Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP3799499B2 - Ground anchor construction and ground anchor structure using trumpet pipe - Google Patents
[go: Go Back, main page]

JP3799499B2 - Ground anchor construction and ground anchor structure using trumpet pipe - Google Patents

Ground anchor construction and ground anchor structure using trumpet pipe Download PDF

Info

Publication number
JP3799499B2
JP3799499B2 JP2002362355A JP2002362355A JP3799499B2 JP 3799499 B2 JP3799499 B2 JP 3799499B2 JP 2002362355 A JP2002362355 A JP 2002362355A JP 2002362355 A JP2002362355 A JP 2002362355A JP 3799499 B2 JP3799499 B2 JP 3799499B2
Authority
JP
Japan
Prior art keywords
pipe
trumpet
ground anchor
casing
grout material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002362355A
Other languages
Japanese (ja)
Other versions
JP2004190427A (en
Inventor
進一 安藤
Original Assignee
株式会社日本海技術コンサルタンツ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社日本海技術コンサルタンツ filed Critical 株式会社日本海技術コンサルタンツ
Priority to JP2002362355A priority Critical patent/JP3799499B2/en
Publication of JP2004190427A publication Critical patent/JP2004190427A/en
Application granted granted Critical
Publication of JP3799499B2 publication Critical patent/JP3799499B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、ラッパ管を用いたグラウンドアンカー工及びその構造体に関するものである。
【0002】
【従来の技術】
グラウンドアンカー工は、不安定な地盤や岩盤を直接安定な地盤や岩盤に緊結して崩落・剥落を防止するために用いられる工法であり、基盤内にボーリングで削孔しセメントモルタル等を注入してアンカー体を形成する方法で、次の3つの基本的要素からなる。
「アンカー頭部」:構造物からの力を引張り部に無理なく引張り力として伝達させるための部分。
「引張り部」:引張り力を基盤内のアンカー体へ伝達する部分。
「アンカー体」:引張り部からの引張り力を基盤に伝達し抵抗する部分。
【0003】
グラウンドアンカー工の一般的な施工方法は、図7に示すように、例えばロータリーパーカッション式削孔機で基盤に至る深さまで掘削した削孔に、ケーシングパイプ2を挿入する[同図(a)]。そして、同図(b)のように該ケーシングパイプ2内にグラウト材Gを充填して、テンドン4(引張材)を挿通する[同図(c)]。次に、同図(d)のようにケーシングパイプ2を引き抜きながらグラウト材Gを加圧注入して、アンカー体3を形成する。このようにして安定層に形成したアンカー体3と、地表面に設けた構造物との間で、引張り部を緊張させることによって、不安定層の補強が図られる[同図(e)]。
【0004】
グラウンドアンカー工の主な特徴は、引張り部にプレストレスをかけることにより、滑落の危険のある斜面を押さえ付けて安定化させる締め付け機能。引張り部の引張強さを利用して地滑り土塊が滑動しようとするのを引き止めるものであるが、杭工と異なり引張り部に対して初期にある程度のプレストレスをかけることで、引張り部の伸び(地滑りによる変形量)の少ない段階で抑止効果が上げられる初期引き止め機能がある。この他、アンカー体を滑り面を挟んで形成し、引張り部の引張強さによる滑り面の強度を高める縫い合わせ機能がある。
【0005】
【発明が解決しようとする課題】
上述したように、斜面補強工としてグラウンドアンカー工を採用する上で、最も期待される効果は、引張り部にプレストレスがかけられるという点にあるということはいうまでもない。ところが、従来のグラウンドアンカー工においては、最大の特徴であるプレストレスが構造的にほとんどかけることができないのが実情であった。
【0006】
これは、不安定層の圧縮すべき部分がグラウト材の注入によってアンカー体と連続して一体となってしまうためである。このような現象は、ケーシング加圧注入方法において生じ、アンカー頭部に与えられたプレストレスが、圧縮すべき部分にまで侵入したグラウト材にかかり、この部分のグラウト材が破壊しない限り不安定層に圧縮域が生じないことになる。仮に、グラウト材が破壊しても圧縮は破壊局部に限られるし、グラウト材による張り的性格が不安定層全域で失われない限り、グラウンドアンカー工の実質的な機能が充分発揮できないことになる。
【0007】
【課題を解決するための手段】
そこで本発明者は上記問題に鑑み鋭意研究の結果、本発明を成し得たものであり、その特徴とするところは、グラウンドアンカー工において、削孔に圧入したケーシングパイプに、引張材との間に隙間を有する径のパイプ部と該パイプ部の先端部に設けられこれに連通する拡径部とにより構成したラッパ管を挿通し、該ケーシングパイプ内に充填されたグラウト材を該ラッパ管のパイプ部を通じて排出させることにより該パイプ部外面側に形成した空隙に、該引張材の緊張後に固化させるモルタル類を注入することにある。(第1発明)
【0008】
或いは、グラウンドアンカー工において、ケーシングパイプにグラウト材を圧入して基盤内にアンカー体部を形成後、引張材との間に隙間を有する径のパイプ部と該パイプ部の先端部に設けられこれに連通する拡径部とによって構成したラッパ管を、該ケーシングパイプ内に挿通することによって、該ケーシングパイプと該ラッパ管との間のグラウト材を該ラッパ管のパイプ部を通じて排出し、該ケーシングパイプを引き抜いた後、モルタル類を充填する注入パイプを削孔壁とラッパ管との間の空隙に挿入することにある。(第2発明)
【0009】
或いは、アンカー体と地表構造物との間で緊張させた引張材の周囲に、ケーシングパイプ内に挿通して充填されたグラウト材を排出させるもので該引張材との間に隙間を有する径のパイプ部と該パイプ部の先端部に設けられこれに連通する拡径部とによって構成したラッパ管と、該パイプ部と該引張材との間のグラウト材と、該パイプ部と削孔壁との間に注入したモルタル類と、を配したことにある。(第3発明)
【0010】
ここで、本明細書中でいう「アンカー体」とは、地表から安定基盤に至る深さまで削孔機で削孔した孔に、ケーシングパイプを挿通し、該ケーシングパイプ内にセメントミルクやセメントモルタルなどのグラウト材を圧入することによって、基盤内に形成する塊をいう。削孔機には、種々の構造のものがあるが、例えばロータリーパーカッション型やダウンザホールハンマー型などがある。ロータリーパーカッション型ではケーシングパイプを引き抜きながらグラウト材を圧入してアンカー体を形成するが、ダウンザホールハンマー型はアンカー体を形成する部分が一連の工程で削孔され、ケーシングパイプを引き抜くことなくアンカー体が形成される。本発明においては、ケーシングパイプにラッパ管を挿通することにより、アンカー体までのグラウト材を除去することから、アンカー体部としてはケーシングパイプの径と同じ程度でもよい。
【0011】
「引張材」とは、一端をアンカー体に埋設し、他端を地表側から引っ張ることによってプレストレスをかける鋼材をいう。一般的には、PC鋼より線、PC鋼複合より線束、PC鋼棒などが用いられる。通常、引張材にはシースを被せて内部にグリスなどの防錆材を封入する。一般的にマンションや定着体などを設けたものをテンドンと称している。
【0012】
「ラッパ管」とは、ケーシングパイプ内に充填されたグラウト材の一部を外部に排出するための部材をいう。これは、ケーシングパイプ内にグラウト材を加圧注入してアンカー体部を形成した後、ラッパ管を該ケーシングパイプ内に挿通することで、拡径部からパイプ部の内部を通じてグラウト材を外部に排出させて、アンカー頭部の引張り力をアンカー体に確実に伝達させるようにするためのものである。ラッパ管の挿通長さは、基本的にアンカー体まで行う。つまり、ケーシングパイプとラッパ管との間のグラウト材を取り除くと共に、アンカー体注入グラウト材の自由長部への流出を防ぐことを基本とする。
【0013】
本発明の最大の目的は、不安定層の圧縮すべき部分がグラウト材の注入によってアンカー体と連続して一体となり、不安定層に圧縮域が生じなくなることを防止することである。そしてその上で、ラッパ管と削孔壁との間に生じた空隙にモルタル類を注入して引張材の保護をより確実にすることにある。これらのことから、不安定層に圧縮域が生じる程度にラッパ管を挿通して(アンカー体に届かない長さ)、ケーシングパイプとラッパ管との間のグラウト材の一部(自由長部の軸方向の一部)を取り除くだけでもよい。
【0014】
ラッパ管は、パイプ部とこれの先端に設けて連通する拡径部とによって構成する。パイプ部は引張材に嵌め込む部分であり、グラウト材はパイプ部の中を通って排出される。このため、パイプ部の内径は引張材との間に隙間を生じる径とする。材質は特に限定するものではないが、アルミニウムやポリ塩化ビニルなどのプラスチックで軽量にするのが好ましい。
【0015】
拡径部は、パイプ部の先端に設けることにより、ケーシングパイプ内のグラウト材を該パイプ部に導入させるためのもので、円錐台状やお椀型である。これの材質はゴム・皮・合成ゴム・合成皮革などの軟質部材で形成して、ケーシングパイプの内周面に沿わせるようにする。拡径部でケーシングパイプ内周面部分のグラウト材まで取り除くようにするのが好ましいが、ある程度残っても引張材の緊締時に容易に破壊されることや、ケーシングパイプ引き抜き時に取り除かれる場合もある。従って、ケーシングパイプの内径に対して隙間が生じる径でもよく、金属やプラスチックなどの硬質部材で形成しても、アンカー体の引張を阻害するグラウト材のほとんどを取り除くことができる。
【0016】
拡径部には先端側にガイド部材を設けておくのが好ましい。これは、ケーシングパイプ内にカップリングなどの異径部分が存在すると、拡径部が引っ掛かってそれ以上挿通できなくなる可能性があるためである。ガイド部材としては、例えば金属やプラスチックなどのピン状のものを適宜間隔に設けておく。この場合、ガイド部材が異径部分に引っ掛からないように内方に傾斜させて設けたり、先端部を内方に曲げておく。
【0017】
ラッパ管は、挿通させた状態で残存させておくことにより、引張材の防錆に大きく寄与する。また、ラッパ管と引張材との間に残存するグラウト材も引張材の保護に寄与することから、ラッパ管挿通後にパイプ部にキャップを被せるなどの方法で内部のグラウト材がアンカー体側に流出しないようにするのが好ましい。挿通したラッパ管は、通常、パイプ部が引張材より突出した状態となるため、ケーシングパイプを引き抜いた後、パイプ部を切断することによって引張材の頭部を露出させる。この場合、パイプ部を継ぎ手構造とすることで、切断することなく継ぎ手部分を取り外すようにしてもよい。
【0018】
「注入パイプ」とは、ラッパ管でグラウト材を排出させたことによって、削孔壁と該ラッパ管との間に生じた隙間に挿入する部材であり、コンクリートやモルタルなどのモルタル類を注入するための部材をいう。この注入パイプは、ラッパ管でグラウト材を排出した後、ケーシングパイプを引き抜いた後に挿入する。モルタル類の注入は、テンドンの緊張に影響を与えないように、緊張後に固化するように行う。通常、受圧板や支圧板などを取り付けてテンドンを緊張させて定着した後で注入する。再緊張を必要とする場合は、その後に注入する。注入パイプは、モルタル類を注入して引き抜く他、切断して内部に放置してもよい。
【0019】
【発明の実施の形態】
以下、本発明を図面に示す発明の実施の形態に基づいて詳細に説明する。
【0020】
ラッパ管を用いたグラウンドアンカー工の実施の形態の一例を図1に示す。先ず、(a)のようにダウンザホールハンマー型削孔機でケーシングパイプ2を挿通する孔と、アンカー体3を形成する孔を削孔し、(b)のようにケーシングパイプ2とテンドン(引張材)4を挿入する。次に、(c)のようにグラウト材Gをケーシングパイプ2内に加圧注入してアンカー体3を形成する。以上までの工程は、従来のグラウンドアンカー工と同様である。
【0021】
アンカー体3を形成した段階で、(d)のようにケーシングパイプ2内へラッパ管1を押し込む。ラッパ管1の挿通によって、該ケーシングパイプ2内のグラウト材Gがラッパ管1のパイプ部11を通じて外部に排出される。グラウト材Gの排出後は、一般的なグラウンドアンカー工と同様にケーシングパイプ2の引き抜き(e)、緊張(f)、定着(g)で完了する。
【0022】
ラッパ管1の実施の形態の一例を図2に示す。ラッパ管1は、同図(a)のようにパイプ部11と拡径部12とによって構成し、該拡径部12の先端部には同図(b)のように内方に折曲させた複数のガイド部材13を設けている。本例では、挿通したラッパ管1の頭部を処理するためのラッパ管ストッパーシース14を装着した例を示している。同図(c)は、ラッパ管1をケーシングパイプ2内に押し込んでいる状態であり、拡径部12でかき込まれたグラウト材Gがパイプ部11内部のテンドン4との隙間を通じて排出される状態を示している。また、本例のようにケーシングパイプ2内にカップリング21の存在による異径部分がある場合でも、ガイド部材13によって拡径部12が図の鎖線のように変形して押し込むことができる。
【0023】
ラッパ管を用いたグラウンドアンカー工で施工したアンカーの構造は、図3に示すように自由長部にテンドン4による圧縮を阻害させるものが存在せず、引張り部からの引張り力をアンカー体3に確実に伝達でき、二次引張も効果的に行うことが可能となる。
【0024】
図4は、本発明の第1発明に係るラッパ管を用いたグラウンドアンカー工の実施の形態の一例を示すもので、受圧板6や支圧板7の取り付けなどテンドン頭部の処理を行って緊張させる。そして、削孔壁とラッパ管1との間の空隙に挿入した注入パイプ5からモルタル類8を注入する。通常、緊張後に受圧板7の沈下などの検査確認を実行し、再緊張が必要な場合はその後にモルタル類8の注入を行う。注入パイプ5は、注入後切断して内部に残存させたり、注入しながら引き抜いて作業が完了する。
【0025】
図5は、本発明の第2発明に係るラッパ管を用いたグラウンドアンカー工の実施の形態の一例を示すもので、ケーシングパイプ2を引き抜いた後、削孔壁とラッパ管1との間の空隙に注入パイプ5を挿入する。モルタル類の注入は、この時点では行わず、テンドン4の緊張が確実になった後で行う。注入パイプ5の挿入は、ケーシングパイプ2を引き抜いた後であればよく、テンドン4を緊張させて検査した後でもよい。本例では、ホルダー17を孔口に設置して、ラッパ管1のパイプ部11を削孔のほぼセンターに位置させるようにしている。また、ラッパ管のグラウト材排出部15であるパイプ部11に、内部のグラウト材Gがアンカー体3側に流出しないようにキャップ16を被せている。
【0026】
本発明の第3発明に係るグラウンドアンカー構造体30は、支圧板7などの地表構造物とアンカー体3との間で緊張させたテンドン4の周囲を、複数の層で覆うことができ、テンドン4の保護効果が極めて高くなる。これは、図6に示すように、ラッパ管1のパイプ部11、該パイプ部11とテンドン4との間に残存したグラウト材G、そして注入パイプ5によって注入したモルタル類8、によって保護されることになる。また、テンドン4自体シース42に防錆剤を充填して引張材41を覆った構造であることから、地盤の乱れなどによるシース42の損傷を防止する効果のみならず、シース42損傷防止による引張材41の防錆効果に大きく寄与することになる。
【0027】
【発明の効果】
以上のように本発明に係るラッパ管を用いたグラウンドアンカー工及びグラウンドアンカー構造体は、自由長部にプレストレスを確実にかけることができるラッパ管を用いたグラウンドアンカー工を基本とし、ラッパ管挿通によって生じた空隙にモルタル類を注入したことにより、テンドンひいては引張材の保護をより確実にすることができ、耐久性、施工性、安全性に優れたグラウンドアンカー工本来の機能を充分に活かすことができる。
【図面の簡単な説明】
【図1】(a)乃至(g)は、ラッパ管を用いたグラウンドアンカー工の実施の形態の一例を示す概略側面図である。
【図2】本発明に利用するラッパ管の実施の形態の一例を示すもので、(a)は縦断面図、(b)は拡径部の斜視図、(c)はラッパ管の使用状態の一例を示す概略断面図である。
【図3】ラッパ管を挿通したグラウンドアンカー工の構造体の実施の形態の一例を示す概略断面図である。
【図4】本発明の第1発明に係るラッパ管を用いたグラウンドアンカー工の実施の形態の一例を示す概略断面図である。
【図5】本発明の第2発明に係るラッパ管を用いたグラウンドアンカー工の実施の形態の一例を示す概略断面図である。
【図6】本発明の第3発明に係るグラウンドアンカー構造体の実施の形態の一例を示す概略断面図である。
【図7】(a)乃至(e)は、夫々従来のグラウンドアンカー工の一例を示す概略断面図である。
【符号の説明】
G グラウト材
1 ラッパ管
11 パイプ部
12 拡径部
13 ガイド部材
14 ラッパ管ストッパーシース
15 グラウト材排出部
16 キャップ
17 ホルダー
2 ケーシングパイプ
21 カップリング
3 アンカー体
4 テンドン
41 引張材
42 シース
5 注入パイプ
6 受圧板
7 支圧板
8 モルタル類
30 グラウンドアンカー構造体
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a ground anchor construction using a trumpet pipe and a structure thereof.
[0002]
[Prior art]
Ground anchor method is a method used to prevent unstable collapse or peeling by bonding unstable ground or rock directly to stable ground or rock, and drilling holes in the base to inject cement mortar etc. The anchor body is formed by the following three basic elements.
"Anchor head": A part that allows force from the structure to be transmitted to the tension part as a tension force.
"Tensile part": A part that transmits the tensile force to the anchor body in the base.
"Anchor body": A part that transmits the tensile force from the tension part to the base and resists it.
[0003]
As shown in FIG. 7, the general construction method of the ground anchor method is to insert the casing pipe 2 into a drilled hole drilled to a depth to the base, for example, with a rotary percussion drilling machine [FIG. . Then, the grout material G is filled into the casing pipe 2 and the tendon 4 (tensile material) is inserted through the casing pipe 2 as shown in FIG. Next, the grout material G is injected under pressure while the casing pipe 2 is pulled out as shown in FIG. The unstable layer is reinforced by tensioning the tension portion between the anchor body 3 formed in the stable layer in this way and the structure provided on the ground surface [(e)].
[0004]
The main feature of the ground anchor work is a tightening function that presses and stabilizes the slope where there is a risk of slipping by prestressing the tension part. The tensile strength of the tensile part is used to prevent the landslide mass from trying to slide, but unlike the pile work, by applying a certain amount of prestress to the tensile part at an early stage, the elongation of the tensile part ( There is an initial detent function that can increase the deterrent effect when the amount of deformation due to landslide is small. In addition, there is a sewing function in which the anchor body is formed across the sliding surface and the strength of the sliding surface is increased by the tensile strength of the tensile portion.
[0005]
[Problems to be solved by the invention]
As described above, it goes without saying that the most expected effect in adopting the ground anchor method as the slope reinforcing work is that a prestress is applied to the tension portion. However, in the conventional ground anchor construction, the prestress, which is the greatest feature, is hardly structurally applied.
[0006]
This is because the portion of the unstable layer to be compressed is continuously integrated with the anchor body by the injection of the grout material. Such a phenomenon occurs in the casing pressure injection method. Prestress applied to the anchor head is applied to the grout material that has penetrated to the portion to be compressed, and the unstable layer is not damaged unless the grout material in this portion is broken. No compression zone will occur. Even if the grout material breaks, the compression is limited to the fracture locality, and unless the tensile property of the grout material is lost throughout the unstable layer, the substantial function of the ground anchor construction cannot be fully exhibited. .
[0007]
[Means for Solving the Problems]
Therefore, the present inventor has been able to achieve the present invention as a result of intensive studies in view of the above problems, and the feature thereof is that in the ground anchor work, the casing pipe press-fitted into the drilling hole is connected with a tensile material. A trumpet pipe composed of a pipe portion having a gap in between and a diameter-enlarged portion provided at the tip portion of the pipe portion and communicating with the pipe portion is inserted, and the grout material filled in the casing pipe is inserted into the trumpet tube. It is to inject mortars to be solidified after tension of the tensile material into the gap formed on the outer surface side of the pipe part by discharging through the pipe part. (First invention)
[0008]
Or, in ground anchor work, after the grout material is press-fitted into the casing pipe to form the anchor body part in the base, it is provided at the diameter of the pipe part having a gap between the tensile material and the tip part of the pipe part. A trumpet pipe formed by an enlarged diameter portion communicating with the casing pipe is inserted into the casing pipe, whereby the grout material between the casing pipe and the trumpet pipe is discharged through the pipe section of the trumpet pipe, and the casing After pulling out the pipe, an injection pipe filled with mortars is inserted into the gap between the drilling wall and the trumpet pipe. (Second invention)
[0009]
Alternatively, the grout material inserted through the casing pipe and discharged around the tension material tensioned between the anchor body and the surface structure is discharged, and has a diameter having a gap between the tension material. A trumpet pipe formed by a pipe portion and a diameter-expanded portion provided at a tip portion of the pipe portion and communicating with the pipe portion, a grout material between the pipe portion and the tensile material, the pipe portion and a drilling wall, And mortars injected between the two. (Third invention)
[0010]
Here, the “anchor body” in the present specification means that a casing pipe is inserted into a hole drilled by a drilling machine from the ground surface to a depth from the stable base to cement milk or cement mortar in the casing pipe. It refers to a lump formed in the base by press-fitting grout material. There are various hole drilling machines, for example, a rotary percussion type and a down-the-hole hammer type. In the rotary percussion type, the anchor body is formed by press-fitting the grout material while pulling out the casing pipe, but in the down-the-hole hammer type, the anchor forming portion is drilled in a series of processes, and the anchor body is not pulled out. It is formed. In the present invention, since the grout material up to the anchor body is removed by inserting the trumpet pipe through the casing pipe, the anchor body portion may have the same diameter as the casing pipe.
[0011]
“Tensile material” refers to a steel material that is prestressed by embedding one end in an anchor body and pulling the other end from the ground surface side. Generally, a PC steel strand, a PC steel composite wire bundle, a PC steel rod, or the like is used. Usually, a tensile material is covered with a sheath and a rust preventive material such as grease is enclosed inside. Generally, an apartment or a fixed body is called a tendon.
[0012]
“Trumper pipe” refers to a member for discharging a part of the grout material filled in the casing pipe to the outside. This is because the grout material is pressurized and injected into the casing pipe to form the anchor body part, and then the trumpet pipe is inserted into the casing pipe, so that the grout material is brought outside through the inside of the pipe part from the enlarged diameter part. It is for discharging and ensuring that the tensile force of the anchor head is transmitted to the anchor body. The insertion length of the trumpet tube is basically up to the anchor body. That is, the grout material between the casing pipe and the trumpet tube is removed, and the anchor body injection grout material is basically prevented from flowing out to the free length portion.
[0013]
The greatest object of the present invention is to prevent the portion to be compressed of the unstable layer from being continuously integrated with the anchor body by the injection of the grout material, so that no compression region is generated in the unstable layer. On top of that, mortars are injected into the gap formed between the trumpet tube and the drilling wall to further ensure the protection of the tensile material. For these reasons, the trumpet tube is inserted to such an extent that a compression zone is generated in the unstable layer (the length that does not reach the anchor body), and a part of the grout material between the casing pipe and the trumpet tube (of the free length portion) It is also possible to remove only a part of the axial direction.
[0014]
The trumpet tube is constituted by a pipe portion and a diameter-expanded portion provided at and communicated with the pipe portion. The pipe portion is a portion that fits into the tensile material, and the grout material is discharged through the pipe portion. For this reason, let the internal diameter of a pipe part be a diameter which produces a clearance gap between tensile materials. The material is not particularly limited, but it is preferable to reduce the weight with a plastic such as aluminum or polyvinyl chloride.
[0015]
The enlarged diameter portion is provided at the tip of the pipe portion to introduce the grout material in the casing pipe into the pipe portion, and has a truncated cone shape or a bowl shape. The material is made of a soft material such as rubber, leather, synthetic rubber, or synthetic leather, and is made to follow the inner peripheral surface of the casing pipe. It is preferable to remove even the grout material on the inner peripheral surface portion of the casing pipe at the enlarged diameter portion, but even if it remains to some extent, it may be easily broken when the tension material is tightened or removed when the casing pipe is pulled out. Accordingly, the diameter of the casing pipe may be a diameter where a gap is generated, and even when formed of a hard member such as metal or plastic, most of the grout material that hinders the tension of the anchor body can be removed.
[0016]
It is preferable to provide a guide member on the distal end side of the enlarged diameter portion. This is because if there is a portion with a different diameter such as a coupling in the casing pipe, the enlarged diameter portion may be caught and cannot be inserted further. As the guide member, pin-shaped members such as metal and plastic are provided at appropriate intervals. In this case, the guide member is provided so as to be inclined inward so as not to be caught by the different diameter portion, or the tip portion is bent inward.
[0017]
By leaving the trumpet tube in the inserted state, it greatly contributes to rust prevention of the tensile material. In addition, since the grout material remaining between the trumpet tube and the tension material also contributes to the protection of the tension material, the inner grout material does not flow out to the anchor body by a method such as covering the pipe portion after inserting the trumpet pipe. It is preferable to do so. Since the trumpet pipe that has been inserted normally has a pipe portion protruding from the tensile material, the head portion of the tensile material is exposed by cutting the pipe portion after the casing pipe is pulled out. In this case, the pipe portion may have a joint structure, and the joint portion may be removed without being cut.
[0018]
An “injection pipe” is a member that is inserted into a gap formed between a drilling wall and the trumpet pipe by discharging the grout material with the trumpet pipe, and injects mortars such as concrete and mortar. The member for. The injection pipe is inserted after the grout material is discharged by the trumpet pipe and then the casing pipe is pulled out. The injection of mortars is performed to solidify after tension so as not to affect tendon tension. Usually, a pressure receiving plate or a bearing plate is attached and the tendon is tensioned and fixed before injecting. If re-tension is required, infuse afterwards. In addition to injecting and extracting mortars, the injection pipe may be cut and left inside.
[0019]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, the present invention will be described in detail based on embodiments of the invention shown in the drawings.
[0020]
An example of an embodiment of ground anchor work using a trumpet pipe is shown in FIG. First, a hole for inserting the casing pipe 2 and a hole for forming the anchor body 3 are drilled by a down-the-hole hammer type drilling machine as shown in (a), and the casing pipe 2 and tendon (tensile material) as shown in (b). ) 4 is inserted. Next, the grout material G is pressurized and injected into the casing pipe 2 as shown in FIG. The steps up to here are the same as those of the conventional ground anchor method.
[0021]
When the anchor body 3 is formed, the trumpet pipe 1 is pushed into the casing pipe 2 as shown in (d). By inserting the trumpet pipe 1, the grout material G in the casing pipe 2 is discharged to the outside through the pipe portion 11 of the trumpet pipe 1. After discharging the grout material G, the casing pipe 2 is completely pulled out (e), tensioned (f), and fixed (g) in the same manner as a general ground anchor.
[0022]
An example of the embodiment of the trumpet tube 1 is shown in FIG. The trumpet tube 1 is composed of a pipe portion 11 and an enlarged diameter portion 12 as shown in FIG. 1A, and the distal end portion of the enlarged diameter portion 12 is bent inward as shown in FIG. A plurality of guide members 13 are provided. In this example, an example is shown in which a trumpet tube stopper sheath 14 for processing the head of the trumpet tube 1 inserted is attached. FIG. 2C shows a state in which the trumpet pipe 1 is pushed into the casing pipe 2, and the grout material G that has been stirred by the enlarged diameter portion 12 is discharged through a gap with the tendon 4 inside the pipe portion 11. Indicates the state. Moreover, even when there is a different diameter portion due to the presence of the coupling 21 in the casing pipe 2 as in this example, the enlarged diameter portion 12 can be deformed and pushed in by the guide member 13 as shown by a chain line in the figure.
[0023]
As shown in FIG. 3, the anchor structure constructed by the ground anchor construction using the trumpet pipe has no free length part that inhibits compression by tendon 4, and the tensile force from the tension part is applied to the anchor body 3. It can be transmitted reliably, and secondary tension can be effectively performed.
[0024]
FIG. 4 shows an example of an embodiment of the ground anchor construction using the trumpet pipe according to the first invention of the present invention. The tension is applied by processing the tendon head such as attaching the pressure receiving plate 6 and the bearing plate 7. Let Then, the mortars 8 are injected from the injection pipe 5 inserted into the gap between the drilling wall and the trumpet tube 1. Usually, after the tension, the inspection confirmation such as the settlement of the pressure plate 7 is executed, and when the re-tension is necessary, the mortars 8 are injected thereafter. The injection pipe 5 is cut after injection and left inside, or pulled out while being injected to complete the operation.
[0025]
FIG. 5 shows an example of an embodiment of the ground anchor construction using the trumpet pipe according to the second invention of the present invention. After the casing pipe 2 is pulled out, the gap between the drilling wall and the trumpet pipe 1 is shown. The injection pipe 5 is inserted into the gap. The injection of mortars is not performed at this point, but after the tendon 4 has been reliably tensioned. The injection pipe 5 may be inserted after the casing pipe 2 is pulled out, and may be after the tendon 4 is tensioned and inspected. In this example, the holder 17 is installed in the hole, so that the pipe portion 11 of the trumpet pipe 1 is positioned substantially at the center of the drilling hole. Further, a cap 16 is put on the pipe portion 11 which is the grout material discharge portion 15 of the trumpet tube so that the inner grout material G does not flow out to the anchor body 3 side.
[0026]
The ground anchor structure 30 according to the third aspect of the present invention can cover the periphery of the tendon 4 between the ground structure such as the bearing plate 7 and the anchor body 3 with a plurality of layers. The protective effect of 4 is extremely high. As shown in FIG. 6, this is protected by the pipe portion 11 of the trumpet tube 1, the grout material G remaining between the pipe portion 11 and the tendon 4, and the mortars 8 injected by the injection pipe 5. It will be. Further, since the tendon 4 itself has a structure in which the sheath 42 is filled with a rust preventive agent and covers the tension member 41, not only the effect of preventing the sheath 42 from being damaged due to ground disturbance but also the tension by the sheath 42 damage prevention. This greatly contributes to the rust prevention effect of the material 41.
[0027]
【The invention's effect】
As described above, the ground anchor work and the ground anchor structure using the trumpet pipe according to the present invention are based on the ground anchor work using the trumpet pipe that can reliably apply the prestress to the free length portion. By injecting mortars into the gap created by the insertion, the tendon and thus the tensile material can be protected more reliably, and the original functions of the ground anchor with excellent durability, workability and safety can be fully utilized. be able to.
[Brief description of the drawings]
FIGS. 1A to 1G are schematic side views showing an example of an embodiment of a ground anchor construction using a trumpet pipe.
FIGS. 2A and 2B show an example of an embodiment of a trumpet tube used in the present invention. FIG. 2A is a longitudinal sectional view, FIG. 2B is a perspective view of an enlarged diameter portion, and FIG. It is a schematic sectional drawing which shows an example.
FIG. 3 is a schematic cross-sectional view showing an example of an embodiment of a ground anchor structure that has been passed through a trumpet tube.
FIG. 4 is a schematic cross-sectional view showing an example of an embodiment of a ground anchor construction using a trumpet pipe according to the first invention of the present invention.
FIG. 5 is a schematic cross-sectional view showing an example of an embodiment of a ground anchor construction using a trumpet pipe according to the second invention of the present invention.
FIG. 6 is a schematic sectional view showing an example of the embodiment of the ground anchor structure according to the third invention of the present invention.
7A to 7E are schematic cross-sectional views showing examples of conventional ground anchor methods.
[Explanation of symbols]
G Grout
1 Trumpet pipe
11 Pipe section
12 Expanded part
13 Guide member
14 Trumpet tube stopper sheath
15 Grout material discharge section
16 cap
17 Holder
2 Casing pipe
21 coupling
3 Anchor body
4 Tendon
41 Tensile material
42 sheath
5 Injection pipe
6 Pressure plate
7 Supporting plate
8 Mortars
30 Ground anchor structure

Claims (3)

グラウンドアンカー工において、削孔に圧入したケーシングパイプに、引張材との間に隙間を有する径のパイプ部と該パイプ部の先端部に設けられこれに連通する拡径部とにより構成したラッパ管を挿通し、該ケーシングパイプ内に充填されたグラウト材を該ラッパ管のパイプ部を通じて排出させることにより該パイプ部外面側に形成した空隙に、該引張材の緊張後に固化させるモルタル類を注入することを特徴とするラッパ管を用いたグラウンドアンカー工。In the ground anchor work, a trumpet pipe comprising a casing pipe press-fitted into a drilled hole, a pipe part having a diameter having a gap with a tensile material, and a diameter-enlarging part provided at the tip part of the pipe part and communicating with the pipe part Mortars to be solidified after tension of the tensile material is injected into the gap formed on the outer surface side of the pipe part by discharging the grout material filled in the casing pipe through the pipe part of the trumpet pipe Ground anchor construction using a trumpet pipe characterized by that. グラウンドアンカー工において、ケーシングパイプにグラウト材を圧入して基盤内にアンカー体部を形成後、引張材との間に隙間を有する径のパイプ部と該パイプ部の先端部に設けられこれに連通する拡径部とによって構成したラッパ管を、該ケーシングパイプ内に挿通することによって、該ケーシングパイプと該ラッパ管との間のグラウト材を該ラッパ管のパイプ部を通じて排出し、該ケーシングパイプを引き抜いた後、モルタル類を充填する注入パイプを削孔壁とラッパ管との間の空隙に挿入することを特徴とするラッパ管を用いたグラウンドアンカー工。In ground anchor work, after grout material is press-fitted into the casing pipe to form the anchor body part in the base, it is provided at the pipe part with a diameter having a gap between the tensile material and the tip part of the pipe part and communicates with this By inserting a trumpet pipe constituted by the expanded diameter portion into the casing pipe, the grout material between the casing pipe and the trumpet pipe is discharged through the pipe section of the trumpet pipe, and the casing pipe is A ground anchor construction using a trumpet pipe, wherein an injection pipe filled with mortar is inserted into the gap between the drilling wall and the trumpet pipe after being pulled out. アンカー体と地表構造物との間で緊張させた引張材の周囲に、ケーシングパイプ内に挿通して充填されたグラウト材を排出させるもので該引張材との間に隙間を有する径のパイプ部と該パイプ部の先端部に設けられこれに連通する拡径部とによって構成したラッパ管と、該パイプ部と該引張材との間のグラウト材と、該パイプ部と削孔壁との間に注入したモルタル類と、を配したことを特徴とするグラウンドアンカー構造体。A pipe part with a diameter having a gap between the tension member and the tension member between the anchor body and the ground surface structure, which discharges the grout material inserted and filled in the casing pipe around the tension member. And a trumpet pipe formed by a diameter-increased portion provided at the tip portion of the pipe portion and communicating therewith, a grout material between the pipe portion and the tensile material, and between the pipe portion and the drilling wall And a mortar injected into the ground anchor structure.
JP2002362355A 2002-12-13 2002-12-13 Ground anchor construction and ground anchor structure using trumpet pipe Expired - Fee Related JP3799499B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002362355A JP3799499B2 (en) 2002-12-13 2002-12-13 Ground anchor construction and ground anchor structure using trumpet pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002362355A JP3799499B2 (en) 2002-12-13 2002-12-13 Ground anchor construction and ground anchor structure using trumpet pipe

Publications (2)

Publication Number Publication Date
JP2004190427A JP2004190427A (en) 2004-07-08
JP3799499B2 true JP3799499B2 (en) 2006-07-19

Family

ID=32760819

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002362355A Expired - Fee Related JP3799499B2 (en) 2002-12-13 2002-12-13 Ground anchor construction and ground anchor structure using trumpet pipe

Country Status (1)

Country Link
JP (1) JP3799499B2 (en)

Also Published As

Publication number Publication date
JP2004190427A (en) 2004-07-08

Similar Documents

Publication Publication Date Title
US5775849A (en) Coupler for ducts used in post-tension rock anchorage systems
KR102017848B1 (en) balloon type intensively expandable anchor apparatus
KR100876129B1 (en) Anchor assembly using PS strand and ground reinforcement method using same
US20070172315A1 (en) Method and Apparatus for Creating Soil or Rock Subsurface Support
JP3799499B2 (en) Ground anchor construction and ground anchor structure using trumpet pipe
US9879397B2 (en) Strand pressure-pipe anchor
JPH10266200A (en) Preparation method of ground anchor, preparation method of lock bolt and these pressure-receiving structure
KR20190093476A (en) Metallath permanent anchor assembly
JP3760335B2 (en) Ground anchor construction using trumpet pipe and trumpet pipe
JP3915052B2 (en) Non-plate ground anchors and trumpet pipes for non-plate ground anchors
KR101816641B1 (en) Permanent anchor assembly and its mounting structure
JP5555050B2 (en) Construction structure of rebar insertion work using composite rebar
JP3809467B2 (en) Ground anchor construction and grout material discharge device using trumpet pipe and method thereof
JP2008088638A (en) Ground anchor and ground anchor method
KR100944199B1 (en) Prestressed concrete anchor body structure using together poly bar nail
KR100741506B1 (en) Civil reinforcement
JPH08134923A (en) Cut slope stabilization method
JPH04194227A (en) Earth reinforcing method with tubular reinforcement
JP3543393B2 (en) How to stop the water at the anchor anchor length
KR101368055B1 (en) Ground anchor
KR101816643B1 (en) A method of constructing a permanent anchor assembly
KR100479358B1 (en) Ground Stabilization Device and Method of Ground Stabilization Using the Device
KR100729661B1 (en) Ground Improvement Anchor Construction Method
KR20070085176A (en) Civil reinforcement
JP2007170038A (en) Natural mountain reinforcement and construction method of natural mountain reinforcement

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040609

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060307

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060411

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100512

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110512

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120512

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130512

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees