JP3495412B2 - Pipe laying method - Google Patents
[go: Go Back, main page]

JP3495412B2 - Pipe laying method - Google Patents

Pipe laying method

Info

Publication number
JP3495412B2
JP3495412B2 JP08055194A JP8055194A JP3495412B2 JP 3495412 B2 JP3495412 B2 JP 3495412B2 JP 08055194 A JP08055194 A JP 08055194A JP 8055194 A JP8055194 A JP 8055194A JP 3495412 B2 JP3495412 B2 JP 3495412B2
Authority
JP
Japan
Prior art keywords
pipe
sand
backfill
work
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP08055194A
Other languages
Japanese (ja)
Other versions
JPH07293748A (en
Inventor
宗英 藤田
政雄 太田
修 岩本
将広 山本
広 菊池
浩 上島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kansai Electric Power Co Inc
Original Assignee
Kansai Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kansai Electric Power Co Inc filed Critical Kansai Electric Power Co Inc
Priority to JP08055194A priority Critical patent/JP3495412B2/en
Publication of JPH07293748A publication Critical patent/JPH07293748A/en
Application granted granted Critical
Publication of JP3495412B2 publication Critical patent/JP3495412B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)

Description

【発明の詳細な説明】 【0001】 【産業上の利用分野】本発明は、管体の敷設工法に関す
るものである。 【0002】 【従来の技術】従来より、管体、例えば、配電管を車道
や歩道など(以下、道路などという。)に埋設して管路
を地中に形成することが行われている。この配電管の敷
設工事は、一の工事区間において、前段の工事区間で敷
設された先端の配電管の管口を露出させる準備工事と、
その露出させた配電管に続いて新たな配電管を敷設接続
する配管工事と、車輌などが通行できるようにアスファ
ルトなどを施工する舗装仮復旧工事から主に構成され、
この一連の工事を隣接する工事区間で順次繰り返すこと
により、管路を延長させている。 【0003】このうち、準備工事の具体的な内容は、図
4に示すように、先に敷設した先端の配電管Pの管口近
傍において、掘削機械Bを利用してアスファルトなどの
舗装仮復旧部Aおよび配電管Pを埋設している川砂や山
砂などの埋め戻し用砂Sを所定深さまで掘削する機械掘
削工程と、図5に示すように、作業者の手掘りにて配電
管Pの管口が露出するまで埋め戻し用砂Sを掘り進める
管口手掘り工程と、配電管Pの内部に侵入した埋め戻し
用砂Sを取り除いて清掃する管口清掃工程から構成され
ている。また、配管工事の具体的な内容は、前述した準
備工事によって露出された配電管Pに連続するように、
道路などを掘削機械Bを用いて掘削し、一定深さの溝を
所定長さにわたって形成する機械掘削工程と、その溝に
新たな配電管Pを敷設接続する配管工程と、掘削された
溝に埋め戻し用砂Sを投入して配電管Pを埋設する埋め
戻し工程から構成されている。 【0004】 【発明が解決しようとする課題】ところで、このような
敷設工事は、交通事情を考慮して1日当たりの作業時間
が規制される傾向にある。しかしながら、1日当たりの
作業時間が規制されても、先に埋設した先端の配電管の
管口を露出させるための再掘削に要する工数は変化しな
いことから、その分、配管工事に振り向けられる工数が
減少し、1日に敷設できる管路長さが減少して工期が長
期化するという問題があった。このため、準備工事のな
かで大きな比重を占める作業者の手掘りに代えて機械掘
削することも考えられるが、配電管は衝撃に弱く、掘削
機械の刃先が当たると配電管を破損させるおそれがある
ことから、再掘削の全てを機械掘削に転換することはで
きない。 【0005】また、掘削された土砂は、掘削前の圧密状
態から解放され、かつ、不純物を混在しているため、そ
の掘削した土砂をそのまま埋め戻すことはできず、建設
副産物として廃棄する必要がある。このため、配電管を
敷設した後の溝を埋め戻すため、前述した埋め戻し用砂
を投入しているが、先端の配電管の管口近傍に投入され
た埋め戻し用砂を再掘削した場合、その埋め戻し用砂
は、不純物を含む周辺不良土と混合する結果、同様に建
設副産物として廃棄処分しなければならず、費用がかさ
むばかりでなく、環境を悪化させる一因にもなるという
問題もあった。 【0006】本発明は、このような問題点に鑑みてなさ
れたもので、一時的に仮復旧した道路などを再掘削して
管体を敷設する際、再掘削に要する工数を可及的に少な
くすることのできる管体の敷設工法を提供するものであ
る。 【0007】 【課題を解決するための手段】本発明は、道路などを掘
削して溝を形成し、その溝に管体を敷設して順次接続
し、溝に埋め戻し用砂を投入して管体を埋設し、道路な
どを舗装仮復旧する一連の作業を一の工事区間について
行い、以下、隣接する工事区間で前述した一連の作業を
順次繰り返すことにより、管体の管路を延長させる管体
の敷設工法において、各工事区間における先端の管体の
管口に土砂侵入防止用シール材を装着した後、該土砂侵
入防止用シール材に沿って耐圧性を有するとともに、上
面から底面にかけて徐々に面積が減少するテーパー状箱
体に形成されたブロック状の埋め戻し材を設置して埋設
し、仮復旧させることを特徴とするものである。 【0008】 【作用】仮復旧された道路などを先に埋設した埋め戻し
材が現れるまで掘削し、その露出された埋め戻し材およ
び土砂侵入防止用シール材を取り除く。この際、ブロッ
ク状の埋め戻し材は、上面から底面にかけて徐々に面積
が減少するテーパー状箱体に形成されていることから、
容易に引き上げることができ、また、管体の管口に土砂
侵入防止用シール材を装着したことにより、管体の内部
に侵入する埋め戻し用砂を抑制することができ、管口清
掃に要する工数を減少させることができる。次いで、先
に埋設した管体に連続するように道路などを掘削して溝
を形成し、その溝に新たな管体を敷設し、順次接続す
る。そして、先端の管体の管口に土砂侵入防止用シール
材を装着した後、土砂侵入防止用シール材に沿って埋め
戻し材を設置し、掘削した溝に埋め戻し用砂を投入して
管体とともに埋め戻し材を埋設し、道路などを仮復旧さ
せる。 【0009】この結果、準備工事における再掘削に要す
る工数が大幅に削減され、その分1日当たりの掘削距
離、すなわち、管体の敷設長さを増加することが可能と
なり、総工期の短縮を図ることができる。さらに、埋め
戻し材に相当する容量の砂が不要となり、その分建設副
産物の排出量を削減して環境問題を改善できるととも
に、コストを低減することができる。 【0010】 【実施例】以下、本発明の実施例を図面を参照して説明
する。 【0011】図1は、一の工事区間において、道路など
に埋設された先端の配電管Pの管口近傍を示しており、
その配電管Pの管口に沿ってブロック状の埋め戻し材U
が設置されている。この埋め戻し材Uは、埋設した際の
土圧および活荷重に耐えることのできる板厚の鋼材を用
いて、その上面から底面にかけて徐々に面積が減少する
テーパ状箱体に形成されている。そして、埋め戻し材U
の上部には、丸棒をU字状に屈曲した複数個のリングR
が取り付けられている。 【0012】この結果、埋設された埋め戻し材Uの引き
上げを容易に行うことができる他、リングRに図示しな
いワイヤーを取り付けることにより、掘削機械Bなどを
利用して吊り上げることができる。 【0013】また、配電管Pの管口には、断面L字状の
シール材Kが装着されており、このシール材Kを配電管
Pの管口に介在させることにより、配電管Pの内部に侵
入する埋め戻し用砂Sを抑制することができ、管口清掃
に要する工数を減少させることができる。 【0014】なお、この実施例における埋め戻し材U
は、繰り返して使用できるように、鋼材を利用して形成
したが、発泡プラスチックを用いて箱状に形成してもよ
い。このように発泡プラスチックを利用して箱状に形成
した場合、重量を大幅に軽減することができ、作業者に
よって容易に持ち運びできる利点がある。ただし、その
稜の摩滅を防止するため、断面L字状の鋼材フレームで
稜を包囲し、繰り返し使用に耐えるように構成する必要
がある。 【0015】さらに、埋め戻し材Uを、鋼材以外の金属
材料やコンクリート、FRP、木材などの非金属材料を
用いて埋め戻し材Uを形成することもできる。このう
ち、コンクリートで形成された埋め戻し材Uは、取り扱
いの点で若干難点があるものの、低コストで製造できる
利点がある。 【0016】したがって、前段の工事区間で敷設した配
電管Pに続いて新たな配電管Pを敷設するには、図2に
示すように、先に敷設した配電管Pの管口近傍におい
て、埋め戻し材Uが現れるまで掘削機械Bを用いて機械
掘りする。そして、埋め戻し材Uが現れたならば、図3
に示すように、そのリングRにワイヤーを取り付けて埋
め戻し材Uを掘削機械Bで吊り上げて取り除き、配電管
Pの管口を露出させる。次いで、配電管Pの管口に装着
されたシール材Kを除去し、その後、露出された配電管
Pに続いて道路などを掘削機械Bを用いて掘削し、一定
深さの溝を所定長さにわたって形成する。その後、掘削
溝に配電管Pを敷設するとともに、先に敷設した配電管
Pに順次接続する。配電管Pの敷設が終了すれば、その
先端の配電管Pの管口にシール材Kを装着するととも
に、シール材Kに沿って埋め戻し材Uを設置する。そし
て、掘削溝に埋め戻し用砂Sを投入し、配電管Pととも
に埋め戻し材Uを埋設した後、その上にアスファルトな
どの舗装仮復旧部Aを形成し、交通に支障がないように
道路などを仮復旧すればよい。 【0017】この結果、準備作業において、従来作業者
の手掘り作業を埋め戻し材の除去に代えることができ、
作業時間を大きく軽減することができる。そして、その
軽減された工数を配管工事に振り向けることができるこ
とから、1日に敷設する管路長さを増加させることがで
きるとともに、合わせて総工期を短縮することができ
る。しかも、埋め戻し材Uを利用することにより、その
容積に相当する埋め戻し用砂Sの使用を削減すると同時
に、その投入に要する工数を削減することができ、全体
としてコストを大きく低減することができる。さらに、
配電管Pの管口にシール材Sを装着することによってそ
の内部への埋め戻し用砂Sの侵入を抑制することができ
る。 【0018】なお、本実施例においては、配電管Pの管
路を形成する場合について説明したが、その他の管体、
例えば、ガス管、下水および上水の水道管、通信管およ
びこれらの集合管などを埋設して管路を形成する場合に
も利用することができる他、管体を敷設する以外に、一
時的に仮復旧した道路などを再掘削する場合にも適用す
ることができる。 【0019】また、本実施例の配電管Pは、二段積みで
例示したことにより、大きさの異なる複数個の埋め戻し
材Uを使用したが、配電管Pなど管体の積み重ね個数、
その管径や形状、さらには、埋設深さなどによって埋め
戻し材Uの大きさや個数を決定すればよい。 【0020】さらに、配電管Pを複数段にわたって積み
重ねる場合、上段の配電管Pの管口に装着するシール材
Kの下辺を前方に延長させ、その上に埋め戻し材Uを載
置するようにすれば(図1参照)、下段の配電管Pに対
する埋め戻し材Uによる応力集中などの影響を緩和する
ことができ、その結果、配電管Pの管口の密封とともに
配電管Pの保護を図ることができる。 【0021】 【発明の効果】以上のように本発明によれば、各工事区
間における先端の管体の管口に土砂侵入防止用シール材
を装着する一方、土砂侵入防止用シール材に沿って耐圧
性を有するとともに、上面から底面にかけて徐々に面積
が減少するテーパー状箱体に形成されたブロック状の埋
め戻し材を設置して埋設し、仮復旧させることにより、
準備工事における再掘削に要する工数が大幅に削減さ
れ、その分1日当たりの掘削距離、すなわち、管体の敷
設長さを増加することが可能となり、総工期の短縮を図
ることができる他、埋め戻し材に相当する容量の埋め戻
し用砂が不要となり、コストを低減することができると
ともに、建設副産物の排出量を削減して環境問題を改善
することができる。
Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pipe laying method. 2. Description of the Related Art Conventionally, a pipe, for example, a power distribution pipe has been buried in a road or a sidewalk (hereinafter referred to as a road) to form a pipe in the ground. This distribution pipe laying work includes, in one construction section, preparation work for exposing the tip of the tip of the distribution pipe laid in the preceding construction section,
It mainly consists of plumbing work to lay and connect a new distribution pipe following the exposed distribution pipe, and temporary pavement restoration work to construct asphalt so that vehicles etc. can pass,
The pipeline is extended by sequentially repeating this series of works in adjacent work sections. [0003] The concrete contents of the preparatory work are, as shown in FIG. 4, as shown in FIG. Mechanical excavation step of excavating backfill sand S such as river sand or mountain sand burying the portion A and the distribution pipe P to a predetermined depth, and as shown in FIG. And a pipe mouth cleaning step of digging the backfill sand S until the pipe mouth is exposed, and a pipe mouth cleaning step of removing and cleaning the backfill sand S that has entered the inside of the distribution tube P. Also, the specific contents of the plumbing work should be continuous with the distribution pipe P exposed by the above-mentioned preparation work.
Excavating a road or the like by using an excavating machine B to form a groove having a constant depth over a predetermined length, a piping step of laying and connecting a new distribution pipe P to the groove, It comprises a backfilling step of charging the backfill sand S and burying the distribution tube P. [0004] By the way, in such laying work, the working time per day tends to be regulated in consideration of traffic conditions. However, even if the working time per day is regulated, the man-hour required for re-digging to expose the mouth of the distribution pipe at the tip of the previously buried tip does not change. Thus, there is a problem that the length of the pipeline that can be laid in one day is reduced and the construction period is prolonged. For this reason, it is conceivable that mechanical excavation may be performed instead of manual excavation by workers who occupy a large specific gravity during the preparatory work.However, the distribution pipe is vulnerable to impact, and the distribution pipe may be damaged if the cutting edge of the drilling machine hits it. For some reason, not all re-digging can be converted to mechanical drilling. In addition, excavated earth and sand is released from the consolidation state before excavation and contains impurities, so that the excavated earth and sand cannot be backfilled as it is and must be discarded as a construction by-product. is there. For this reason, in order to backfill the trench after laying the distribution tube, the above-mentioned backfill sand is injected, but when the backfill sand injected near the mouth of the distribution tube at the tip is re-excavated As a result, the sand for backfilling must be disposed of as a by-product of construction as a result of being mixed with the surrounding defective soil containing impurities, which not only increases costs but also contributes to the deterioration of the environment. There was also. SUMMARY OF THE INVENTION The present invention has been made in view of such a problem, and when laying a pipe by re-excavating a temporarily restored road or the like, the man-hour required for re-excavation is reduced as much as possible. It is intended to provide a pipe laying method which can be reduced. According to the present invention, a groove is formed by excavating a road or the like, a pipe is laid in the groove and connected sequentially, and sand for backfilling is introduced into the groove. A series of work for burying the pipe and temporarily paving the road etc. is performed for one construction section, and the above-mentioned series of work is sequentially repeated in the adjacent construction section to extend the pipe of the pipe. In the pipe laying method, after installing a sealing material for preventing intrusion of sediment at the mouth of the leading end of the pipe in each construction section, and having pressure resistance along the sealing material for preventing intrusion of soil, from the top surface to the bottom surface The present invention is characterized in that a block-shaped back-up material formed in a tapered box whose area gradually decreases is installed, buried, and temporarily restored. The temporarily restored roads and the like are excavated until the backfill material buried earlier appears, and the exposed backfill material and the sealing material for preventing intrusion of earth and sand are removed. At this time, since the block-shaped backfill material is formed in a tapered box whose area gradually decreases from the top surface to the bottom surface,
It can be easily pulled up, and since the sealing material for preventing intrusion of earth and sand is attached to the mouth of the tube, sand for backfill that intrudes into the inside of the tube can be suppressed, which is required for cleaning the mouth of the tube. Man-hours can be reduced. Next, a groove is formed by excavating a road or the like so as to be continuous with the previously buried pipe, and a new pipe is laid in the groove and connected sequentially. Then, after attaching the sealing material for preventing intrusion of earth and sand to the mouth of the pipe at the tip, a backfill material is installed along the sealing material for preventing intrusion of soil and sand, and the sand for backfilling is introduced into the excavated groove, and the pipe is filled. The backfill material is buried together with the body, and roads are temporarily restored. As a result, the number of man-hours required for re-excavation in the preparatory work is significantly reduced, and the excavation distance per day, that is, the length of laying of the pipe can be increased, thereby shortening the total construction period. be able to. Further, the amount of sand equivalent to the backfill material is not required, so that the amount of construction by-products can be reduced, environmental problems can be improved, and costs can be reduced. Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 shows the vicinity of a mouth of a distribution pipe P at a tip buried in a road or the like in one construction section.
A block-shaped backfill material U is provided along the opening of the distribution tube P.
Is installed. The backfill material U is formed of a steel material having a thickness that can withstand the earth pressure and live load when the backfill material is buried, and is formed in a tapered box body whose area gradually decreases from the top surface to the bottom surface. And backfill material U
In the upper part of the ring, a plurality of rings R formed by bending a round bar into a U shape
Is attached. As a result, the buried backfill material U can be easily pulled up, and can be lifted by using a drilling machine B or the like by attaching a wire (not shown) to the ring R. Further, a sealing material K having an L-shaped cross section is attached to the mouth of the distribution tube P, and the sealing material K is interposed in the mouth of the distribution tube P to thereby form the inside of the distribution tube P. The sand S for backfill which invades the inside can be suppressed, and the man-hour required for pipe opening cleaning can be reduced. The backfill material U in this embodiment
Is formed using a steel material so that it can be used repeatedly, but may be formed in a box shape using foamed plastic. When formed into a box shape using foamed plastic as described above, the weight can be significantly reduced, and there is an advantage that it can be easily carried by an operator. However, in order to prevent the abrasion of the ridge, it is necessary to surround the ridge with a steel material frame having an L-shaped cross section so as to withstand repeated use. Further, the backfill material U can be formed by using a metal material other than steel, or a nonmetal material such as concrete, FRP, or wood. Among them, the backfill material U made of concrete has an advantage that it can be manufactured at low cost, though there are some difficulties in handling. Therefore, in order to lay a new power distribution pipe P following the power distribution pipe P laid in the preceding construction section, as shown in FIG. Machine excavation is performed using the excavating machine B until the return material U appears. Then, when the backfill material U appears, FIG.
As shown in (1), a wire is attached to the ring R, and the backfill material U is lifted and removed by the excavating machine B to expose the opening of the distribution tube P. Next, the sealing material K attached to the outlet of the distribution pipe P is removed, and then, following the exposed distribution pipe P, a road or the like is excavated using the excavating machine B, and a groove having a predetermined depth is formed by a predetermined length. Formed over Thereafter, the distribution pipes P are laid in the excavation trenches, and are sequentially connected to the distribution pipes P laid earlier. When the installation of the distribution tube P is completed, the sealing material K is attached to the end of the distribution tube P at the tip thereof, and the backfill material U is installed along the sealing material K. Then, sand S for backfilling is put into the excavation trench, and after backfilling material U is buried together with the distribution pipe P, a temporary pavement restoring part A such as asphalt is formed thereon, so that the traffic is not hindered. What should be done is temporary restoration. As a result, in the preparatory work, the manual digging work of the conventional worker can be replaced with the removal of the backfill material.
Work time can be greatly reduced. And since the reduced man-hour can be diverted to the plumbing work, the length of the pipeline laid in one day can be increased, and the total construction period can be shortened. In addition, by using the backfill material U, it is possible to reduce the use of the backfill sand S corresponding to the volume thereof, and at the same time, to reduce the number of steps required for putting the sand therein, thereby greatly reducing the cost as a whole. it can. further,
By attaching the sealing material S to the opening of the distribution tube P, the penetration of the backfill sand S into the inside thereof can be suppressed. In this embodiment, the case where the conduit of the distribution tube P is formed has been described.
For example, it can be used for burying gas pipes, water pipes for sewage and clean water, communication pipes and their collective pipes, etc. to form pipelines. The present invention can also be applied to the case where a temporarily restored road or the like is re-excavated. Further, the distribution tube P of the present embodiment uses a plurality of backfill materials U of different sizes by exemplifying the distribution tube P in a two-stage stacking.
The size and number of the backfill material U may be determined according to the tube diameter and shape, and further, the burial depth and the like. Further, when the distribution tubes P are stacked in a plurality of stages, the lower side of the sealing material K attached to the mouth of the upper distribution tube P is extended forward, and the backfill material U is placed thereon. By doing so (see FIG. 1), it is possible to alleviate the influence of stress concentration and the like caused by the backfill material U on the lower distribution tube P, and as a result, to seal the opening of the distribution tube P and protect the distribution tube P. be able to. As described above, according to the present invention, the sealing material for preventing intrusion of earth and sand is attached to the mouth of the pipe at the tip end in each construction section, while the sealing material for preventing intrusion of earth and sand is attached. By installing and embedding a block-shaped back-up material formed in a tapered box whose area gradually decreases from the top surface to the bottom surface while having pressure resistance, and temporarily recovering it,
The number of man-hours required for re-excavation in the preparatory work has been significantly reduced, and the excavation distance per day, that is, the length of pipe laying, can be increased, and the total construction period can be shortened. This eliminates the need for backfilling sand having a capacity equivalent to the reclaimed material, thereby reducing costs and reducing the amount of construction by-products emitted, thereby improving environmental problems.

【図面の簡単な説明】 【図1】本発明によって敷設された管体の管口近傍を示
す断面図である。 【図2】本発明によって管体を敷設する際の準備工程を
示す説明図である。 【図3】本発明によって管体を敷設する際の準備工程を
示す説明図である。 【図4】従来の管体を敷設する際の準備工程を示す説明
図である。 【図5】従来の管体を敷設する際の準備工程を示す説明
図である。 【符号の説明】 U 埋め戻し材 K シール材 P 配電管(管体) S 埋め戻し用砂 A 舗装仮復旧部(アスファルト) B 掘削機械
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a sectional view showing the vicinity of a mouth of a pipe laid according to the present invention. FIG. 2 is an explanatory diagram showing a preparation process when laying a pipe according to the present invention. FIG. 3 is an explanatory view showing a preparation step when laying a pipe according to the present invention. FIG. 4 is an explanatory view showing a preparation step when laying a conventional pipe body. FIG. 5 is an explanatory view showing a preparation step when laying a conventional pipe body. [Description of Signs] U Backfilling Material K Sealing Material P Distribution Tube (Tube) S Sand for Backfilling A Temporary Paving Restoration Section (Asphalt) B Excavating Machine

───────────────────────────────────────────────────── フロントページの続き (72)発明者 岩本 修 大阪市北区中之島3丁目3番22号 関西 電力株式会社内 (72)発明者 山本 将広 大阪市北区中之島3丁目3番22号 関西 電力株式会社内 (72)発明者 菊池 広 大阪市北区中之島3丁目3番22号 関西 電力株式会社内 (72)発明者 上島 浩 大阪市北区本庄東2丁目3番41号 株式 会社きんでん内 (56)参考文献 特開 昭58−127833(JP,A) 特開 昭60−226908(JP,A) (58)調査した分野(Int.Cl.7,DB名) F16L 1/024 E01C 9/08 ────────────────────────────────────────────────── ─── Continuing on the front page (72) Osamu Iwamoto, Inventor 3-3-22 Nakanoshima, Kita-ku, Osaka Kansai Electric Power Co., Inc. (72) Inventor Masahiro Yamamoto 3-2-2, Nakanoshima, Kita-ku, Osaka Kansai Hiroshi Kikuchi (72) Inventor Hiroshi Kikuchi 3-3-22 Nakanoshima, Kita-ku, Osaka-shi Kansai Electric Power Company (72) Inventor Hiroshi Uejima 2-41, Honjohigashi, Kita-ku, Osaka Kindenchi Co., Ltd. (56) References JP-A-58-127833 (JP, A) JP-A-60-226908 (JP, A) (58) Fields investigated (Int. Cl. 7 , DB name) F16L 1/024 E01C 9 / 08

Claims (1)

(57)【特許請求の範囲】 【請求項1】 道路などを掘削して溝を形成し、その溝
に管体を敷設して順次接続し、溝に埋め戻し用砂を投入
して管体を埋設し、道路などを舗装仮復旧する一連の作
業を一の工事区間について行い、以下、隣接する工事区
間で前述した一連の作業を順次繰り返すことにより、管
体の管路を延長させる管体の敷設工法において、各工事
区間における先端の管体の管口に土砂侵入防止用シール
材を装着した後、該土砂侵入防止用シール材に沿って耐
圧性を有するとともに、上面から底面にかけて徐々に面
積が減少するテーパー状箱体に形成されたブロック状の
埋め戻し材を設置して埋設し、仮復旧させることを特徴
とする管体の敷設工法。
(57) [Claims] [Claim 1] Excavating a road or the like to form a groove, laying a pipe in the groove, sequentially connecting the pipes, and putting backfill sand into the groove to form a pipe. A series of work to bury the building and temporarily restore the pavement of roads, etc. is performed for one construction section, and then the above-described series of work is sequentially repeated in an adjacent construction section to extend the pipe line of the pipe body In the laying method, a seal for preventing intrusion of sediment into the mouth of the pipe at the tip of each construction section
After installing the material , it has pressure resistance along the seal material for preventing intrusion of soil and sand, and gradually faces from the top to the bottom.
A pipe laying method characterized by installing and burying a block-shaped backing material formed in a tapered box having a reduced volume and temporarily restoring it.
JP08055194A 1994-04-19 1994-04-19 Pipe laying method Expired - Fee Related JP3495412B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP08055194A JP3495412B2 (en) 1994-04-19 1994-04-19 Pipe laying method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP08055194A JP3495412B2 (en) 1994-04-19 1994-04-19 Pipe laying method

Publications (2)

Publication Number Publication Date
JPH07293748A JPH07293748A (en) 1995-11-10
JP3495412B2 true JP3495412B2 (en) 2004-02-09

Family

ID=13721487

Family Applications (1)

Application Number Title Priority Date Filing Date
JP08055194A Expired - Fee Related JP3495412B2 (en) 1994-04-19 1994-04-19 Pipe laying method

Country Status (1)

Country Link
JP (1) JP3495412B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4822426B2 (en) * 2006-04-03 2011-11-24 鹿島建設株式会社 Construction method of buried pipe under the road
JP5845560B2 (en) * 2010-08-05 2016-01-20 株式会社大林組 Backfill structure and backfill method
JP5311604B1 (en) * 2012-11-05 2013-10-09 日新化成工業株式会社 Protective structure for resin buried pipe and protective block for resin buried pipe

Also Published As

Publication number Publication date
JPH07293748A (en) 1995-11-10

Similar Documents

Publication Publication Date Title
US4329083A (en) Methods of laying underground conduits
JP3495412B2 (en) Pipe laying method
CN116365421A (en) Embedding method of high-low voltage power cable
JPH05280664A (en) Piping method and piping materials used in this piping method
KR200336460Y1 (en) foundation bottom permanent drainage structure using trench and drainage member
JP4863311B2 (en) Excavation method
JP5115456B2 (en) Laying and burying pipelines on steep slopes
US6691727B2 (en) Device and method for protecting a subterranean pipe from damage during excavation
JP3095339B2 (en) Pipe temporary burial structure
JP2953843B2 (en) Pipe line laying method by non-cutting propulsion method
JPH05263457A (en) Box culvert connection structure for propulsion method
JPH0663269B2 (en) Pipe burying method
KR20050029332A (en) Basic bottom permanent drainage structure using trench and drainage member and it's construction method
KR20250175822A (en) Communication cable/power cable box structure for trenching of aerial utility cable, and construction method for the same
RU2359292C2 (en) Method of arranging subsurface chamber to store cable boxes and stock
JPH0814350B2 (en) Civil engineering method for underground pipes
CN1382934A (en) Method for directly burying underground pipeline with warning belt
CN116464140A (en) A protective trench excavation method for municipal large-diameter pipelines in soft ground
JPH03241196A (en) Earthwork for underground piping
JP2000045675A (en) Service pipe laying method and device used in such method
JPH03241195A (en) Earthwork for underground piping
JPS5930861B2 (en) Buried piping construction method
JP3110927B2 (en) Backfill injection method in propulsion method
JPH0814349B2 (en) Civil engineering method for underground pipes
JPH0791857B2 (en) Box culvert connection structure for propulsion method

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071121

Year of fee payment: 4

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081121

Year of fee payment: 5

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081121

Year of fee payment: 5

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091121

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees