Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3462702B2 - Method of forming underground continuous wall - Google Patents
[go: Go Back, main page]

JP3462702B2 - Method of forming underground continuous wall - Google Patents

Method of forming underground continuous wall

Info

Publication number
JP3462702B2
JP3462702B2 JP08806597A JP8806597A JP3462702B2 JP 3462702 B2 JP3462702 B2 JP 3462702B2 JP 08806597 A JP08806597 A JP 08806597A JP 8806597 A JP8806597 A JP 8806597A JP 3462702 B2 JP3462702 B2 JP 3462702B2
Authority
JP
Japan
Prior art keywords
hole
holes
leading
trailing
consolidation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP08806597A
Other languages
Japanese (ja)
Other versions
JPH10280385A (en
Inventor
重夫 渡辺
Original Assignee
成幸工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 成幸工業株式会社 filed Critical 成幸工業株式会社
Priority to JP08806597A priority Critical patent/JP3462702B2/en
Publication of JPH10280385A publication Critical patent/JPH10280385A/en
Application granted granted Critical
Publication of JP3462702B2 publication Critical patent/JP3462702B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】 【0001】 【発明の属する技術分野】本発明は、セメントミルクの
ような固結用液状物と原位置の土砂とを攪拌混合して地
中連続壁等を形成するための方法に関するものである。 【0002】 【従来の技術】従来から、セメントミルクのような固結
用液状物を注入しながら地盤を掘削して固結用液状物と
掘削された原位置の土砂とを攪拌混合して地中連続壁を
形成することが行われている。この場合、多軸掘削機、
例えば3軸の多軸掘削機を用いて地盤を掘削しながら固
結用液状物と原位置の土砂とを攪拌混合して先行孔を間
隔を隔てて形成し、その後、固結用液状物を注入しなが
ら先行孔間の未掘削地盤を掘削して原位置の土砂と攪拌
混合して後行孔を形成すると共に後行孔の端部を先行孔
の端部と平面視で一部重複させ、これにより先行孔と後
行孔とが平面視で一部重複する連続孔を形成することで
地中連続壁を形成している。 【0003】ところが、一定間隔を隔てて先行孔を形成
した後に後行孔を形成するまでの間に時間が経過し、先
行孔内において硬化が進み、後行孔の端部を先行孔の端
部と平面視で一部重複させた後に、芯材等を挿入する
際、先行孔部分が後行孔部分よりも早く硬化が開始して
いるので、先行孔部分に芯材を挿入する施工性が悪く、
芯材を必要な深さまで挿入することができない(いゆる
芯材の高止まり)という事態が生じるという問題があっ
た。 【0004】そこで、先行孔を形成する際に用いる固結
用液状物の流動性を高めるため水の量を多くして水セメ
ント比を高くすることが考えられるが、これだと、強度
が低下し、また、注入量が多くなるので、地上に排出さ
れる固結用液状物の量が多くなって、泥土処分のコスト
が高くなり、更に、泥土として処分されるセメントも無
駄になり、結局使用する全セメント量も増えるという問
題があった。 【0005】 【発明が解決しようとする課題】本発明は上記の従来例
の問題点に鑑みて発明したものであって、先行孔の流動
性を保持して芯材の挿入を容易に行え、また、水量、注
入量も減らし、泥土の発生量を減少させ、品質低下を招
くことなく、更に横方向にわたって品質が均等で且つ高
品質の地中連続壁を形成することができる地中連続壁の
形成方法を提供することを課題とするのである。 【0006】 【課題を解決するための手段】上記課題を解決するため
に本発明の地中連続壁の形成方法は、地盤1を掘削しな
がら分散剤が添加された固結用液状物と原位置の土砂と
を攪拌混合して先行孔2を間隔を隔てて形成し、その
後、分散剤を添加しない固結用液状物を注入しながら先
行孔2間の未掘削地盤6を掘削して原位置の土砂と攪拌
混合して後行孔3を形成するとともに後行孔3の端部を
先行孔2の端部と平面視で一部重複させて先行孔2と後
行孔3とが連続する連続孔9を形成することを特徴とす
るものである。このような方法を採用することで、先行
孔2内においては分散剤が添加された固結用液状物と原
位置の土砂とが攪拌混合され、分散剤による流動性の向
上により先行孔2内における硬化が遅延し、これによ
り、後行孔3を形成する段階においても、後行孔3と略
同じ流動性にできて、後行孔3形成時における後行孔3
の端部と先行孔2の端部との重複部分における攪拌混合
が良好且つ均一に行え、更に、先行孔2の端部と後行孔
3の端部とを平面視で一部重複するように形成した後
に、先行孔2部分、後行孔3部分に芯材4を挿入するに
当たり、いずれの場合にもスムーズに芯材4が挿入でき
るようになるものである。 【0007】 【発明の実施の形態】以下本発明を添付図面に示す実施
形態に基づいて説明する。まず、図1に示すように多軸
掘削機10により地盤1を掘削して先行孔2を形成する
のであるが、この場合、多軸掘削機10により掘削する
際に該多軸掘削機10に設けた注入孔(図示を省略して
いる)から分散剤を添加したセメントミルクのような固
結用液状物を地中に注入し、この分散剤を添加したセメ
ントミルクのような固結用液状物と原位置の掘削土砂と
を多軸掘削機10に設けた攪拌手段5により攪拌混合す
るものである。添付図面に示す実施形態においては多軸
掘削機10は3軸の例であり、3つの孔が平面視で互い
に一部重複する状態で連続して形成される。同様にして
図2に示すように、別の先行孔2を一定間隔を隔てて形
成する。ここで、先行孔2の一端部の孔の中心と隣りの
先行孔2の一端部の中心との間の距離L1 は、先行孔2
の両端部の孔の中心間の距離L2 と等しくなっている。
上記のようにして一定間隔を隔てて次々と先行孔2を形
成するものである。なお、分散剤としては例えば「エフ
・ピー・ケー株式会社製の商品名ジオスパーK」を使用
することができる。 【0008】上記のようにして多数の先行孔2を一定間
隔を隔てて形成した後に、多軸掘削機10により先行孔
2間の未掘削地盤6を掘削して後行孔3を形成する。こ
の場合、多軸掘削機10に掘削する際に該多軸掘削機1
0に設けた注入孔から分散剤を添加しないセメントミル
クのような固結用液状物を地中に注入し、セメントミル
クのような固結用液状物と未掘削地盤6を掘削した掘削
土砂とを攪拌混合するものである。この場合、多軸掘削
機10の両端部に位置する掘削軸10aがそれぞれ隣合
う先行孔2の端部の孔に挿入され、これをガイドとしな
がら多軸掘削機10の中央に位置する掘削軸10aによ
り図3のように先行孔2間の未掘削地盤6を掘削するの
であるが、同時に、該固結用液状物と未掘削地盤6を掘
削した掘削土砂との混合物と、隣合う先行孔2の端部の
孔内に充填してある分散剤を添加した固結用液状物と原
位置の掘削土砂との混合物とが更に攪拌混合されて、先
行孔2内の充填物Aと後行孔3内の充填物Bとを均一な
状態に攪拌混合することになる。 【0009】そして、上記工程において、先行孔2内に
充填してある充填物Aは分散剤を添加したセメントミル
クのような固結用液状物が注入されて原位置の土砂と攪
拌混合されているので、多数の先行孔2を形成する間に
長い時間が過ぎても、分散剤により流動性が増加させら
れていて硬化が遅延しているので、後行孔3内に充填さ
れる充填物Bと略同じ程度の流動性を発現でき、したが
って、先行孔2と後行孔3との端部の平面視において一
部重複し合う部分においても同じ流動性を発現できるも
のである。この結果、上記のようにして先行孔2の端部
と後行孔3の端部とを平面視で一部重複するように形成
した後に、図4のように、芯材4を挿入して建て込むの
であるが、芯材4を挿入して建て込むに当たり、先行孔
2部分、後行孔3部分、先行孔2の端部と後行孔3の端
部とが平面視で一部重複している部分のいずれの部分に
おいても同じ程度の流動性を呈しているためスムーズに
芯材4を挿入して建て込むことができるものである。 【0010】上記のようにして先行孔2と後行孔3との
互いの端部同士が一部重複するように連続孔9を形成
し、充填物が硬化することで、芯材4を有する地中連続
壁を形成することができるのである。 【0011】 【発明の効果】本発明にあっては、上述のように、地盤
を掘削しながら分散剤が添加された固結用液状物と原位
置の土砂とを攪拌混合して先行孔を間隔を隔てて形成
し、その後、分散剤を添加しない固結用液状物を注入し
ながら先行孔間の未掘削地盤を掘削して原位置の土砂と
攪拌混合して後行孔を形成するとともに後行孔の端部を
先行孔の端部と平面視で一部重複させて先行孔と後行孔
とが連続する連続孔を形成するので、先行孔の形成に当
たって、水の使用量を少なくしても分散剤による流動化
作用により先行孔内に充填された充填物の流動化を高め
て硬化を遅延させ、これにより後行孔を形成した後に、
芯材を挿入して建て込む際に、先行孔部分、後行孔部
分、先行孔の端部と後行孔の端部とが平面視で一部重複
している部分のいずれの部分においても同じ程度の流動
性を呈していることになって、スムーズな芯材の挿入建
て込みができるものであり、従来のように、先行孔部分
において硬化が進行して芯材の挿入がしにくくて芯材の
高止まり現象が生じることがなく、また、先行孔の流動
性を高くするに当たって、水の量を増やして流動性を高
くするものではないので、水量を減らすことができて、
強度の低下を招くことがなく、また、先行孔の形成に当
たって、固結用液状物の注入量も少なくできて、地上に
溢れる泥土の発生量を減少させることができて、泥土の
処理費用が少なくて済むとともに、泥土として処分する
ものの中に含まれる無駄に投棄されるセメントの量を少
なくできて、この点でもコストダウンが図れるものであ
り、また、先行孔内の充填物が硬化が進行しない前の段
階で後行孔の端部と一部重複させて攪拌混合するので、
形成される地中連続壁の横方向の品質を略等しくできて
高品質の地中連続壁を形成することができるものであ
る。
Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an underground continuous wall formed by stirring and mixing a liquid for consolidation such as cement milk and earth and sand in situ. For the method. 2. Description of the Related Art Conventionally, a ground has been excavated while a liquid for consolidation such as cement milk is being injected, and the liquid for consolidation and the excavated in-situ earth and sand have been stirred and mixed. Forming a continuous wall is performed. In this case, a multi-axis excavator,
For example, while excavating the ground using a three-axis multi-screw excavator, the consolidation liquid and the in-situ earth and sand are stirred and mixed to form leading holes at intervals, and then the consolidation liquid is formed. Excavate the unexcavated ground between the preceding holes while pouring, mix with the in-situ earth and sand to form the following hole, and partially overlap the end of the following hole with the end of the preceding hole in plan view. Thereby, the underground continuous wall is formed by forming a continuous hole in which the preceding hole and the following hole partially overlap in plan view. However, the time elapses between the formation of the leading hole at a certain interval and the formation of the trailing hole, the curing proceeds in the leading hole, and the end of the trailing hole is moved to the end of the leading hole. When inserting the core material etc. after partially overlapping the part in plan view, the workability of inserting the core material into the preceding hole part because the leading hole part begins to harden faster than the following hole part Is bad,
There has been a problem that the core material cannot be inserted to the required depth (the core material stays high). [0004] Therefore, it is conceivable to increase the water-cement ratio by increasing the amount of water to increase the fluidity of the liquid for consolidation used in forming the preceding hole, but this would reduce the strength. In addition, since the injection amount is large, the amount of the consolidating liquid discharged to the ground is large, which increases the cost of mud disposal, and furthermore, the cement disposed of as mud is also wasted. There was a problem that the amount of total cement used also increased. SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned problems of the prior art, and can easily insert a core material while maintaining the fluidity of a preceding hole. In addition, the amount of water and the amount of pouring are also reduced, the amount of mud generated is reduced, and the underground continuous wall which can form a high quality underground continuous wall with uniform quality in the lateral direction without lowering the quality. It is an object of the present invention to provide a method for forming a film. In order to solve the above-mentioned problems, a method of forming an underground continuous wall according to the present invention comprises: The pre-holes 2 are formed at intervals by stirring and mixing the soil and sand at the position, and then the unexcavated ground 6 between the pre-holes 2 is excavated while the liquid for consolidation without adding a dispersant is injected. The trailing hole 3 is formed by stirring and mixing with the earth and sand at the position, and the end of the trailing hole 3 partially overlaps the end of the leading hole 2 in plan view, so that the leading hole 2 and the trailing hole 3 are continuous. A continuous hole 9 is formed. By adopting such a method, the liquid for consolidation to which the dispersant is added and the in-situ earth and sand are agitated and mixed in the preceding hole 2, and the fluidity of the preceding hole 2 is improved by the flowability of the dispersant. At the stage where the trailing hole 3 is formed, the same fluidity as that of the trailing hole 3 can be obtained.
In the overlapping portion between the end of the leading hole 2 and the end of the leading hole 2, good and uniform stirring can be performed, and the end of the leading hole 2 and the end of the trailing hole 3 partially overlap in plan view. When the core material 4 is inserted into the leading hole 2 portion and the trailing hole 3 portion after being formed, the core material 4 can be smoothly inserted in any case. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below based on embodiments shown in the accompanying drawings. First, as shown in FIG. 1, the ground 1 is excavated by the multi-axial excavator 10 to form the preceding hole 2. In this case, when excavating by the multi-axial excavator 10, the multi-axial excavator 10 A consolidation liquid such as cement milk to which a dispersant is added is injected into the ground through an injection hole (not shown) provided, and a consolidation liquid such as cement milk to which this dispersant is added. The object and the excavated earth and sand at the original position are stirred and mixed by the stirring means 5 provided in the multi-screw excavator 10. In the embodiment shown in the accompanying drawings, the multi-axis excavator 10 is an example of a three-axis excavator, and three holes are continuously formed in a state where the holes partially overlap each other in plan view. Similarly, as shown in FIG. 2, other preceding holes 2 are formed at regular intervals. Here, the distance L 1 between the center of the hole at one end of the preceding hole 2 and the center of one end of the adjacent preceding hole 2 is equal to the distance of the leading hole 2.
It is equal to the distance L 2 between the centers of both end portions of the holes of.
The preceding holes 2 are formed one after another at regular intervals as described above. In addition, as a dispersing agent, for example, “Geospar K (trade name, manufactured by FPC Inc.)” can be used. After a large number of preceding holes 2 are formed at regular intervals as described above, the unexcavated ground 6 between the preceding holes 2 is excavated by the multiaxial excavator 10 to form the trailing holes 3. In this case, when excavating the multi-axis excavator 10, the multi-axis excavator 1
A liquid for consolidation, such as cement milk, to which no dispersant is added, is injected into the ground through an injection hole provided at 0, and a liquid for consolidation, such as cement milk, and excavated earth and sand excavated from the undigged ground 6 Are mixed with stirring. In this case, the excavating shafts 10a located at both ends of the multi-screw excavator 10 are respectively inserted into the holes at the ends of the adjacent preceding holes 2, and the excavating shafts positioned at the center of the multi-screw excavator 10 while using these as guides. 10a, the unexcavated ground 6 between the preceding holes 2 is excavated as shown in FIG. 3, but at the same time, a mixture of the liquid for consolidation and the excavated earth and sand excavated from the unexcavated ground 6, and the adjacent preceding hole The mixture of the liquid for consolidation to which the dispersant added in the hole at the end of the hole 2 and the excavated earth and sand in situ are further stirred and mixed, and the filler A in the preceding hole 2 and the subsequent The filler B in the hole 3 is stirred and mixed in a uniform state. In the above process, the filler A filled in the preceding hole 2 is filled with a liquid for consolidation such as cement milk to which a dispersant is added, and is stirred and mixed with the in-situ earth and sand. Therefore, even if a long time passes between the formation of the large number of leading holes 2, since the flowability is increased by the dispersant and the curing is delayed, the filler filled in the trailing holes 3 B can exhibit substantially the same degree of fluidity as that of B, and therefore can exhibit the same fluidity even in a part of the ends of the leading hole 2 and the trailing hole 3 that partially overlap in plan view. As a result, after the end of the leading hole 2 and the end of the trailing hole 3 are formed so as to partially overlap in plan view as described above, the core 4 is inserted as shown in FIG. When inserting and inserting the core material 4, the leading hole 2, the trailing hole 3, and the end of the leading hole 2 partially overlap with the end of the trailing hole 3 in plan view. Since the same degree of fluidity is exhibited in any of the portions, the core material 4 can be smoothly inserted and built. As described above, the continuous hole 9 is formed such that the ends of the leading hole 2 and the trailing hole 3 partially overlap each other, and the core material 4 is obtained by curing the filler. Underground continuous walls can be formed. According to the present invention, as described above, while excavating the ground, the liquid for consolidation to which the dispersant has been added and the in-situ earth and sand are stirred and mixed to form the preceding hole. Formed at intervals, and then, while injecting the liquid for consolidation without adding a dispersant, excavating the undigged ground between the preceding holes and stirring and mixing with the in-situ earth and sand to form the trailing holes Since the end of the trailing hole partially overlaps the end of the leading hole in plan view to form a continuous hole in which the leading hole and the trailing hole are continuous, in forming the leading hole, the amount of water used is reduced. Even after the fluidizing action of the dispersant increases the fluidization of the filler filled in the preceding hole and delays curing, thereby forming the trailing hole,
When inserting and embedding the core material, the leading hole portion, the trailing hole portion, any part of the portion where the end of the leading hole and the end of the trailing hole partially overlap in plan view Having the same degree of fluidity, it is possible to insert and insert the core material smoothly, and as in the past, hardening progresses in the preceding hole part and it is difficult to insert the core material. The phenomenon that the core material does not stay high does not occur, and in increasing the fluidity of the preceding hole, the amount of water is not increased by increasing the amount of water, so the amount of water can be reduced,
It does not cause a decrease in strength, and in forming the preceding hole, the injection amount of the liquid for consolidation can be reduced, and the amount of generated mud overflowing on the ground can be reduced. In addition to reducing the amount of waste, the amount of waste cement discarded in the material to be disposed of as mud can be reduced, which can also reduce costs, and the filling in the preceding hole progresses hardening. Because it does not partially overlap with the end of the trailing hole at the stage before being stirred and mixed,
The quality of the formed underground continuous wall can be made substantially equal in the lateral direction, and a high-quality underground continuous wall can be formed.

【図面の簡単な説明】 【図1】(a)は本発明の一実施形態における施工順序
を示す正面断面図であり、(b)は平面断面図である。 【図2】(a)は同上の施工順序を示す正面断面図であ
り、(b)は平面断面図である。 【図3】(a)は同上の施工順序を示す正面断面図であ
り、(b)は平面断面図である。 【図4】(a)は同上の施工順序を示す正面断面図であ
り、(b)は平面断面図である。 【符号の説明】 1 地盤 2 先行孔 3 後行孔 4 芯材
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 (a) is a front sectional view showing a construction order in one embodiment of the present invention, and FIG. 1 (b) is a plan sectional view. FIG. 2 (a) is a front sectional view showing a construction order according to the embodiment, and FIG. 2 (b) is a plan sectional view. FIG. 3 (a) is a front sectional view showing a construction order according to the embodiment, and FIG. 3 (b) is a plan sectional view. FIG. 4 (a) is a front sectional view showing the same working order as in the above, and FIG. 4 (b) is a plan sectional view. [Description of Signs] 1 Ground 2 Leading hole 3 Trailing hole 4 Core material

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E02D 3/12 E02D 5/18 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 7 , DB name) E02D 3/12 E02D 5/18

Claims (1)

(57)【特許請求の範囲】 【請求項1】 地盤を掘削しながら分散剤が添加された
固結用液状物と原位置の土砂とを攪拌混合して先行孔を
間隔を隔てて形成し、その後、分散剤を添加しない固結
用液状物を注入しながら先行孔間の未掘削地盤を掘削し
て原位置の土砂と攪拌混合して後行孔を形成するととも
に後行孔の端部を先行孔の端部と平面視で一部重複させ
て先行孔と後行孔とが連続する連続孔を形成することを
特徴とする地中連続壁の形成方法。
(57) [Claims 1] While excavating the ground, a liquid for consolidation to which a dispersant is added and earth and sand in situ are stirred and mixed to form leading holes at intervals. After that, the unexcavated ground between the preceding holes is excavated while pouring the liquid for consolidation without adding a dispersant, and is stirred and mixed with the in-situ earth and sand to form the following holes and ends of the following holes. Wherein the end of the leading hole partially overlaps in plan view to form a continuous hole in which the leading hole and the trailing hole are continuous.
JP08806597A 1997-04-07 1997-04-07 Method of forming underground continuous wall Expired - Lifetime JP3462702B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP08806597A JP3462702B2 (en) 1997-04-07 1997-04-07 Method of forming underground continuous wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP08806597A JP3462702B2 (en) 1997-04-07 1997-04-07 Method of forming underground continuous wall

Publications (2)

Publication Number Publication Date
JPH10280385A JPH10280385A (en) 1998-10-20
JP3462702B2 true JP3462702B2 (en) 2003-11-05

Family

ID=13932461

Family Applications (1)

Application Number Title Priority Date Filing Date
JP08806597A Expired - Lifetime JP3462702B2 (en) 1997-04-07 1997-04-07 Method of forming underground continuous wall

Country Status (1)

Country Link
JP (1) JP3462702B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100386483C (en) * 2005-11-30 2008-05-07 王平 High-performance cement-soil continuous wall construction method

Also Published As

Publication number Publication date
JPH10280385A (en) 1998-10-20

Similar Documents

Publication Publication Date Title
JP3462702B2 (en) Method of forming underground continuous wall
JPH11256564A (en) Continuous two-plane soil improvement body and construction method therefor
JPH06228947A (en) Construction of landslide protection wall in ground filled up with wastes
JP4020858B2 (en) Manufacturing method for underground structures
JPH07103550B2 (en) Pile or continuous wall and its construction method
JPH11247200A (en) Caisson settlement method
JP3523051B2 (en) Ground improvement method
JPH0249896A (en) Open shield method and machine thereof
JPS6198817A (en) Method of forming concrete wall of underground structure employing composite sheet pile and composite sheet pile as weir panel
JP3462701B2 (en) Method of forming underground structure
JP2645322B2 (en) Construction method of soil cement composite pile
JP3580740B2 (en) How to install large concrete block products
JP2698768B2 (en) Method of forming underground continuous wall
JP3335593B2 (en) Underground structure construction structure
JP2000178983A (en) Foundation building method
JP7548766B2 (en) Soil cement diaphragm wall construction method
JP3030622B2 (en) How to build a tunnel
JP4576768B2 (en) Composite type underground continuous wall and construction method of the same wall
JP2698772B2 (en) Slag graft system underground wall construction method
JP2895378B2 (en) Steep slope construction method
JP2631066B2 (en) Underground rectangular body construction method
JPS5911004B2 (en) How to construct seawalls, etc.
JPS62209189A (en) Method to consolidate stabilizing solution in underground wall construction work
JPH04140314A (en) Construction method of peristyle continuous underground wall
JPH0913394A (en) Precast concrete foundation block, and forming method of foundation

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20030715

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080815

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090815

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100815

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100815

Year of fee payment: 7

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100815

Year of fee payment: 7

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100815

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110815

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110815

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120815

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120815

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130815

Year of fee payment: 10

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term