹脂流動速度Vを算出し、そ
の速度を維持するように流量調整弁9,10の開度を制御す
る働きをしている。 一方、本発明によってライニング補修すべき既設配管
は、地下(道路下)に埋設の支管A(あるいは本管)お
よび一端を地上に突出させてメータ類に接続される供内
管Bであり、上記供内管Bは支管Aから分岐されてい
る。 そしてライニング補修は、先づ、供内管Bについて行な
われ、次いで支管Aについて行なわれるが、それに先立
って次のような補修のための準備がなされる。すなわち
支管Aについては、所定長さの補修区間に区切ってその
両端を開放するため、対応する個所に、第2図に示すよ
うな立坑C,Dを形成し、そこで支管Aの端を切断によっ
て開放する。 また支管Aの補修区間の中間点Mにも、立坑Fを形成
し、立坑F内で露出された支管Aの上面に通孔A′を穿
設する。そして、ここに管路27を連通し、これをレシー
バ28に接続する。上記レシーバ28には、排気バルブ29お
よびレシーバ28に入った樹脂をうけ入れるレシーバタン
ク30が接続してある。上記管路27の接続のために、この
実施例ではクランプ31を用いる。このクランプ31は、半
割りのクランプ片31a,31bを、支管Aの上下から当てて
ボルト31cで締め付け、支管Aをパッキング32を介して
気密に上下から抱きかかえるようにすると共に、クラン
プ片31aに設けたジョイント31dを上記通孔A′に対応さ
せる。そして上記ジョイント31dの部分で管路27に接続
することで、支管Aと管路27とを中間点Mにおいて連通
するのである(なお管路27との接続には通孔A′にタッ
プを立て、ニップルを螺合する構成にしてもよい)。 更に、この支管Aに連通する供内管Bについては、メー
タ類を取外し、地上端を開放する。そして支管Aおよび
供内管Bに圧力空気を通して内部の塵埃を除去する。 補修施工は、先づ、供内管Bの開放端にランチャ6を接
続し、電磁開閉弁5を開いて樹脂注入器3から加圧気体
でライニング樹脂をランチャ6内に供給,充填し、ラン
チャ6内を充満させるように樹脂プラグを形成する。そ
して電磁開閉弁5を閉じ、電磁開閉弁12の開放で、調圧
された加圧気体を上記ランチャ6内に供給し、これによ
り樹脂プラグの前後に生じる圧力差で樹脂プラグに流動
性を与えて樹脂プラグを供内管Bへと送り、管内面に対
して所定厚さのライニング膜を形成するのである。 この時、コントロールユニット20では、樹脂の流量調整
弁9,10の開度調節がなされる。この場合、上記コントロ
ールユニット20の演算基礎は、下記の算式に依存してい
る。 まず、供内管Bに流入した加圧気体の量Q1,圧力P1(例
えば0.6kg/cm2)とすれば、 π/4・D2・l1・P1=Q1・P0…(1) の関係にあるので、加圧気体による樹脂プラグの送り開
始の時刻T1におけるQ1,P0,P1を測定すれば、(1)式よ
りl1を知ることができる。なおここで供内管Bに流入し
た気体の量Q1とは流量計13,14の各計測値F1およびF2
差で得られる。この場合、上記流量計13,14に質量流量
計を使用すると、気体の温度の影響がないので演算し易
い。またここでl1は時刻T1における樹脂プラグの位置、
P0,P1は圧力計15,16の計測値、Dは上記供内管Bのライ
ニング内径である。 同様にして、時刻T2における圧力P2および流入量Q2を計
測し、演算して得られる樹脂プラグの位置をl2とすれ
ば、樹脂プラグの流動速度Vは、 V=Δl/Δtとなる。 但し、Δl=l2-l1であり、Δt=T2-T1とする。 したがって所定時間間隔Δtをコントロールユニット20
内の発振器のクロックで設定し、その都度、流量計13,1
4から管内に流入した流入気体量を、また圧力計15,16か
らそれぞれの圧力を計測し、各瞬時の樹脂流動速度Vが
一定の所定値に保持されるように流量調整弁9,10を制御
するのである。 供内管B内では、樹脂プラグの長さは管内面へのライニ
ングに消費されるために減少するが、コントロールユニ
ット20では時間経過に従って消費される樹脂量を演算し
ており、これに対応して押圧気体の圧力を略直線的に降
下する(第4図参照)ので、樹脂プラグの流動速度は一
定の値に保持できる。 供内管Bの内面の樹脂ライニングが管の全長にわたって
完了しないうちに樹脂プラグの樹脂が消費されてしまう
と、その時点で、樹脂プラグを押圧していた加圧気体は
供内管Bを吹き抜け、支管Aの大気圧まで降下してしま
う。このような圧力の変化は急激に起るので、これをコ
ントロールユニット20側でチェックして今回の樹脂ライ
ニング分についての終了と判定し、この時まで供内管B
に供給した気体の流入量Q,樹脂ライニングが終了した位
置までの長さl,経過時間t0などをメモリに記憶し、電磁
開閉弁12を閉じる。 次いで上記コントロールユニット20では、電磁開閉弁5,
流量調整弁19を開き、樹脂注入器3からライニング樹脂
をランチャ6内に供給,充填して所定量の樹脂プラグを
ランチャ6内に形成させる。そして上記電磁開閉弁5,流
量調整弁19を閉じ、電磁開閉弁12を開放して、再び前述
と同様に樹脂プラグEを速度Vにコントロールしながら
供内管Bをライニングする。 このときライニング樹脂プラグEが、前回ライニングし
てある領域を通過する間は、速度Vが維持されている限
り、樹脂プラグの長さ,換言すれば樹脂量は変化しない
ので、コントロールユニット20によって制御される押圧
気体の圧力も略一定値に保持される。しかして樹脂プラ
グEが供内管Bの未だライニングされていない位置に到
達した後は、前述と同様にライニングにより樹脂が消費
され、樹脂プラグEの長さが減少し、したがって押圧気
体の圧力も漸次低下しながらライニングが進行される。
そして樹脂プラグ長が略0になり、押圧気体が吹き抜け
て大気圧まで降下するまでの経過時間は略2t0となり、
またライニングの終了位置までの長さも略2lとなる。 このようにして樹脂プラグの導入と、加圧気体による樹
脂プラグの流動進行でライニングを繰返しながら逐次ラ
イニング領域を延長してゆく。供内管Bのライニングが
終了し、樹脂プラグの長さがまだ残ったまま支管Aとの
接続部(分岐個所)に到達すると、樹脂プラグEは支管
A内に流入して樹脂プラグEを押圧していた加圧気体は
支管A内に吹き抜ける。このため圧力計16の計測値は急
激に降下し、略々大気圧になる。これをコントロールユ
ニット20で判定する。これは予想される経過時間(n×
t)(ここでnは樹脂の導入回数,tは1回の樹脂プラグ
のライニング完了までの時間長)よりも短い(n−1)
t+t′(但しt′<t)で、上記のような急激な圧力
降下をもたらしたか否かで判断される。即ち押圧力の急
激な低下,実経過時間と予測経過時間との差から、樹脂
プラグが支管A内に到達したとの判定がなされ、該当す
る供内管Bについてのライニング補修を終了するのであ
る。 なおt′≒tの場合には、測定誤差の問題もあるので、
更に1回分の樹脂を導入して支管Aへの到達までの時間
を計測するとよい。この誤差範囲は、コントロールユニ
ット20で予め設定して置くとよい。即ちコントロールユ
ニット20は、誤差範囲にあれば再度の樹脂導入を指令
し、誤差範囲になければ終了の指令を出力する。 なお、後に支管A内をライニングする時、支管A内に残
置された樹脂量が不明であると、支管Aのライニング過
程における樹脂プラグ長が変化するので、支管A内の残
置樹脂を支管Aのライニングに先立って除去するか、あ
るいはこの残置樹脂をコントロールユニット20のメモリ
に記憶させて置いて、支管Aのライニングに際してその
分岐個所(支管A内における供内管Bとの接続個所)に
樹脂プラグが到達した時、残置樹脂量を加えた樹脂プラ
グの長さに補正するように、上記コントロールユニット
20で演算してもよい。 このようにして補修区間の支管Aから分岐された各供内
管Bについての樹脂ライニングが終了した後、第5図に
示すように、供内管Bの開放端には透明管などより構成
されるレシーバ21を接続する。このレシーバ21には流量
調整弁22を介して圧縮空気などの加圧気体のボンベ23を
接続すると共に、上記レシーバ21の分岐部21aに絞り弁2
4を接続し、また圧力計25および流量計26を設ける。 この状態で、次に、支管Aに対する補修を施工する。 支管Aに対する補修施工は、第6図に示すように、支管
Aの両端開口部にそれぞれ寸法の合うランチャ6,6を接
続し、それぞれのランチャ6,6に備える樹脂供給装置1,1
から前記供内管Bの場合と同じように、補修用樹脂がプ
ラグ状の状態で管内に供給充填される。この支管Aに対
する補修施工では、樹脂プラグがランチャ6,6を介して
各別に支管Aの両端開口部より導入され、支管Aの管路
内を、両端開口部より補修区間の中間点Mに向けて流動
進行することで支管Aに対する管内面の樹脂ライニング
が実現される。 なお第6図の図示では、中間点Mを境にして左右の支管
Aにはその一方の側にのみ供内管Bが図示され、他方側
には供内管Bが図示されていないが、中間点Mを境にし
た左右の支管Aには通常のごとく管路の敷設状況に応じ
た個数の供内管Bが分岐されていることはいうまでもな
い。 そして支管Aに対する補修施工時には、左右の支管Aよ
り分岐された供内管Bに対して上述した流量調整弁22を
介してボンベ23から加圧気体が供給され、このとき絞り
弁24は閉じられている。ここに加圧気体としては、例え
ば支管Aにおいて樹脂プラグEに付与させる加圧気体の
圧力が1.5kg/cm2とすると、供内管Bにはこれより若干
低圧の例えば1.3kg/cm2の圧力を保持する。この場合、
支管A内において樹脂プラグEを押圧する加圧気体は、
前述のように樹脂がライニングのために消費されて樹脂
プラグ長が短くなると漸次降下されるので、この情報に
基づいて流量調整弁22をコントロールユニット20で調節
して圧力差が例えば−0.2kg/cm2に維持されるようにコ
ントロールするとよい。 その結果、第7図に示すように両端開口部から中間点M
に至る支管Aのライニング過程で、支管Aと供内管Bと
の接続個所に樹脂プラグEが到達した時、圧力差分だけ
の樹脂量(所定量)が供内管Bに侵入する。このとき供
内管B内の加圧気体は、侵入樹脂E′で圧縮され、圧力
が上昇(支管A側の押圧のための加圧気体圧力相当)す
るが、これを圧力計25で検知して、コントロールユニッ
ト20で解析し、指令を出して流量調整弁22を閉じる。 このため、支管A内でライニングのために樹脂が消費さ
れ、樹脂プラグがなくなって加圧気体が吹き抜けを起す
まで、上記供内管B内には侵入樹脂が保持されるが(第
8図参照)、吹き抜けた時に、支管A内の内圧が大気圧
まで降下することにより、支管A内に上記侵入樹脂が供
内管B側の気体圧力で排出され、支管A内に残置される
(第9図参照)。 コントロールユニット20では、供内管Bに侵入した樹脂
量を、その時の気体圧力差,供内管Bの内径などから演
算し、これによって供内管Bとの接続個所(分岐部)を
通過した後の樹脂プラグ長を補正し、樹脂プラグの速度
Vを一定に保持するようにする。 供内管Bから侵入樹脂が支管A内に排出されると、コン
トロールユニット20は圧力計25の指示圧力の低下でこれ
を検知し、再び流量調整弁22を開放し、ボンベ23から加
圧気体を所要圧力で供内管B内に供給する。このため支
管Aに次の樹脂プラグが導入されて該当の供内管Bとの
接続個所を通過する時、再び同量の樹脂が供内管B内に
侵入するので、ライニング未済領域まで樹脂プラグが加
圧気体で送られる過程では支管A内の樹脂プラグの長さ
は変化しない。 このようにして補修区間の支管Aに対しその両端開口部
から管内に導入される樹脂プラグの導入,加圧気体によ
る圧力差で流動進行させてライニングを繰返し実行し、
最終的に支管Aの中間点Mに設けられた通孔A′を介し
て導出管路27よりレシーバ28に、樹脂プラグが排出され
るまで、ライニング作業が継続される。そしてレシーバ
28に樹脂プラグが到達すると、樹脂はレシーバタンク30
に受けられ、加圧気体は吹き抜けを起して大気圧まで降
下し、コントロールユニット20は支管Aに対するライニ
ング作業の終了時点を検知する。 そして最後に、所要量の樹脂プラグを支管Aの両端開口
部より管内に供給導入し、加圧気体で流動進行させる
と、最終的に前述と同様に一定量で、樹脂が供内管Bに
侵入する。この時にはコントロールユニット20は、圧力
計25で供内管Bへの樹脂侵入を検知し、流量調整弁22を
閉じた後、所定時間経過した時点,即ち支管A内で樹脂
プラグEがその該当する供内管Bとの接続個所を通過し
た後、絞り弁24を所定開度で開放するようにコントロー
ルする。 その結果、供内管Bの開放端側の加圧気体は、上記絞り
弁24を介して徐々に大気中へ放出され、侵入樹脂は、支
管A内の加圧気体に押されて供内管B内を移行し、この
過程でライニング層として消費されるか、あるいはその
まま押圧されてレシーバ21に到達する。この過程で流量
計26は加圧気体の排出量を計測しておりコントロールユ
ニット20では、支管A側に供給する加圧気体の流入量
を、上記排出量を考慮して補正する。そしてレシーバ21
に侵入樹脂が到達した段階あるいは支管A側の加圧気体
がレシーバ21内に吹き抜けた段階(侵入樹脂がライニン
グ層として消費される場合)において、絞り弁24を閉じ
る。 このようにして次々に支管Aに連通する供内管Bでの侵
入樹脂の始末が付けられた後、支管A内を通った樹脂プ
ラグは、中間点Mにおいて通孔A′より管27を経由して
レシーバ28に排出され、これによって仕上げライニング
が完了するのである(第10図参照)。 この後、管路27を外し、例えばジョイント31dに盲栓な
どを螺着して、支管Aにおける通孔A′を、実質的に外
部から遮断する。 なお上記実施例では、供内管Bに対して、その外部開放
端より樹脂を導入して先づ供内管Bの樹脂ライニングを
達成するようにしたが、支管Aの樹脂ライニングの時、
同時に供内管Bへの侵入樹脂でライニングするなど、供
内管Bの樹脂ライニングを、支管Aの樹脂ライニングに
並行して実施するようにしてもよい。なおこの場合、支
管Aから供内管Bへの樹脂量の分配,加圧気体による樹
脂送り速度Vの確保などはコントロールユニット20にお
ける制御で達成するとよい。またこの場合には、上記供
内管Bの開放端には上述のようなレシーバ21,絞り弁24
などを設けるとよい。 このように支管Aの両端開口部よりそれぞれ樹脂プラグ
の導入および加圧気体による押圧を行なって管内面のラ
イニングを実施する際、1回のライニング分の時間t,長
さlとする時、支管Aの一端から他端に向けて一方向に
ライニング樹脂の導入および加圧気体による押圧を行な
う方式に比べ、同じ長さL=nlをライニングするに要す
る時間は略4分の1でよいことになり、作業時間の大幅
な節約となる(すなわち一端からの場合にはT=n2
n)/2・tであるが、両端からの場合(本発明)にはT
=n2/4+n/2・tである)。
An embodiment of the present invention will be specifically described below with reference to the drawings. In the figure, reference numeral 1 is a resin supply device used in the repairing method of the present invention, and 2 is an additive used when the lining resin supplied from the resin supply device 1 to the repaired part of the existing pipe is made to flow with a pressurized gas. It is a pressurized gas supply device. The resin supply device 1 includes a resin injector 3, a supply pipe 4 that communicates with the bottom of the resin injector 3, and a launcher 6 that communicates with the supply pipe 4 via an electromagnetic on-off valve 5. When the electromagnetic on-off valve 5 is open, the lining resin in the resin injector 3 is supplied and filled in the launcher 6, and the resin plug E is formed in the launcher 6. The resin injector 3 is provided with a plunger 3a,
Pressurized gas is supplied to the top portion by means such as that described later so that the resin can be extruded. The lining resin with which the launcher 6 is filled is, for example, a room temperature two-liquid curing type resin prepared by mixing a main agent and a curing agent,
Of these, the main component is a composition whose main component is unsaturated polyester resin, vinyl ester resin, epoxy resin, urethane resin, etc., and pigments, thixotropic agents, etc. are added to this to have thixotropic properties (eg, 250,000). ~ 300,000cp
TI value is 6 with s. On the other hand, the pressurized gas supply device 2 includes the compressor 7, the air tank 8, the flow rate adjusting valves 9 and 10, and the launcher 6 described above.
The electromagnetic on-off valve 12 is attached to the gas supply pipe 11 connected to the end of, and flowmeters 13 and 14 and pressure gauges 15 and 16 are provided corresponding to the flow rate adjusting valves 9 and 10. Further, if necessary, a three-way switching valve 17 is provided on the outlet side of the compressor 7 so that the pressurized gas can be branched to the pipe line 18, and the resin injection described above can be performed via the pipe line 18 and the flow rate adjusting valve 19. It communicates with the top of the vessel 3. The output information from the flowmeters 13 and 14 and the pressure gauges 15 and 16 is received, and calculation is performed according to the required program,
A control unit 20 for adjusting and controlling 9, 10 is provided in the pressurized gas supply device 2. In the control unit 20, the amount of resin to be filled into the launcher 6 is calculated from the adjustment of the opening degree of the flow rate adjusting valve 19 and the opening time of the electromagnetic on-off valve 5, and the amount is stored in the memory and the electromagnetic on-off valve 5 is also stored.
Of the resin flow rate V for achieving the resin lining with a predetermined film thickness from the opening time of the, and the output information of the flowmeters 13 and 14 and the pressure gauges 15 and 16 thereafter every moment, and the speed is calculated. It functions to control the opening degree of the flow rate adjusting valves 9 and 10 so as to maintain it. On the other hand, the existing pipes to be repaired with the lining according to the present invention are the branch pipe A (or the main pipe) buried underground (under the road) and the service pipe B connected to the meters with one end protruding to the ground. The service pipe B is branched from the branch pipe A. Then, the lining repair is first performed on the service pipe B and then on the branch pipe A, but prior to that, preparations for the following repairs are made. That is, the branch pipe A is divided into repair sections of a predetermined length and both ends thereof are opened. Therefore, vertical shafts C and D as shown in FIG. 2 are formed at the corresponding places, and the end of the branch pipe A is cut there by cutting. Open. A shaft F is also formed at the midpoint M of the repair section of the branch pipe A, and a through hole A'is formed in the upper surface of the branch pipe A exposed in the shaft F. Then, the conduit 27 is communicated with here, and is connected to the receiver 28. To the receiver 28, an exhaust valve 29 and a receiver tank 30 for receiving the resin contained in the receiver 28 are connected. A clamp 31 is used in this embodiment for connecting the pipe line 27. In this clamp 31, half-divided clamp pieces 31a, 31b are applied from above and below the branch pipe A and tightened with bolts 31c so that the branch pipe A can be airtightly held from above and below via a packing 32, and the clamp piece 31a The joint 31d provided corresponds to the through hole A '. By connecting the pipe 31 to the pipe 27 at the joint 31d, the branch pipe A and the pipe 27 are communicated with each other at the intermediate point M (a tap is made in the through hole A'to connect the pipe 27). , The nipple may be screwed together). Further, for the service pipe B communicating with the branch pipe A, the meters are removed and the ground end is opened. Then, pressurized air is passed through the branch pipe A and the supply pipe B to remove dust inside. In the repair work, first, the launcher 6 is connected to the open end of the service pipe B, the electromagnetic opening / closing valve 5 is opened, and the lining resin is supplied and filled into the launcher 6 by the pressurized gas from the resin injector 3. A resin plug is formed so as to fill the inside of 6. Then, the electromagnetic on-off valve 5 is closed, and the electromagnetic on-off valve 12 is opened to supply the regulated pressurized gas into the launcher 6, thereby giving fluidity to the resin plug by the pressure difference generated before and after the resin plug. The resin plug is sent to the inner pipe B to form a lining film having a predetermined thickness on the inner surface of the pipe. At this time, in the control unit 20, the opening degree of the resin flow rate adjusting valves 9 and 10 is adjusted. In this case, the calculation basis of the control unit 20 depends on the following formula. First, assuming that the amount Q 1 of pressurized gas flowing into the supply pipe B and the pressure P 1 (eg, 0.6 kg / cm 2 ) are π / 4 · D 2 · l 1 · P 1 = Q 1 · P 0 Since there is a relation of (1), if Q 1 , P 0 , P 1 at the time T 1 when the feeding of the resin plug by the pressurized gas is started is measured, then l 1 can be known from the equation (1). The amount Q 1 of gas flowing into the service pipe B is obtained by the difference between the measured values F 1 and F 2 of the flowmeters 13 and 14. In this case, if a mass flowmeter is used for the flowmeters 13 and 14, there is no influence of the temperature of the gas, and therefore the calculation is easy. Also here, l 1 is the position of the resin plug at time T 1 ,
P 0 and P 1 are measured values of the pressure gauges 15 and 16, and D is a lining inner diameter of the service pipe B. Similarly, if the position of the resin plug obtained by measuring and calculating the pressure P 2 and the inflow amount Q 2 at time T 2 is l 2 , the flow velocity V of the resin plug is V = Δl / Δt Become. However, Δl = l 2 −l 1 and Δt = T 2 −T 1 . Therefore, the predetermined time interval Δt is set to the control unit 20.
Set with the clock of the internal oscillator, and each time, the flowmeter 13,1
The amount of inflowing gas flowing into the pipe from 4 and the respective pressures from the pressure gauges 15 and 16 are measured, and the flow rate adjusting valves 9 and 10 are set so that the instantaneous resin flow velocity V is maintained at a constant value. Control it. In the supply pipe B, the length of the resin plug is reduced because it is consumed for lining the inner surface of the pipe, but the control unit 20 calculates the amount of resin consumed over time, which corresponds to this. Since the pressure of the pressing gas drops substantially linearly (see FIG. 4), the flow velocity of the resin plug can be maintained at a constant value. If the resin of the resin plug is consumed before the resin lining on the inner surface of the supply pipe B is completed over the entire length of the pipe, the pressurized gas pressing the resin plug at that time blows through the supply pipe B. , It drops to the atmospheric pressure of the branch pipe A. Since such a pressure change occurs abruptly, it is checked on the control unit 20 side and it is determined that the resin lining for this time has ended.
The inflow amount Q of the gas supplied to, the length l to the position where the resin lining is finished, the elapsed time t 0, etc. are stored in the memory, and the electromagnetic opening / closing valve 12 is closed. Next, in the control unit 20, the solenoid opening / closing valve 5,
The flow rate adjusting valve 19 is opened, and the lining resin is supplied from the resin injector 3 into the launcher 6 and filled therein to form a predetermined amount of resin plug in the launcher 6. Then, the electromagnetic opening / closing valve 5 and the flow rate adjusting valve 19 are closed, the electromagnetic opening / closing valve 12 is opened, and the inner pipe B is lined while controlling the resin plug E to the speed V again as described above. At this time, as long as the speed V is maintained, the length of the resin plug, in other words, the amount of resin, does not change while the lining resin plug E passes through the area that has been lined last time. The pressure of the pressed gas is also maintained at a substantially constant value. However, after the resin plug E reaches the position where the inner pipe B is not yet lined, the resin is consumed by the lining as described above, the length of the resin plug E is reduced, and the pressure of the pressing gas is also reduced. The lining proceeds while gradually decreasing.
Then, the resin plug length becomes approximately 0, and the elapsed time until the pressure gas blows through and falls to the atmospheric pressure becomes approximately 2t 0 ,
The length to the end of the lining is also about 2l. In this way, the lining region is sequentially extended while the lining is repeated by the introduction of the resin plug and the flow of the resin plug by the pressurized gas. When the lining of the supply pipe B is completed and the length of the resin plug still remains and reaches the connection portion (branch point) with the branch pipe A, the resin plug E flows into the branch pipe A and presses the resin plug E. The pressurized gas that has been blown blows into the branch pipe A. Therefore, the measured value of the pressure gauge 16 drops sharply to almost atmospheric pressure. This is judged by the control unit 20. This is the expected elapsed time (n ×
t) (where n is the number of times the resin is introduced, t is the length of time until the lining of the resin plug is completed once) (n-1)
At t + t '(however, t'<t), it is judged whether or not the rapid pressure drop as described above is brought. That is, it is determined that the resin plug has reached the branch pipe A based on the sudden decrease in the pressing force and the difference between the actual elapsed time and the predicted elapsed time, and the lining repair for the corresponding supply pipe B is completed. . If t'≈t, there is a problem of measurement error.
Furthermore, it is advisable to introduce the resin once more and measure the time required to reach the branch pipe A. This error range may be preset by the control unit 20. That is, the control unit 20 commands the resin introduction again if it is within the error range, and outputs the command of termination if it is not within the error range. If the amount of resin remaining in the branch pipe A is unknown when the branch pipe A is lined later, the resin plug length in the lining process of the branch pipe A changes, so that the residual resin in the branch pipe A is not Either remove it prior to lining, or store this residual resin in the memory of the control unit 20 and place a resin plug at the branch point (the connection point with the inner pipe B in the branch pipe A) when lining the branch pipe A. When the temperature reaches, the above control unit will be adjusted so that it will be corrected to the length of the resin plug including the residual resin amount.
You may calculate by 20. After the resin lining for each inner pipe B branched from the branch pipe A in the repair section in this way is completed, as shown in FIG. 5, the inner end of the inner pipe B is made of a transparent pipe or the like. Connect the receiver 21 that A cylinder 23 of compressed gas such as compressed air is connected to the receiver 21 via a flow rate adjusting valve 22, and a throttle valve 2 is connected to a branch portion 21a of the receiver 21.
4 are connected, and a pressure gauge 25 and a flow meter 26 are provided. In this state, the branch pipe A is then repaired. As shown in FIG. 6, the repair work for the branch pipe A is performed by connecting the launchers 6, 6 with matching dimensions to the opening portions at both ends of the branch pipe A, and providing the resin supply devices 1, 1 for the respective launchers 6, 6.
Therefore, as in the case of the service pipe B, the repair resin is supplied and filled into the pipe in the form of a plug. In the repair work for this branch pipe A, resin plugs are individually introduced from the both end openings of the branch pipe A through the launchers 6 and 6, and the inside of the branch pipe A is directed from the both end openings to the intermediate point M of the repair section. The resin lining on the pipe inner surface with respect to the branch pipe A is realized by the progress of the flow. In addition, in the illustration of FIG. 6, the branch pipes A on the left and right with the middle point M as a boundary are shown with the service pipe B on only one side, and the service pipe B on the other side is not shown. It goes without saying that the left and right branch pipes A having the middle point M as a boundary are normally branched with the number of supply pipes B according to the laying condition of the pipeline. When repairing the branch pipe A, pressurized gas is supplied from the cylinder 23 to the service pipe B branched from the left and right branch pipes A via the above-described flow rate adjusting valve 22, and the throttle valve 24 is closed at this time. ing. As the pressurized gas, for example, assuming that the pressure of the pressurized gas applied to the resin plug E in the branch pipe A is 1.5 kg / cm 2 , the pressure in the service pipe B is slightly lower than that of, for example, 1.3 kg / cm 2 . Hold the pressure. in this case,
The pressurized gas that presses the resin plug E in the branch pipe A is
As described above, when the resin is consumed for lining and the resin plug length becomes shorter, the resin is gradually lowered.Therefore, based on this information, the flow rate adjusting valve 22 is adjusted by the control unit 20 so that the pressure difference is, for example, −0.2 kg / It is recommended to control so as to keep it at cm 2 . As a result, as shown in FIG.
When the resin plug E reaches the connection point between the branch pipe A and the service pipe B in the process of lining the service pipe A up to, the resin amount (predetermined amount) corresponding to the pressure difference enters the service pipe B. At this time, the pressurized gas in the supply pipe B is compressed by the invading resin E'and the pressure rises (corresponding to the pressure of the pressurized gas for pressing on the branch pipe A side), which is detected by the pressure gauge 25. Then, the control unit 20 analyzes it and issues a command to close the flow rate adjusting valve 22. Therefore, the resin is consumed for the lining in the branch pipe A, and the invading resin is retained in the service pipe B until the pressurized resin is blown out because the resin plug disappears (see FIG. 8). ), When blown through, the internal pressure in the branch pipe A drops to atmospheric pressure, so that the invading resin is discharged into the branch pipe A at the gas pressure on the side of the service pipe B and left in the branch pipe A (9th). See figure). In the control unit 20, the amount of resin that has penetrated into the service pipe B is calculated from the gas pressure difference at that time, the inner diameter of the service pipe B, etc., and passes through the connection point (branch portion) with the service pipe B. The subsequent resin plug length is corrected so that the speed V of the resin plug is kept constant. When the invading resin is discharged into the branch pipe A from the supply pipe B, the control unit 20 detects this by a decrease in the pressure indicated by the pressure gauge 25, opens the flow rate adjusting valve 22 again, and pressurizes the gas from the cylinder 23. Is supplied into the supply pipe B at a required pressure. Therefore, when the next resin plug is introduced into the branch pipe A and passes through the connection point with the corresponding inner pipe B, the same amount of resin invades into the inner pipe B again, so that the resin plug reaches the unlined area. The length of the resin plug in the branch pipe A does not change in the process of being sent by pressurized gas. In this way, for the branch pipe A in the repair section, the resin plug introduced into the pipe from the openings at both ends thereof is introduced, the flow is advanced by the pressure difference due to the pressurized gas, and the lining is repeatedly executed.
Finally, the lining work is continued until the resin plug is discharged from the outlet pipe 27 to the receiver 28 through the through hole A ′ provided at the intermediate point M of the branch pipe A. And receiver
When the resin plug reaches 28, the resin will
Then, the pressurized gas blows through and drops to the atmospheric pressure, and the control unit 20 detects the end point of the lining operation for the branch pipe A. Finally, a required amount of the resin plug is introduced into the pipe through the openings at both ends of the branch pipe A, and is made to flow with pressurized gas. Finally, a fixed amount of the resin is delivered to the supply pipe B in the same manner as described above. invade. At this time, the control unit 20 detects the resin intrusion into the service pipe B with the pressure gauge 25, and closes the flow rate adjusting valve 22 and then a predetermined time elapses, that is, the resin plug E in the branch pipe A. After passing through the connection point with the service pipe B, the throttle valve 24 is controlled to open at a predetermined opening. As a result, the pressurized gas on the open end side of the service pipe B is gradually released into the atmosphere through the throttle valve 24, and the invading resin is pushed by the pressurized gas in the branch pipe A to serve the service pipe. It moves inside B and is consumed as a lining layer in this process, or is pressed as it is and reaches the receiver 21. In this process, the flow meter 26 measures the discharge amount of the pressurized gas, and the control unit 20 corrects the inflow amount of the pressurized gas supplied to the branch pipe A side in consideration of the discharge amount. And receiver 21
The throttle valve 24 is closed at the stage where the invading resin has reached the position or when the pressurized gas on the side of the branch pipe A has blown into the receiver 21 (when the invading resin is consumed as the lining layer). In this way, the resin plug that has passed through the branch pipe A after the entry resin is cleaned up in the inner pipe B communicating with the branch pipe A one after another passes through the pipe 27 from the through hole A ′ at the intermediate point M. It is then discharged to the receiver 28, which completes the finishing lining (see FIG. 10). After this, the pipe line 27 is removed, and a blind plug or the like is screwed on the joint 31d, for example, to substantially block the through hole A'in the branch pipe A from the outside. In the above embodiment, the resin is introduced into the inner pipe B from the outer open end thereof to achieve the resin lining of the inner pipe B first.
At the same time, the resin lining of the inner pipe B may be performed in parallel with the resin lining of the branch pipe A, for example, by lining with the resin penetrating into the inner pipe B. In this case, the control unit 20 may control the distribution of the amount of resin from the branch pipe A to the supply pipe B and the securing of the resin feed speed V by the pressurized gas. Further, in this case, the receiver 21 and the throttle valve 24 as described above are provided at the open end of the service pipe B.
Etc. should be provided. In this way, when the resin plug is introduced from both end openings of the branch pipe A and the inner surface of the pipe is lined by pressing with the pressurized gas, when the time t for one lining and the length l are set, Compared with the method of introducing the lining resin from one end to the other end of A in one direction and pressing with a pressurized gas, the time required for lining the same length L = nl may be approximately one fourth. And saves a lot of work time (ie T = n 2 + from one end)
n) / 2 · t, but T from both ends (invention)
= A n 2/4 + n / 2 · t).

【発明の効果】【The invention's effect】

本発明によれば、以上に詳述したように補修区間の既設
配管に対してその両端開口部から樹脂をプラグ状に導入
し、補修区間の中間点から、吹抜けを起した管内空気,
余剰樹脂,加圧気体を排出するようにライニング作業を
行うようにしたので、従来方式のように一方通孔的にラ
イニング作業を行なうものに比べて作業時間が略4分の
1になり、ライニング補修作業の作業能率を大巾に向上
できるという優れた効果が得られる。
According to the present invention, as described in detail above, the resin is introduced into the existing pipe in the repair section from both end openings in a plug shape, and from the midpoint of the repair section, the blown-in pipe air,
Since the lining work is performed so as to discharge the surplus resin and the pressurized gas, the working time is about one-fourth as compared with the conventional method in which the lining work is performed through the one-way hole, and the lining is performed. The excellent effect that the work efficiency of repair work can be greatly improved is obtained.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明の一実施例を示す概略構成図、第2図は
補修すべき既設管の状況を示す説明図、第3図は供内管
の樹脂ライニング状況を示す説明図、第4図は樹脂ライ
ニングの繰返し状況を示すタイムチャート、第5図は供
内管の開放端における侵入樹脂対策手段を示す説明図、
第6図は支管の樹脂ライニング状況を示す説明図、第7
図は支管内で樹脂プラグが供内管への分岐部へ到達した
時の状況を示す説明図、第8図は上記分岐部を樹脂プラ
グが通過した後の状況を示す説明図、第9図は支管内で
の加圧気体が吹き抜けた時の状況を示す説明図、第10図
は仕上げライニング時の状況を示す説明図である。 1……樹脂供給装置、2……加圧気体供給装置、5……
電磁開閉弁、6……ランチャ、7……コンプレッサ、8
……エアタンク、9,10……流量調整弁、12……電磁開閉
弁、13,14……流量計、15,16……圧力計、19……流量調
整弁、20……コントロールユニット、21……レシーバ、
22……流量調整弁、23……ボンベ、24……絞り弁、25…
…圧力計、26……流量計、27……管路、28……レシー
バ、A……支管、B……供内管、A′……通孔、M……
中間点。
FIG. 1 is a schematic configuration diagram showing an embodiment of the present invention, FIG. 2 is an explanatory diagram showing a condition of an existing pipe to be repaired, FIG. 3 is an explanatory diagram showing a resin lining condition of a service pipe, and FIG. FIG. 5 is a time chart showing the repeated state of resin lining, and FIG. 5 is an explanatory view showing means for preventing invading resin at the open end of the service pipe.
FIG. 6 is an explanatory view showing a resin lining state of a branch pipe, and FIG.
FIG. 8 is an explanatory view showing a situation when a resin plug reaches a branch portion to a service pipe in a branch pipe, FIG. 8 is an explanatory view showing a situation after the resin plug has passed through the branch portion, and FIG. FIG. 10 is an explanatory view showing a situation when the pressurized gas blows through the branch pipe, and FIG. 10 is an explanatory view showing a situation at the time of finishing lining. 1 ... Resin supply device, 2 ... Pressurized gas supply device, 5 ...
Electromagnetic on-off valve, 6 ... Launcher, 7 ... Compressor, 8
...... Air tank, 9,10 ...... Flow control valve, 12 ...... Electromagnetic on-off valve, 13,14 ...... Flow meter, 15,16 ...... Pressure gauge, 19 ...... Flow control valve, 20 ...... Control unit, 21 ...... Receiver,
22 …… Flow control valve, 23 …… Cylinder, 24 …… Throttle valve, 25…
… Pressure gauge, 26 …… Flowmeter, 27 …… Pipe line, 28 …… Receiver, A …… Branch pipe, B …… Service pipe, A ′ …… Through hole, M ……
Midpoint.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 篠崎 正人 神奈川県大和市代官3丁目18番地の4 株 式会社ハッコー開発技術研究所内 ─────────────────────────────────────────────────── ─── Continuation of front page (72) Inventor Masato Shinozaki Four stock companies, 3-18, Daiko City, Kanagawa Prefecture

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】一端開口部より液状樹脂を管内に充満する
ようにプラグ状に導入し、上記樹脂プラグの前後の管内
に圧力差を生起させて樹脂プラグを他端開口部側へ流動
進行させ、この樹脂プラグの進行により管内面に所要膜
厚のライニングを施工する補修工法において、 上記ライニング対象の既設配管の一端開口部と他端開口
部のそれぞれを作業入口として、両開口部より管内に導
入される樹脂プラグを上記圧力差により補修区間の管路
中間に向けて流動進行させると共に、 上記両開口部の中間位置の既設配管に、作業出口となる
導出通路を設け、中間位置の導出通路から樹脂プラグの
吹き抜けを起した管内空気,余剰樹脂,加圧気体を排出
するように施工することを特徴とする管内面のライニン
グ補修工法。
1. A liquid resin is introduced into a pipe from an opening at one end so as to fill the pipe, and a pressure difference is generated in the pipe before and after the resin plug to allow the resin plug to flow toward the opening at the other end. , In the repairing method of constructing a lining of the required film thickness on the inner surface of the pipe by the progress of this resin plug, one end opening and the other end opening of the existing pipe to be lined are used as working inlets, and the inside of the pipe is opened from both openings. The resin plug introduced is caused to flow toward the middle of the pipeline in the repair section due to the above pressure difference, and a discharge passage serving as a work outlet is provided in the existing pipe at the intermediate position of both openings, and the discharge passage at the intermediate position is provided. A lining repairing method for the inner surface of the pipe, which is characterized in that it is constructed so that the air in the pipe that has blown through the resin plug, excess resin, and pressurized gas are discharged.
JP1339839A 1989-12-26 1989-12-26 Pipe inner surface lining repair method Expired - Lifetime JPH0722737B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1339839A JPH0722737B2 (en) 1989-12-26 1989-12-26 Pipe inner surface lining repair method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1339839A JPH0722737B2 (en) 1989-12-26 1989-12-26 Pipe inner surface lining repair method

Publications (2)

Publication Number Publication Date
JPH03196877A JPH03196877A (en) 1991-08-28
JPH0722737B2 true JPH0722737B2 (en) 1995-03-15

Family

ID=18331306

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1339839A Expired - Lifetime JPH0722737B2 (en) 1989-12-26 1989-12-26 Pipe inner surface lining repair method

Country Status (1)

Country Link
JP (1) JPH0722737B2 (en)

Also Published As

Publication number Publication date
JPH03196877A (en) 1991-08-28

Similar Documents

Publication Publication Date Title
US5089297A (en) Method for repairing interior portions of a pipeline
CA1335700C (en) Method for lining pipe inner surface in multibranch piping
JPH0722737B2 (en) Pipe inner surface lining repair method
JPH0722738B2 (en) Pipe inner surface lining repair method
JP2700325B2 (en) Repair method for lining of pipe inner surface
JP2700326B2 (en) Repair method for lining of pipe inner surface
JP2700328B2 (en) Repair method for lining of pipe inner surface
JPH0722736B2 (en) Pipe inner surface lining repair method
JP2639692B2 (en) Repair method for lining of pipe inner surface
JP2598303B2 (en) Continuous injection system for lining resin
JPH0729085B2 (en) How to detect the end of resin lining on a branch pipe
JP2766908B2 (en) Pipe lining repair equipment
JP2700331B2 (en) Control system for pipe lining repair
US5219614A (en) Method for lining pipe inner surface in multibranch piping
JP2665920B2 (en) Repair method for lining of pipe inner surface
JP2665921B2 (en) Repair method for lining of pipe inner surface
JP2665922B2 (en) Repair method for lining of pipe inner surface
JP2562372Y2 (en) Operation check jig for lining work
JP2598294B2 (en) Control method of resin pushing dynamic pressure in lining repair method of pipe inner surface
JP2900199B2 (en) Inner lining repair method for different diameter pipes
JP2639671B2 (en) Repair method for lining of pipe inner surface
JPH04293577A (en) Non-excavation lining repairing construction method of existing piping
JP2598304B2 (en) Continuous injection system for lining resin
JPH01293168A (en) Method for repairing lining of inner surface of pipe
JP2843846B2 (en) Existing piping lining method