JP3638890B2 - Pin operation machine and pin attachment / detachment attachment - Google Patents
[go: Go Back, main page]

JP3638890B2 - Pin operation machine and pin attachment / detachment attachment - Google Patents

Pin operation machine and pin attachment / detachment attachment Download PDF

Info

Publication number
JP3638890B2
JP3638890B2 JP2001225025A JP2001225025A JP3638890B2 JP 3638890 B2 JP3638890 B2 JP 3638890B2 JP 2001225025 A JP2001225025 A JP 2001225025A JP 2001225025 A JP2001225025 A JP 2001225025A JP 3638890 B2 JP3638890 B2 JP 3638890B2
Authority
JP
Japan
Prior art keywords
pin
arm
striking
attachment
piston
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001225025A
Other languages
Japanese (ja)
Other versions
JP2003040590A (en
Inventor
光▲邦▼ 岩崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobelco Construction Machinery Co Ltd
Original Assignee
Kobelco Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobelco Construction Machinery Co Ltd filed Critical Kobelco Construction Machinery Co Ltd
Priority to JP2001225025A priority Critical patent/JP3638890B2/en
Publication of JP2003040590A publication Critical patent/JP2003040590A/en
Application granted granted Critical
Publication of JP3638890B2 publication Critical patent/JP3638890B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Forklifts And Lifting Vehicles (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、作業機のロングアタッチメントを組み立てまたは分解する際に行われる連結ピンの脱着作業に好適であるピン操作機械及びピン脱着用アタッチメントに関するものである。
【0002】
【従来の技術】
従来、ビルの解体作業においてはロングアタッチメントの先端に破砕機を装備した解体機が使用されている。
【0003】
この種の解体機は、現状では地上高43mまで届く超ロングアタッチメントを備えたものが知られているが、ビルの高層化に伴ってさらなるアタッチメントの長尺化が検討されている。
【0004】
このような大型解体機は、通常、解体機本体からクローラ、アタッチメント、カウンタウエイトを取り外した状態で現場に搬入され、現場で組み立てられる。図9及び図10はその組立手順を示したものである。
【0005】
まず、解体機本体70にクローラ70aを装着し、上部旋回体71にカウンタウエイト72を取り付ける(図9(a)参照)。
【0006】
次に、上部旋回体71のフロアプレートにブームフットピンを介して連結されている基端第1ブーム73aの先端に、予め接続されている基端第2ブーム73b及び基端第3ブーム73cを接続する(図9(b)参照)。
【0007】
同様にして基端第3ブーム73cの先端に基端第4ブーム73dを接続する(図9(c)参照)。
【0008】
さらに、基端第4ブーム73dの先端に基端第5ブーム73eを接続することにより基端ブーム73が完成する。
【0009】
次に、この基端ブーム73の先端に中間ブーム74を接続する(図9(d)参照)。
【0010】
中間ブーム74のシリンダ74aを縮小させ、中間ブーム74を下向きに折り曲げる(図10(e)参照)。
【0011】
次に、上部旋回体71を旋回させるか、またはブームを起こすことにより退避させる。
【0012】
先端第1ブーム75aと先端第2ブーム75bを地上に置き、退避させていた中間ブーム74を戻して接続する(図10(f)参照)。
【0013】
次いで先端第1ブーム75aに備えられたシリンダ75cのロッドポイント部を中間ブーム74に接続する(図10(g)参照)。
【0014】
次に、上部旋回体71を旋回させるか、またはブームを起こすことにより退避させ、予め接続されている先端第3ブーム75dと第4ブーム76を地上に置き、先端第2ブーム75bの先端に接続する(図10(h)参照)。
【0015】
上記組み立て手順により、2つ折れ式のロングアタッチメントが構成される。
【0016】
また、上記した大型解体機では、ロングアタッチメントの各連結部に連結ピンが挿入されるが(例えば図9(c)参照)、それらの連結ピンPも直径100〜120mmと大型である。
【0017】
【発明が解決しようとする課題】
従来、アタッチメントを組み立てる場合には、複数の作業者が連結ピンPを抱えてブーム連結部のピン穴まで運搬していたが、連結ピンが重量物になると複数の人手が必要となる。また、ピン穴が高所の場合には小型クレーンも必要となる。そのため、連結ピンの運搬が容易でないという問題があった。
【0018】
また、ピン穴へ連結ピンを挿入する作業は、ハンマーを用いて打撃することによって行われるが、ピン穴が高所になると作業者用の足場が必要となる。このように小型クレーンで吊り上げた連結ピンを、その足場に乗った作業者がハンマーで打撃するという作業では、作業性が悪いだけでなくアタッチメントの組立に多大な時間が費やされるという問題があった。
【0019】
本発明は以上のような従来のロングアタッチメント組み立てにおける課題を考慮してなされたものであり、人手や足場を必要とせず、連結ピンをブーム連結部のピン穴まで容易に移動させることができ、また、その連結ピンを水平方向に打撃して挿入完了位置まで打ち込むことができるピン操作機械及びピン脱着用アタッチメントを提供するものである。
【0020】
【課題を解決するための手段】
本発明のピン操作機械は、構造物同士を連結するためのピンを、その構造物に設けられたピン穴に対して挿入しまたは抜き取るピン操作機械であって、自走式のベースマシンに支持された起伏及び屈伸自在な作業アームの先端に、上記ピンを把持・解放可能なピン把持手段と、ピンを軸方向に打撃するピン打撃手段とが並設され、上記作業アームとピン把持手段とによって上記ピンを上記ピン穴に挿入し、作業アームと上記ピン打撃手段とによってこのピンを挿入完了位置まで打ち込み、またはこの挿入完了位置から抜き取るように構成されたことを要旨とする。
【0021】
このピン操作機械に従えば、重量物であるピンを把持して任意の高さのピン穴まで移動させることができる。
【0022】
また、ピン穴に挿入されたピンをピン打撃手段によって挿入完了位置まで打ち込み、またはそのピン挿入穴に挿入されているピンを打撃することによって抜き取るため、ピン穴が高所であってもピンを簡便に打ち込むことができ、またピン穴から簡便にピンを抜き取ることができるようになる。
【0023】
上記ピン把持手段は、一対のアームを開閉動作させるアーム開閉装置で構成することができる。また、上記打撃手段は、ピンと同軸で係合し得る打撃ロッドをピストンで打撃するピストン・シリンダ装置から構成することができる。
【0024】
また、上記打撃ロッドとして、ピンを挿入完了位置まで打ち込むための挿入用ロッドと、ピン穴を貫通することができピン穴に挿入されているピンを打撃によって抜き取る抜取用ロッドを有することができる。
【0025】
また、上記ピストン・シリンダ装置を作業アームに固定し、アーム開閉装置をピストン・シリンダ装置の周囲に設けられた筒状ケースの外壁に固定することが好ましい。この構成に従えば、ピン打撃力が直接、アーム開閉装置に作用しないため、アーム開閉装置の信頼性を高めることができる。
【0026】
また、筒状ケースをその筒軸まわりに回転させるケース回転機構を設け、アーム開閉装置を回転させることができるように構成すれば、ピン打撃時にはアーム開閉装置を回転させて退避させることができるため、地上から低い位置であっても確実にピンを打撃することができる。
【0027】
記自走式ベースマシンとして、走行する下部走行体とその下部走行体上に縦軸まわりに旋回可能に搭載された上部旋回体を有する油圧ショベル等の建設機械を用いることができる。
【0028】
また、本発明のピン脱着用アタッチメントは、建設機械における起伏及び屈伸自在な作業アームにブラケットを介して装着されるピン脱着用アタッチメントであって、構造物同士を連結するピンを把持・解放可能なピン把持手段と、ピンを軸方向に打撃するピン打撃手段とが並設され、上記作業アームとピン把持手段とによって上記ピンを上記ピン穴に挿入し、作業アームと上記ピン打撃手段とによってこのピンを挿入完了位置まで打ち込み、またはこの挿入完了位置から抜き取るように構成されたことを要旨とする。
【0029】
このピン脱着用アタッチメントに従えば、既存の建設機械の作業アームに本発明をオプション装置として装着することができる。
【0030】
【発明の実施の形態】
以下、図面に示した実施形態に基づいて本発明を詳細に説明する。
【0031】
図1は、本発明に係るピン操作機械1を示したものである。
【0032】
同図に示すピン操作機械1の本体2は、いわゆるミニショベルと呼ばれる小型油圧ショベルからバケットを取り外したものであり、クローラ3を装着した下部走行体4上に上部旋回体5が旋回自在に搭載され自走式ベースマシンとして機能する。
【0033】
この上部旋回体5における運転席6の前方には、起伏及び屈伸動作するピン操作手段としての作業アーム7が装備されており、この作業アーム7は、ブーム8とそのブーム8の先端部に連結されて回動するアーム9とを備えている。
【0034】
上記ブーム8の基端部8aは、上部旋回体5のフロアプレートから延設されたスイングブラケット部10のブーム取付部10aに対し、ブームフットピン11を介して連結されている。
【0035】
従って、この構成の作業アーム7は、ブームシリンダ12の伸縮によって起伏動作することができるとともに、図示しないスイングシリンダの伸縮によって車体幅方向にも所定角度スイングすることができるようになっている。なお、アーム9はアームシリンダ13の伸縮によってショベル前後方向に回動するようになっている。
【0036】
14はそのアーム9の先端部に取り付けられたピン脱着用アタッチメントである。
【0037】
このピン脱着用アタッチメント(以下、アタッチメントと略称する)14は、アームトップ部9aに接続するためのブラケット15と、このブラケット15に設けられる打撃手段としてのピストン・シリンダ装置16と、同じくブラケット15に設けられるピン把持手段としてのアーム開閉装置17とから主として構成されている。
【0038】
このアタッチメント14は、水平方向に打撃を行う姿勢のまま上下方向にHmin〜Hmaxの範囲で移動することができる。
【0039】
図2は上記アタッチメント14を拡大して示した縦断面図である。
【0040】
同図において、アームトップ部9aに接続するブラケット15は矩形状の基板15aを有し、この基板15aから平行して縦板15b,15b、同じく平行して横板15c,15dが延設され全体として箱形に組み立てられている(図3参照)。
【0041】
上記縦板15b,15bには、アーム9に架設されるリンク18をピンで連結するためのリンクピン穴15eと、アームトップ部9aにピンで連結するための連結ピン穴15fがそれぞれ設けられている。
【0042】
上記横板15cには後述するシリンダ22のシリンダチューブが固定されている。
【0043】
上記基板15aには回転軸19が水平方向に配置されており、この回転軸19の後端部には回転軸19の直径方向にアーム20が固着されている。
【0044】
図3に示すように、アーム20はピン21を介してシリンダ22のロッドと連結されている。それにより、シリンダ22のロッドが伸長すると、アーム20が押し下げられ、回転軸19を矢印A方向に90°回転させる。
【0045】
回転軸19の前端部には図2に示すように、揺動アーム23を備えたボス部23aが嵌合されており、このボス部23aと回転軸19はキー溝23bを備えることによって固定されている。
【0046】
また、揺動アーム23の先端部にはU字状の切欠き部23aが形成されており、この切欠き部23aに回転リング24から突設されたピン25が係合している。
【0047】
回転リング24には、図2に示すように、一部切り欠きを有する円筒ケース26が固定されている。従って、シリンダ22が伸長すると、アーム20を介して回転軸19が90°回転し、その回転軸19に固定された揺動アーム23が同じく90°回転し、その結果、円筒ケース26が筒軸を中心として矢印A方向に90°回転することになる。
【0048】
27は回転軸19を中心として回転するベアリング装置であり、このベアリング装置27の外輪は上記円筒ケース26に接続されている。内輪は、基板15aと対向する状態でブラケット15に固定されている円板28に支持されている。なお、27aは外輪と内輪との間に介設されて転動するベアリングである。また、28aは円板28と基板15aとを接続している筒状の接続板である。ただし、接続板28aにおける揺動アーム23揺動範囲については、揺動アーム23と接触しないように切り欠きが設けられている。
【0049】
また、回転することができる円筒ケース26の外周面にはアーム開閉装置17が取り付けられている。
【0050】
このアーム開閉装置17は、図4に示すように、円筒ケース26の外壁に下向きに取付金具30を固定し、その取付金具30に対しピン31,32を介してアーム33,34が取り付けられている。
【0051】
一方のアーム34は、ピン32取付位置より上方に突出部34aが形成されており、この突出部34aにシリンダ35のロッド35aが連結されている。なお、シリンダ35のヘッド側端部は、円筒ケース26の外壁から垂下された別の取付金具36に支持されている。
【0052】
そして、アーム33と34におけるピン32取付位置寄りにはリンク37が連結され両アーム33,34を連動させるようになっている。
【0053】
従って、シリンダ35のロッドが縮小すると、ピン32を支点として突出部34aが矢印B方向に移動し、アーム34が実線で示す位置から二点鎖線で示す位置に移動して開かれる。このとき、リンク37によって連結されているアーム34は、リンク連結点が37aから37bに移動し、それにより、アーム33も連動して開かれる。なお、アーム33,34のピンつかみ動作は上記と逆の動作によって行われる。
【0054】
また、アーム33の先端部33a及びアーム34の先端部34aはそれぞれV字状に切り込まれ、断面円形のピンPを確実に把持できるようになっている。
【0055】
次に、図2に戻ってピストン・シリンダ装置16の構成を説明する。
【0056】
上述した円板28には、ピストン・シリンダ装置16を支持するための一対の支持部材41,42(奥側の支持部材41のみ図示)の各基端部が固定されており、各支持部材41,42はピン43及び44を用いて接続することにより、保形及び補強がなされている。
【0057】
この支持部材41,42に対し、ボルト・ナットを用いてピストン・シリンダ装置16の取付部45及び46が固定されている。
【0058】
ピストン・シリンダ装置16の本体は、公知の油圧ブレーカを利用しており、その原理を図5に示す。
【0059】
なお、図中C1はピストン上側の窒素ガス封入室、C2はピストン中段の上側の部屋、C3はピストン中断の下側の部屋、C4はメインバルブの段部の部屋をそれぞれ示している。
【0060】
(a)ピストン後退行程
同図(a)において、図示しない操作弁を開くと管路"IN"から圧油が供給され、油圧が部屋C3とプランジャ40aの後端に働き、メインバルブ40bは前側プレート40cに押し付けられる。それにより、圧油はピストン40dの後退のみに使われ、窒素ガスの圧力に抗して後退する。このとき、部屋C2内の圧油は管路"OUT"から排出される。
【0061】
(b)メインバルブ後退行程
同図(b)において、ピストン40dが後退して部屋C3と管路L3が連通すると、圧油は部屋C4内に流入する。部屋C4の断面積はプランジャ40aのそれよりも大きいため、メインバルブ40bは後退し始める。それにより、挿入用ロッド54とピストン40dが離間する。
【0062】
(c)打撃行程
同図(c)において、メインバルブ40bが後退して管路L1と管路L6が連通すると、ピストン40dは窒素ガスの圧力で進出し始め、このとき、管路"IN"は管路L1と遮断される一方で管路L2と連通する。管路L3がピストン40dで遮断されている限り圧油は部屋C4に供給されるため、メインバルブ40bは後退したまま保持され部屋C3内の圧油の排出が円滑に行われる。
【0063】
部屋C3より排出される圧油は、管路L1→管路L6→管路L4→部屋C2へと流れ、すなわち、部屋C3から排出される圧油が部屋C2に吸収されるようになり、ピストン40dは負荷を受けることなく挿入用ロッド54を打撃することができるようになる。
【0064】
(d)メインバルブ進出行程
ピストン40dが進出して管路L3が部屋C2と連通すると、部屋C4内の圧油が管路"OUT"から排出され、メインバルブ40bはプランジャ40aによって押圧され、それにより、再びピストン後退行程に入る。
【0065】
なお、図中破線は、ピストン40dの打撃によって移動した挿入用ロッド54を表している。
【0066】
また、図2に示すように、挿入用ロッド54は、ピストン・シリンダ装置16の先端部に設けられたホルダ52及びブッシュ53を貫通して装着されるようになっており、この挿入用ロッド54の先端には、ピンPの端部を係合するための係合凹部54aが形成されている。
【0067】
上述した挿入用ロッド54は、ピン挿入時の打撃用として使用されるものであり、図6に示すように、ホルダ52に装着されているリテーナピン55aを抜き取ることによりホルダ52から取り外すことができる。なお、55bはストッパワッシャ、55cはスプリングピンである。
【0068】
取り外した挿入用ロッド54の代わりに、抜取用ロッド56を装着すると、ブームの連結部分に挿入されているピンを打撃しながら抜き取ることができる。そのため、抜取用ロッド56の軸長さLは、連結部分のピン穴長さより長く設定されている。また、抜取用ロッド56の先端にもピンPの端部と係合し得る係合凹部56aが形成されている。
【0069】
なお、54b(または56b)はストッパとして機能する凹溝であり、挿入用ロッド54が往復運動するときに、その凹溝54bの端面54cまたは54dのどちらか一方にリテーナピン55aが当接することによって挿入用ロッド54のストロークが規制されるようになっている。
【0070】
次に、上記構成を有するピン操作機械の動作を図7及び図8を参照しながら説明する。
【0071】
図7は構造物としてのブームの連結部に設けられているピン穴にピンPを挿入する場合の手順を示している。
【0072】
同図(a)において、60は図9に示した解体機のブーム断面を示している。ピン穴60aにピンPを挿入するにあたり、まず、枕木61に置かれたピンPの挿入側と反対側の端部を、アーム開閉装置17の一対のアーム33,34で把持する。
【0073】
次いで作業アーム7を操作することにより、図7(b)に示すように、ピンPを水平姿勢を保ちながら持ち上げ、ピン穴60aにピンPの挿入側端部を挿入する。このとき、ピンPがピン穴60aから脱落しない深さまでピンPを挿入するものとする。
【0074】
次いでアーム33,34をピンPから離し、図7(c)に示すように、ピストン・シリンダ装置16の挿入用ロッド54をピン位置まで移動させる。このとき、円筒ケース26を90°回転させることにより、アーム開閉装置17のアーム33,34が地面に接触しないよう退避させる。
【0075】
この状態でピストン・シリンダ装置16を駆動させてピンPを矢印D方向に打撃する。
【0076】
図7(d)はピンPが挿入完了位置まで打ち込まれた状態を示している。
【0077】
このようにしてブーム60のピン穴60aにピンPが打ち込まれることにより、ブームが連結される。
【0078】
なお、ピンPをピン穴に挿入する際、上下方向の位置決めは作業アーム7の起伏動作によって行うことができ、左右方向の位置決めは、スイングシリンダによって作業アーム7を車幅方向にスイングさせることによって行うことができる。また、別のブーム連結部にピンを挿入する場合は建設機械を自走させる。
【0079】
次に、ブーム60を分解するときのピン抜き取り動作を図8を参照しながら説明する。
【0080】
まず、挿入用ロッド54を抜取用ロッド56と交換する。
【0081】
次いで、ピン操作機械をピン打ち込み側と反対側に移動させ、抜き取り対象となるピンPの端部に抜取用ロッド56を嵌める。
【0082】
この状態でピストン・シリンダ装置16を駆動させてピンPを矢印E方向に打撃する。
【0083】
作業アーム7を操作することにより、抜取られるピンPに合わせて抜取用ロッド56を矢印E方向に移動させる。それにより、抜取用ロッド56がピン穴60aを貫通し、ピンPがブーム60から取り外される。
【0084】
また、上述したようにアタッチメント14を、破砕機や油圧ブレーカ等のオプション装置と同じようにアームに対して脱着できるようにすれば、オプション装置用の予備バルブを標準装備した建設機械をベースマシンとして使用することにより、新たに油圧機器を設置することなくアタッチメント14を作動させることができるようになる。
【0085】
なお、本発明のピン操作機械は、上記実施形態では自走式ベースマシンとして作業アームを備えた建設機械を使用したが、これに限らず、構造物の連結部に自ら移動することができ、用意されたピンを把持して連結部のピン穴まで移動させることができるものであれば、例えばフォークリフト等の自走機をベースマシンとすることもできる。
【0086】
また、上記実施形態では、アーム開閉装置17のアーム33,34をシリンダ22を用いて90°回転させたが、これに限らず、例えば油圧モータを用いて360°回転させるように構成することもできる。それにより、ピン脱着操作における操作性を向上させることができる。
【0087】
【発明の効果】
上記のように本発明によると自走式のベースマシンに支持された起伏及び屈伸自在な作業アームの先端に、上記ピンを把持・解放可能なピン把持手段と、ピンを軸方向に打撃するピン打撃手段とを並設し、上記作業アームとピン把持手段とによって上記ピンを上記ピン穴に挿入し、作業アームと上記ピン打撃手段とによってこのピンを挿入完了位置まで打ち込み、またはこの挿入完了位置から抜き取るように構成したから、重量物であるピンを把持して任意の高さのピン穴まで移動させることができ、連結作業を簡単かつ短時間で行うことができるようになる。
【0088】
また、ピン穴に挿入されたピンをピン打撃手段によって挿入完了位置まで打ち込み、またはそのピン挿入穴に挿入されているピンを打撃することによって抜き取るため、ピン穴が高所であってもピンを簡便に打ち込むことができ、またピン穴から簡便にピンを抜き取ることができる。
【0089】
請求項2の発明によれば、一対のアームを開閉動作させる簡単な構成でピンを把持または解放することができる。
【0090】
請求項3の発明によれば、ピンの被把持部分に装着される打撃ロッドを用意すれば、打撃装置本体は油圧ハンマーのような既存のピストン・シリンダ装置から構成することができる。
【0091】
請求項4の発明によれば、ピンを挿入完了位置まで打ち込むための挿入用ロッドと、ピン穴を貫通することができる抜取用ロッドを取り替えることにより、ピン挿入とピン抜き取りの双方の作業が行えるようになる。
【0092】
請求項5の発明によれば、ピストン・シリンダ装置を作業アームに固定し、アーム開閉装置をピストン・シリンダ装置の周囲に設けられた筒状ケースの外壁に固定したため、ピン打撃力が直接、アーム開閉装置に作用しないため、アーム開閉装置の信頼性を高めることができる。
【0093】
請求項6の発明によれば、筒状ケースをその筒軸まわりに回転させるケース回転機構を設けたため、ピン打撃時にはアーム開閉装置を回転させて退避させることができるようになり、地上から低い位置であっても確実にピンを打撃することができる。
【0094】
請求項7の発明によれば、自走式ベースマシンとして、走行する下部走行体とその下部走行体上に縦軸まわりに旋回可能に搭載された上部旋回体を有する油圧ショベル等の建設機械を用いることができる。
【0095】
請求項8の発明によれば、既存の建設機械の作業アームに本発明をオプション装置として装着することができる。
【図面の簡単な説明】
【図1】 本発明に係るピン操作機械の外観図である。
【図2】 図1に示すピン脱着用アタッチメントの拡大図である。
【図3】 図1に示すアーム開閉装置の回転動作を説明する説明図である。
【図4】 アーム開閉装置の構成を示す拡大図である。
【図5】 (a)〜(d)は、図1に示すピストン・シリンダ装置の動作原理を示す説明図である。
【図6】 ピン挿入ロッドとピン抜取ロッドの交換方法を説明する斜視図である。
【図7】 (a)〜(d)はピン挿入動作を説明する説明図である。
【図8】 (a)及び(b)はピン抜取動作を説明する説明図である。
【図9】 (a)〜(d)は従来のブーム組立手順を説明した工程図である。
【図10】 (e)〜(h)は図9に続くブーム組立手順を説明した工程図である。
【符号の説明】
P 連結ピン
1 ピン操作機械
2 自走式ベースマシン
3 クローラ
4 下部走行体
5 上部旋回体
7 作業アーム
8 ブーム
9 アーム
12 ブームシリンダ
13 アームシリンダ
14 アタッチメント
15 ブラケット
16 ピストン・シリンダ装置
17 アーム開閉装置
18 リンク
19 回転軸
20 アーム
22 シリンダ
23 揺動アーム
24 回転リング
26 円筒ケース
27 ベアリング装置
33,34 アーム
35 シリンダ
37 リンク
54 挿入用ロッド
56 抜取用ロッド
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a pin operating machine and a pin attachment / detachment attachment that are suitable for a connection / removal operation of a connecting pin performed when assembling or disassembling a long attachment of a working machine.
[0002]
[Prior art]
Conventionally, in a building demolition work, a demolition machine equipped with a crusher at the tip of a long attachment is used.
[0003]
Currently, this type of dismantling machine is known to have an ultra-long attachment that reaches a height of 43m above ground, but further increases in the length of the attachment are being considered as the building becomes taller.
[0004]
Such a large dismantling machine is normally carried into the site with the crawler, attachment, and counterweight removed from the dismantling machine body and assembled on site. 9 and 10 show the assembling procedure.
[0005]
First, the crawler 70a is attached to the dismantling machine body 70, and the counterweight 72 is attached to the upper swing body 71 (see FIG. 9A).
[0006]
Next, the proximal second boom 73b and the proximal third boom 73c that are connected in advance to the distal end of the proximal first boom 73a connected to the floor plate of the upper swing body 71 via a boom foot pin. Connect (see FIG. 9B).
[0007]
Similarly, the proximal fourth boom 73d is connected to the distal end of the proximal third boom 73c (see FIG. 9C).
[0008]
Further, the base end boom 73 is completed by connecting the base end fifth boom 73e to the tip of the base end fourth boom 73d.
[0009]
Next, the intermediate boom 74 is connected to the distal end of the proximal boom 73 (see FIG. 9D).
[0010]
The cylinder 74a of the intermediate boom 74 is reduced, and the intermediate boom 74 is bent downward (see FIG. 10E).
[0011]
Next, the upper turning body 71 is turned or retracted by raising the boom.
[0012]
The tip first boom 75a and the tip second boom 75b are placed on the ground, and the retracted intermediate boom 74 is returned and connected (see FIG. 10 (f)).
[0013]
Next, the rod point portion of the cylinder 75c provided on the first distal end boom 75a is connected to the intermediate boom 74 (see FIG. 10G).
[0014]
Next, the upper swing body 71 is swung or retracted by raising the boom, the tip third boom 75d and the fourth boom 76 connected in advance are placed on the ground and connected to the tip of the tip second boom 75b. (See FIG. 10 (h)).
[0015]
By the above assembly procedure, a two-fold long attachment is configured.
[0016]
Moreover, in the above-mentioned large dismantling machine, although a connection pin is inserted in each connection part of a long attachment (for example, refer FIG.9 (c)), those connection pins P are also 100-120 mm in diameter and large.
[0017]
[Problems to be solved by the invention]
Conventionally, when assembling an attachment, a plurality of workers hold the connecting pin P and carry it to the pin hole of the boom connecting portion. However, when the connecting pin becomes heavy, a plurality of hands are required. In addition, when the pin hole is high, a small crane is also required. For this reason, there is a problem that the connection pin is not easily transported.
[0018]
Moreover, although the operation | work which inserts a connection pin to a pin hole is performed by hit | damaging using a hammer, when a pin hole becomes a high place, the scaffold for an operator will be needed. In this way, when the worker who got on the scaffold hits the connecting pin lifted by a small crane with a hammer, there is a problem that not only workability is bad but also a lot of time is spent on assembly of the attachment. .
[0019]
The present invention was made in consideration of the problems in the conventional long attachment assembly as described above, and does not require a manpower or a scaffold, and can easily move the connecting pin to the pin hole of the boom connecting portion. In addition, the present invention provides a pin operating machine and a pin detachment attachment that can hit the connecting pin in the horizontal direction and drive it to the insertion completion position.
[0020]
[Means for Solving the Problems]
Pin Operation machine of the present invention, the pin for connecting the structures together, a insert against the pin hole provided on the structure or sampling lupine operation mechanical, self-propelled base machine A pin gripping means capable of gripping / releasing the pin and a pin striking means for striking the pin in the axial direction are arranged in parallel at the tip of the undulating and bending work arm supported by the arm. The gist of the invention is that the pin is inserted into the pin hole by means, and the pin is driven to the insertion completion position by the working arm and the pin striking means, or extracted from the insertion completion position .
[0021]
According to this pin operating machine, a heavy pin can be gripped and moved to a pin hole of an arbitrary height.
[0022]
Moreover, for drawing by pin implanted an inserted pin hole to the insertion completion position by a pin striking means, or striking the pins that are inserted into the pin insertion hole, also pin holes a high place The pin can be easily driven and the pin can be easily extracted from the pin hole.
[0023]
The pin gripping means can be composed of an arm opening / closing device that opens and closes a pair of arms. Further, the hitting means can be constituted by a piston / cylinder device that hits a hitting rod that can be engaged coaxially with a pin with a piston.
[0024]
Further, as the hitting rod, there can be provided an insertion rod for driving the pin to the insertion completion position, and an extraction rod that can penetrate the pin hole and extract the pin inserted into the pin hole by hitting.
[0025]
Preferably, the piston / cylinder device is fixed to a working arm , and the arm opening / closing device is fixed to an outer wall of a cylindrical case provided around the piston / cylinder device. According to this configuration, since the pin striking force does not directly act on the arm opening / closing device, the reliability of the arm opening / closing device can be improved.
[0026]
Also, if a case rotation mechanism for rotating the cylindrical case around its cylinder axis is provided so that the arm opening and closing device can be rotated, the arm opening and closing device can be rotated and retracted when the pin is hit. Even if it is a low position from the ground, a pin can be hit reliably.
[0027]
As above Symbol self Hashishiki base machine, it is possible to use a construction machine such as a hydraulic excavator having a lower traveling body and pivotally mounted on the upper rotating body to the vertical axis around on its lower traveling body travels.
[0028]
Moreover, the pin attachment / detachment attachment of the present invention is a pin attachment / detachment attachment that is attached to a working arm that can be raised and lowered in a construction machine via a bracket, and can hold and release a pin that connects structures together. A pin gripping means and a pin striking means for striking the pin in the axial direction are provided side by side. The pin is inserted into the pin hole by the work arm and the pin gripping means, and the work arm and the pin striking means driving pins to the insertion completion position, or the gist that it has been configured to withdraw from the insertion completion position.
[0029]
According to this pin attachment / detachment attachment, the present invention can be mounted as an optional device on a work arm of an existing construction machine.
[0030]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, the present invention will be described in detail based on the embodiments shown in the drawings.
[0031]
FIG. 1 shows a pin operating machine 1 according to the present invention.
[0032]
The main body 2 of the pin operating machine 1 shown in the figure is obtained by removing a bucket from a small hydraulic excavator called a so-called mini excavator, and an upper swing body 5 is rotatably mounted on a lower traveling body 4 on which a crawler 3 is mounted. It functions as a self-propelled base machine.
[0033]
In front of the driver's seat 6 in the upper swing body 5, a working arm 7 is provided as a pin operating means for performing ups and downs and bending operations. The working arm 7 is connected to the boom 8 and the tip of the boom 8. And an arm 9 that rotates.
[0034]
A base end portion 8 a of the boom 8 is connected to a boom mounting portion 10 a of a swing bracket portion 10 extending from the floor plate of the upper swing body 5 via a boom foot pin 11.
[0035]
Accordingly, the work arm 7 having this configuration can move up and down by expansion and contraction of the boom cylinder 12, and can swing by a predetermined angle in the vehicle body width direction by expansion and contraction of a swing cylinder (not shown). The arm 9 is rotated in the front-rear direction of the shovel by the expansion and contraction of the arm cylinder 13.
[0036]
Reference numeral 14 denotes a pin attachment / detachment attached to the tip of the arm 9.
[0037]
This pin attachment / detachment attachment (hereinafter abbreviated as “attachment”) 14 includes a bracket 15 for connecting to the arm top portion 9 a, a piston / cylinder device 16 as a striking means provided on the bracket 15, and a bracket 15. It is mainly comprised from the arm opening / closing apparatus 17 as a pin holding means provided.
[0038]
The attachment 14 can move in the range of Hmin to Hmax in the vertical direction while maintaining the posture of hitting in the horizontal direction.
[0039]
FIG. 2 is an enlarged longitudinal sectional view showing the attachment 14.
[0040]
In the figure, a bracket 15 connected to the arm top portion 9a has a rectangular substrate 15a. Vertical plates 15b and 15b are parallelly extended from the substrate 15a, and horizontal plates 15c and 15d are also extended in parallel. As a box (see FIG. 3).
[0041]
The vertical plates 15b and 15b are respectively provided with a link pin hole 15e for connecting the link 18 installed on the arm 9 with a pin and a connection pin hole 15f for connecting with the arm top portion 9a with a pin. Yes.
[0042]
A cylinder tube of a cylinder 22 to be described later is fixed to the horizontal plate 15c.
[0043]
A rotating shaft 19 is disposed in the horizontal direction on the substrate 15 a, and an arm 20 is fixed to the rear end portion of the rotating shaft 19 in the diameter direction of the rotating shaft 19.
[0044]
As shown in FIG. 3, the arm 20 is connected to the rod of the cylinder 22 through a pin 21. Thereby, when the rod of the cylinder 22 is extended, the arm 20 is pushed down, and the rotating shaft 19 is rotated by 90 ° in the direction of arrow A.
[0045]
As shown in FIG. 2, a boss portion 23a having a swing arm 23 is fitted to the front end portion of the rotating shaft 19, and the boss portion 23a and the rotating shaft 19 are fixed by being provided with a key groove 23b. ing.
[0046]
Further, a U-shaped notch 23a is formed at the tip of the swing arm 23, and a pin 25 protruding from the rotating ring 24 is engaged with the notch 23a.
[0047]
As shown in FIG. 2, a cylindrical case 26 having a notch is fixed to the rotating ring 24. Therefore, when the cylinder 22 is extended, the rotary shaft 19 is rotated by 90 ° through the arm 20, and the swing arm 23 fixed to the rotary shaft 19 is also rotated by 90 °. As a result, the cylindrical case 26 is moved to the cylindrical shaft. Is rotated by 90 ° in the direction of arrow A around the center.
[0048]
Reference numeral 27 denotes a bearing device that rotates about the rotation shaft 19. The outer ring of the bearing device 27 is connected to the cylindrical case 26. The inner ring is supported by a disk 28 fixed to the bracket 15 in a state of facing the substrate 15a. In addition, 27a is a bearing which is interposed between the outer ring and the inner ring and rolls. Reference numeral 28a denotes a cylindrical connection plate that connects the disk 28 and the substrate 15a. However, the swinging range of the swinging arm 23 in the connection plate 28 a is notched so as not to contact the swinging arm 23.
[0049]
An arm opening / closing device 17 is attached to the outer peripheral surface of the cylindrical case 26 that can rotate.
[0050]
As shown in FIG. 4, the arm opening / closing device 17 has a mounting bracket 30 fixed downward on the outer wall of the cylindrical case 26, and arms 33 and 34 are attached to the mounting bracket 30 via pins 31 and 32. Yes.
[0051]
One arm 34 has a protrusion 34a formed above the pin 32 mounting position, and a rod 35a of a cylinder 35 is connected to the protrusion 34a. The head side end of the cylinder 35 is supported by another mounting bracket 36 that hangs down from the outer wall of the cylindrical case 26.
[0052]
A link 37 is connected to the arm 33 and 34 near the pin 32 mounting position so that the arms 33 and 34 are interlocked.
[0053]
Accordingly, when the rod of the cylinder 35 is reduced, the projecting portion 34a moves in the direction of arrow B with the pin 32 as a fulcrum, and the arm 34 moves from the position indicated by the solid line to the position indicated by the two-dot chain line and is opened. At this time, the link point of the arm 34 connected by the link 37 moves from 37a to 37b, so that the arm 33 is also opened in conjunction. Note that the pin gripping operation of the arms 33 and 34 is performed by the reverse operation to that described above.
[0054]
Further, the distal end portion 33a of the arm 33 and the distal end portion 34a of the arm 34 are each cut into a V shape so that the pin P having a circular cross section can be securely gripped.
[0055]
Next, returning to FIG. 2, the configuration of the piston / cylinder device 16 will be described.
[0056]
Each base end portion of a pair of support members 41 and 42 (only the back side support member 41 is shown) for supporting the piston / cylinder device 16 is fixed to the disk 28 described above. , 42 are connected to each other using pins 43 and 44 so that they are shaped and reinforced.
[0057]
Attachment portions 45 and 46 of the piston / cylinder device 16 are fixed to the support members 41 and 42 using bolts and nuts.
[0058]
The main body of the piston / cylinder device 16 uses a known hydraulic breaker, and its principle is shown in FIG.
[0059]
In the figure, C1 indicates a nitrogen gas sealing chamber above the piston, C2 indicates a chamber above the middle piston stage, C3 indicates a chamber below the piston suspension, and C4 indicates a chamber at the main valve step.
[0060]
(a) Piston retreating stroke In FIG. 6 (a), when an operation valve (not shown) is opened, pressure oil is supplied from the pipe line "IN", and hydraulic pressure acts on the rear end of the chamber C3 and the plunger 40a, and the main valve 40b Pressed against the plate 40c. As a result, the pressure oil is used only for the retraction of the piston 40d, and retreats against the pressure of the nitrogen gas. At this time, the pressure oil in the room C2 is discharged from the pipe line "OUT".
[0061]
(b) Backward stroke of main valve In FIG. 5B, when the piston 40d moves backward and the chamber C3 and the pipe line L3 communicate with each other, the pressure oil flows into the chamber C4. Since the cross-sectional area of the room C4 is larger than that of the plunger 40a, the main valve 40b starts to move backward. Thereby, the insertion rod 54 and the piston 40d are separated.
[0062]
(c) Stroke stroke In FIG. 6 (c), when the main valve 40b retreats and the pipe line L1 and the pipe line L6 communicate with each other, the piston 40d starts to advance with the pressure of nitrogen gas. At this time, the pipe line "IN" Is cut off from the pipe L1 while communicating with the pipe L2. As long as the pipe line L3 is blocked by the piston 40d, the pressure oil is supplied to the chamber C4. Therefore, the main valve 40b is kept retracted and the pressure oil in the chamber C3 is discharged smoothly.
[0063]
The pressure oil discharged from the room C3 flows from the pipe L1 → the pipe L6 → the pipe L4 → the room C2, that is, the pressure oil discharged from the room C3 is absorbed by the room C2, and the piston 40d can hit the insertion rod 54 without receiving a load.
[0064]
(d) Main valve advance stroke When the piston 40d advances and the pipe line L3 communicates with the room C2, the pressure oil in the room C4 is discharged from the pipe line "OUT", and the main valve 40b is pressed by the plunger 40a. Thus, the piston retreat stroke starts again.
[0065]
In addition, the broken line in the drawing represents the insertion rod 54 that has been moved by striking the piston 40d.
[0066]
Further, as shown in FIG. 2, the insertion rod 54 is mounted so as to penetrate through a holder 52 and a bush 53 provided at the tip of the piston / cylinder device 16. An engaging recess 54a for engaging the end of the pin P is formed at the tip of the pin.
[0067]
The insertion rod 54 described above is used for striking when a pin is inserted, and can be removed from the holder 52 by removing the retainer pin 55a attached to the holder 52 as shown in FIG. In addition, 55b is a stopper washer, and 55c is a spring pin.
[0068]
If the extraction rod 56 is attached instead of the removed insertion rod 54, the pin inserted into the connecting portion of the boom can be extracted while striking. Therefore, the shaft length L of the sampling rod 56 is set longer than the pin hole length of the connecting portion. An engaging recess 56 a that can engage with the end of the pin P is also formed at the tip of the extraction rod 56.
[0069]
Reference numeral 54b (or 56b) denotes a concave groove that functions as a stopper. When the insertion rod 54 reciprocates, the retainer pin 55a abuts on either the end face 54c or 54d of the concave groove 54b. The stroke of the service rod 54 is regulated.
[0070]
Next, the operation of the pin operating machine having the above configuration will be described with reference to FIGS.
[0071]
FIG. 7 shows a procedure when the pin P is inserted into a pin hole provided in a connecting portion of a boom as a structure.
[0072]
In FIG. 9A, reference numeral 60 denotes a boom section of the dismantling machine shown in FIG. In inserting the pin P into the pin hole 60 a, first, the end on the opposite side to the insertion side of the pin P placed on the sleeper 61 is gripped by the pair of arms 33 and 34 of the arm opening / closing device 17.
[0073]
Next, by operating the work arm 7, as shown in FIG. 7B, the pin P is lifted while maintaining a horizontal posture, and the insertion side end of the pin P is inserted into the pin hole 60a. At this time, the pin P is inserted to such a depth that the pin P does not fall out of the pin hole 60a.
[0074]
Next, the arms 33 and 34 are separated from the pin P, and as shown in FIG. 7C, the insertion rod 54 of the piston / cylinder device 16 is moved to the pin position. At this time, by rotating the cylindrical case 26 by 90 °, the arms 33 and 34 of the arm opening / closing device 17 are retracted so as not to contact the ground.
[0075]
In this state, the piston / cylinder device 16 is driven to strike the pin P in the direction of arrow D.
[0076]
FIG. 7D shows a state where the pin P has been driven to the insertion completion position.
[0077]
Thus, the boom is connected by driving the pin P into the pin hole 60a of the boom 60.
[0078]
When the pin P is inserted into the pin hole, the vertical positioning can be performed by raising / lowering the work arm 7, and the horizontal positioning is performed by swinging the work arm 7 in the vehicle width direction by a swing cylinder. It can be carried out. Moreover, when inserting a pin in another boom connection part, a construction machine is self-propelled.
[0079]
Next, a pin extracting operation when the boom 60 is disassembled will be described with reference to FIG.
[0080]
First, the insertion rod 54 is replaced with the extraction rod 56.
[0081]
Next, the pin operating machine is moved to the side opposite to the pin driving side, and the extraction rod 56 is fitted to the end of the pin P to be extracted.
[0082]
In this state, the piston / cylinder device 16 is driven to hit the pin P in the direction of arrow E.
[0083]
By operating the work arm 7, the extraction rod 56 is moved in the direction of arrow E in accordance with the pin P to be extracted. Thereby, the extraction rod 56 passes through the pin hole 60 a and the pin P is removed from the boom 60.
[0084]
As described above, if the attachment 14 can be attached to and detached from the arm in the same manner as an optional device such as a crusher or a hydraulic breaker, a construction machine equipped with a spare valve for the optional device as a standard machine can be used as a base machine. By using it, the attachment 14 can be operated without newly installing a hydraulic device.
[0085]
The pin operating machine of the present invention uses a construction machine equipped with a work arm as a self-propelled base machine in the above embodiment, but is not limited to this, and can move to the connecting portion of the structure itself, A self-propelled machine such as a forklift can be used as the base machine as long as the prepared pin can be gripped and moved to the pin hole of the connecting portion.
[0086]
Moreover, in the said embodiment, although the arms 33 and 34 of the arm opening / closing apparatus 17 were rotated 90 degrees using the cylinder 22, it is not restricted to this, For example, it is also comprised so that it may rotate 360 degrees using a hydraulic motor. it can. Thereby, the operativity in pin attachment / detachment operation can be improved.
[0087]
【The invention's effect】
As described above, according to the present invention, the pin gripping means capable of gripping / releasing the pin and the pin are hit in the axial direction at the tip of a working arm that is supported by a self-propelled base machine that can be raised and lowered. A pin striking means is juxtaposed, the pin is inserted into the pin hole by the working arm and the pin gripping means, and the pin is driven to the insertion completion position by the working arm and the pin striking means, or the insertion is completed. Since it is configured to be extracted from the position , the pin which is a heavy object can be gripped and moved to a pin hole of an arbitrary height, and the connecting operation can be performed easily and in a short time.
[0088]
Also, driving the inserted pin pin hole to the insertion completion position by a pin striking means, or order to that sampling by striking pins that are inserted into the pin insertion hole, the pin hole was at height However, the pin can be easily driven, and the pin can be easily extracted from the pin hole.
[0089]
According to inventions of claims 2, it is possible to grip or release the pin with a simple structure for opening and closing the pair of arms.
[0090]
According to inventions of claims 3, by preparing a blow rod to be attached to the grip portion of the pin, the striking device body can be constructed from an existing piston-cylinder device, such as a hydraulic hammer.
[0091]
According to inventions of claims 4, an insertion rod for driving a pin to the insertion completion position, by replacing the sampling rod can penetrate the pin holes, both working pin insertion and pin extraction is You can do it.
[0092]
According to inventions of claims 5, a piston-cylinder device secured to the working arm, for fixing the arm opening and closing device on the outer wall of the cylindrical case disposed around the piston-cylinder device, the pin striking force directly, Since it does not act on the arm opening / closing device, the reliability of the arm opening / closing device can be improved.
[0093]
According to inventions of claims 6, due to the provision of a case rotating mechanism for rotating the cylindrical case around the cylinder axis, when the pin blow will be able to be retracted by rotating the arm switchgear, lower from the ground Even if it is a position, a pin can be hit reliably.
[0094]
According to inventions of claims 7, as a self Hashishiki base machine, a construction machine such as a hydraulic excavator, having a lower traveling body and pivotally mounted on the upper rotating body to the vertical axis about its undercarriage on the traveling Can be used .
[0095]
According to inventions of claims 8, it is possible to mount the present invention as an optional device to the working arm of an existing construction machine.
[Brief description of the drawings]
FIG. 1 is an external view of a pin operating machine according to the present invention.
FIG. 2 is an enlarged view of the pin attachment / detachment attachment shown in FIG.
FIG. 3 is an explanatory diagram for explaining a rotation operation of the arm opening / closing device shown in FIG. 1;
FIG. 4 is an enlarged view showing a configuration of an arm opening / closing device.
FIGS. 5A to 5D are explanatory views showing an operation principle of the piston / cylinder device shown in FIG. 1;
FIG. 6 is a perspective view for explaining a method of exchanging the pin insertion rod and the pin extraction rod.
FIGS. 7A to 7D are explanatory views for explaining a pin insertion operation.
FIGS. 8A and 8B are explanatory views for explaining a pin extracting operation. FIG.
FIGS. 9A to 9D are process diagrams illustrating a conventional boom assembling procedure.
FIGS. 10E to 10H are process diagrams illustrating a boom assembling procedure subsequent to FIG.
[Explanation of symbols]
P connecting pin 1 pin operating machine 2 self-propelled base machine 3 crawler 4 lower traveling body 5 upper turning body 7 working arm 8 boom 9 arm 12 boom cylinder 13 arm cylinder 14 attachment 15 bracket 16 piston / cylinder device 17 arm opening / closing device 18 Link 19 Rotating shaft 20 Arm 22 Cylinder 23 Swing arm 24 Rotating ring 26 Cylindrical case 27 Bearing device 33, 34 Arm 35 Cylinder 37 Link 54 Insertion rod 56 Extraction rod

Claims (8)

構造物同士を連結するためのピンを、その構造物に設けられたピン穴に対して挿入しまたは抜き取るピン操作機械であって、自走式のベースマシンに支持された起伏及び屈伸自在な作業アームの先端に、上記ピンを把持・解放可能なピン把持手段と、ピンを軸方向に打撃するピン打撃手段とが並設され、上記作業アームとピン把持手段とによって上記ピンを上記ピン穴に挿入し、作業アームと上記ピン打撃手段とによってこのピンを挿入完了位置まで打ち込み、またはこの挿入完了位置から抜き取るように構成されことを特徴とするピン操作機械。Pins for connecting the structures together, a the for the pin hole provided in the structure inserted or sampling lupine operation machine, universal undulations and bending is supported on a self-propelled base machine A pin gripping means capable of gripping / releasing the pin and a pin striking means for striking the pin in the axial direction are arranged in parallel at the tip of a work arm, and the pin is pinned by the work arm and the pin gripping means. was inserted into the hole, the pin operating machine, characterized in that it is configured to withdraw the pin driving to the insertion completion position, or from the insertion completed position by the working arm and the pin striking means. 上記ピン把持手段として、一対のアームを開閉動作させるアーム開閉装置が設けられた請求項1記載のピン操作機械。The pin operating machine according to claim 1, wherein an arm opening / closing device for opening / closing a pair of arms is provided as the pin gripping means . 上記ピン打撃手段が、上記ピンと同軸で係合し得る打撃ロッドを有し、この打撃ロッドをピストンで打撃するピストン・シリンダ装置からなる請求項1または2記載のピン操作機械。The pin striking means has a striking rod engageable with said pin and coaxial pins operating machine of the blow rod Ru claim 1 or 2, wherein Na from the piston-cylinder device for the striking piston. 上記打撃ロッドとして、上記ピンを挿入完了位置まで打ち込むための挿入用ロッドと、上記ピン穴を貫通することができ上記ピン穴に挿入されている上記ピンを打撃によって抜き取る抜き取り用ロッドとを有する請求項3記載のピン操作機械。As the striking rod, there are an insertion rod for driving the pin to the insertion completion position, and an extraction rod that can penetrate the pin hole and extract the pin inserted into the pin hole by striking. The pin operating machine according to claim 3 . 上記ピストン・シリンダ装置は上記作業アームに固定され、上記アーム開閉装置は上記ピストンシリンダ装置の周囲に設けられた筒状ケースの外壁に固定されている請求項3または4記載のピン操作機械。The piston-cylinder device is secured to the working arm, the pin operating machinery of the arm opening and closing device according to claim 3 or 4, wherein that is fixed to the outer wall of the cylindrical case disposed around the piston cylinder device. 上記筒状ケースをその筒軸まわりに回転させるケース回転機構を有し、上記アーム開閉装置を回転させることができるように構成されている請求項5記載のピン操作機械。 6. The pin operating machine according to claim 5 , further comprising a case rotating mechanism for rotating the cylindrical case about its cylindrical axis, wherein the arm opening / closing device can be rotated . 上記ベースマシンとして、走行する下部走行体と、この下部走行体上に縦軸まわりに旋回可能に搭載された上部旋回体を有する建設機械が用いられた請求項1乃至のいずれか1項に記載のピン操作機械。 As the base machine, the undercarriage of the running, in any one of claims 1 to 6 the construction machine is used with the undercarriage on the pivotally mounted on the upper rotating body to the vertical axis around The pin operating machine described. 建設機械における起伏及び屈伸自在な作業アームにブラケットを介して装着されるピン脱着用アタッチメントであって、構造物同士を連結するピンを把持・解放可能なピン把持手段と、ピンを軸方向に打撃するピン打撃手段とが並設され、上記作業アームとピン把持手段とによって上記ピンを上記ピン穴に挿入し、作業アームと上記ピン打撃手段とによってこのピンを挿入完了位置まで打ち込み、またはこの挿入完了位置から抜き取るように構成されたことを特徴とするピン脱着用アタッチメント。A pin attachment / detachment attachment that is attached to a working arm that can be raised and lowered in a construction machine via a bracket. The pin holding means that can hold and release a pin that connects structures together, and the pin is hit in the axial direction. And a pin striking means to be inserted in parallel, the pin is inserted into the pin hole by the working arm and the pin gripping means, and the pin is driven to the insertion completion position by the working arm and the pin striking means, or the insertion A pin attachment / detachment attachment configured to be extracted from a completion position.
JP2001225025A 2001-07-25 2001-07-25 Pin operation machine and pin attachment / detachment attachment Expired - Fee Related JP3638890B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001225025A JP3638890B2 (en) 2001-07-25 2001-07-25 Pin operation machine and pin attachment / detachment attachment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001225025A JP3638890B2 (en) 2001-07-25 2001-07-25 Pin operation machine and pin attachment / detachment attachment

Publications (2)

Publication Number Publication Date
JP2003040590A JP2003040590A (en) 2003-02-13
JP3638890B2 true JP3638890B2 (en) 2005-04-13

Family

ID=19058085

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001225025A Expired - Fee Related JP3638890B2 (en) 2001-07-25 2001-07-25 Pin operation machine and pin attachment / detachment attachment

Country Status (1)

Country Link
JP (1) JP3638890B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020164276A (en) * 2019-03-29 2020-10-08 コベルコ建機株式会社 Connecting pin insertion device

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4609431B2 (en) * 2006-01-16 2011-01-12 コベルコ建機株式会社 Detachment device for connecting pin
JP6174284B1 (en) * 2017-03-06 2017-08-02 株式会社エス・エス・ケイ Connecting pin insertion jig
CN110238630B (en) * 2019-07-23 2023-12-01 山东科技大学 An automatic disassembly equipment for mining hydraulic support pins and its application

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020164276A (en) * 2019-03-29 2020-10-08 コベルコ建機株式会社 Connecting pin insertion device
JP7251267B2 (en) 2019-03-29 2023-04-04 コベルコ建機株式会社 Connecting pin insertion device

Also Published As

Publication number Publication date
JP2003040590A (en) 2003-02-13

Similar Documents

Publication Publication Date Title
KR200271162Y1 (en) coupler for excavator
ES2383458T3 (en) Tool interface for compact excavator
JP2005504198A (en) Attachment coupling device for heavy machinery
US8075242B2 (en) Working machine with structure for assembling boom thereof
JP3638890B2 (en) Pin operation machine and pin attachment / detachment attachment
JP2022133008A (en) Construction machine
JP6830513B2 (en) Auxiliary lifting device and hydraulic cylinder
JPH11193542A (en) Construction machinery front device, boom used therefor, and building method thereof
JP5645707B2 (en) Grapple equipment
JP6559605B2 (en) Auxiliary lifting device and work machine with auxiliary lifting device
WO2020066120A1 (en) Work machine
JP4244765B2 (en) Work machine and its assembly / disassembly method
KR101200359B1 (en) Jaw replaceable attachment
JP2767219B2 (en) Hydraulic excavator with front fork
JP2001020697A (en) ELECTRIC DEVICE AND ASSEMBLING METHOD OF SUPPORT
JP2005002683A (en) Pin extraction/insertion method and pin extraction/insertion fixture for use therein
JP4000053B2 (en) Dismantling machine
JP3715397B2 (en) Work vehicle with earth removing device
KR200254081Y1 (en) attachment for hydraulic crane cutting machine
JP4511894B2 (en) Work machine
JP3706330B2 (en) Multi-stage telescopic arm and working machine
JPH0682162U (en) Work vehicle with work implement fall prevention mechanism
CN223256084U (en) Excavator and its bucket arm
JPH0559879A (en) Casing drive type inner excavator
JP3061575B2 (en) Drilling rig

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040420

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040618

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20041228

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050112

R150 Certificate of patent or registration of utility model

Ref document number: 3638890

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080121

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090121

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090121

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100121

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100121

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110121

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120121

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130121

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130121

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees