JP3743166B2 - Manufacturing method of branch connection pipe - Google Patents
Manufacturing method of branch connection pipe Download PDFInfo
- Publication number
- JP3743166B2 JP3743166B2 JP17814898A JP17814898A JP3743166B2 JP 3743166 B2 JP3743166 B2 JP 3743166B2 JP 17814898 A JP17814898 A JP 17814898A JP 17814898 A JP17814898 A JP 17814898A JP 3743166 B2 JP3743166 B2 JP 3743166B2
- Authority
- JP
- Japan
- Prior art keywords
- branch
- passage
- hose
- main
- rubber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Branch Pipes, Bends, And The Like (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、複数のホースを分岐接続した分岐接続管の製造方法に関する。
【0002】
【従来の技術】
従来、この種の分岐接続管として、例えば、特開平7−83369号公報に記載されている技術が知られている。図17は主ホース220から、分岐管本体250を用いて副ホース230を分岐した構成を示す断面図である。図17において、副ホース230は、主ホース220に対して分岐管本体250及びゴム成形部260を介して接続されている。すなわち、主ホース220には分岐口225が形成され、この分岐口225に分岐管本体250の一端部が挿入されると共にゴム成形部260で覆われることにより、主ホース220と副ホース230とが接続されている。この構成では、分岐管本体250の下端部にフランジ部252が設けられており、このフランジ部252により分岐管本体250が主ホース220から抜けるのを防止している。
【0003】
【発明が解決しようとする課題】
しかし、従来の分岐接続管では、分岐管本体250のフランジ部252が主ホース220の通路221a内に突出しているために、通路221aを流れる流体の抵抗が大きくなるという問題があった。また、通路221aに突出した分岐管本体250の根元の部分が流体に晒されるために、主ホース220と分岐管本体250との接合端部で剥離が生じやすい。このため、剥離した隙間から通路221aを流れる流体が浸入して、主ホース220との分岐管本体250との接合状態が損なわれ易いという問題があった。
【0004】
本発明は、上記従来の技術の問題を解決するものであり、主ホース内の流路抵抗が小さく、しかも主ホースと副ホースとの接合力の大きい分岐接続管の製造方法を提供することを目的とする。
【0005】
【課題を解決するための手段およびその作用・効果】
上記課題を解決するためになされた第1の発明は、
流体を流す主通路に接続される分岐口を有する主ホースと、上記分岐口を介して接続される副通路を有する副ホースと、主ホースと副ホースとを接続する分岐接続部と、を備えた分岐接続管を製造する方法において、
上記分岐接続部を製造する工程は、
未加硫または半加硫のゴム材料から形成され、上記分岐口に接続される連結通路を有する筒体部および該筒体部と一体であり上記分岐口の開口周縁部から上記主通路側にわたって設けられた裾部から構成されたゴム充填部をセットするとともに、分岐通路を有する分岐本体部と該分岐本体部の一端部に形成されたフランジ部とを有する分岐管本体を準備し、上記分岐通路を上記連結通路に接続するように分岐管本体をセットする工程と、
上記分岐管本体の外周側にキャビティを形成するように上記分岐管本体および上記主ホースを金型にセットする工程と、
上記キャビティにゴム材料を注入し、その後、該注入したゴム材料および上記ゴム充填部のゴム材料を加硫することで上記ゴム充填部と一体になったゴム成形部を形成する工程と、
を備えたことを特徴とする。
【0006】
第1の発明によって製造される分岐接続管は、主ホースから副ホースが分岐接続部を介して接続されている。分岐接続部は、分岐管本体と、ゴム充填部と、ゴム成形部とから構成されている。分岐管本体は、その一端部にフランジ部が設けられており、このフランジ部は主ホースの外周側に所定間隙を隔てて配置され、この所定間隔にゴム充填部及びゴム成形部が充填されている。これにより、フランジ部がゴム成形部に埋設されて抜止される。このようなフランジ部は、主ホースの主通路内に配置されていないので、主通路を流れる流体の抵抗を増大させない。
【0007】
また、ゴム充填部は、分岐口の開口周縁部でありかつ主通路側で裾部となっており、副ホースの脱落を防止する作用が大きく、しかもゴム成形部とともに加硫により一体化すると、主ホースと副ホースとの間を接続する通路の隙間をなくし、流体の漏れを確実に防止することができる。
【0008】
第2の発明は、
流体を流す主通路に接続される分岐口を有する主ホースと、上記分岐口を介して接続される副通路を有する副ホースと、主ホースと副ホースとを接続する分岐接続部と、を備えた分岐接続管を製造する製造方法において、
上記分岐接続部を製造する工程は、
未加硫または半加硫のゴム材料から形成され、上記分岐口に接続される連結通路を有する筒体部および該筒体部と一体であり上記分岐口の開口周縁部から上記主通路側にわたって設けられた裾部から構成されたゴム充填部をセットする工程と、
上記副ホースの一端部にフランジ部を形成し、上記副通路を上記連結通路に接続するとともに、上記フランジ部の外周側にキャビティを形成するように主ホースおよび副ホースを金型にセットする工程と、
上記キャビティにゴム材料を注入し、その後、該注入したゴム材料および上記ゴム充填部のゴム材料を加硫することで上記ゴム充填部と一体になったゴム成形部を形成する工程と、
を備えたことを特徴とする。
【0009】
第2の発明にかかる製造方法は、第1の発明にかかる分岐管本体を用いないで、副ホースの一端部にフランジ部を形成したものであり、第1の発明より部品点数を減少させている。
【0010】
第3の発明は、
流体を流す主通路に接続される分岐口を有する主ホースと、上記分岐口に接続される分岐接続部と、を備えた分岐接続管を製造する方法において、
上記分岐接続部を製造する工程は、
未加硫または半加硫のゴム材料から形成され、上記分岐口に接続される連結通路を有する筒体部および該筒体部と一体であり上記分岐口の開口周縁部から上記主通路側にわたって配置された裾部とから構成されたゴム充填部をセットする工程と、
外部に連通する分岐通路を有する分岐本体部と、該分岐本体部の一端部に形成されたフランジ部とを有する分岐管本体を準備し、上記分岐通路を上記連結通路に接続するとともに、上記分岐管本体の外周側にキャビティを形成するように、上記分岐管本体および上記主ホースを金型にセットする工程と、
上記キャビティにゴム材料を注入し、その後、該注入したゴム材料および上記ゴム充填部のゴム材料を加硫することで上記ゴム充填部と一体になったゴム成形部を形成する工程と、
を備えたことを特徴とする。
【0011】
第3の発明による製造方法は、第1の発明にかかる副ホースを用いない場合にも好適に適用できる構成である。上記分岐管本体の分岐通路には、その一部を少なくとも閉じるように装着される閉止部材を設けてもよい。この閉止部材は、分岐管本体に副ホースを接続しない場合に密閉用の栓としたり、外部に連通するエアー抜き用の通路を有する栓としたり、水温センサを装着するための栓とすることにより、好適な態様として実現することができる。
【0012】
ここで、分岐接続部の好適な態様として、主ホースの分岐口の開口周縁部を、主ホースの外周側へ突出させることによりスペースを形成し、該スペースに、上記ゴム充填部の裾部が主ホースの主通路の流路面積を変更しないように配置することが好ましい。この構成により、ゴム充填部の裾部が主ホースの主通路に突出しないので、主通路を流れる流体の抵抗を増大しない。
【0014】
第1ないし第3の発明によれば、主ホース、分岐管本体、ゴム充填材などを金型にセットして、分岐管本体の周囲にゴム材料を注入し、加硫することによりゴム成形部を簡単に形成することができる。
【0015】
【発明の実施の形態】
以上説明した本発明の構成・作用を一層明らかにするために、以下本発明の好適な実施例について説明する。
【0016】
図1は本発明の一実施の形態にかかる図示しない自動車のエンジンとラジエータとを接続している主ホース20の分岐部分を示す斜視図である。主ホース20には、副ホース30が分岐接続部40を介して接続されている。主ホース20は、一端でラジエータの下部に接続され、他端部でエンジンに接続されている。また、副ホース30は、他端部でリザーバに接続されている。
【0017】
図2は図1の2−2線に沿った断面図である。図2に示すように、主ホース20は、EPDMゴム材料からなる内管層21と外管層22とを備え、冷却媒体を流す主通路21aを設けている。上記内管層21と外管層22との間には、糸層23が介在しており、主ホース20を補強している。また、主ホース20の端部の側壁には、分岐突出部26が形成され、この分岐突出部26の中央に形成された分岐口25を介して副ホース30が分岐接続部40を介して接続されている。
【0018】
副ホース30は、主ホース20より直径が1/3〜1/2と細いだけで主ホース20とほぼ同じ構成であり、つまり、EPDMゴム材料から形成され、内管層31と、外管層32と、糸層33とを積層し、内管層31内を副通路31aとしている。
【0019】
図3は図2の分岐接続部40の付近を拡大して示す断面図である。図3において、分岐接続部40は、分岐管本体50と、ゴム充填部56と、ゴム成形部58とを備えている。分岐管本体50は、樹脂材料で形成されており、分岐通路51aを有する分岐本体部51と、分岐本体部51の下部に一体形成されたフランジ部52とを備えており、分岐本体部51の上端部に、副ホース30の端部からの抜止作用を果たすための接続端部53が形成されている。
【0020】
また、ゴム充填部56は、分岐管本体50の下側に配置されており、円筒状の筒体部56aと、この筒体部56aの下部に一体に形成された裾部56bとから形成され、その内部に分岐管本体50の分岐通路51aと主ホース20の主通路21aとを接続する連結通路56cが形成されている。上記筒体部56a及び裾部56bもEPDMから形成されている。上記裾部56bは、ほぼ円盤状であり、主ホース20の分岐突出部26の内周側のスペースSpを充填するように設けられている。
【0021】
図2に戻り、主ホース20と分岐管本体50の下部は、EPDMから形成されたゴム成形部58により覆われている。このゴム成形部58は、加硫接着によりゴム充填部56と一体になっている。
【0022】
次に、分岐接続管の製造方法について説明する。図4ないし図10は分岐接続管の一連の製造工程を説明する説明図である。図4に示すように、まず、主ホース20を形成するための未加硫のホース押出体20Aを製造するとともに、副ホース30を形成するためのホース押出体30Aを製造する。ホース押出体20A,30Aは、通常の方法、つまり押出機によりゴム材料を押し出しつつ糸層23,33を形成するための補強糸を螺旋状に巻回することにより製造する。ここに、ホース押出体20A,30Aの形状として、例えば、ホース押出体20Aの内径D1を30〜37mm、厚さt1を4.5mmとし、ホース押出体30Aの内径D2を5.8〜16mmとすることができる。
【0023】
続いて、ホース押出体20Aを加硫すると同時に所定の形状に癖付けする工程を行なう。図5及び図6は加硫工程及び癖付け工程を説明する図である。癖付け及び加硫工程は、マンドレルMD及び加硫装置(図示省略)を用いて行なう。マンドレルMDは、ホース押出体20Aの内径D1とほぼ同じ太さの棒体であり、所定の形状に曲げられている。また、マンドレルMDの外周には、主ホース20の分岐突出部26を形成するための山状部MDbが形成されている。本工程では、マンドレルMDにホース押出体20Aを押し入れ(図6の状態)、その後、加硫装置内に装填して、150℃、30分の加硫条件で加硫し、主ホース20を形成する。この主ホース20をマンドレルMDから抜くと、主ホース20は、マンドレルMDの山状部MDbに対応した個所に分岐突出部26が形成された状態にて所定形状に曲げられている。その後、図7に示すように、主ホース20の分岐突出部26に、ドリルDrなどにより分岐口25を形成する。
【0024】
次に、主ホース20に、分岐管本体50(図3参照)を介して副ホース30を接続する工程を行なう。ここで、分岐管本体50は、予め射出成形により成形しておく。図8は金型の一部を構成する第1中芯61に主ホース20をセットした状態を説明する説明図である。図8において、第1中芯61は、主ホース20の内径D1とほぼ同じ外径を有した円柱部61aと、円柱部61aの端部の基部61bとから構成されている。この第1中芯61の先端部61cから主ホース20内に円柱部61aを挿入することにより、主ホース20を第1中芯61に装着するが、このとき、第1中芯61の円柱部61aの外周と主ホース20の分岐口25の開口周縁部の間には、分岐突出部26の突出した形状に倣った円盤状のスペースSpが形成されている。
【0025】
続いて、上記スペースSpに未加硫のゴム環材56Abを装填する。すなわち、未加硫の棒状のゴム材料を環状に形成したゴム環材56Abを形成し、このゴム環材56Abを、分岐口25を通して第1中芯61の外周に置くと、ゴム環材56AbがスペースSpに充填される。なお、ゴム環材56Abの充填に先立って、スペースSp部分のホース内周壁表面を研磨(粗面化及び表面の汚れ落とし)などの処理をすることが、加硫接着性を向上させる点から好ましい。
【0026】
続いて、図9に示すように、第2中芯71に分岐管本体50を位置決めすると共にゴム筒材56Aaをセットする工程を行なう。すなわち、分岐管本体50に第2中芯71の円柱部71aを挿入すると共に、円柱部71aの先端部71c側から円柱部71aにゴム筒材56Aaを挿入する。その後、分岐管本体50のフランジ部52や分岐本体部51等に接着剤を塗布する。この接着剤は、分岐管本体50とゴム成形部58との接着力を高める作用をする。
【0027】
続いて、図10に示すように、金型80に、上記第1中芯61に支持した主ホース20や第2中芯71に支持した分岐管本体50などをセットする工程を行なう。すなわち、第1中芯61を介して主ホース20を金型80にセットするとともに、第2中芯71の先端部71cを主ホース20の分岐口25に挿入した状態にて、第2中芯71を金型80にセットする。このとき、分岐管本体50の接続端部53を金型80の凹所80aに嵌合して支持する。このセット工程により、金型80内には、分岐口25の外周部の付近にキャビティ83が形成される。
【0028】
次の工程では、金型80の型締めを行なった後に、ゴム射出成形を行なう。すなわち、図示しない射出成型機からゴム材料をキャビティ83内に注入する。その後、金型80を加熱することによりキャビティ83内のゴム材料を加硫するプレス加硫を行なう。加硫の条件としては、160℃で20分を採ることができる。これにより、キャビティ83のゴム材料及びゴム充填材56Aは加硫されて一体となり、ゴム成形部58及びゴム充填部56になる。そして、金型80を型開きした後に、第1中芯61及び第2中芯71を外すことにより、分岐管本体50がゴム充填部56及びゴム成形部58を介して一体になった主ホース20が完成する。
【0029】
上記実施の形態にかかる分岐接続管によれば、主ホース20から副ホース30への通路、つまり、ゴム充填部56の連結通路56c、分岐管本体50の分岐通路51aは、ゴム充填部56、主ホース20の分岐口25の周縁部及びゴム成形部58が加硫接着により一体になってその間の隙間をなくしているので、流体の漏れを確実に防止することができる。
【0030】
また、分岐管本体50のフランジ部52は、ゴム成形部58に埋設されて抜止作用を果たしているので、主ホース20からの脱落を確実に防止することができる。
【0031】
さらに、分岐管本体50のフランジ部52は、主ホース20の外周側に配置されており、主ホース20の主通路21aに突出していないので、主ホース20の主通路21aを流れる流体の抵抗を増大させない。
【0032】
しかも、主ホース20の分岐口25の付近は、分岐突出部26になり、その主通路21a側にゴム充填部56の裾部56bが配置されているので、裾部56bが主通路21aへ突出する形状になっておらず、分岐口25の周辺部における主通路21aの断面積を変えず、よってその部分における流量抵抗を増大させることもない。
【0033】
また、図11に示すように、ゴム充填部56の裾部56bは、主ホース20の主通路21aと連続した面になっており、直角のエッジになっていないので、その部分での剥離を生じにくい。よって、剥離した隙間を通じて主ホース20の糸層23への流体が浸入することもない。
【0034】
また、ゴム充填部56の裾部56bは、主ホース20の主通路21aの内壁面に沿って広い面積で接合されているので、主ホース20の主通路21aを通る流体が糸層23へ浸入することもない。
【0035】
さらに、図10に示すゴム射出成形工程の際に、分岐管本体50は、第2中芯71に支持されると共に、ゴム筒材56Aaにより支持されているので、主ホース20に対する高い位置決め精度を得ることができる。
【0036】
なお、この発明は上記実施例に限られるものではなく、その要旨を逸脱しない範囲において種々の態様において実施することが可能であり、例えば次のような変形も可能である。
【0037】
(1) 図12は第2の実施の形態にかかる分岐接続管を示す断面図である。図12において、本実施の形態では、分岐ホース130の端部130aをゴム成形部158に埋設した構成に特徴を有している。すなわち、主ホース120の分岐口125の開口周縁部は、分岐突出部126が形成され、この分岐突出部126の上部にゴム成形部158が形成されている。このゴム成形部158には、分岐ホース130の端部130aを埋設している。この分岐ホース130の端部130aは、フレア形状になっておりゴム成形部158からの抜止作用を高めている。
【0038】
(2) 図13は分岐管本体150A,150B,150Cのそれぞれのフランジ部を示す説明図である。すなわち、図13(A)のフランジ部152Aは、円盤状に形成され、その4方に透孔152Aaが形成されている。この透孔152Aaは、ゴム成形部との一体性を高めるとともに分岐管本体150Aの周り止めを果たす作用もある。また、図13(B)のようにフランジ部152Bを歯車状に形成したり、図13(C)のようにフランジ部153Cを正方形の板形状にすることにより周り止めの作用を高めても良い。
【0039】
(3) 図14は他の実施の形態にかかるゴム充填材190Aを示す断面図である。本実施例では、第1の実施の形態の図10にて説明したようにゴム筒材56Aaとゴム環材56Abとを別体に形成したゴム充填材56Aの代わりに、ゴム筒材190Aaと裾部190Abとを一体に形成したものであってもよい。この場合には、裾部190Abは、図1に示す主ホース20の分岐口25への挿入に支障がない限り大きく張り出して形成することが好ましい。
【0040】
(4) 図10などに示すゴム充填材56Aを形成するゴム材料は、未加硫のもののほか、半加硫であってもよい。このような半加硫のゴム材料を用いることにより、裾部56bの形状を安定した厚さや形状にすることができる。
【0041】
(5) 図15は他の実施の形態にかかる分岐接続部40Dの付近を示す断面図である。本実施の形態では、分岐接続部40Dに副ホースを接続しない場合に、分岐管本体50Dの分岐通路51Daを栓60Dにより閉じることができる構成に特徴を有している。図15において、分岐管本体50Dの分岐通路51Daの内壁面には、雌ネジ51Dbが形成されている。また、上記栓60Dは、上記分岐通路51Daを閉じる部材であり、頭部61Daと、雄ネジ部61Dbと、封止部61Dcとから一体に形成されており、上記雄ネジ部61Dbが上記雌ネジ51Dbに螺着されるように形成されている。また、封止部61Dcの外径d1は、ゴム充填部56Dの筒体部56Daの連結通路56Dcの内径d2より僅かに大きく形成されている。
【0042】
上記構成において、栓60Dの雄ネジ部61Dbを分岐管本体50Dの雌ネジ51Dbにネジ込むと、栓60Dの封止部61Dcなどにより分岐管本体50Dの分岐通路51Daが封止される。このように、分岐管本体50Dの分岐通路51Daの内面に、雌ネジ51Dbを形成することで、副ホースを接続しない場合において栓60Dにより分岐通路51Daを封止することができる。
【0043】
また、上記栓60Dの封止部61Dcの外径d1は、ゴム充填部56Dの連結通路56Dcの内径d2より大きく形成されているので、栓60Dを分岐管本体50Dに装着したときに、封止部61Dcがゴム充填部56Dを押圧するので、Oリングなどのシール部材を用いることなく、高いシール性を得ることができる。
【0044】
なお、図15の栓60Dは、分岐本体部51Dの分岐通路51Daを完全に閉じる封止部材として構成したが、これに限らず、エアーまたは水抜きのための連通孔を形成して主通路21aを外部に連通させるための部材として構成してもよい。
【0045】
(6) 図16はさらに他の実施の形態にかかる分岐接続部40Eの付近を示す断面図である。本実施の形態では、分岐接続部40Eに、栓60Eを介して水温センサ70を装着することができる構成に特徴を有している。図16において、分岐管本体50Eの端部53Eには、係合突起53Eaが形成されている。また、上記栓60Eは、頭部61Eaと、大径部61Ebと、小径部61Ecとから一体に形成されている。上記栓60Eの頭部61Eaには、上記係合突起53Eaに係合する係合爪61Edが形成されている。さらに、栓60Eには、水温センサ70が装着されている。すなわち、水温センサ70は、その先端の検出部70aが小径部61Ecの下端から突出し、さらに、リード線70bが小径部61Ec、大径部61Ebから頭部61Eaを貫通して引き出されている。また、分岐管本体50Eの下部に配置されたゴム充填部56Eには、その連結通路56Ecの内壁面にシール部56Edが形成されている。このシール部56Edは、多数の環状のヒダから形成され、上記栓60Eの小径部61Ecに対して密着してシールするように構成されている。
【0046】
こうした構成により、分岐管本体50Eの分岐通路51Eaに、栓60Eの小径部61Ecから挿入すると、小径部61Ecがシール部56Edでシールされるとともに、栓60Eの係合爪61Edが分岐管本体50Eの係合突起53Eaに係合する。このように、栓60Eは、分岐管本体50Eの分岐通路51Eaを外部に対してシールした状態にて閉じるとともに、分岐管本体50Eにワンタッチで抜止された状態にて取り付けることができる。また、栓60Eは、分岐口25を単に閉じる封止部材として用いるほか、水温センサ70などを装着するための部材として利用している。
【図面の簡単な説明】
【図1】本発明の一実施の形態にかかる主ホース20の分岐部分を示す斜視図である。
【図2】図1の2−2線に沿った断面図である。
【図3】図2の分岐接続部40の付近を拡大して示す断面図である。
【図4】主ホース20を製造する工程を説明する説明図である。
【図5】ホース押出体20AをマンドレルMDにセットする工程を説明する説明図である。
【図6】ホース押出体20Aを加硫する工程を説明する説明図である。
【図7】主ホース20の分岐突出部26にドリルDrなどにより分岐口25を形成する工程を説明する説明図である。
【図8】第1中芯61に主ホース20をセットした状態を説明する説明図である。
【図9】第2中芯71に分岐管本体50を位置決めすると共にゴム筒材56Aaをセットする工程を説明する説明図である。
【図10】主ホース20などを金型80にセットした状態を示す断面図である。
【図11】分岐接続管の要部を示す断面図である。
【図12】第2の実施の形態にかかる分岐接続管を示す断面図である。
【図13】分岐管本体のフランジ部152Aなどの変形例を説明する説明図である。
【図14】他の実施の形態にかかるゴム充填材190Aを示す断面図である。
【図15】さらに他の実施の形態にかかる分岐接続部40Dの周辺部を示す断面図である。
【図16】別の実施の形態にかかる分岐接続部40Eの周辺部を示す断面図である。
【図17】従来の技術にかかる分岐接続管を示す断面図である。
【符号の説明】
20…主ホース
20A…ホース押出体
21…内管層
21a…主通路
22…外管層
23…糸層
25…分岐口
26…分岐突出部
30…副ホース
30A…ホース押出体
31…内管層
31a…副通路
32…外管層
33…糸層
40…分岐接続部
40B…分岐接続部
40C…分岐接続部
40D…分岐接続部
40E…分岐接続部
50…分岐管本体
50D…分岐管本体
50E…分岐管本体
51a…分岐通路
51…分岐本体部
51D…分岐本体部
51Da…分岐通路
51Db…雌ネジ
51Ea…分岐通路
52…フランジ部
53…接続端部
53E…端部
53Ea…係合突起
56…ゴム充填部
56a…筒体部
56b…裾部
56c…連結通路
56A…ゴム充填材
56Aa…ゴム筒材
56Ab…ゴム環材
56D…ゴム充填部
56Da…筒体部
56Dc…連結通路
56E…ゴム充填部
56Ec…連結通路
56Ed…シール部
58…ゴム成形部
60D…栓
60E…栓
61…第1中芯
61a…円柱部
61b…基部
61c…先端部
61Da…頭部
61Db…雄ネジ部
61Dc…封止部
61Ea…頭部
61Eb…大径部
61Ec…小径部
61Ed…係合爪
70…水温センサ
70a…検出部
70b…リード線
71…第2中芯
71a…円柱部
71c…先端部
80…金型
80a…凹所
83…キャビティ
90A…ゴム充填材
120…主ホース
125…分岐口
126…分岐突出部
130…分岐ホース
130a…端部
150A,150B,150C…分岐管本体
150…分岐管本体
152A…フランジ部
152Aa…透孔
152B…フランジ部
153C…フランジ部
158…ゴム成形部
190A…ゴム充填材
190Aa…ゴム筒材
190Ab…裾部
Sp…スペース
MD…マンドレル
MDb…山状部
Dr…ドリル[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method of manufacturing a branch connection tube a plurality of hoses to the branch connection.
[0002]
[Prior art]
Conventionally, for example, a technique described in Japanese Patent Application Laid-Open No. 7-83369 is known as this type of branch connection pipe. FIG. 17 is a cross-sectional view showing a configuration in which the
[0003]
[Problems to be solved by the invention]
However, in the conventional branch connection pipe, the
[0004]
The present invention solves the above-mentioned problems of the prior art, and provides a method for manufacturing a branch connection pipe having a small flow path resistance in the main hose and a large joining force between the main hose and the sub hose. Objective.
[0005]
[Means for solving the problems and their functions and effects]
The first invention made to solve the above problems is
A main hose having a branch port connected to a main passage through which a fluid flows, a sub hose having a sub passage connected via the branch port, and a branch connection portion connecting the main hose and the sub hose. In the method of manufacturing a branched connecting pipe,
The step of manufacturing the branch connection part is as follows:
A cylindrical part formed of an unvulcanized or semi-vulcanized rubber material and having a connecting passage connected to the branch port, and integral with the cylindrical body part, from the opening peripheral edge of the branch port to the main passage side A branch pipe body having a branch body portion having a branch passage and a flange portion formed at one end of the branch body portion is prepared while setting a rubber filling portion composed of a provided skirt portion, and the branch Setting the branch pipe body to connect the passage to the connecting passage;
Setting the branch pipe body and the main hose in a mold so as to form a cavity on the outer peripheral side of the branch pipe body;
Injecting a rubber material into the cavity, and then vulcanizing the injected rubber material and the rubber material of the rubber filling portion to form a rubber molding portion integrated with the rubber filling portion;
It is provided with.
[0006]
In the branch connection pipe manufactured by the first invention , the sub hose is connected from the main hose via the branch connection portion. The branch connection part is comprised from the branch pipe main body, the rubber filling part, and the rubber molding part. The branch pipe main body is provided with a flange portion at one end thereof, and this flange portion is arranged on the outer peripheral side of the main hose with a predetermined gap, and the rubber filling portion and the rubber molding portion are filled in the predetermined interval. Yes. Thereby, a flange part is embed | buried under a rubber molding part and it stops. Since such a flange portion is not disposed in the main passage of the main hose, the resistance of the fluid flowing through the main passage is not increased.
[0007]
In addition, the rubber filling part is the opening peripheral part of the branch port and is a skirt part on the main passage side, and has a large effect of preventing the secondary hose from falling off, and when integrated with the rubber molding part by vulcanization, A gap in the passage connecting the main hose and the sub hose can be eliminated, and fluid leakage can be reliably prevented.
[0008]
The second invention is
A main hose having a branch port connected to a main passage through which a fluid flows, a sub hose having a sub passage connected via the branch port, and a branch connection portion connecting the main hose and the sub hose. In a manufacturing method for manufacturing a branched connecting pipe,
The step of manufacturing the branch connection part is as follows:
A cylindrical part formed of an unvulcanized or semi-vulcanized rubber material and having a connecting passage connected to the branch port, and integral with the cylindrical body part, from the opening peripheral edge of the branch port to the main passage side A step of setting a rubber filling portion configured from the provided hem portion; and
A step of forming a flange portion at one end of the sub hose, connecting the sub passage to the connecting passage, and setting the main hose and the sub hose in a mold so as to form a cavity on the outer peripheral side of the flange portion. When,
Injecting a rubber material into the cavity, and then vulcanizing the injected rubber material and the rubber material of the rubber filling portion to form a rubber molding portion integrated with the rubber filling portion;
It is provided with.
[0009]
The manufacturing method according to the second invention is such that a flange portion is formed at one end of the auxiliary hose without using the branch pipe body according to the first invention, and the number of parts is reduced from that of the first invention. Yes.
[0010]
The third invention is
In a method of manufacturing a branch connection pipe comprising a main hose having a branch port connected to a main passage through which a fluid flows, and a branch connection part connected to the branch port,
The step of manufacturing the branch connection part is as follows:
A cylindrical part formed of an unvulcanized or semi-vulcanized rubber material and having a connecting passage connected to the branch port, and integral with the cylindrical body part, from the opening peripheral edge of the branch port to the main passage side A step of setting a rubber filling portion composed of the arranged hem portion; and
A branch pipe body having a branch body portion having a branch passage communicating with the outside and a flange portion formed at one end of the branch body portion is prepared, the branch passage is connected to the connection passage, and the branch A step of setting the branch pipe body and the main hose in a mold so as to form a cavity on the outer peripheral side of the pipe body;
Injecting a rubber material into the cavity, and then vulcanizing the injected rubber material and the rubber material of the rubber filling portion to form a rubber molding portion integrated with the rubber filling portion;
It is provided with.
[0011]
The manufacturing method according to the third aspect of the invention can be suitably applied even when the sub hose according to the first aspect of the invention is not used. The branch passage of the branch pipe body may be provided with a closing member that is mounted so as to close at least a part thereof. This closing member can be a sealing plug when a secondary hose is not connected to the branch pipe body, a plug having an air vent passage communicating with the outside, or a plug for mounting a water temperature sensor. Can be realized as a preferred embodiment.
[0012]
Here, as a preferable aspect of the branch connection portion, a space is formed by projecting the opening peripheral edge portion of the branch opening of the main hose to the outer peripheral side of the main hose, and the skirt portion of the rubber filling portion is formed in the space. It is preferable to arrange so that the flow passage area of the main passage of the main hose is not changed. With this configuration, since the skirt portion of the rubber filling portion does not protrude into the main passage of the main hose, the resistance of the fluid flowing through the main passage is not increased.
[0014]
According to the first to third inventions, the main hose, the branch pipe main body, the rubber filler, etc. are set in the mold, the rubber material is injected around the branch pipe main body, and vulcanized to form the rubber molded portion. Can be easily formed.
[0015]
DETAILED DESCRIPTION OF THE INVENTION
In order to further clarify the configuration and operation of the present invention described above, preferred embodiments of the present invention will be described below.
[0016]
FIG. 1 is a perspective view showing a branching portion of a
[0017]
FIG. 2 is a cross-sectional view taken along line 2-2 of FIG. As shown in FIG. 2, the
[0018]
The
[0019]
FIG. 3 is an enlarged sectional view showing the vicinity of the
[0020]
The
[0021]
Returning to FIG. 2, the lower portions of the
[0022]
Next, the manufacturing method of a branch connection pipe is demonstrated. 4 to 10 are explanatory views for explaining a series of manufacturing steps of the branch connection pipe. As shown in FIG. 4, first, an
[0023]
Subsequently, the
[0024]
Next, the process of connecting the
[0025]
Subsequently, an unvulcanized rubber ring material 56Ab is loaded into the space Sp. That is, a rubber ring material 56Ab in which an unvulcanized rod-shaped rubber material is formed in an annular shape is formed, and when this rubber ring material 56Ab is placed on the outer periphery of the
[0026]
Subsequently, as shown in FIG. 9, the step of positioning the branch pipe
[0027]
Subsequently, as shown in FIG. 10, a step of setting the
[0028]
In the next step, after the
[0029]
According to the branch connection pipe according to the above embodiment, the passage from the
[0030]
Further, since the
[0031]
Furthermore, since the
[0032]
In addition, the vicinity of the
[0033]
Further, as shown in FIG. 11, the
[0034]
Further, since the
[0035]
Furthermore, in the rubber injection molding process shown in FIG. 10, the
[0036]
The present invention is not limited to the above-described embodiments, and can be implemented in various modes without departing from the gist thereof. For example, the following modifications are possible.
[0037]
(1) FIG. 12 is a cross-sectional view showing a branch connection pipe according to a second embodiment. In FIG. 12, the present embodiment is characterized in that the
[0038]
(2) FIG. 13 is an explanatory diagram showing the flange portions of the branch pipe
[0039]
(3) FIG. 14 is a cross-sectional view showing a rubber filler 190A according to another embodiment. In the present embodiment, as described in FIG. 10 of the first embodiment, instead of the
[0040]
(4) The rubber material forming the
[0041]
(5) FIG. 15 is a sectional view showing the vicinity of a
[0042]
In the above configuration, when the male screw portion 61Db of the
[0043]
Further, since the outer diameter d1 of the sealing portion 61Dc of the
[0044]
The
[0045]
(6) FIG. 16 is a cross-sectional view showing the vicinity of a branch connection portion 40E according to still another embodiment. The present embodiment is characterized in that the
[0046]
With such a configuration, when the small diameter part 61Ec of the
[Brief description of the drawings]
FIG. 1 is a perspective view showing a branch portion of a
FIG. 2 is a cross-sectional view taken along line 2-2 of FIG.
3 is an enlarged cross-sectional view showing the vicinity of a
FIG. 4 is an explanatory diagram for explaining a process for manufacturing a
FIG. 5 is an explanatory diagram illustrating a process of setting the
FIG. 6 is an explanatory diagram illustrating a process of vulcanizing the
FIG. 7 is an explanatory diagram for explaining a process of forming a
FIG. 8 is an explanatory diagram for explaining a state in which the
FIG. 9 is an explanatory diagram for explaining a process of positioning the
10 is a cross-sectional view showing a state where the
FIG. 11 is a cross-sectional view showing a main part of a branch connection pipe.
FIG. 12 is a cross-sectional view showing a branch connection pipe according to a second embodiment.
FIG. 13 is an explanatory view illustrating a modification of the
FIG. 14 is a cross-sectional view showing a rubber filler 190A according to another embodiment.
FIG. 15 is a cross-sectional view showing a peripheral portion of a
FIG. 16 is a cross-sectional view showing a peripheral portion of a branch connection portion 40E according to another embodiment.
FIG. 17 is a cross-sectional view showing a branch connection pipe according to a conventional technique.
[Explanation of symbols]
DESCRIPTION OF
Claims (4)
上記分岐接続部を製造する工程は、
未加硫または半加硫のゴム材料から形成され、上記分岐口に接続される連結通路を有する筒体部および該筒体部と一体であり上記分岐口の開口周縁部から上記主通路側にわたって設けられた裾部から構成されたゴム充填部をセットするとともに、分岐通路を有する分岐本体部と該分岐本体部の一端部に形成されたフランジ部とを有する分岐管本体を準備し、上記分岐通路を上記連結通路に接続するように分岐管本体をセットする工程と、
上記分岐管本体の外周側にキャビティを形成するように上記分岐管本体および上記主ホースを金型にセットする工程と、
上記キャビティにゴム材料を注入し、その後、該注入したゴム材料および上記ゴム充填部のゴム材料を加硫することで上記ゴム充填部と一体になったゴム成形部を形成する工程と、
を備えたことを特徴とする分岐接続管の製造方法。A main hose having a branch port connected to a main passage through which a fluid flows, a sub hose having a sub passage connected via the branch port, and a branch connection portion connecting the main hose and the sub hose. In the method of manufacturing a branched connecting pipe,
The step of manufacturing the branch connection part is as follows:
A cylindrical part formed of an unvulcanized or semi-vulcanized rubber material and having a connecting passage connected to the branch port, and integral with the cylindrical body part, from the opening peripheral edge of the branch port to the main passage side A branch pipe body having a branch body portion having a branch passage and a flange portion formed at one end of the branch body portion is prepared while setting a rubber filling portion composed of a provided skirt portion, and the branch Setting the branch pipe body to connect the passage to the connecting passage;
Setting the branch pipe body and the main hose in a mold so as to form a cavity on the outer peripheral side of the branch pipe body;
Injecting a rubber material into the cavity, and then vulcanizing the injected rubber material and the rubber material of the rubber filling portion to form a rubber molding portion integrated with the rubber filling portion;
A method for manufacturing a branch connection pipe, comprising:
上記分岐接続部を製造する工程は、
未加硫または半加硫のゴム材料から形成され、上記分岐口に接続される連結通路を有する筒体部および該筒体部と一体であり上記分岐口の開口周縁部から上記主通路側にわたって設けられた裾部から構成されたゴム充填部をセットする工程と、
上記副ホースの一端部にフランジ部を形成し、上記副通路を上記連結通路に接続するとともに、上記フランジ部の外周側にキャビティを形成するように主ホースおよび副ホースを金型にセットする工程と、
上記キャビティにゴム材料を注入し、その後、該注入したゴム材料および上記ゴム充填部のゴム材料を加硫することで上記ゴム充填部と一体になったゴム成形部を形成する工程と、
を備えたことを特徴とする分岐接続管の製造方法。A main hose having a branch port connected to a main passage through which a fluid flows, a sub hose having a sub passage connected via the branch port, and a branch connection portion connecting the main hose and the sub hose. In a manufacturing method for manufacturing a branched connecting pipe,
The step of manufacturing the branch connection part is as follows:
A cylindrical part formed of an unvulcanized or semi-vulcanized rubber material and having a connecting passage connected to the branch port, and integral with the cylindrical body part, from the opening peripheral edge of the branch port to the main passage side A step of setting a rubber filling portion configured from the provided hem portion; and
A step of forming a flange portion at one end of the sub hose, connecting the sub passage to the connecting passage, and setting the main hose and the sub hose in a mold so as to form a cavity on the outer peripheral side of the flange portion. When,
Injecting a rubber material into the cavity, and then vulcanizing the injected rubber material and the rubber material of the rubber filling portion to form a rubber molding portion integrated with the rubber filling portion;
A method for manufacturing a branch connection pipe, comprising:
上記分岐接続部を製造する工程は、
未加硫または半加硫のゴム材料から形成され、上記分岐口に接続される連結通路を有する筒体部および該筒体部と一体であり上記分岐口の開口周縁部から上記主通路側にわたって配置された裾部とから構成されたゴム充填部をセットする工程と、
外部に連通する分岐通路を有する分岐本体部と、該分岐本体部の一端部に形成されたフランジ部とを有する分岐管本体を準備し、上記分岐通路を上記連結通路に接続するとともに、上記分岐管本体の外周側にキャビティを形成するように、上記分岐管本体および上記主ホースを金型にセットする工程と、
上記キャビティにゴム材料を注入し、その後、該注入したゴム材料および上記ゴム充填部のゴム材料を加硫することで上記ゴム充填部と一体になったゴム成形部を形成する工程と、
を備えたことを特徴とする分岐接続管の製造方法。In a method of manufacturing a branch connection pipe comprising a main hose having a branch port connected to a main passage through which a fluid flows, and a branch connection part connected to the branch port,
The step of manufacturing the branch connection part is as follows:
A cylindrical part formed of an unvulcanized or semi-vulcanized rubber material and having a connecting passage connected to the branch port, and integral with the cylindrical body part, from the opening peripheral edge of the branch port to the main passage side A step of setting a rubber filling portion composed of the arranged hem portion; and
A branch pipe body having a branch body portion having a branch passage communicating with the outside and a flange portion formed at one end of the branch body portion is prepared, the branch passage is connected to the connection passage, and the branch A step of setting the branch pipe body and the main hose in a mold so as to form a cavity on the outer peripheral side of the pipe body;
Injecting a rubber material into the cavity, and then vulcanizing the injected rubber material and the rubber material of the rubber filling portion to form a rubber molding portion integrated with the rubber filling portion;
A method for manufacturing a branch connection pipe, comprising:
上記主ホースの分岐口の周辺部を該主ホースの外周側へ突出させることにより、上記分岐口の開口周縁部でありかつ主通路側にスペースを形成し、該スペースは、上記ゴム充填部の裾部が主ホースの主通路の流路面積を変更しないように形成されている分岐接続管の製造方法。In the manufacturing method in any one of Claim 1 thru | or 3,
By projecting the peripheral part of the branch port of the main hose to the outer peripheral side of the main hose, a space is formed on the peripheral edge side of the branch port and on the main passage side, and the space is formed on the rubber filling part. A method for manufacturing a branch connection pipe in which a skirt portion is formed so as not to change a flow passage area of a main passage of a main hose.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP17814898A JP3743166B2 (en) | 1998-06-09 | 1998-06-09 | Manufacturing method of branch connection pipe |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP17814898A JP3743166B2 (en) | 1998-06-09 | 1998-06-09 | Manufacturing method of branch connection pipe |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH11351483A JPH11351483A (en) | 1999-12-24 |
| JP3743166B2 true JP3743166B2 (en) | 2006-02-08 |
Family
ID=16043486
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP17814898A Expired - Fee Related JP3743166B2 (en) | 1998-06-09 | 1998-06-09 | Manufacturing method of branch connection pipe |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP3743166B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2014077360A (en) * | 2012-10-09 | 2014-05-01 | Nifco Inc | Flow channel member |
-
1998
- 1998-06-09 JP JP17814898A patent/JP3743166B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH11351483A (en) | 1999-12-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US5529743A (en) | Methods for the manufacture of clean air ducts | |
| JP2001113590A (en) | Tank insert and its manufacturing method | |
| KR100243511B1 (en) | Manufacturing method of tire tube containing sealant | |
| US7678324B2 (en) | Method for forming a hollow plastic product | |
| EP0606484B1 (en) | Resin hose manufacturing method | |
| JP3743166B2 (en) | Manufacturing method of branch connection pipe | |
| CN107921863A (en) | Liquid vehicle tank comprising a fastened component | |
| KR102302975B1 (en) | Liquid container for automobile and injection molding method thereof | |
| JP4089870B2 (en) | Flange member with barrier layer | |
| EP1089029A2 (en) | Coupling sleeve for connecting a metal pipe and a resin hose | |
| JP3695246B2 (en) | Branch connection pipe and its manufacturing method | |
| JP4301707B2 (en) | Will | |
| JP3873839B2 (en) | Manufacturing method of branch connection pipe | |
| EP0944465B1 (en) | Method and mould for moulding a sealing assembly comprising a sealing ring and a retaining ring | |
| CN108778814A (en) | blow molded inlet check valve support | |
| JPH09290814A (en) | Liquid tank with nipple | |
| JP4096400B2 (en) | Branch hose and manufacturing method thereof | |
| JP4058545B2 (en) | Manufacturing method of waterproof connector housing | |
| CN113137502B (en) | Check valve and method for manufacturing a check valve | |
| CN113165767A (en) | Storage container and method for manufacturing same | |
| JPH1148800A (en) | Resin fuel pipe for automobile | |
| JPH0318366Y2 (en) | ||
| JP2574113Y2 (en) | Fuel leakage prevention valve for vehicles | |
| JPH04319420A (en) | Manufacture of hose | |
| JPH07125047A (en) | Hose manufacturing method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20050125 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20050315 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050511 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20050607 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20050804 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20051025 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20051107 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081125 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091125 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091125 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101125 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20101125 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111125 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111125 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121125 Year of fee payment: 7 |
|
| LAPS | Cancellation because of no payment of annual fees |