Branch connection pipe and its manufacturing method Download PDF

Info

Publication number
JP3695246B2
JP3695246B2 JP27197299A JP27197299A JP3695246B2 JP 3695246 B2 JP3695246 B2 JP 3695246B2 JP 27197299 A JP27197299 A JP 27197299A JP 27197299 A JP27197299 A JP 27197299A JP 3695246 B2 JP3695246 B2 JP 3695246B2
Authority
JP
Japan
Prior art keywords
branch
passage
hose
main hose
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP27197299A
Other languages
Japanese (ja)
Other versions
JP2001099378A (en
Inventor
直巳 中島
晃治 伊藤
研一 三井
元彦 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyoda Gosei Co Ltd
Original Assignee
Toyoda Gosei Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyoda Gosei Co Ltd filed Critical Toyoda Gosei Co Ltd
Priority to JP27197299A priority Critical patent/JP3695246B2/en
Publication of JP2001099378A publication Critical patent/JP2001099378A/en
Application granted granted Critical
Publication of JP3695246B2 publication Critical patent/JP3695246B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L41/00Branching pipes; Joining pipes to walls
    • F16L41/04Tapping pipe walls, i.e. making connections through the walls of pipes while they are carrying fluids; Fittings therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Joints That Cut Off Fluids, And Hose Joints (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、主ホースの通路を流れる流体を分岐箇所において通路から外部に導く分岐接続管とその製造方法に関する。
【0002】
【従来の技術】
従来、この種の分岐接続管として、例えば、図17に示すのもが知られている。この図17の断面図に示すように、主ホース220からは、分岐管本体250を用いて副ホース230が分岐接続されている。図17において、副ホース230は、主ホース220に対して分岐管本体250及びゴム成形部260を介して接続されている。すなわち、主ホース220には分岐口225が形成され、この分岐口225に分岐管本体250の一端部が挿入されると共にゴム成形部260で覆われることにより、主ホース220と副ホース230とが接続されている。この構成では、分岐管本体250の下端部にフランジ部252が設けられており、このフランジ部252により分岐管本体250が主ホース220から抜けるのを防止している。
【0003】
【発明が解決しようとする課題】
しかし、従来の分岐接続管では、分岐管本体250を一般に樹脂製としているので、通路221aに突出した分岐管本体250の根元部分と通路221aの内周壁面との間に隙間を生じやすい。そして、この分岐管本体250の根元部分は定常的に流体に晒されるために、主ホース220と分岐管本体250との接合端部で剥離が生じやすい。このため、剥離した隙間から通路221aを流れる流体が浸入して、主ホース220との分岐管本体250との接合状態が損なわれ易いという問題があった。
【0004】
本発明は、上記従来の技術の問題を解決するものであり、主ホースに対して高い接合力を維持できる分岐接続管を提供することを目的とする。
【0005】
【課題を解決するための手段およびその作用・効果】
かかる課題を解決するため、本発明の第1の分岐接続管は、
ゴム材料からなる主ホースの通路を流れる流体を分岐箇所において前記通路から外部に導く分岐接続管であって、
前記流体を外部に導くための分岐通路を前記通路に連通して形成する分岐接続部を有し、
該分岐接続部は、
前記主ホースの通路内において前記分岐通路の末端部分を形成するよう、前記主ホースの内周壁に沿って広がった分岐通路第1形成部と、
前記主ホースの外周壁から間隙を隔てて位置するフランジを有すると共に、前記主ホースの外部において前記分岐通路の先端部分を形成する分岐通路第2形成部と、
前記分岐通路第1形成部の前記分岐通路末端部分と前記分岐通路第2形成部の前記分岐通路先端部分の間において前記分岐通路を形成する分岐通路第3形成部と、
前記主ホースの前記分岐箇所において、前記フランジを覆うよう前記主ホースの外周壁に形成された被覆部とを有し、
前記分岐通路第1形成部と前記分岐通路第3形成部と前記被覆部は、加硫処理により一体化可能なゴム材料から形成され、
前記分岐通路第1形成部は、前記主ホース内周壁に沿って広がった部分において、加硫処理により前記主ホース内周壁に密着している
ことを特徴とする。
【0006】
上記構成を有する本発明の分岐接続管では、主ホースの通路から流体を外部に導くための分岐通路を、分岐接続部の第1ないし第3の分岐通路形成部で形成し、この分岐通路を通路に連通させる。そして、分岐通路第2形成部のフランジを主ホース外周壁から間隙を隔てて配置し、このフランジを主ホース外周壁の側から被覆部で覆う。これにより、フランジは被覆部に埋設されるので、分岐通路第2形成部は、このフランジにより被覆部に対して抜止される。
【0007】
その一方、主ホース通路内の内周壁に沿って広がった分岐通路第1形成部は、分岐通路第3形成部を介在させて被覆部と加硫処理により一体化している。これにより、分岐通路を形成した分岐接続部が主ホースと一体となった分岐接続管となる。この一体化はゴム材料同士の加硫によるものであることから、分岐通路第1形成部と分岐通路第3形成部並びに被覆部の分離は起きにくい。そして、主ホース周壁を挟んで外壁側の被覆部と内壁側の分岐通路第1形成部が一体であることから、被覆部はもとよりこの被覆部に対して上記のように抜止された分岐通路第2形成部は、主ホースに対して抜止される。しかも、主ホース通路内の内周壁に沿って広がった部分における分岐通路第1形成部と主ホースの密着は、加硫処理による密着であると共に同質材料であるゴム材料の密着である。よって、この密着部分が定常的に流体に晒されても密着部分での剥離は起き難くなるので、上記した各部の抜止作用と相まって、主ホースに対して高い接合力を維持できる。また、前記分岐通路第1形成部を、前記主ホースの内周壁の側が大径のテーパ状斜面を有するで、主ホース通路内の内周壁に沿って広がった部分での通路の流通流体の抵抗を低減でき、主ホース通路における流体流通に大きな支障を来たさない。
【0008】
ここで、分岐接続部の好適な態様として、前記被覆部を、前記分岐箇所において前記主ホースの外周壁周りを全周に亘って被覆するよう形成されているものとすることができる。
こうすれば、主ホースの分岐箇所において流体分岐流通により内圧が高まり主ホースにホース径を拡張する応力が大きくなっても、主ホース外周壁周りの被覆部によりホース径の拡張を抑制できる。
【0010】
本発明の分岐接続管製造方法は、
ゴム材料からなる主ホースの通路を流れる流体を分岐箇所において前記通路から外部に導く分岐接続管の製造方法であって、
ホース周壁に分岐口が空けられた主ホースを準備する工程と、
前記分岐口より大径に形成された凹部を外周に有する第1心材を前記主ホースの通路に挿入し、前記凹部が前記分岐口に重なるよう前記第1心材をセットする工程と、
未加硫または加硫未了のゴム材料の塊状物を前記分岐口から挿入すると共に、挿入した前記塊状物を前記凹部の形状に倣うよう拡張変形させ、前記分岐口の前記通路側周縁に拡張変形後の前記塊状物を介在させる工程と、
フランジを有し、前記流体を外部に導くための分岐通路の先端部分を前記主ホースの外部において形成する分岐通路先端部形成部材を準備する工程と、
前記第1心材がセットされて前記塊状物が介在済みの前記主ホースと前記分岐通路先端部形成部材を金型にセットする金型セット工程であって、金型セットに際して、前記フランジを前記主ホースの外周壁から間隙を隔てて位置させると共に、前記分岐通路の先端部分に挿入された第2心材を前記分岐口を貫通して配置させ、かつ、前記フランジと前記間隙を取り囲むキャビティを前記主ホースの前記分岐箇所において形成する前記金型セット工程と、
前記キャビティへのゴム材料注入とその後の加硫処理とを実行する工程とを有する
ことを特徴とする。
【0011】
上記構成を有する本発明の製造方法によれば、以下に説明するように、上記の本発明の分岐接続管を容易に製造することができる。
【0012】
主ホースと分岐通路先端部形成部材がセットされた金型のキャビティにゴム材料を注入すると、キャビティにゴム材料が充填される。よって、分岐通路先端部形成部材のフランジは、主ホース外周壁から間隙を隔てた状態で、主ホース外周壁の側から上記の充填ゴム材料により覆われる。つまり、分岐通路先端部形成部材は上記した本発明の分岐接続管における分岐通路第2形成部となり、これを主ホース外周壁の側から覆う部分のゴム材料が被覆部となる。
【0013】
また、注入されたゴム材料は、分岐通路先端部形成部材の分岐通路先端部分に挿入された第2心材周りにおいて、分岐通路先端部形成部材のフランジ下端から主ホースに挿入済みの塊状物に至るまでの領域(第2心材周囲領域)に亘って充填される。この際、ゴム材料は、主ホースの分岐口と第2心材との間の間隙にも行き渡ってこの間隙を埋める。これにより、主ホース通路内で第1心材の凹部形状に倣って拡張変形済みの塊状物は、フランジ下端の上記第2心材周囲領域に充填された部分のゴム材料を介在させて、フランジを主ホース外周壁の側から覆う部分のゴム材料(被覆部)と連続する。つまり、第2心材周囲領域に充填された部分のゴム材料が上記した本発明の分岐接続管における分岐通路第3形成部となり、主ホース通路内の第1心材の凹部形状に倣って拡張変形した塊状物が分岐通路第1形成部となる。そして、ゴム材料注入後の加硫を経ると、上記のように各部に充填されたゴム材料と塊状物は一体化し、この塊状物はゴム材料の主ホース内周壁とも加硫密着する。その後、離型、心材取り外しを行うことで本発明の分岐接続管が得られ、第2心材にて分岐通路先端部形成部材の分岐通路先端部分に続く分岐通路が形成される。なお、分岐通路先端部形成部材の分岐通路先端部分に続く分岐通路が塊状物を貫通していない場合は、打ち抜き等の工程により、塊状物に貫通孔を空けこれを分岐通路の末端とすればよい。
【0014】
ここで、好適な態様として、前記金型セット工程を前記キャビティを前記分岐箇所において前記主ホースの外周壁周りを全周に亘って形成するものとすることができる。
こうすれば、分岐箇所において主ホース外周壁周りに亘って被覆部を有する分岐接続管を製造することができる。
【0015】
【発明の実施の形態】
以上説明した本発明の構成・作用を一層明らかにするために、以下本発明の好適な実施例について説明する。
【0016】
図1は本発明の一実施の形態にかかる分岐接続管の要部斜視図であり、図示しない自動車のエンジンとラジエータとを接続している主ホース20の分岐箇所を示す斜視図である。図2は図1の2−2線に沿ったホース分岐箇所を切断した断面端面図であり、図3はホース長手方向に沿ってホース分岐箇所を切断した断面端面図である。
【0017】
図1に示すように、本実施例の分岐接続管BKは、主ホース20の分岐箇所において、主ホース20から副ホース30を分岐接続部40を介して分岐接続して備える。主ホース20は、一端でラジエータの下部に接続され、他端部でエンジンに接続されている。また、副ホース30は、他端部でリザーバに接続されている。
【0018】
図2および図3に示すように、主ホース20は、EPDMゴム材料からなる内管層21と外管層22とを備え、冷却媒体を流す主通路21aを設けている。上記内管層21と外管層22との間には、糸層23が介在しており、主ホース20を補強している。主ホース20の分岐箇所には、分岐口25が空けられている。
【0019】
副ホース30は、主ホース20より直径が1/3〜1/2と細いだけで主ホース20とほぼ同じ構成である。つまり、副ホース30にあっても、EPDMゴム材料から形成され、内管層31と外管層32と糸層33とを積層し、内管層31内を副通路31aとしている。
【0020】
主ホース20と副ホース30を接続するための分岐接続部40は、主ホース20の外側に位置する分岐管本体42と、主通路21a内に位置する管内環状体44と、分岐部被覆体46とを備える。そして、この分岐接続部40は、これら各部材を貫通する穴を、主通路21aから流体(冷却媒体)を外部に導くための分岐通路41として備える。
【0021】
分岐管本体42は、樹脂材料で管状に形成されており、中央の貫通孔42aを主ホースの外部において分岐通路41の先端部分41aとする。この分岐管本体42の下端は、主ホース外周壁から間隙を隔てて位置するフランジ42bとされ、分岐管本体42の上端は、副ホース30の抜止作用を果たすために膨らんだ接続端部42cとされている。
【0022】
管内環状体44は、分岐管製造過程で加硫処理を受けたEPDMゴム材料品であり、主通路21aの内周壁に沿って広がった湾曲円盤状をなす。この管内環状体44は、中央に貫通孔44aを備え、この貫通孔44aを主通路21a内において分岐通路41の末端部分41bとする。管内環状体44の周縁部は、図示するように、主通路21aの内周壁側が大径のテーパ状斜面44bとされている。
【0023】
分岐部被覆体46は、分岐管製造過程で金型キャビティに注入されたEPDMゴム材料に加硫処理を施して主ホース20の外周壁に形成されている。この分岐部被覆体46は、フランジ42bをその外側から覆うフランジ被覆部46aとフランジ下端の間隙を埋めるフランジ下端領域部46bとからなり、フランジ下端領域部46bで管内環状体44と接合・一体化している。また、フランジ下端領域部46bは、主ホース20の分岐口25周縁を埋め尽くし、その貫通孔46cを管内環状体44の末端部分41bから分岐管本体42の先端部分41aに至るまでの分岐通路41の中間部分41cとする。
【0024】
次に、分岐接続管の製造方法について説明する。図4ないし図10は分岐接続管の一連の製造工程を説明する説明図である。図4に示すように、まず、主ホース20を形成するための未加硫のホース押出体20Aを製造するとともに、副ホース30を形成するためのホース押出体30Aを製造する。ホース押出体20A,30Aは、通常の方法、つまり押出機によりゴム材料を押し出しつつ糸層23,33を形成するための補強糸を螺旋状に巻回することにより製造する。ここに、ホース押出体20A,30Aの形状として、例えば、ホース押出体20Aの内径D1を30〜37mm、厚さt1を4.5mmとし、ホース押出体30Aの内径D2を5.8〜16mmとすることができる。
【0025】
続いて、ホース押出体20Aを加硫すると同時に所定の形状に癖付けする工程を行なう。図5及び図6は加硫工程及び癖付け工程を説明する図である。癖付け及び加硫工程は、マンドレルMD及び加硫装置(図示省略)を用いて行なう。マンドレルMDは、ホース押出体20Aの内径D1とほぼ同じ太さの棒体であり、所定の形状に曲げられている。本工程では、マンドレルMDにホース押出体20Aを押し入れ、その後、加硫装置内に装填して、150℃、30分の加硫条件で加硫し、主ホース20を形成する。この主ホース20をマンドレルMDから抜くと、マンドレルMDの曲げ形状に倣って癖付けされた主ホース20が得られる。その後、図6に示すように、主ホース20の分岐箇所に、ドリルDrなどにより分岐口25を形成する。
【0026】
次に、主ホース20に、分岐管本体42(図2,図3参照)を介して副ホース30を接続する工程を行なう。ここで、分岐管本体42は、予め射出成形により成形しておく。図7、図8は、主ホース20への第1中心セット工程と、本製造工程完了後に管内環状体44となる環状体形成用塊状物48のホース内セット工程とを説明する説明図であり、図7(a)、図8(a)は、ホース長手方向に沿った様子を説明する説明図である。図7(b)、図8(b)は、ホース断面方向からの様子を説明する説明図である。
【0027】
これら各図に示すように、第1中芯61は、上下に分割された第1中芯上半部61aと第1中芯下半部61bで構成され、ホースへの挿入箇所は、主ホース20の内径D1とほぼ同じ外径を有した円柱形状とされ、端部は拡張基部61cとされている。また、第1中芯61は、第1中芯上半部61aの頂上外周部に、主ホース20の分岐口25より大径に形成された凹部62を有する。この凹部62は、第1中芯上半部61aの外周に倣って湾曲した陥没形状とされており、陥没周縁62aは、外周側が大径のテーパ状斜面とされている。凹部62には適宜箇所にエアー抜き孔62bが形成されており、環状体形成用塊状物48の圧入時に凹部内のエアーをこのエアー抜き孔62bと中芯中央の貫通孔61dを経て放出するようにされている。この第1中芯61をその円柱形状部先端側から主ホース20内に挿入して、主ホース20を第1中芯61に装着する。この際、凹部62と分岐口25がほぼ同心に重なるようにされる。
【0028】
続いて、上記の凹部62にホース外部から環状体形成用塊状物48を装填する。この環状体形成用塊状物48は、分岐口25とほぼ同一の径の円柱体であり、未加硫のEDPMゴム材料で形成されている。この環状体形成用塊状物48の装填に際しては、第1中芯61のセット済みの主ホース20をいわゆるVブロック63に保持し、主ホース20に挿入ジグ64をセットする。この挿入ジグ64は、分岐口25に連続した筒状部64aを有し、この筒状部64aは環状体形成用塊状物48の装填案内となる。こうしたジグセットに続いて、環状体形成用塊状物48を挿入ジグ64の筒状部64aに入れ、エアーシリンダや油圧シリンダ等によりピストン65を筒状部64a内で下降させる。これにより、環状体形成用塊状物48は、ピストンで押されて分岐口25から凹部62に装填される。ピストン65がストローク端まで下降した状態では、図8に示すように、環状体形成用塊状物48は、凹部62の陥没形状に倣って拡張変形し、この凹部62の各部に行き渡ると共に、分岐口25の周縁領域を埋める。次いで、ピストン65を上昇させ、挿入ジグやVブロックを取り外す。ピストン65が取り除かれても、環状体形成用塊状物48は、凹部62の陥没形状に倣って拡張変形したまま凹部62に残る。なお、環状体形成用塊状物48の充填に先立って、分岐口25の開口周壁や分岐口25の周縁部の主ホース内外壁表面を研磨(粗面化および表面の汚れ落とし)などの処理をすることが、加硫接着性を向上させる点から好ましい。
【0029】
続いて、図9に示すように、第2中芯71の円柱部71aを分岐管本体42の貫通孔42aに挿入し、分岐管本体42を第2中芯71に位置決めして装着セットする。そして、フランジ42bの上下表面を含む分岐管本体42の外表部領域に接着剤を塗布する。この接着剤は、分岐管本体42と分岐部被覆体46との接着力を高める作用をする。
【0030】
続いて、図10に示すように、金型80に、上記第1中芯61に支持した主ホース20や第2中芯71に支持した分岐管本体42などをセットする工程を行なう。すなわち、第1中芯61を介して主ホース20を金型80にセットするとともに、第2中芯71の先端部71cを主ホース20の分岐口25に挿入した状態にて、第2中芯71を金型80にセットする。このとき、分岐管本体42の接続端部42cを金型80の凹所80aに嵌合して支持し、分岐管本体42のフランジ42bを主ホース20の外周壁から間隙を隔てて位置させる。また、凹部62の環状体形成用塊状物48を第2中芯71の先端部71cで押圧するようにする。なお、先端部71cでの環状体形成用塊状物48の押圧時に、環状体形成用塊状物48に貫通孔を空けるようにしてもよい。上記したセット工程により、金型80内には、主ホース20の外周壁の側に、分岐管本体42のフランジ42bとフランジ下端領域並びに分岐口25を取り囲むキャビティ83が形成される。
【0031】
次の工程では、金型80の型締めを行なった後に、ゴム射出成形を行なう。すなわち、図示しない射出成型機からゴム材料をキャビティ83内に注入する。その後、金型80を加熱することによりキャビティ83内のゴム材料を加硫するプレス加硫を行なう。加硫の条件としては、160℃で20分を採ることができる。これにより、キャビティ83のゴム材料と凹部62の環状体形成用塊状物48は加硫されて一体となり、分岐部被覆体46と管内環状体44になる。そして、金型80を型開きした後に、第1中芯61および第2中芯71を外すことにより、分岐管本体42が分岐部被覆体46および管内環状体44と一体になった分岐接続部40を有する主ホース20が完成する。第1中芯61の取り外しの際には、第1中芯下半部61bを先に取り外し、その後に第1中芯上半部61aを取り外す。こうすれば、凹部62から管内環状体44を離した状態で第1中芯上半部61aを簡単に取り外せる。なお、第1中芯61が上下に分割されていない場合には、エアー抜き孔62bを介して凹部62へのエアー吹き込みにより主ホース20をわずかに拡張させておき、この状態で第1中芯61を取り外せばよい。
【0032】
第2中芯71のセット時に環状体形成用塊状物48に貫通孔が空けられていない場合は、金型を取り外した後に分岐管本体42の貫通孔42aに打ち抜きシャフトと挿入して、管内環状体44に貫通孔44a(分岐通路41の末端部分41b)を形成すればよい。
【0033】
上記実施の形態にかかる分岐接続管によれば、主ホース20から副ホース30への分岐通路41を、管内環状体44と、分岐部被覆体46のフランジ下端領域部46b並びに分岐管本体42の各貫通孔で形成する。そして、管内環状体44と分岐部被覆体46を加硫により一体化させ、分岐管本体42をそのフランジ42bが埋設された状態で分岐部被覆体46に加硫接着させた。よって、分岐通路41はその先端から末端に亘って連続した孔となり、流体の漏れを確実に防止することができる。
【0034】
また、分岐管本体42のフランジ42を主ホース20の外周壁から離して分岐部被覆体46でその外部から覆うようにした。よって、こうして分岐部被覆体46に埋設されたフランジ42bが分岐部被覆体46に対する分岐管本体42の抜止作用を確実に果たす。しかも、この分岐部被覆体46を主通路21a内で分岐口25の周縁に広がった湾曲円盤状の管内環状体44に加硫処理を経て一体とし、管内環状体44については、主ホース20の主通路21a内壁に加硫接着した。よって、分岐部被覆体46と管内環状体44の分離並びに主通路21a内壁からの管内環状体44の剥離は起きにくくなり、分岐接続部40を主ホース20に対して高い接合力で固定できると共に、主ホース20からの脱落を確実に防止することができる。
【0035】
また、主ホース20の主通路21aに存在する管内環状体44あっては、その周縁を通路内周壁の側が大径のテーパ状斜面44bとした。よって、主ホース20を通過する流体(冷却媒体)が主通路21aを流通する際の抵抗を低減でき、主通路21aにおける流体流通に大きな支障を来さない。
【0036】
しかも、テーパ状斜面44bとしたことでも管内環状体44の剥離を起きにくくできるので、剥離による糸層23への流体浸入を抑制できる。また、管内環状体44を分岐口25周縁において主通路21aの内壁面に沿って広い面積で接合(加硫接着)させているので、糸層23へ流体浸入をより確実に防止できる。
【0037】
この発明は上記実施例に限られるものではなく、その要旨を逸脱しない範囲において種々の態様において実施することが可能であり、例えば次のような変形も可能である。
【0038】
(1)図11は第2の実施の形態にかかる分岐接続管BKAを示す断面図、図12はこの分岐接続管BKAの製造時における金型セット状態を説明する説明図である。図11において、この実施の形態の分岐接続管BKAは、上記した分岐部被覆体46に替わって、フランジ被覆部46aとフランジ下端領域部46bに加え主ホース被覆部46dを有する分岐部被覆体46Aを有する。この主ホース被覆部46dにより、主ホース20は分岐箇所において外周壁周りを被覆されるので、この分岐箇所で内圧が高まっても主ホース20の拡張を抑制できる。
このような分岐接続管BKAの製造には、金型で形成されるキャビティ83は、図12に示すように、主ホース20の外周壁周りまで形成される。
【0039】
(2)図13は変形例の環状体形成用塊状物48を表す概略斜視図である。図示するように、変形例の環状体形成用塊状物48では、その下端側にスリット48aが等間隔に形成されている。この変形例の環状体形成用塊状物48の下端側は、スリット48aを境にして周囲に容易に広がるので、小さな力でこの環状体形成用塊状物48を第1中芯61の凹部62に容易に装填できる。
なお、この変形例や上記した実施例の環状体形成用塊状物48を、中央に貫通孔を有する円柱状のものとすることもできる。こうすれば、貫通孔が存在する分だけ広がりやすくなり、凹部62への装填が容易となる。
【0040】
(3)図14は第3の実施の形態にかかる分岐接続管BKBを示す断面端面図である。この実施の形態では、上記の副ホース30に相当する分岐ホース130のホース端部130aをフランジ状(フレア状)とし、このホース端部130aを分岐部被覆体146に埋設した構成に特徴を有している。すなわち、主ホース120の分岐口125において、ホース通路内に管内環状体144が密着形成され、この管内環状体144は、フランジ状のホース端部130aをその外側から覆うよう形成された分岐部被覆体146と、加硫処理を経て一体化されている。この分岐接続管BKBでは、フランジ状のホース端部130aが上記の分岐管本体42におけるフランジ42bと同一の作用を果たし、分岐ホース130は確実に抜止されて主ホース120に固定されている。なお、この分岐接続管BKBにおける分岐通路141は、管内環状体144と分岐部被覆体146並びに分岐ホース130の末端管路部分で形成されている。
【0041】
(4)図15は分岐管本体42に替わる分岐管本体150A,150B,150Cのそれぞれのフランジ部を示す説明図である。すなわち、図15(A)のフランジ部152Aは、円盤状に形成され、その4方に透孔152Aaが形成されている。この透孔152Aaは、分岐部被覆体46との一体性を高めるとともに分岐管本体150Aの周り止めを果たす作用もある。また、図15(B)のようにフランジ部152Bを歯車状に形成したり、図15(C)のようにフランジ部153Cを正方形の板形状にすることにより周り止めの作用を高めても良い。
【0042】
(5)図2等に示す管内環状体44、144となる環状体形成用塊状物48(図7,図8並びに図13参照)を形成するゴム材料は、未加硫のもののほか、加硫未了、具体的には半加硫であってもよい。このような半加硫のゴム材料を用いることにより、凹部62の陥没形状に倣って安定して拡張変形させることができる。
【0043】
(6)図16は他の実施の形態にかかる分岐接続部40Dの付近を示す断面端面図である。本実施の形態では、分岐接続部40Dに副ホースを接続しない場合に、分岐管本体142から管内環状体44までの分岐通路41を栓60Dにより閉じることができる構成に特徴を有している。図16において、分岐管本体142において、分岐通路41の内壁面には、雌ネジ143が形成されている。また、上記の1栓60Dは、分岐通路41を閉じる部材であり、頭部61Daと、雄ネジ部61Dbと、封止部61Dcとから一体に形成されている。この場合、雄ネジ部61Dbは、上記雌ネジ143に水密に螺合可能とされている。また、封止部61Dcの外径d1は、分岐部被覆体46のフランジ下端領域部46bと管内環状体44における分岐通路41の内径d2より僅かに大きく形成されている。
【0044】
上記構成において、栓60Dの雄ネジ部61Dbを分岐管本体142の雌ネジ143にネジ込むと、栓60Dの雄ネジ部61Db並びに封止部61Dcにより、分岐管本体42Dの分岐通路41が封止される。このように、分岐管本体42Dの分岐通路41の内面に、雌ネジ143を形成することで、副ホースを接続しない場合において栓60Dにより分岐通路41を封止することができる。なお、分岐管本体142では、射出成型時において雌ネジ143が予め形成される。
【0045】
また、栓60Dの封止部61Dcの外径d1は、上記したように分岐通路41の内径d2より大きく形成されているので、栓60Dを分岐管本体42Dに装着したときに、封止部61Dcが分岐部被覆体46を押圧する。よって、Oリングなどのシール部材を用いることなく、高いシール性を得ることができる。
【0046】
なお、図16の栓60Dは、分岐管本体142にネジ止めされて分岐通路41を完全に閉じる封止部材として構成したが、これに限らず、エアーまたは水抜きのための連通孔を形成して主通路21aを外部に連通させるための部材として構成してもよい。また、栓60Dは、その内部に水温センサを貫通して備えるものとして、この水温センサを主ホース20の主通路21aに装着するための部材として利用することができる。
【図面の簡単な説明】
【図1】本発明の一実施の形態にかかる主ホース20の分岐部分を示す斜視図である。
【図2】図1の2−2線に沿ったホース分岐箇所を切断した断面端面図である。
【図3】ホース長手方向に沿ってホース分岐箇所を切断した断面端面図である。
【図4】主ホース20を製造する工程を説明する説明図である。
【図5】ホース押出体20AをマンドレルMDにセットする工程を説明する説明図である。
【図6】主ホース20の分岐突出部26にドリルDrなどにより分岐口25を形成する工程を説明する説明図である。
【図7】主ホース20への第1中心セット工程と、本製造工程完了後に管内環状体44となる環状体形成用塊状物48のホース内セット工程とを説明する説明図であり、図7(a)は、環状体形成用塊状物48装填前のホース長手方向に沿った様子を説明する説明図、図7(b)は、ホース断面方向からの様子を説明する説明図である。
【図8】主ホース20への第1中心セット工程と、本製造工程完了後に管内環状体44となる環状体形成用塊状物48のホース内セット工程とを説明する説明図であり、図8(a)は、環状体形成用塊状物48装填時のホース長手方向に沿った様子を説明する説明図、図8(b)は、ホース断面方向からの様子を説明する説明図である。
【図9】第2中芯71に分岐管本体42を位置決めしてセットする工程を説明する説明図である。
【図10】主ホース20などを金型80にセットした状態を示す断面図である。
【図11】第2の実施の形態にかかる分岐接続管BKAを示す断面図である。
【図12】この分岐接続管BKAの製造時における金型セット状態を説明する説明図である。
【図13】変形例の環状体形成用塊状物48を表す概略斜視図である。
【図14】第3の実施の形態にかかる分岐接続管BKBを示す断面端面図である。
【図15】分岐管本体のフランジ部152Aなどの変形例を説明する説明図である。
【図16】さらに他の実施の形態にかかる分岐接続部40Dの周辺部を示す断面図である。
【図17】従来の技術にかかる分岐接続管を示す断面図である。
【符号の説明】
20…主ホース
20A,30A…ホース押出体
21…内管層
21a…主通路
22…外管層
23,33…糸層
25…分岐口
26…分岐突出部
30…副ホース
31…内管層
31a…副通路
32…外管層
40…分岐接続部
40D…分岐接続部
41…分岐通路
41a…先端部分
41b…末端部分
41c…中間部分
42…フランジ
42…分岐管本体
42D…分岐管本体
42a…貫通孔
42b…フランジ
42c…接続端部
44…管内環状体
44a…貫通孔
44b…テーパ状斜面
46…分岐部被覆体
46A…分岐部被覆体
46a…フランジ被覆部
46b…フランジ下端領域部
46c…貫通孔
46d…主ホース被覆部
48…環状体形成用塊状物
48a…スリット
60D…栓
61…第1中芯
61Da…頭部
61Db…雄ネジ部
61Dc…封止部
61a…第1中芯上半部
61b…第1中芯下半部
61c…拡張基部
61d…貫通孔
62…凹部
62a…陥没周縁
62b…エアー抜き孔
63…Vブロック
64…挿入ジグ
64a…筒状部
65…ピストン
71…第2中芯
71a…円柱部
71c…先端部
80…金型
80a…凹所
83…キャビティ
120…主ホース
125…分岐口
130…分岐ホース
130a…ホース端部
141…分岐通路
142…分岐管本体
143…雌ネジ
144…管内環状体
146…分岐部被覆体
150A,150B,150C…分岐管本体
152A…フランジ部
152Aa…透孔
152B…フランジ部
153C…フランジ部
220…主ホース
221a…通路
225…分岐口
230…副ホース
250…分岐管本体
252…フランジ部
260…ゴム成形部
BK…分岐接続管
BKA…分岐接続管
BKB…分岐接続管
Dr…ドリル
MD…マンドレル
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a branch connection pipe that guides a fluid flowing through a passage of a main hose from the passage to the outside at a branch point, and a manufacturing method thereof.
[0002]
[Prior art]
Conventionally, as this kind of branch connection pipe, for example, the one shown in FIG. 17 is known. As shown in the cross-sectional view of FIG. 17, a sub hose 230 is branched and connected from the main hose 220 using a branch pipe main body 250. In FIG. 17, the secondary hose 230 is connected to the main hose 220 via the branch pipe body 250 and the rubber molding portion 260. That is, a branch port 225 is formed in the main hose 220, and one end portion of the branch pipe body 250 is inserted into the branch port 225 and covered with the rubber molding portion 260, so that the main hose 220 and the sub hose 230 are connected. It is connected. In this configuration, a flange portion 252 is provided at the lower end portion of the branch pipe main body 250, and the flange portion 252 prevents the branch pipe main body 250 from coming off the main hose 220.
[0003]
[Problems to be solved by the invention]
However, in the conventional branch connection pipe, since the branch pipe main body 250 is generally made of resin, a gap is easily generated between the root portion of the branch pipe main body 250 protruding into the passage 221a and the inner peripheral wall surface of the passage 221a. Since the root portion of the branch pipe body 250 is constantly exposed to the fluid, peeling is likely to occur at the joint end portion between the main hose 220 and the branch pipe body 250. For this reason, there is a problem that the fluid flowing through the passage 221a enters from the separated gap and the joining state between the main hose 220 and the branch pipe main body 250 is easily impaired.
[0004]
An object of the present invention is to solve the above-described problems of the prior art, and to provide a branch connection pipe capable of maintaining a high bonding force with respect to a main hose.
[0005]
[Means for solving the problems and their functions and effects]
In order to solve such a problem, the first branch connection pipe of the present invention includes:
A branch connection pipe for guiding fluid flowing through a passage of a main hose made of a rubber material to the outside from the passage at a branch point;
A branch connection portion that forms a branch passage for guiding the fluid to the outside in communication with the passage;
The branch connection is
A branch passage first forming portion extending along an inner peripheral wall of the main hose so as to form an end portion of the branch passage in the passage of the main hose;
A branch passage second forming portion having a flange located at a distance from an outer peripheral wall of the main hose, and forming a tip portion of the branch passage outside the main hose;
A branch passage third forming portion that forms the branch passage between the branch passage end portion of the branch passage first forming portion and the branch passage tip portion of the branch passage second forming portion;
The branch portion of the main hose has a covering portion formed on the outer peripheral wall of the main hose so as to cover the flange,
The branch passage first forming portion, the branch passage third forming portion, and the covering portion are formed of a rubber material that can be integrated by vulcanization,
The branch passage first forming portion is in close contact with the inner peripheral wall of the main hose by a vulcanization process at a portion extending along the inner peripheral wall of the main hose.
It is characterized by that.
[0006]
In the branch connection pipe of the present invention having the above-described configuration, a branch passage for guiding fluid from the passage of the main hose to the outside is formed by the first to third branch passage forming portions of the branch connection portion, and this branch passage is formed. Communicate with the aisle. Then, the flange of the branch passage second forming portion is disposed with a gap from the main hose outer peripheral wall, and this flange is covered with the covering portion from the main hose outer peripheral wall side. Thereby, since the flange is embedded in the covering portion, the branch passage second forming portion is secured to the covering portion by this flange.
[0007]
  On the other hand, the branch passage first forming portion extending along the inner peripheral wall in the main hose passage is integrated with the coating portion by vulcanization with the branch passage third forming portion interposed therebetween. Thereby, the branch connection part which formed the branch passage becomes a branch connection pipe united with the main hose. Since this integration is by vulcanization of rubber materials, separation of the branch passage first forming portion, the branch passage third forming portion, and the covering portion is unlikely to occur. Since the outer wall-side covering portion and the inner wall-side branch passage first forming portion are integrated with the main hose peripheral wall in between, the branch passage first is prevented from being removed from the covering portion as well as the covering portion. 2 formation part is stopped with respect to the main hose. Moreover, the close contact between the branch passage first forming portion and the main hose at the portion extending along the inner peripheral wall in the main hose passage is close contact by the vulcanization treatment and close contact of the rubber material which is a homogeneous material. Therefore, even if this close contact portion is constantly exposed to the fluid, peeling at the close contact portion is difficult to occur, so that it is possible to maintain a high bonding force with respect to the main hose in combination with the above-described preventing action of each portion.. In addition, the first passage forming portion of the branch passage has a tapered inclined surface having a large diameter on the side of the inner peripheral wall of the main hose, so that the resistance of the fluid flowing through the passage at a portion extending along the inner peripheral wall in the main hose passage And the fluid flow in the main hose passage is not hindered.
[0008]
Here, as a preferred aspect of the branch connection portion, the covering portion may be formed so as to cover the entire circumference of the outer peripheral wall of the main hose at the branch point.
In this way, even if the internal pressure is increased due to the fluid branch flow at the branch location of the main hose and the stress for expanding the hose diameter is increased, the expansion of the hose diameter can be suppressed by the covering portion around the outer wall of the main hose.
[0010]
The branch connection pipe manufacturing method of the present invention comprises:
A method of manufacturing a branch connection pipe for guiding fluid flowing through a passage of a main hose made of a rubber material to the outside from the passage at a branch point,
A step of preparing a main hose with a branch opening in the peripheral wall of the hose;
Inserting a first core material having a concave portion formed larger in diameter than the branch port into the outer periphery of the main hose, and setting the first core material so that the concave portion overlaps the branch port;
A lump of unvulcanized or unvulcanized rubber material is inserted from the branch port, and the inserted lump is expanded and deformed so as to follow the shape of the recess, and is expanded to the peripheral edge of the branch port. Interposing the mass after deformation; and
Providing a branch passage tip portion forming member having a flange and forming a tip portion of the branch passage for guiding the fluid to the outside outside the main hose;
A mold setting step of setting the main hose on which the first core material has been set and the lump has been interposed, and the branch passage tip portion forming member in a mold; A second core material inserted at the tip of the branch passage is disposed through the branch port, and a cavity surrounding the flange and the gap is positioned at a distance from the outer peripheral wall of the hose. The mold setting step to be formed at the branch point of the hose;
And a step of performing a rubber material injection into the cavity and a subsequent vulcanization process.
It is characterized by that.
[0011]
According to the manufacturing method of the present invention having the above-described configuration, the branch connecting pipe of the present invention can be easily manufactured as described below.
[0012]
When the rubber material is injected into the cavity of the mold in which the main hose and the branch passage tip portion forming member are set, the cavity is filled with the rubber material. Therefore, the flange of the branch passage tip portion forming member is covered with the above-mentioned filled rubber material from the main hose outer peripheral wall side with a gap from the main hose outer peripheral wall. That is, the branch passage tip portion forming member becomes the branch passage second forming portion in the above-described branch connection pipe of the present invention, and the rubber material of the portion covering this from the main hose outer peripheral wall side becomes the covering portion.
[0013]
In addition, the injected rubber material reaches a lump that has been inserted into the main hose from the lower end of the flange of the branch passage tip portion forming member around the second core material inserted into the branch passage tip portion of the branch passage tip portion forming member. It fills up to the area (second core material surrounding area). At this time, the rubber material reaches the gap between the branch port of the main hose and the second core material and fills this gap. As a result, the mass that has been expanded and deformed following the concave shape of the first core material in the main hose passage interposes the rubber material in the portion surrounding the second core material at the lower end of the flange, and the flange is mainly used. Continuing with the rubber material (covering part) of the part covered from the hose outer peripheral wall side That is, the portion of the rubber material filled in the region surrounding the second core material becomes the third branch passage formation portion in the above-described branch connection pipe of the present invention, and is expanded and deformed following the concave shape of the first core material in the main hose passage. The lump is the branch passage first forming portion. Then, after vulcanization after injecting the rubber material, the rubber material filled in each part and the lump are integrated as described above, and this lump is vulcanized and adhered to the inner peripheral wall of the main hose of the rubber material. Thereafter, the branch connection pipe of the present invention is obtained by releasing the mold and removing the core material, and the second core material forms a branch passage that follows the branch passage tip portion of the branch passage tip portion forming member. If the branch passage following the branch passage tip portion of the branch passage tip forming member does not penetrate the lump, a through hole is made in the lump by a process such as punching, and this is used as the end of the branch passage. Good.
[0014]
Here, as a preferred embodiment, the mold setting step may form the cavity around the outer peripheral wall of the main hose over the entire circumference at the branch point.
If it carries out like this, the branch connection pipe which has a coating | coated part over the main hose outer peripheral wall periphery can be manufactured in a branch location.
[0015]
DETAILED DESCRIPTION OF THE INVENTION
In order to further clarify the configuration and operation of the present invention described above, preferred embodiments of the present invention will be described below.
[0016]
FIG. 1 is a perspective view of a main part of a branch connection pipe according to an embodiment of the present invention, and is a perspective view showing a branch point of a main hose 20 connecting an automobile engine and a radiator (not shown). 2 is a cross-sectional end view of the hose branching section cut along line 2-2 in FIG. 1, and FIG. 3 is a cross-sectional end view of the hose branching section cut along the hose longitudinal direction.
[0017]
As shown in FIG. 1, the branch connection pipe BK of this embodiment includes a branch connection of a main hose 20 to a sub hose 30 via a branch connection portion 40 at a branch point of the main hose 20. The main hose 20 is connected to the lower part of the radiator at one end and connected to the engine at the other end. The sub hose 30 is connected to the reservoir at the other end.
[0018]
As shown in FIGS. 2 and 3, the main hose 20 includes an inner tube layer 21 and an outer tube layer 22 made of an EPDM rubber material, and a main passage 21a through which a cooling medium flows. A thread layer 23 is interposed between the inner tube layer 21 and the outer tube layer 22 to reinforce the main hose 20. A branch port 25 is opened at a branch point of the main hose 20.
[0019]
The auxiliary hose 30 has substantially the same configuration as the main hose 20 except that the diameter is 1/3 to 1/2 that of the main hose 20. That is, even in the secondary hose 30, it is formed of an EPDM rubber material, and the inner tube layer 31, the outer tube layer 32, and the thread layer 33 are laminated, and the inner tube layer 31 is used as the sub passage 31a.
[0020]
The branch connection portion 40 for connecting the main hose 20 and the sub hose 30 includes a branch pipe main body 42 located outside the main hose 20, an in-pipe annular body 44 located in the main passage 21a, and a branch portion covering body 46. With. And this branch connection part 40 is provided with the hole which penetrates each of these members as the branch channel | path 41 for guide | inducing the fluid (cooling medium) outside from the main channel | path 21a.
[0021]
The branch pipe main body 42 is formed in a tubular shape with a resin material, and the central through hole 42a serves as a tip end portion 41a of the branch passage 41 outside the main hose. The lower end of the branch pipe main body 42 is a flange 42b positioned with a gap from the outer wall of the main hose, and the upper end of the branch pipe main body 42 is connected to a connection end 42c bulged to prevent the sub hose 30 from being pulled out. Has been.
[0022]
The in-pipe annular body 44 is an EPDM rubber material product that has been vulcanized in the branch pipe manufacturing process, and has a curved disk shape that spreads along the inner peripheral wall of the main passage 21a. This in-pipe annular body 44 has a through hole 44a in the center, and this through hole 44a serves as a terminal portion 41b of the branch passage 41 in the main passage 21a. As shown in the figure, the peripheral portion of the annular inner body 44 is a tapered inclined surface 44b having a large diameter on the inner peripheral wall side of the main passage 21a.
[0023]
The branch cover 46 is formed on the outer peripheral wall of the main hose 20 by vulcanizing the EPDM rubber material injected into the mold cavity during the branch pipe manufacturing process. This branch portion covering body 46 includes a flange covering portion 46a that covers the flange 42b from the outside and a flange lower end region portion 46b that fills the gap at the lower end of the flange. The flange lower end region portion 46b is joined and integrated with the in-pipe annular body 44. ing. The flange lower end region portion 46b fills the periphery of the branch port 25 of the main hose 20, and the branch passage 41 extends from the end portion 41b of the inner annular body 44 to the tip end portion 41a of the branch tube main body 42 through the through hole 46c. Intermediate portion 41c.
[0024]
Next, the manufacturing method of a branch connection pipe is demonstrated. 4 to 10 are explanatory views for explaining a series of manufacturing steps of the branch connection pipe. As shown in FIG. 4, first, an unvulcanized hose extrudate 20 </ b> A for forming the main hose 20 is manufactured, and a hose extrudate 30 </ b> A for forming the auxiliary hose 30 is manufactured. The hose extrudates 20A and 30A are manufactured by a normal method, that is, by spirally winding reinforcing yarns for forming the yarn layers 23 and 33 while extruding a rubber material by an extruder. Here, as the shapes of the hose extrudates 20A and 30A, for example, the inner diameter D1 of the hose extrudate 20A is 30 to 37 mm, the thickness t1 is 4.5 mm, and the inner diameter D2 of the hose extrudate 30A is 5.8 to 16 mm. can do.
[0025]
Subsequently, the hose extrudate 20A is vulcanized and simultaneously brazed into a predetermined shape. 5 and 6 are diagrams for explaining the vulcanization process and the brazing process. The brazing and vulcanization steps are performed using a mandrel MD and a vulcanizer (not shown). The mandrel MD is a rod having the same thickness as the inner diameter D1 of the hose extrudate 20A, and is bent into a predetermined shape. In this step, the hose extrudate 20A is pushed into the mandrel MD, and then loaded into a vulcanizer, and vulcanized under vulcanization conditions at 150 ° C. for 30 minutes to form the main hose 20. When the main hose 20 is pulled out of the mandrel MD, the main hose 20 brazed according to the bent shape of the mandrel MD is obtained. Then, as shown in FIG. 6, the branch port 25 is formed in the branch location of the main hose 20 with a drill Dr or the like.
[0026]
Next, the process of connecting the sub hose 30 to the main hose 20 via the branch pipe main body 42 (refer FIG. 2, FIG. 3) is performed. Here, the branch pipe main body 42 is previously formed by injection molding. 7 and 8 are explanatory views for explaining the first center setting step for the main hose 20 and the step for setting the in-hose forming mass 48 to be the ring-in-tube annular body 44 after the completion of the manufacturing process. FIGS. 7A and 8A are explanatory diagrams for explaining a state along the longitudinal direction of the hose. FIG. 7B and FIG. 8B are explanatory views for explaining a state from the cross-sectional direction of the hose.
[0027]
As shown in these drawings, the first core 61 is composed of a first core upper half 61a and a first core lower half 61b which are divided into upper and lower parts, and the insertion point to the hose is the main hose. A cylindrical shape having substantially the same outer diameter as the inner diameter D1 of 20 is formed, and an end portion is an expansion base 61c. Further, the first core 61 has a recess 62 formed on the top outer peripheral portion of the first core upper half 61 a so as to have a larger diameter than the branch port 25 of the main hose 20. The recess 62 has a recessed shape that is curved along the outer periphery of the first core upper half 61a, and the recessed peripheral edge 62a is a tapered inclined surface having a large diameter on the outer peripheral side. An air vent hole 62b is formed at an appropriate location in the concave portion 62, so that air in the concave portion is discharged through the air vent hole 62b and the through hole 61d in the center of the core when the annular body forming block 48 is press-fitted. Has been. The first core 61 is inserted into the main hose 20 from the front end side of the cylindrical portion, and the main hose 20 is attached to the first core 61. At this time, the concave portion 62 and the branch port 25 overlap substantially concentrically.
[0028]
Subsequently, the annular body forming lump 48 is loaded into the recess 62 from the outside of the hose. The mass 48 for forming an annular body is a cylindrical body having substantially the same diameter as that of the branch port 25, and is formed of an unvulcanized EDPM rubber material. When loading the annular body forming block 48, the main hose 20 with the first core 61 already set is held in a so-called V block 63, and the insertion jig 64 is set on the main hose 20. The insertion jig 64 has a cylindrical portion 64 a continuous to the branch port 25, and the cylindrical portion 64 a serves as a guide for loading the mass 48 for forming an annular body. Following such jig setting, the annular body forming block 48 is put into the cylindrical portion 64a of the insertion jig 64, and the piston 65 is lowered in the cylindrical portion 64a by an air cylinder, a hydraulic cylinder or the like. Thereby, the annular body forming lump 48 is pushed by the piston and loaded into the recess 62 from the branch port 25. In the state where the piston 65 is lowered to the stroke end, as shown in FIG. 8, the annular body forming lump 48 is expanded and deformed following the depressed shape of the recess 62, spreads to each part of the recess 62, and has a branch port. Fill the 25 peripheral areas. Next, the piston 65 is raised, and the insertion jig and the V block are removed. Even when the piston 65 is removed, the annular body forming lump 48 remains in the recess 62 while being expanded and deformed following the depressed shape of the recess 62. Prior to filling of the annular body forming block 48, a treatment such as polishing (roughening and removing dirt on the surface) of the outer peripheral wall of the main hose at the peripheral wall of the branch port 25 or the peripheral edge of the branch port 25 is performed. It is preferable to improve the vulcanization adhesion.
[0029]
Subsequently, as shown in FIG. 9, the cylindrical portion 71 a of the second core 71 is inserted into the through hole 42 a of the branch pipe main body 42, and the branch pipe main body 42 is positioned and mounted on the second core 71. And an adhesive agent is apply | coated to the outer surface part area | region of the branch pipe main body 42 including the upper and lower surfaces of the flange 42b. This adhesive acts to increase the adhesive force between the branch pipe main body 42 and the branch portion covering body 46.
[0030]
Subsequently, as shown in FIG. 10, a step of setting the main hose 20 supported by the first core 61, the branch pipe body 42 supported by the second core 71, and the like on the mold 80 is performed. That is, the main hose 20 is set in the mold 80 via the first core 61 and the second core is in a state where the tip 71c of the second core 71 is inserted into the branch port 25 of the main hose 20. 71 is set in the mold 80. At this time, the connecting end 42c of the branch pipe main body 42 is fitted and supported in the recess 80a of the mold 80, and the flange 42b of the branch pipe main body 42 is positioned with a gap from the outer peripheral wall of the main hose 20. Also, the annular body forming block 48 in the recess 62 is pressed by the tip 71 c of the second core 71. A through hole may be formed in the annular body forming lump 48 when the annular body forming lump 48 is pressed at the tip 71c. By the above-described setting process, a cavity 83 surrounding the flange 42 b and the flange lower end region of the branch pipe main body 42 and the branch port 25 is formed in the mold 80 on the outer peripheral wall side of the main hose 20.
[0031]
In the next step, after the mold 80 is clamped, rubber injection molding is performed. That is, a rubber material is injected into the cavity 83 from an injection molding machine (not shown). Thereafter, press vulcanization is performed to vulcanize the rubber material in the cavity 83 by heating the mold 80. As vulcanization conditions, 20 minutes can be taken at 160 ° C. As a result, the rubber material of the cavity 83 and the mass 48 for forming the annular body of the recess 62 are vulcanized and integrated into a branch portion covering body 46 and an in-pipe annular body 44. Then, after the mold 80 is opened, the first intermediate core 61 and the second intermediate core 71 are removed, whereby the branch pipe main body 42 is integrated with the branch portion covering body 46 and the pipe annular body 44. The main hose 20 having 40 is completed. When removing the first core 61, the first core lower half 61b is removed first, and then the first core upper half 61a is removed. If it carries out like this, the 1st core upper half part 61a can be easily removed in the state which released | separated the annular body 44 from the recessed part 62. FIG. If the first core 61 is not vertically divided, the main hose 20 is slightly expanded by blowing air into the recess 62 through the air vent hole 62b. What is necessary is just to remove 61.
[0032]
If the through-hole is not made in the annular body forming block 48 when the second core 71 is set, the die is removed and then inserted into the through-hole 42a of the branch pipe body 42 with the punched shaft, A through hole 44 a (the end portion 41 b of the branch passage 41) may be formed in the body 44.
[0033]
According to the branch connecting pipe according to the above embodiment, the branch passage 41 from the main hose 20 to the sub hose 30 is connected to the pipe annular body 44, the flange lower end region 46b of the branch cover 46 and the branch pipe main body 42. Each through hole is formed. Then, the pipe annular body 44 and the branch portion covering body 46 were integrated by vulcanization, and the branch pipe main body 42 was vulcanized and bonded to the branch portion covering body 46 with the flange 42b embedded therein. Therefore, the branch passage 41 becomes a continuous hole from the front end to the end, and fluid leakage can be reliably prevented.
[0034]
Further, the flange 42 of the branch pipe main body 42 is separated from the outer peripheral wall of the main hose 20 and is covered from the outside with the branch portion covering body 46. Therefore, the flange 42 b embedded in the branch portion covering body 46 thus reliably prevents the branch pipe body 42 from being removed from the branch portion covering body 46. In addition, this branch portion covering body 46 is integrated with the curved disk-shaped annular annular body 44 that spreads around the periphery of the branch port 25 in the main passage 21a through vulcanization, and the annular annular body 44 is connected to the main hose 20. Vulcanized and bonded to the inner wall of the main passage 21a. Therefore, separation of the branch portion covering body 46 and the pipe inner annular body 44 and separation of the pipe inner annular body 44 from the inner wall of the main passage 21a are less likely to occur, and the branch connection portion 40 can be fixed to the main hose 20 with a high bonding force. , Dropping off from the main hose 20 can be reliably prevented.
[0035]
Further, in the pipe annular body 44 existing in the main passage 21a of the main hose 20, the peripheral edge thereof is a tapered slope 44b having a large diameter on the side of the passage inner peripheral wall. Therefore, the resistance when the fluid (cooling medium) passing through the main hose 20 flows through the main passage 21a can be reduced, and the fluid flow in the main passage 21a is not hindered.
[0036]
In addition, the taper slope 44b makes it difficult for the tubular annular body 44 to be peeled off, so that fluid intrusion into the yarn layer 23 due to the peeling can be suppressed. In addition, since the pipe annular body 44 is joined (vulcanized and bonded) with a wide area along the inner wall surface of the main passage 21a at the periphery of the branch port 25, fluid intrusion into the yarn layer 23 can be prevented more reliably.
[0037]
The present invention is not limited to the above-described embodiments, and can be implemented in various modes without departing from the gist thereof. For example, the following modifications are possible.
[0038]
(1) FIG. 11 is a cross-sectional view showing a branch connection pipe BKA according to the second embodiment, and FIG. 12 is an explanatory view for explaining a mold setting state at the time of manufacturing the branch connection pipe BKA. In FIG. 11, the branch connection pipe BKA of this embodiment is replaced with the above-described branch portion covering body 46, and a branch portion covering body 46 </ b> A having a main hose covering portion 46 d in addition to the flange covering portion 46 a and the flange lower end region portion 46 b. Have Since the main hose 20 is covered around the outer peripheral wall at the branch point by the main hose covering portion 46d, expansion of the main hose 20 can be suppressed even if the internal pressure increases at the branch point.
In the manufacture of such a branch connection pipe BKA, the cavity 83 formed by a mold is formed to the periphery of the outer wall of the main hose 20 as shown in FIG.
[0039]
(2) FIG. 13 is a schematic perspective view showing an annular body forming lump 48 according to a modification. As shown in the drawing, in the annular body forming lump 48 of the modified example, slits 48a are formed at equal intervals on the lower end side thereof. Since the lower end side of the annular body forming lump 48 of this modified example easily spreads around the slit 48 a as a boundary, the annular body forming lump 48 is placed in the recess 62 of the first core 61 with a small force. Easy to load.
It should be noted that the annular body forming lump 48 of this modified example or the above-described embodiment may be a cylindrical one having a through hole in the center. If it carries out like this, it will become easy to spread only by the part which a through-hole exists, and the loading to the recessed part 62 will become easy.
[0040]
(3) FIG. 14 is a sectional end view showing a branch connection pipe BKB according to the third embodiment. This embodiment is characterized in that the hose end portion 130a of the branch hose 130 corresponding to the sub hose 30 has a flange shape (flared shape), and the hose end portion 130a is embedded in the branch portion covering body 146. are doing. That is, an in-pipe annular body 144 is tightly formed in the hose passage at the branch port 125 of the main hose 120, and this in-pipe annular body 144 is formed to cover the flange-like hose end portion 130a from the outside. It is integrated with the body 146 through vulcanization. In this branch connection pipe BKB, the flange-like hose end portion 130 a performs the same function as the flange 42 b in the branch pipe main body 42, and the branch hose 130 is securely stopped and fixed to the main hose 120. Note that the branch passage 141 in the branch connection pipe BKB is formed by an end pipe line portion of the in-pipe annular body 144, the branch portion covering body 146, and the branch hose 130.
[0041]
(4) FIG. 15 is an explanatory view showing the flange portions of the branch pipe main bodies 150A, 150B, and 150C that replace the branch pipe main body. That is, the flange portion 152A of FIG. 15A is formed in a disc shape, and through holes 152Aa are formed in four directions thereof. The through hole 152Aa has an effect of enhancing the integrity with the branch portion covering body 46 and preventing the periphery of the branch pipe main body 150A. 15B, the flange portion 152B may be formed in a gear shape, or the flange portion 153C may be formed in a square plate shape as shown in FIG. .
[0042]
(5) The rubber material for forming the annular body forming mass 48 (see FIGS. 7, 8, and 13) to be the tubular annular bodies 44, 144 shown in FIG. 2 and the like is not vulcanized but also vulcanized. Incomplete, specifically semi-vulcanized. By using such a semi-vulcanized rubber material, it is possible to stably expand and deform following the depressed shape of the recess 62.
[0043]
(6) FIG. 16 is a sectional end view showing the vicinity of a branch connection portion 40D according to another embodiment. The present embodiment is characterized in that the branch passage 41 from the branch pipe main body 142 to the in-pipe annular body 44 can be closed by the plug 60D when the secondary hose is not connected to the branch connection portion 40D. In FIG. 16, a female screw 143 is formed on the inner wall surface of the branch passage 41 in the branch pipe main body 142. Moreover, said 1 plug 60D is a member which closes the branch channel | path 41, and is integrally formed from head 61Da, external thread part 61Db, and sealing part 61Dc. In this case, the male screw portion 61Db can be screwed into the female screw 143 in a watertight manner. The outer diameter d1 of the sealing portion 61Dc is slightly larger than the flange lower end region 46b of the branch covering body 46 and the inner diameter d2 of the branch passage 41 in the pipe annular body 44.
[0044]
In the above configuration, when the male screw portion 61Db of the plug 60D is screwed into the female screw 143 of the branch tube main body 142, the branch passage 41 of the branch pipe main body 42D is sealed by the male screw portion 61Db and the sealing portion 61Dc of the plug 60D. Is done. Thus, by forming the female screw 143 on the inner surface of the branch passage 41 of the branch pipe main body 42D, the branch passage 41 can be sealed by the plug 60D when the secondary hose is not connected. In the branch pipe body 142, a female screw 143 is formed in advance at the time of injection molding.
[0045]
Further, since the outer diameter d1 of the sealing portion 61Dc of the plug 60D is formed larger than the inner diameter d2 of the branch passage 41 as described above, when the plug 60D is attached to the branch pipe body 42D, the sealing portion 61Dc. Presses the branch covering 46. Therefore, high sealing performance can be obtained without using a sealing member such as an O-ring.
[0046]
The plug 60D in FIG. 16 is configured as a sealing member that is screwed to the branch pipe main body 142 to completely close the branch passage 41. However, the present invention is not limited to this, and a communication hole for air or water drainage is formed. The main passage 21a may be configured as a member for communicating with the outside. Further, the plug 60D can be used as a member for mounting the water temperature sensor in the main passage 21a of the main hose 20, assuming that the water temperature sensor penetrates the plug 60D.
[Brief description of the drawings]
FIG. 1 is a perspective view showing a branch portion of a main hose 20 according to an embodiment of the present invention.
FIG. 2 is a cross-sectional end view of a hose branch portion taken along line 2-2 in FIG.
FIG. 3 is a cross-sectional end view in which a hose branch portion is cut along a hose longitudinal direction.
FIG. 4 is an explanatory diagram for explaining a process for manufacturing a main hose 20;
FIG. 5 is an explanatory diagram illustrating a process of setting the hose extrudate 20A to the mandrel MD.
FIG. 6 is an explanatory diagram for explaining a process of forming a branch port 25 with a drill Dr or the like in the branch protrusion 26 of the main hose 20;
7 is an explanatory diagram for explaining a first center setting step for the main hose 20 and a step for setting the in-hose forming mass 48 to be the ring-in-tube annular body 44 after the completion of the manufacturing process; FIG. (A) is explanatory drawing explaining the mode along the hose longitudinal direction before loading the annular body formation lump 48, FIG.7 (b) is explanatory drawing explaining the mode from a hose cross-section direction.
8 is an explanatory diagram for explaining a first center setting step for the main hose 20 and a step for setting the in-hose forming mass 48 to be the ring-in-tube annular body 44 after the completion of the manufacturing process; FIG. (A) is explanatory drawing explaining a mode along the hose longitudinal direction at the time of the annular body formation lump 48 loading, FIG.8 (b) is explanatory drawing explaining the mode from a hose cross-sectional direction.
FIG. 9 is an explanatory diagram for explaining a process of positioning and setting the branch pipe main body on the second core 71;
10 is a cross-sectional view showing a state where the main hose 20 and the like are set in a mold 80. FIG.
FIG. 11 is a cross-sectional view showing a branch connection pipe BKA according to a second embodiment.
FIG. 12 is an explanatory diagram for explaining a mold setting state at the time of manufacturing this branch connection pipe BKA.
FIG. 13 is a schematic perspective view showing an annular body forming lump 48 according to a modification.
FIG. 14 is a sectional end view showing a branch connection pipe BKB according to a third embodiment.
FIG. 15 is an explanatory view for explaining a modification of the flange portion 152A and the like of the branch pipe main body.
FIG. 16 is a cross-sectional view showing a peripheral portion of a branch connection portion 40D according to still another embodiment.
FIG. 17 is a cross-sectional view showing a branch connection pipe according to a conventional technique.
[Explanation of symbols]
20 ... Main hose
20A, 30A ... hose extrudate
21 ... Inner tube layer
21a ... Main passage
22 ... Outer tube layer
23, 33 ... Yarn layer
25 ... Branch
26: Branch protrusion
30 ... Sub hose
31 ... Inner tube layer
31a ... Secondary passage
32 ... Outer tube layer
40 ... Branch connection
40D ... Branch connection
41 ... Branch passage
41a ... tip portion
41b ... Terminal part
41c ... middle part
42 ... Flange
42 ... Branch pipe body
42D ... Branch pipe body
42a ... through hole
42b ... Flange
42c ... Connection end
44. In-pipe annular body
44a ... through hole
44b ... Tapered slope
46 ... Branched part covering
46A ... Branched part covering
46a ... Flange coating
46b ... flange lower end region
46c ... through hole
46d ... Main hose covering part
48 ... Mass for forming annular body
48a ... Slit
60D ... stopper
61 ... first core
61 Da ... head
61Db ... Male thread
61Dc ... Sealing part
61a ... First core upper half
61b ... lower half of the first core
61c ... Expansion base
61d ... through hole
62 ... concave
62a ... Sinking margin
62b ... Air vent hole
63 ... V block
64 ... Insert jig
64a ... cylindrical portion
65 ... Piston
71: Second core
71a ... Cylindrical part
71c ... tip
80 ... Mold
80a ... recess
83 ... cavity
120 ... main hose
125 ... Branch
130 ... Branch hose
130a ... Hose end
141 ... Branch passage
142 ... Branch pipe body
143 ... Female thread
144: Annular pipe
146 ... Branched part covering
150A, 150B, 150C ... Branch pipe body
152A ... Flange
152Aa ... Through hole
152B ... Flange
153C ... Flange
220 ... Main hose
221a ... passage
225 ... fork
230 ... Sub hose
250 ... Branch pipe body
252 ... Flange
260 ... Rubber molding part
BK ... Branch connection pipe
BKA ... Branch connection pipe
BKB ... Branch connection pipe
Dr ... Drill
MD ... Mandrel

Claims (4)

ゴム材料からなる主ホースの通路を流れる流体を分岐箇所において前記通路から外部に導く分岐接続管であって、
前記流体を外部に導くための分岐通路を前記通路に連通して形成する分岐接続部を有し、
該分岐接続部は、
前記主ホースの通路内において前記分岐通路の末端部分を形成するよう、前記主ホースの内周壁に沿って広がった分岐通路第1形成部と、
前記主ホースの外周壁から間隙を隔てて位置するフランジを有すると共に、前記主ホースの外部において前記分岐通路の先端部分を形成する分岐通路第2形成部と、
前記分岐通路第1形成部の前記分岐通路末端部分と前記分岐通路第2形成部の前記分岐通路先端部分の間において前記分岐通路を形成する分岐通路第3形成部と、
前記主ホースの前記分岐箇所において、前記フランジを覆うよう前記主ホースの外周壁に形成された被覆部とを有し、
前記分岐通路第1形成部と前記分岐通路第3形成部と前記被覆部は、加硫処理により一体化可能なゴム材料から形成され、
前記分岐通路第1形成部は、前記主ホース内周壁に沿って広がった部分において、加硫処理により前記主ホース内周壁に密着していると共に、前記主ホースの内周壁の側が大径のテーパ状斜面を有する
ことを特徴とする分岐接続管。
A branch connection pipe for guiding fluid flowing through a passage of a main hose made of a rubber material to the outside from the passage at a branch point;
A branch connection portion that forms a branch passage for guiding the fluid to the outside in communication with the passage;
The branch connection is
A branch passage first forming portion extending along an inner peripheral wall of the main hose so as to form an end portion of the branch passage in the passage of the main hose;
A branch passage second forming portion having a flange located at a distance from an outer peripheral wall of the main hose, and forming a tip portion of the branch passage outside the main hose;
A branch passage third forming portion that forms the branch passage between the branch passage end portion of the branch passage first forming portion and the branch passage tip portion of the branch passage second forming portion;
The branch portion of the main hose has a covering portion formed on the outer peripheral wall of the main hose so as to cover the flange,
The branch passage first forming portion, the branch passage third forming portion, and the covering portion are formed of a rubber material that can be integrated by vulcanization,
The branch passage first forming portion, the flared portion along said main hose wall, Rutotomoni in close contact to the main hose wall by vulcanization, the inner peripheral wall of the side large-diameter taper of the main hose Branch connecting pipe characterized by having an inclined surface .
請求項1記載の分岐接続管であって、
前記被覆部は、前記分岐箇所において前記主ホースの外周壁周りを全周に亘って被覆するよう形成されている、分岐接続管。
The branch connection pipe according to claim 1,
The said covering part is a branch connection pipe | tube formed so that the circumference | surroundings of the outer peripheral wall of the said main hose may be coat | covered over the perimeter in the said branch location.
ゴム材料からなる主ホースの通路を流れる流体を分岐箇所において前記通路から外部に導く分岐接続管の製造方法であって、
ホース周壁に分岐口が空けられた主ホースを準備する工程と、
前記分岐口より大径に形成された凹部を外周に有する第1心材を前記主ホースの通路に挿入し、前記凹部が前記分岐口に重なるよう前記第1心材をセットする工程と、
未加硫または加硫未了のゴム材料の塊状物を前記分岐口から挿入すると共に、挿入した前記塊状物を前記凹部の形状に倣うよう拡張変形させ、前記分岐口の前記通路側周縁に拡張変形後の前記塊状物を介在させる工程と、
フランジを有し、前記流体を外部に導くための分岐通路の先端部分を前記主ホースの外部において形成する分岐通路先端部形成部材を準備する工程と、
前記第1心材がセットされて前記塊状物が介在済みの前記主ホースと前記分岐通路先端部形成部材を金型にセットする金型セット工程であって、金型セットに際して、前記フランジを前記主ホースの外周壁から間隙を隔てて位置させると共に、前記分岐通路の先端部分に挿入された第2心材を前記分岐口を貫通して配置させ、かつ、前記フランジと前記間隙を取り囲むキャビティを前記主ホースの前記分岐箇所において形成する前記金型セット工程と、
前記キャビティへのゴム材料注入とその後の加硫処理とを実行する工程とを有する
ことを特徴とする分岐接続管の製造方法。
A method of manufacturing a branch connection pipe for guiding fluid flowing through a passage of a main hose made of a rubber material to the outside from the passage at a branch point,
A step of preparing a main hose with a branch opening in the peripheral wall of the hose;
Inserting a first core material having a concave portion formed larger in diameter than the branch port into the outer periphery of the main hose, and setting the first core material so that the concave portion overlaps the branch port;
A lump of unvulcanized or unvulcanized rubber material is inserted from the branch port, and the inserted lump is expanded and deformed so as to follow the shape of the recess, and is expanded to the peripheral edge of the branch port. Interposing the mass after deformation; and
Providing a branch passage tip portion forming member having a flange and forming a tip portion of the branch passage for guiding the fluid to the outside outside the main hose;
A mold setting step of setting the main hose on which the first core material has been set and the lump has been interposed, and the branch passage tip portion forming member in a mold; A second core material inserted at the tip of the branch passage is disposed through the branch port, and a cavity surrounding the flange and the gap is positioned at a distance from the outer peripheral wall of the hose. The mold setting step to be formed at the branch point of the hose;
A method of manufacturing a branch connection pipe, comprising: a step of performing a rubber material injection into the cavity and a subsequent vulcanization process.
請求項3記載の製造方法であって、
前記金型セット工程は、
前記キャビティを前記分岐箇所において前記主ホースの外周壁周りを全周に亘って形成する、分岐接続管の製造方法。
A claim 3 Symbol mounting method of manufacturing,
The mold setting step includes
A method for manufacturing a branch connection pipe, wherein the cavity is formed around the outer peripheral wall of the main hose over the entire circumference at the branch point.
JP27197299A 1999-09-27 1999-09-27 Branch connection pipe and its manufacturing method Expired - Fee Related JP3695246B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP27197299A JP3695246B2 (en) 1999-09-27 1999-09-27 Branch connection pipe and its manufacturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP27197299A JP3695246B2 (en) 1999-09-27 1999-09-27 Branch connection pipe and its manufacturing method

Publications (2)

Publication Number Publication Date
JP2001099378A JP2001099378A (en) 2001-04-10
JP3695246B2 true JP3695246B2 (en) 2005-09-14

Family

ID=17507379

Family Applications (1)

Application Number Title Priority Date Filing Date
JP27197299A Expired - Fee Related JP3695246B2 (en) 1999-09-27 1999-09-27 Branch connection pipe and its manufacturing method

Country Status (1)

Country Link
JP (1) JP3695246B2 (en)

Also Published As

Publication number Publication date
JP2001099378A (en) 2001-04-10

Similar Documents

Publication Publication Date Title
KR100243511B1 (en) Manufacturing method of tire tube containing sealant
EP0052017B1 (en) Channelled plastic pipe with channel ends closed and method of producing the same
US5746344A (en) Tank connector construction
EP0606484B1 (en) Resin hose manufacturing method
KR100279934B1 (en) Tube-built tires
JP3695246B2 (en) Branch connection pipe and its manufacturing method
JP2905416B2 (en) End part forming method of composite insulator and end part forming jig used therefor
JPH092575A (en) Manufacture of tank and connector assembly of that tank
JP3759981B2 (en) Fuel filler pipe and its manufacturing method
JP4424137B2 (en) Manufacturing method of tube resin joint
EP0692367B1 (en) Method of fabricating a tank and method of fabricating a tank connector therefor
US6106647A (en) Process for producing sealant-incorporated tire tube
JP3743166B2 (en) Manufacturing method of branch connection pipe
JP3873839B2 (en) Manufacturing method of branch connection pipe
US6338766B1 (en) Retention mold for bonding tire tube
JP4096400B2 (en) Branch hose and manufacturing method thereof
JP3853983B2 (en) Tire with sealant
JP3757725B2 (en) Branch hose
JPH08142100A (en) Manufacture of hollow resin molded product, and gas-injecting-hole-sealing device therefor
JP3999338B2 (en) Manufacturing method of tire with sealant
JPH0557812A (en) Hose forming method
JP2005113988A (en) Bent hose
JPH0611144Y2 (en) Mold
JP3123666B2 (en) Method of manufacturing hose having resin intermediate holder
JPH07125047A (en) Hose manufacturing method

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050125

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050329

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050414

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050607

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050620

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080708

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090708

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090708

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100708

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110708

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120708

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120708

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130708

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees