JP3850405B2 - Sleepers, roadbed tracks and construction girders - Google Patents
[go: Go Back, main page]

JP3850405B2 - Sleepers, roadbed tracks and construction girders - Google Patents

Sleepers, roadbed tracks and construction girders Download PDF

Info

Publication number
JP3850405B2
JP3850405B2 JP2003356662A JP2003356662A JP3850405B2 JP 3850405 B2 JP3850405 B2 JP 3850405B2 JP 2003356662 A JP2003356662 A JP 2003356662A JP 2003356662 A JP2003356662 A JP 2003356662A JP 3850405 B2 JP3850405 B2 JP 3850405B2
Authority
JP
Japan
Prior art keywords
sleeper
sleepers
roadbed
pair
attached
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003356662A
Other languages
Japanese (ja)
Other versions
JP2005120696A (en
Inventor
昌弘 三輪
卓司 大上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central Japan Railway Co
Original Assignee
Central Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central Japan Railway Co filed Critical Central Japan Railway Co
Priority to JP2003356662A priority Critical patent/JP3850405B2/en
Publication of JP2005120696A publication Critical patent/JP2005120696A/en
Application granted granted Critical
Publication of JP3850405B2 publication Critical patent/JP3850405B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Railway Tracks (AREA)

Description

本発明は、例えば有道床軌道のレール上を列車が繰り返し通過することにより、まくらぎと縦梁とを連結する部分が疲労破壊する時期が、設計時に想定した時期よりも早まることを防ぐとともに、まくらぎと縦梁との連結の分離ならびに再連結を容易に行う技術に関する。   The present invention prevents, for example, the time at which the part connecting the sleeper and the longitudinal beam from fatigue breaks earlier than the time assumed at the time of design by repeatedly passing the train on the rail of the bedded floor track, The present invention relates to a technique for easily separating and reconnecting a sleeper and a vertical beam.

従来より、路盤上に道床を設け、その道床上にまくらぎおよびレールを配した有道床軌道が知られている。このような有道床軌道の構造としては、路盤上に形成した道床にまくらぎを並べ、その上に一対のレールを一定間隔に平行に取り付けたものが一般的である。このような有道床軌道を構成する道床には、バラスト、スラブなどがあり、路線の様々な条件を考慮して選定されている。その中でも、砂利・砕石等のバラストを用いたバラスト道床軌道は、従来から最もよく知られている。このようなバラストを用いた道床は、その性質上、重い車両の走行を合理的に支え、かつ経済的にも優れていることから、長年採用されてきている。また、砂利・砕石等のバラストは、まくらぎをしっかり保持し、列車からレールおよびまくらぎを経て伝わる荷重を路盤へ均等に分散させ、軌道に弾性を持たせるとともに、つき固め等の保守作業が容易に行えることや、軌道の排水をよくし噴泥や雑草の発生を防ぐなどの機能を持っている。   2. Description of the Related Art Conventionally, a bedded track in which a roadbed is provided on a roadbed and sleepers and rails are arranged on the roadbed is known. As a structure of such a roadbed track, a sleeper is generally arranged on a roadbed formed on a roadbed, and a pair of rails are mounted on the roadbed in parallel at regular intervals. There are ballasts, slabs, and the like in the roadbed constituting such a roadbed track, which are selected in consideration of various conditions of the route. Among them, the ballast track bed using ballast such as gravel and crushed stone has been most well known. A roadbed using such a ballast has been adopted for many years because it reasonably supports the travel of heavy vehicles and is economically superior. In addition, ballasts such as gravel and crushed stone hold the sleepers firmly, distribute the load transmitted from the train via the rails and sleepers evenly to the roadbed, make the track elastic, and perform maintenance work such as compaction It has functions such as easy operation and good drainage of the orbit to prevent generation of mud and weeds.

また、この種の有道床軌道の中には、その断面がL字状であり、まくらぎの側面および上面を覆うよう配された2本の縦梁に、まくらぎの端部を接合したものがある(例えば、特許文献1参照。)。すなわち、図5に例示するように、PC(プレストレストコンクリート)まくらぎの端部にはその上面から下方に向けて円形断面の盲孔が形成されており、この盲孔には、その内部にねじ山が形成されたインサート部材が埋設されている。一方、縦梁におけるまくらぎの上面を覆う部分には、インサート部材に連通するボルト挿通孔が開けられている。そして、縦梁におけるまくらぎの上面および側面を覆う部分とまくらぎの上面および側面との間には可変パッドが配されている。この可変パッドとは、ポリエステル等をガラス長繊維不織布等で補強した適度な通気性を有する薄膜状材料からなり偏平な袋状に形成された袋体に、不飽和ポリエステル系樹脂,ビニールエステル系ゴム変性樹脂,アスファルト変性ウレタン樹脂,ウレタン変性ビニールエステル樹脂等の合成樹脂からなる流動体状の主剤と、メチルエチルケトンパーオキサイド等の合成樹脂を主成分とする流動体状の硬化剤を混合した充填材を詰めたものである。この充填材を袋体に注入すると袋体が膨張し、袋体の水平部分の下面がまくらぎの端部の上面に密着するととともに、袋体の上面が縦梁におけるまくらぎの上面を覆う部分に密着する。続いて充填材が袋体内の隅々まで行き渡り、不織布で構成されている袋体の全体から充填材が滲み出したら充填材の注入を止め、静置して硬化させる。すると、袋体から滲み出して硬化した充填材がまくらぎの端部の上面および縦梁におけるまくらぎの上面を覆う部分に接着するとともに、まくらぎの端部の上面と縦梁におけるまくらぎの上面を覆う部分との間の間隙が硬化した充填材で密接させる。このことにより、縦梁におけるまくらぎの上面を覆う部分が可変パッドを介してまくらぎの端部の上面に接着される。さらに、縦梁のボルト挿通孔を挿通したボルトを、まくらぎのインサート部材にねじ入れることにより、まくらぎと縦梁とを可変パッドを介して接合する。このような構成により、縦梁におけるまくらぎの上面を覆う部分とまくらぎの端部の上面との間にガタつきが生じることを防ぐことができる。
特開平11−81204号公報(第3,4,5頁、図4)
Moreover, in this kind of roadbed track, the cross section is L-shaped, and there are two vertical beams arranged so as to cover the side surface and the upper surface of the sleeper, and the ends of the sleeper are joined. (For example, refer to Patent Document 1). That is, as illustrated in FIG. 5, a blind hole having a circular cross section is formed at the end of a PC (prestressed concrete) sleeper from the upper surface to the lower side, and the blind hole has a screw thread inside thereof. An insert member in which is formed is embedded. On the other hand, a bolt insertion hole communicating with the insert member is formed in a portion of the vertical beam that covers the upper surface of the sleeper. And the variable pad is distribute | arranged between the part which covers the upper surface and side surface of the sleeper in a vertical beam, and the upper surface and side surface of a sleeper. This variable pad is an unsaturated polyester resin or vinyl ester rubber formed in a flat bag made of a thin, air-permeable thin film material reinforced with polyester or the like with a nonwoven glass fiber nonwoven fabric. A filler that is a mixture of a fluid main agent made of synthetic resin such as modified resin, asphalt modified urethane resin, urethane modified vinyl ester resin, etc., and fluid curing agent mainly composed of synthetic resin such as methyl ethyl ketone peroxide. Stuffed. When this filler is injected into the bag body, the bag body expands, and the lower surface of the horizontal portion of the bag body is in close contact with the upper surface of the end of the sleeper, and the upper surface of the bag body is in close contact with the portion of the longitudinal beam that covers the upper surface of the sleeper To do. Subsequently, the filling material spreads to every corner of the bag body, and when the filling material oozes out from the whole bag body made of the nonwoven fabric, the filling material is stopped from being injected and allowed to stand and harden. Then, the filler that has oozed out of the bag and hardened adheres to the upper surface of the end of the sleeper and the upper surface of the sleeper in the vertical beam, and also covers the upper surface of the upper end of the sleeper and the upper surface of the sleeper in the vertical beam The gap between the two is intimately closed with a hardened filler. As a result, the portion of the longitudinal beam that covers the upper surface of the sleeper is bonded to the upper surface of the end portion of the sleeper via the variable pad. Furthermore, the bolster and the vertical beam are joined via the variable pad by screwing a bolt inserted through the bolt insertion hole of the vertical beam into the insert member of the sleeper. With such a configuration, it is possible to prevent rattling from occurring between the portion of the longitudinal beam that covers the upper surface of the sleeper and the upper surface of the end portion of the sleeper.
JP 11-81204 A (3rd, 4th, 5th pages, FIG. 4)

しかし、上述のような有道床軌道においては、次のような理由により、充填材による可変パッドとまくらぎとの密着部分が剥離することがあった。すなわち、上述のような有道床軌道のレール上を列車が走行する際には、列車の重量による下方に押し下げる力と、列車の通過後にその押し下げる力が解除されることによって押し下げる力とは逆方向に作用する力とが交互にレールに作用する(以下、上下方向の作用力と称す)。また、レールと縦梁の長さや配列は、通常同一とはならないため、レールの温度伸縮と縦梁の温度伸縮との違いによって、互いが逆方向に伸縮しようとする力が作用する。この力は、日中と夜間とで逆方向となり、交互に作用する(以下、前後方向の作用力と称す。)。すると、上述のような有道床軌道のレール上を列車が繰り返し通過した場合に、充填材による可変パッドとまくらぎとの密着部分に上述の上下および前後方向の作用力が繰り返し作用すると、この密着部分における引っ張り強度やせん断強度の値があまり大きくないため、密着部分が剥離することがあった。さらに、この密着部分が剥離すると、ボルトに作用する力が大きくなり、ボルトが疲労破断する時期が当初の想定した時期よりも早まるおそれがあった。   However, in the above-mentioned bedded track, the contact portion between the variable pad and the sleeper made of the filler may be peeled off for the following reason. That is, when a train travels on the rail of a bedded track as described above, the force that pushes down due to the weight of the train and the force that pushes down by releasing the push-down force after passing the train are in the opposite direction. And the force acting on the rail alternately act on the rail (hereinafter referred to as the vertical acting force). In addition, since the length and arrangement of the rail and the vertical beam are not usually the same, a force for expanding and contracting in the opposite direction acts on the difference between the temperature expansion and contraction of the rail and the temperature expansion and contraction of the vertical beam. This force is reversed in the daytime and at night and acts alternately (hereinafter referred to as the front-rear direction force). Then, when the train repeatedly passes on the rail of the bedded track as described above, if the above-described up and down and front-rear direction acting forces repeatedly act on the contact portion between the variable pad and the sleeper by the filler, this contact Since the values of tensile strength and shear strength at the portion are not so large, the close contact portion may be peeled off. Furthermore, if this close contact portion is peeled off, the force acting on the bolt becomes large, and there is a possibility that the time at which the bolt will fatigue breaks earlier than the initially assumed time.

また、まくらぎと縦梁の接合を外す必要が生じた場合、密着部分を人為的に剥離するのは容易ではなく、且つ、剥離できた場合であっても、まくらぎや縦梁の剥離面に残った可変パッドの付着物をきれいに取り除いた後でなければ、再接合をすることができなかった。   In addition, when it is necessary to remove the connection between the sleeper and the longitudinal beam, it is not easy to artificially peel off the contact portion, and even if it can be peeled off, the peeling surface of the sleeper or the longitudinal beam Re-bonding could only be performed after the remaining variable pad deposits had been removed.

本発明は、このような不具合に鑑みなされたものであり、その目的とするところは、例えば有道床軌道のレール上を列車が繰り返し通過することにより、まくらぎと縦梁とを連結する部分が疲労破壊する時期が、設計時に想定した時期よりも早まることを防ぐとともに、まくらぎと縦梁との連結の分離ならびに再連結を容易に行うことにある。   The present invention has been made in view of such a problem, and the purpose of the present invention is, for example, a portion where the sleeper and the vertical beam are connected by the train repeatedly passing on the rail of the bedded floor track. The purpose of this is to prevent the fatigue failure time from being earlier than the time assumed at the time of design, and to easily separate and reconnect the sleeper and the longitudinal beam.

上記課題を解決するためになされた請求項1に係るまくらぎは、路盤上に設けられた道床上に並べて設置されるまくらぎであって、コンクリート製のまくらぎ本体と、前記まくらぎ本体の長手方向における両端部それぞれから張り出した鍔部と、前記まくらぎ本体に埋設された際に自らが前記まくらぎ本体から抜けることを防止する抜け防止部と前記鍔部に自らを取り付けるための取付部とを有し、その抜け防止部を前記まくらぎ本体に埋設させ、且つ前記取付部を前記鍔部に取り付けることにより、前記まくらぎ本体と前記鍔部とを連結する連結部と、を備えることを特徴とする。 A sleeper according to claim 1 made to solve the above-mentioned problem is a sleeper installed side by side on a roadbed provided on a roadbed , comprising: a concrete sleeper body, and A flange that protrudes from both ends in the longitudinal direction, a slip-off preventing portion that prevents the slipper itself from coming off from the sleeper body when embedded in the sleeper body, and a mounting part for attaching itself to the flange And a connecting portion for connecting the sleeper body and the heel portion by embedding the slip-off prevention portion in the sleeper body and attaching the attachment portion to the heel portion. It is characterized by.

従来の有道床軌道においては、有道床軌道のレール上を列車が走行する際に発生する上下および前後方向の作用力がまくらぎ本体に繰り返し作用することにより、充填材による可変パッドとまくらぎとの密着部分が剥離することがあった。さらに、まくらぎとインサート部材との密着部分に上述の上下方向の作用力が繰り返し作用すると、インサート部材とまくらぎとは材質が異なるため、これらの密着部分が剥離することがあった。すると、インサート部材が上述の上下および前後方向の作用力によってまくらぎの盲孔から抜ける方向に移動することにより縦梁とまくらぎとの間の距離が大きくなる。このことにより、上下および前後方向の作用力が原因でボルトに作用する曲げモーメントが、インサート部材がまくらぎの盲孔から抜ける方向に移動した分大きくなり、ボルトが疲労破断する時期が当初の想定した時期よりも早まるおそれがあった。これに対して本発明によれば、連結部(43:この欄においては、発明に対する理解を容易にするため、必要に応じて「発明を実施するための最良の形態」欄で用いた符号を付すが、この符号によって請求の範囲を限定することを意味するものではない。)が、まくらぎ本体(41)に埋設された際にまくらぎ本体から抜けることを防止する抜け防止部(43a)と鍔部(42)に取り付けるための取付部(43b)とを有しており、抜け防止部をまくらぎ本体に埋設させ、且つ取付部を鍔部に取り付けることによりまくらぎ本体と鍔部とを連結している。このことにより、本発明に係るまくらぎを例えば有道床軌道(100)に適用した場合には、次のような作用効果を奏する。すなわち、本発明に係るまくらぎ(4)を有道床軌道上に並べて、さらに、道床の延長方向に沿う方向にて道床上に設置された一対の縦梁(6)に鍔部を、ボルト(71)およびナット(72)などで取り付けることによりまくらぎ同士を連結した場合において、まくらぎ上に固定されたレール(5)上を列車が走行する際に発生する上下および前後方向の作用力がまくらぎ本体に繰り返し作用しても、抜け防止部により連結部がまくらぎ本体から抜ける方向には移動しにくい。このため、鍔部とまくらぎ本体との間の距離が大きくなりにくく、上下および前後方向の作用力によって連結部に作用する曲げモーメントも大きくなりにくい。したがって、連結部が疲労破断する時期が、設計時に想定した時期よりも早まることを防ぐとともに、まくらぎと縦梁との連結の分離ならびに再連結を容易に行うことができる。   In the conventional bedded track, the vertical and longitudinal force generated when the train travels on the rail of the bedded track repeatedly acts on the sleeper body, so that the variable pad and sleeper made of filler can be used. In some cases, the close contact part of the film peeled off. Furthermore, when the above-described vertical acting force repeatedly acts on the close contact portion between the sleeper and the insert member, the close contact portion may peel off because the insert member and the sleeper are made of different materials. Then, the distance between the vertical beam and the sleeper is increased by the insert member moving in the direction of coming out of the blind hole of the sleeper by the above-described vertical and longitudinal acting forces. As a result, the bending moment acting on the bolt due to the acting force in the up and down and front and rear directions becomes larger as the insert member moves in the direction to escape from the blind hole of the sleeper, and the time when the bolt is fatigued is initially assumed. There was a risk of getting ahead of time. On the other hand, according to the present invention, the connecting portion (43: In this column, in order to facilitate understanding of the invention, the reference numerals used in the “Best Mode for Carrying Out the Invention” column are used as necessary. Is attached, but does not mean that the scope of claims is limited by this symbol.) Is prevented from coming off from the sleeper body when embedded in the sleeper body (41) (43a) And an attachment part (43b) for attaching to the collar part (42), the escape prevention part is embedded in the sleeper body, and the attachment part is attached to the collar part to attach the sleeper body and the collar part. Are connected. As a result, when the sleeper according to the present invention is applied to the bedded track (100), for example, the following operational effects can be obtained. That is, the sleepers (4) according to the present invention are arranged on the bedded track, and the flanges are connected to the pair of vertical beams (6) installed on the roadbed in the direction along the extending direction of the roadbed. 71) When the sleepers are connected by attaching them with nuts (72) or the like, the vertical and front / rear direction acting forces generated when the train travels on the rail (5) fixed on the sleepers Even if it repeatedly acts on the sleeper body, the connecting part is difficult to move in the direction in which the connection part comes off from the sleeper body by the slip-off preventing part. For this reason, the distance between the collar portion and the sleeper body is difficult to increase, and the bending moment acting on the connecting portion due to the acting force in the vertical and longitudinal directions is also difficult to increase. Therefore, it is possible to prevent the timing at which the connecting portion is fatigue-ruptured from being earlier than the timing assumed at the time of design, and to easily separate and reconnect the sleeper and the longitudinal beam.

また、従来のように、まくらぎと縦梁とを、可変パッドを介して接合していた場合には、充填材を可変パッドの袋体に注入した後に静置して充填材を硬化させていたため、その施工が天候によって制約を受けていた。これに対して本発明によれば、充填材を使用せずにまくらぎと縦梁とを連結するので、その施工が天候によって制約を受けずに済む。   In addition, when the sleeper and the vertical beam are joined via the variable pad as in the conventional case, the filler is injected into the bag body of the variable pad and then allowed to stand to cure the filler. Therefore, the construction was restricted by the weather. On the other hand, according to the present invention, the sleeper and the longitudinal beam are connected without using a filler, so that the construction is not restricted by the weather.

なお、連結部の具体例としては、U字形ジベル(43)やスタッドジベル(104)、フック(114)などが考えられる。
この場合、抜け防止部が、次のような姿勢にてまくらぎ本体に埋設することが考えられる。すなわち、(イ)抜け防止部が、まくらぎ本体における有道床軌道の道床上に並べて設置された際に上下側となる面からまくらぎ本体の内部へ埋設することが考えられる。このようにすれば、レールと縦梁との温度伸縮の違いによって発生する前後方向の作用力がまくらぎ本体に繰り返し作用しても、その作用力が作用する方向と抜け防止部の長手方向とがほぼ直交するため、その作用力が、抜け防止部がまくらぎ本体から抜ける方向には作用しにくい。一方、有道床軌道のレール上を列車が走行する際に発生する上下方向の作用力がまくらぎ本体に繰り返し作用すると、その作用力が作用する方向と抜け防止部の長手方向とがほぼ同じ方向となるため、その作用力が、抜け防止部がまくらぎ本体から抜ける方向には作用する。この場合、抜け防止部が、連結部がまくらぎ本体から抜ける方向に移動するのを防止する。
In addition, as a specific example of a connection part, a U-shaped dowel (43), a stud dowel (104), a hook (114), etc. can be considered.
In this case, it is conceivable that the slip prevention part is embedded in the sleeper body in the following posture. That is, it is conceivable that (a) the slip-off prevention part is embedded in the sleeper body from the upper and lower surfaces when it is installed side by side on the roadbed of the bedded track in the sleeper body. In this way, even if the acting force in the front-rear direction generated by the difference in temperature expansion and contraction between the rail and the vertical beam repeatedly acts on the sleeper body, the direction in which the acting force acts and the longitudinal direction of the slip-off preventing portion Are substantially perpendicular to each other, so that the acting force is unlikely to act in the direction in which the slip-off preventing portion is pulled out from the sleeper body. On the other hand, if the acting force in the vertical direction generated when the train travels on the rail of the bedded track repeatedly acts on the sleeper body, the direction in which the acting force acts and the longitudinal direction of the slip-off prevention part are almost the same direction Therefore, the acting force acts in the direction in which the slip-off preventing portion is pulled out from the sleeper body. In this case, the disconnection preventing portion prevents the connecting portion from moving in a direction in which the connection portion is detached from the sleeper body.

また、(ロ)抜け防止部が、まくらぎ本体における有道床軌道の道床上に並べて設置された際に、有道床軌道における前後側となる面からまくらぎ本体の内部へ埋設することが考えられる。このようにすれば、有道床軌道のレール上を列車が走行する際に発生する上述の上下方向の作用力がまくらぎ本体に繰り返し作用しても、その作用力が作用する方向と抜け防止部の長手方向とがほぼ直交するため、その作用力が、抜け防止部がまくらぎ本体から抜ける方向には作用しにくい。一方、レールと縦梁との温度伸縮の違いによって発生する上述の前後方向の作用力がまくらぎ本体に繰り返し作用すると、その作用力が作用する方向と抜け防止部の長手方向とがほぼ同じ方向となるため、その作用力が、抜け防止部がまくらぎ本体から抜ける方向には作用する。この場合、抜け防止部が、連結部がまくらぎ本体から抜ける方向に移動するのを防止する。   In addition, (b) when the slip-off prevention part is installed side by side on the bedbed of the bedded track in the sleeper body, it is considered that it is embedded in the sleeper body from the front and back sides of the bedded track. . In this way, even if the above-described vertical acting force generated when the train travels on the rail of the bedded floor track repeatedly acts on the sleeper body, the direction in which the acting force acts and the slip prevention unit Since the longitudinal direction is substantially perpendicular to the longitudinal direction, the acting force is unlikely to act in the direction in which the slip-off preventing portion is pulled out of the sleeper body. On the other hand, when the above-mentioned front-rear direction acting force generated by the difference in temperature expansion and contraction between the rail and the longitudinal beam acts repeatedly on the sleeper body, the direction in which the acting force acts and the longitudinal direction of the slip-off prevention part are substantially the same direction. Therefore, the acting force acts in the direction in which the slip-off preventing portion is pulled out from the sleeper body. In this case, the disconnection preventing portion prevents the connecting portion from moving in a direction in which the connection portion is detached from the sleeper body.

また、(ハ)抜け防止部が、まくらぎ本体の長手方向における端面(41a,41b)からまくらぎ本体の内部へ埋設することが考えられる(請求項2)。このようにすれば、有道床軌道のレール上を列車が走行する際に発生する上述の上下および前後方向の作用力がまくらぎ本体に繰り返し作用しても、それら作用力が作用する方向と抜け防止部の長手方向とがほぼ直交するため、それら作用力が、抜け防止部がまくらぎ本体から抜ける方向には作用しにくい。したがって、上述の(イ)または(ロ)の場合に比べて、抜け防止部により連結部がまくらぎ本体から抜ける方向に移動しにくくすることができる。   (C) It is conceivable that the slip-off preventing portion is embedded from the end face (41a, 41b) in the longitudinal direction of the sleeper body into the sleeper body (claim 2). In this way, even if the above-mentioned vertical and longitudinal acting forces generated when the train travels on the rail of the bedded floor track repeatedly act on the sleeper body, the direction in which those acting forces act and the slipping off. Since the longitudinal direction of the prevention part is substantially orthogonal, these acting forces are unlikely to act in the direction in which the removal prevention part comes out of the sleeper body. Therefore, as compared with the case of (A) or (B) described above, the disconnection preventing portion can make it difficult for the connecting portion to move in the direction in which the connecting portion comes out of the sleeper body.

ところで、連結部を鍔部に取り付ける手法としては、(ニ)連結部の取付部を鍔部に溶接で取り付けることが考えられる(請求項3)。このようにすれば、連結部を鍔部に強固に取り付けることができる。   By the way, as a method of attaching the connecting portion to the flange portion, (d) it is conceivable to attach the attachment portion of the connecting portion to the flange portion by welding (claim 3). If it does in this way, a connection part can be firmly attached to a collar part.

また、(ホ)ボルトとナットなどを利用して連結部を鍔部に取り付けてもよい。具体的には、請求項4のように、まず、連結部(124)の取付部には、その内部に向けて連結部側ボルト取付孔(124a)を設け、そのボルト取付孔の内部にねじ山を形成する。一方、鍔部(123)における連結部が取り付けられる箇所には、連結部を取り付けた際に連結部の連結部側ボルト取付孔に連通する鍔部側ボルト貫通孔(123a)を設ける。さらに、鍔部の鍔部側ボルト貫通孔を貫通したボルト(125)を、連結部の連結部側ボルト取付孔にねじ入れることにより、連結部を鍔部に取り付けることが考えられる。このようにすれば、鍔部をまくらぎ本体から分離したり鍔部をまくらぎ本体に取り付けたりすることを容易に行うことができる。   Further, (e) the connecting portion may be attached to the collar portion using a bolt and a nut. Specifically, as in claim 4, first, a connecting portion side bolt mounting hole (124 a) is provided in the mounting portion of the connecting portion (124) toward the inside, and a screw is provided inside the bolt mounting hole. Form a mountain. On the other hand, the hook side bolt through hole (123a) that communicates with the connecting portion side bolt mounting hole of the connecting portion when the connecting portion is attached is provided at a location where the connecting portion of the hook portion (123) is attached. Furthermore, it is conceivable that the connecting portion is attached to the flange portion by screwing a bolt (125) penetrating the flange side bolt through hole of the flange portion into the connecting portion side bolt mounting hole of the connecting portion. In this way, it is possible to easily separate the heel part from the sleeper body or attach the heel part to the sleeper body.

なお、(ニ)連結部の取付部を鍔部に溶接で取り付ける手法と、(ホ)ボルトとナットなどを利用して連結部を鍔部に取り付ける手法とを比較すると、それぞれ次のような有利な点がある。すなわち、手法(ニ)では、手法(ホ)に比べて連結部を鍔部に強固に取り付けることができる。また、手法(ニ)では鍔部をまくらぎ本体から分離したり鍔部をまくらぎ本体に取り付けたりするのが困難であるのに比べて、手法(ホ)では、鍔部をまくらぎ本体から分離したり鍔部をまくらぎ本体に取り付けたりすることを容易に行うことができる。   In addition, comparing (d) the method of attaching the connecting part of the connecting part to the flange part by welding and (e) the method of attaching the connecting part to the flange part using bolts and nuts, etc., the following advantages are obtained. There is a point. That is, in the method (d), the connecting portion can be firmly attached to the collar portion as compared with the method (e). In contrast to the fact that it is difficult to separate the heel from the sleeper body and attach the heel to the sleeper body in the method (d), in the method (e), the buttock is removed from the sleeper body. It is possible to easily separate or attach the collar to the sleeper body.

なお、上述のまくらぎは、有道床軌道に用いることが考えられる。具体的には、上述のまくらぎを用いた有道床軌道(100)は、路盤(1)上に設けられた道床(3)と、複数の、前記道床上に並べて設置された、請求項1〜請求項の何れかに記載のまくらぎ(4)と、前記複数のまくらぎに取り付けられた一対のレール(5)と、前記複数のまくらぎ同士を連結するための一対の縦梁(6)と、を備え、前記複数のまくらぎがそれぞれ備える一対の鍔部(42)を、前記一対の縦梁に取り付けることにより、前記一対の縦梁を介して前記複数のまくらぎ同士を連結したことを特徴とする。このように本発明の有道床軌道によれば、上述のまくらぎを使用しているので、有道床軌道の耐用年数が縮まるのを防ぐことができる。 In addition, it is possible to use the above sleeper for a bedded track. Specifically, the above-mentioned bedded track (100) using the sleeper is installed side by side on the roadbed (3) provided on the roadbed (1) and on the roadbed. A sleeper (4) according to any one of claims 4 to 7, a pair of rails (5) attached to the plurality of sleepers, and a pair of vertical beams for connecting the plurality of sleepers ( 6), and the plurality of sleepers are connected to each other via the pair of vertical beams by attaching a pair of flanges (42) to each of the plurality of sleepers to the pair of vertical beams. It is characterized by that. As described above, according to the bedded track of the present invention, since the sleepers described above are used, it is possible to prevent the service life of the bedded track from being shortened.

また、上述のまくらぎは、工事桁に用いることが考えられる。具体的には、上述のまくらぎを用いた工事桁(200)は、複数の、前記道床上に並べて設置された、請求項1〜請求項の何れかに記載のまくらぎ(4)と、前記複数のまくらぎ同士を連結するための縦梁としての一対の主桁(201)と、を備え、前記複数のまくらぎがそれぞれ備える一対の鍔部を、前記一対の主桁に取り付けることにより、前記一対の主桁を介して前記複数のまくらぎ同士を連結したことを特徴とする。このように本発明の工事桁によれば、上述のまくらぎを使用するので、工事桁の耐用年数が縮まるのを防ぐことができ、かつ、工事桁の構築および解体が容易である。 The sleepers described above can be used for construction girders. Specifically, the sleeper (4) according to any one of claims 1 to 4 , wherein a plurality of construction girders (200) using the sleepers are installed side by side on the roadbed. A pair of main girders (201) as vertical beams for connecting the plurality of sleepers, and attaching a pair of flanges respectively provided to the plurality of sleepers to the pair of main girders. The plurality of sleepers are connected to each other through the pair of main girders. Thus, according to the construction girder of the present invention, since the sleeper described above is used, the useful life of the construction girder can be prevented from being shortened, and the construction girder can be easily constructed and disassembled.

以下、本発明が適用された実施例について図面を用いて説明する。なお、本発明の実施の形態は、下記の実施例に何ら限定されることなく、本発明の技術的範囲に属する限り種々の形態を採りうることは言うまでもない。   Embodiments to which the present invention is applied will be described below with reference to the drawings. Needless to say, the embodiments of the present invention are not limited to the following examples, and can take various forms as long as they belong to the technical scope of the present invention.

図1は、実施例の有道床軌道100の構成を示す断面図である。また、図2は、実施例のまくらぎを示す平面図(a)、正面図(b)である。
[有道床軌道100の構成の説明]
図1に示すように、この有道床軌道100は、路盤1上に砕石等のバラスト2を敷設し、台形等の所定断面形状の床状構造となるように締固め、有道床軌道100の延長方向に延設することにより形成された道床3と、その長手方向が道床3の延長方向に直交するよう道床3上に並べて設置された複数のまくらぎ4(図1では一つのまくらぎ4のみを図示している。)と、複数のまくらぎ4の上面に道床3の延長方向に沿って締結された一対のレール5と、複数のまくらぎ4の両端部それぞれの近傍に道床3の延長方向に沿って設置された一対の縦梁6と、から構成されている。なお、以降、この有道床軌道100において、まくらぎ4の中央部に対してその両端部がそれぞれ位置する場所の一方を「右側」とし、他方を「左側」とする。
FIG. 1 is a cross-sectional view illustrating a configuration of a bedded track 100 according to the embodiment. Moreover, FIG. 2 is the top view (a) and front view (b) which show the sleeper of an Example.
[Description of the configuration of the bedded track 100]
As shown in FIG. 1, this roadbed track 100 is formed by laying a ballast 2 such as crushed stone on a roadbed 1 and compacting it so as to form a floor structure having a predetermined cross-sectional shape such as a trapezoid. And a plurality of sleepers 4 arranged side by side on the road bed 3 so that the longitudinal direction thereof is orthogonal to the extension direction of the road bed 3 (in FIG. 1, only one sleeper 4 is shown). And a pair of rails 5 fastened to the upper surfaces of the plurality of sleepers 4 along the extending direction of the road bed 3, and the extension of the road bed 3 in the vicinity of both ends of the plurality of sleepers 4. It is comprised from a pair of vertical beam 6 installed along the direction. In the following, in this roadbed track 100, one of the locations where both ends of the sleeper 4 are located with respect to the central portion will be referred to as “right side” and the other as “left side”.

[まくらぎ4の構成の説明]
まくらぎ4は、図2(a)および図2(b)に示すように、まくらぎ本体41、およびまくらぎ本体41の両端それぞれに取り付けられたフランジ部42を備える。このうち、まくらぎ本体41は、プレストレストコンクリートなどのコンクリート製であり、角柱状に形成されている。また、まくらぎ本体41が有する各面のうち、まくらぎ本体41が有道床軌道100に取り付けられた際に、有道床軌道100における左側を向く面である左側面41a、および同じく右側を向く面である右側面41bには、フランジ部42がそれぞれ取り付けられている。
[Description of sleeper 4 configuration]
As shown in FIGS. 2A and 2B, the sleeper 4 includes a sleeper body 41 and flange portions 42 attached to both ends of the sleeper body 41. Among these, the sleeper main body 41 is made of concrete such as prestressed concrete, and is formed in a prismatic shape. Of the surfaces of the sleeper main body 41, when the sleeper main body 41 is attached to the bedded track 100, the left side 41a, which is the surface facing the left side of the bedded track 100, and the surface facing the right side. The flange portions 42 are respectively attached to the right side surface 41b.

次に、左側面41aに対して取り付けられるフランジ部42の構造について説明する。なお、左側面41aに対して取り付けられるフランジ部42の構造と右側面41bに対して取り付けられるフランジ部42の構造とは同じであるので、右側面41bに対して取り付けられるフランジ部42の構造についての詳細な説明は省略する。   Next, the structure of the flange part 42 attached with respect to the left side surface 41a is demonstrated. Since the structure of the flange portion 42 attached to the left side surface 41a is the same as the structure of the flange portion 42 attached to the right side surface 41b, the structure of the flange portion 42 attached to the right side surface 41b. The detailed description of is omitted.

フランジ部42は、長方形の鋼板であり、フランジ部42をまくらぎ本体41に取り付けた際にまくらぎ本体41の左側面41aに合わさる中央部分であるフランジ本体42aと、その際にまくらぎ本体41の左側面41aには合わさらない両翼部分である2つの取付部42bとから構成されている。取付部42bには、取付部42bを縦梁6に取り付けるための2つのフランジ側貫通孔42cが、フランジ部42をまくらぎ本体41に取り付けた際にまくらぎ本体41の長手方向に沿った方向に貫通するよう設けられている。   The flange portion 42 is a rectangular steel plate, and when the flange portion 42 is attached to the sleeper main body 41, the flange main body 42 a that is a central portion that fits the left side surface 41 a of the sleeper main body 41, and the sleeper main body 41 at that time It is comprised from the two attachment parts 42b which are the both wing | blade parts which do not fit in the left side surface 41a. The attachment portion 42b has two flange-side through holes 42c for attaching the attachment portion 42b to the longitudinal beam 6, and the direction along the longitudinal direction of the sleeper body 41 when the flange portion 42 is attached to the sleeper body 41. It is provided so that it may penetrate.

次に、左側面41aに対してフランジ部42を取り付ける構造について説明する。なお、この左側面41aに対してフランジ部42を取り付ける構造、および右側面41bに対してフランジ部42を取り付ける構造は、左右対称に構成されているので、右側面41bに対してフランジ部42を取り付ける構造についての詳細な説明は省略する。   Next, a structure for attaching the flange portion 42 to the left side surface 41a will be described. Since the structure for attaching the flange portion 42 to the left side surface 41a and the structure for attaching the flange portion 42 to the right side surface 41b are configured symmetrically, the flange portion 42 is provided to the right side surface 41b. A detailed description of the mounting structure is omitted.

フランジ本体42aにおけるまくらぎ本体41の左側面41aに対向する面には、2つのジベル43が取り付けられている。このジベル43は、「JIS G3112 SD345」に規定された呼び径D16の異形棒鋼をU字状に曲げることにより構成されており(図2(a)における符号43aが付された部分が相当する。)、その2つの端面43bがフランジ本体42aに溶接で取り付けられている。なお、ジベル43におけるU字形状部分43aは、特許請求の範囲における「抜け防止部」に該当し、ジベル43の端面43bは、特許請求の範囲における「取付部」に該当する。   Two dowels 43 are attached to the surface of the flange body 42a that faces the left side surface 41a of the sleeper body 41. The gibber 43 is configured by bending a deformed steel bar having a nominal diameter D16 defined in “JIS G3112 SD345” into a U shape (corresponding to a portion denoted by reference numeral 43a in FIG. 2A). The two end faces 43b are attached to the flange main body 42a by welding. Note that the U-shaped portion 43a of the dowel 43 corresponds to a “detachment prevention portion” in the claims, and the end face 43b of the dowel 43 corresponds to an “attachment portion” in the claims.

以上のようなまくらぎ4は、次のように製作される。すなわち、(1)まくらぎ本体41を成形するための型枠の内部に、フランジ部42に取り付けられたジベル43におけるU字形状部分43aを位置させる。(2)まくらぎ本体41の材料である液状のコンクリートを型枠に流し込む。(3)型枠に流し込んだコンクリートを硬化させ、ジベル43をまくらぎ本体41の内部に埋設させる。このことにより、ジベル43を介してフランジ部42をまくらぎ本体41に取り付ける。   The sleeper 4 as described above is manufactured as follows. That is, (1) the U-shaped portion 43 a of the dowel 43 attached to the flange portion 42 is positioned inside the mold for molding the sleeper body 41. (2) Pour liquid concrete, which is the material of the sleeper body 41, into the formwork. (3) The concrete poured into the mold is hardened, and the diver 43 is embedded in the sleeper body 41. Thus, the flange portion 42 is attached to the sleeper main body 41 via the gibber 43.

[縦梁6の構成の説明]
ところで、縦梁6は、帯状の鋼板から構成されている。縦梁6は、道床3上に並べられたまくらぎ4の両側において、道床3に対して垂直であり、且つまくらぎ4のフランジ部42に対向するよう設置されている。また、この縦梁6は、対向するまくらぎ4ごとに次のように構成されている。すなわち、縦梁6には、フランジ部42に接するよう配された際に、フランジ部42のフランジ側貫通孔42cに連通する縦梁側貫通孔61が設けられている。そして、まくらぎ4と縦梁6とは、平座金(図示省略)、フランジ部42のフランジ側貫通孔42c、縦梁6の縦梁側貫通孔61、および平座金を順に貫通したボルト71の先端にナット72を取り付けることにより連結される。
[Description of configuration of vertical beam 6]
By the way, the vertical beam 6 is comprised from the strip | belt-shaped steel plate. The vertical beams 6 are installed on both sides of the sleepers 4 arranged on the road bed 3 so as to be perpendicular to the road bed 3 and to face the flange portions 42 of the sleepers 4. Moreover, this vertical beam 6 is comprised as follows for every sleeper 4 which opposes. That is, the vertical beam 6 is provided with a vertical beam side through hole 61 that communicates with the flange side through hole 42 c of the flange portion 42 when arranged so as to contact the flange portion 42. The sleeper 4 and the vertical beam 6 are composed of a flat washer (not shown), a flange side through hole 42c of the flange portion 42, a vertical beam side through hole 61 of the vertical beam 6, and a bolt 71 penetrating through the flat washer. They are connected by attaching a nut 72 to the tip.

なお、有道床軌道100の他の構成は公知技術に従っているので、詳細の説明は省略する。
[有道床軌道100の構築方法の説明]
次に、本実施例の有道床軌道100を構築する方法について、(イ)線路を新設する場合、および(ロ) 既設線路において構築する場合に分けて説明する。
In addition, since the other structure of the bedded track 100 follows a well-known technique, detailed description is abbreviate | omitted.
[Description of the construction method of the bedded track 100]
Next, the method of constructing the roadbed track 100 of the present embodiment will be described separately for (a) when a new track is constructed and (b) when constructing an existing track.

(イ)線路を新設する場合には次のように有道床軌道100を構築する。なお、まくらぎ4および縦梁6は、予め製作しておくこととする。
(イ−1)路盤1上に、敷設予定のまくらぎ4の下面までバラスト2を敷設する。
(A) When a new track is to be constructed, the bedded track 100 is constructed as follows. The sleeper 4 and the longitudinal beam 6 are manufactured in advance.
(A-1) The ballast 2 is laid on the roadbed 1 to the lower surface of the sleeper 4 to be laid.

(イ−2)まくらぎ4を道床3の所定位置に敷設する。
(イ−3)レール5を各まくらぎ4上にそれぞれ締結する。
(イー4)縦梁6をまくらぎ4に取り付ける。この際、まくらぎ4のフランジ部42に設けられたフランジ側貫通孔42cと、縦梁6に設けられた縦梁側貫通孔61とを連通させる。そして、連通させたフランジ側貫通孔42cおよび縦梁側貫通孔61にボルトを貫通させ、そのボルトの先端にナットを取り付ける。
(I-2) The sleeper 4 is laid at a predetermined position on the road bed 3.
(I-3) The rail 5 is fastened on each sleeper 4 respectively.
(E4) The vertical beam 6 is attached to the sleeper 4. At this time, the flange side through hole 42 c provided in the flange portion 42 of the sleeper 4 and the vertical beam side through hole 61 provided in the vertical beam 6 are communicated. Then, a bolt is passed through the flange side through hole 42c and the vertical beam side through hole 61 that are communicated, and a nut is attached to the tip of the bolt.

(イー5)さらに、路盤1上にバラスト2を敷設して道床3を形成する。
以上のように、線路を新設する場合において有道床軌道100を構築する。
(ロ)次に、既設線路の場合には次のように有道床軌道100を構築する。なお、従来の有道床軌道における路盤、バラスト、道床、レールについては、本実施例の有道床軌道100と同様の構成とし、本実施例の有道床軌道100と同じ符号を使用する。また、まくらぎ4および縦梁6は、予め製作しておくこととする。
(E5) Further, the ballast 2 is laid on the roadbed 1 to form the roadbed 3.
As described above, the roadbed track 100 is constructed when a track is newly installed.
(B) Next, in the case of an existing track, the bedded track 100 is constructed as follows. Note that the roadbed, ballast, roadbed, and rail in the conventional roadbed track have the same configuration as the roadbed track 100 of the present embodiment, and the same reference numerals as those of the roadbed track 100 of the present embodiment are used. The sleeper 4 and the vertical beam 6 are manufactured in advance.

(ロ−1)従来の有道床軌道において、レール5の長手方向に10m強の区間を1回の工事区間とし、この工事区間において、まくらぎの両側付近のバラスト2を、道床3の延長方向に連続した溝状にかき出す。   (B-1) In a conventional roadbed track, a section of more than 10 m in the longitudinal direction of the rail 5 is defined as one construction section. In this construction section, the ballast 2 near both sides of the sleeper is extended in the direction in which the roadbed 3 extends. Scrape out into a continuous groove.

(ロ−2)従来のまくらぎをレール5から解放して除去する。このことにより、この工事区間におけるレール5を浮かせた状態とする。
(ロ−3)まくらぎ4を道床3の所定位置に敷設し、レール5に締結する。
(B-2) The conventional sleeper is released from the rail 5 and removed. As a result, the rail 5 in this construction section is brought into a floating state.
(B-3) The sleeper 4 is laid at a predetermined position on the road bed 3 and fastened to the rail 5.

(ロ−4)まくらぎ4の両側付近に形成された溝状空間内に縦梁6を収納する。この際、まくらぎ4のフランジ部42に設けられたフランジ側貫通孔42cと、縦梁6に設けられた縦梁側貫通孔61とを連通させる。そして、連通させたフランジ側貫通孔42cおよび縦梁側貫通孔61にボルトを貫通させ、そのボルトの先端にナットを取り付ける。   (B-4) The vertical beam 6 is housed in a groove-like space formed near both sides of the sleeper 4. At this time, the flange side through hole 42 c provided in the flange portion 42 of the sleeper 4 and the vertical beam side through hole 61 provided in the vertical beam 6 are communicated. Then, a bolt is passed through the flange side through hole 42c and the vertical beam side through hole 61 that are communicated, and a nut is attached to the tip of the bolt.

(ロ−5)まくらぎ4の両側付近に形成された溝状空間内のうち縦梁6が収納された部分以外の部分に、バラスト2を戻して締め固める。
以上のように、既設線路の場合において有道床軌道100を構築する。
(B-5) The ballast 2 is returned and compacted to a portion of the groove-like space formed near both sides of the sleeper 4 other than the portion where the vertical beam 6 is accommodated.
As described above, the bedded track 100 is constructed in the case of an existing track.

[繰り返し載荷試験の説明]
次に、繰り返し載荷試験について説明する。本出願人は、一日平均の列車通過本数が140本の営業線に本実施例の有道床軌道100を適用した場合を想定し、有道床軌道100に対して、新幹線の疲労検討荷重に相当する荷重180kNを繰り返し加える載荷試験を行った。その結果、上述の荷重を約100万回加えたところで、まくらぎ本体41とフランジ部42とを連結するジベル43が破損した。このことにより、本実施例の有道床軌道100の耐用年数は、疲労検討荷重の発生確率を考慮すれば約30年間と考えられ、実用上問題ないと考えられる。一方、特許文献1に挙げた有道床軌道に対して同様の試験を行ったところ、上述の荷重を約14万回加えたところで、まくらぎと縦梁とを連結するボルトが破損した。このことにより、有道床軌道の耐用年数を約7.5倍に向上させることができた。
[Explanation of repeated loading test]
Next, the repeated loading test will be described. The present applicant assumes a case where the roadbed track 100 according to the present embodiment is applied to a business line having an average number of passing trains of 140 a day, and corresponds to the fatigue examination load of the Shinkansen for the roadbed track 100. A loading test in which a load of 180 kN was repeatedly applied was performed. As a result, when the above-described load was applied about 1 million times, the diver 43 connecting the sleeper body 41 and the flange portion 42 was broken. Accordingly, the service life of the bedded track 100 of the present embodiment is considered to be about 30 years considering the probability of occurrence of the fatigue examination load, which is considered to be practically acceptable. On the other hand, when the same test was performed on the bedded track described in Patent Document 1, when the above-described load was applied about 140,000 times, the bolt connecting the sleeper and the vertical beam was damaged. As a result, the service life of the bedded track was improved by about 7.5 times.

[効果]
このように本実施例の有道床軌道100によれば、まくらぎ4のジベル43が、まくらぎ本体41の内部に埋設されるとともに、端面43bが溶接でフランジ部42に取り付けられることにより、まくらぎ本体41とフランジ部42とを連結している。そして、このような複数のまくらぎ4を道床3上に並べて、さらに、一対の縦梁6にまくらぎ4のフランジ部42をボルト71およびナット72で取り付けることによりまくらぎ4同士を連結している。このような構造により、レール5上を列車が走行する際に発生する上下および前後方向の作用力がまくらぎ4に繰り返し作用しても、それら作用力が作用する方向とジベル43の長手方向とがほぼ直交するため、それら作用力は、ジベル43がまくらぎ本体41から抜ける方向には作用しにくく、ジベル43がまくらぎ本体41から抜ける方向には移動しにくい。すると、フランジ部42とまくらぎ本体41との間の距離が大きくなりにくく、ジベル43に作用する曲げモーメントが大きくなりにくい。したがって、ジベル43が疲労破断する時期が、設計時に想定した時期よりも早まることを防ぐとともに、まくらぎと縦梁との連結の分離ならびに再連結を容易に行うことができる。そして、このことにより、有道床軌道100の耐用年数が縮まるのを防ぐことができる。
[effect]
Thus, according to the bedded floor track 100 of the present embodiment, the dive 43 of the sleeper 4 is embedded in the sleeper main body 41 and the end surface 43b is attached to the flange portion 42 by welding. The main body 41 and the flange portion 42 are connected. A plurality of such sleepers 4 are arranged on the road bed 3, and the sleepers 4 are connected to each other by attaching the flange portions 42 of the sleepers 4 to the pair of vertical beams 6 with bolts 71 and nuts 72. Yes. With such a structure, even if the acting force in the vertical and front-rear directions generated when the train travels on the rail 5 acts repeatedly on the sleeper 4, the direction in which these acting forces act and the longitudinal direction of the dowel 43 Are substantially perpendicular to each other, so that these acting forces are unlikely to act in the direction in which the diver 43 is removed from the sleeper body 41, and are difficult to move in the direction in which the diver 43 is removed from the sleeper body 41. Then, the distance between the flange portion 42 and the sleeper body 41 is not easily increased, and the bending moment acting on the dowel 43 is not easily increased. Therefore, it is possible to prevent the time at which the fatigue breakage of the diver 43 is earlier than the time assumed at the time of design, and to easily separate and reconnect the sleeper and the vertical beam. And it can prevent that the useful life of the bedded track 100 is shortened by this.

また、従来のようにまくらぎと縦梁とを、可変パッドを介して接合していた場合には、充填材を可変パッドの袋体に注入した後に静置して充填材を硬化させていたため、その施工が天候によって制約を受けていた。これに対して本実施例の有道床軌道100によれば、充填材を使用せずにまくらぎ4と縦梁6とを連結するので、その施工が天候によって制約を受けずに済む。   In addition, when the sleeper and the vertical beam were joined via the variable pad as in the conventional case, the filler was allowed to stand after being injected into the bag body of the variable pad, and the filler was cured. The construction was limited by the weather. On the other hand, according to the bedded track 100 of the present embodiment, the sleeper 4 and the vertical beam 6 are connected without using a filler, so that the construction is not restricted by the weather.

[別実施例]
(1)上記実施例では、ジベル43が、まくらぎ本体41の左側面41aおよび右側面41bからまくらぎ本体41の内部へ埋設しているが、これには限られず、ジベル43が、まくらぎ本体41の他の面からまくらぎ本体41の内部へ埋設するようにしてもよい。例えば、ジベル43が、まくらぎ本体41を道床3上に並べて設置された際に上下側となる面からまくらぎ本体41の内部へ埋設するようにしてもよい。このようにすれば、レール5と縦梁6との温度伸縮の違いによって発生する前後方向の作用力がまくらぎ本体41に繰り返し作用しても、その作用力が作用する方向とジベル43の長手方向とがほぼ直交するため、その作用力が、ジベル43がまくらぎ本体41から抜ける方向には作用しにくい。一方、レール5上を列車が走行する際に発生する上下方向の作用力がまくらぎ本体41に繰り返し作用すると、その作用力が作用する方向とジベル43の長手方向とがほぼ同じ方向となるため、その作用力は、ジベル43がまくらぎ本体41から抜ける方向に作用する。この場合、ジベル43におけるU字形に曲げられた部分が、ジベル43がまくらぎ本体41から抜ける方向に移動するのを防止する。したがって、このように構成しても上記実施例と同様の作用効果を奏する。
[Another embodiment]
(1) In the above embodiment, the gibber 43 is embedded from the left side surface 41a and the right side surface 41b of the sleeper body 41 into the sleeper body 41. However, the present invention is not limited to this. You may make it embed | buy into the sleeper main body 41 from the other surface of the main body 41. FIG. For example, when the sleeper main body 41 is installed side by side on the road bed 3, the gibber 43 may be embedded in the sleeper main body 41 from the upper and lower surfaces. By doing so, even if the acting force in the front-rear direction generated by the difference in temperature expansion and contraction between the rail 5 and the longitudinal beam 6 acts repeatedly on the sleeper body 41, the direction in which the acting force acts and the longitudinal direction of the diver 43 Since the direction is substantially orthogonal, the acting force is unlikely to act in the direction in which the dowel 43 is removed from the sleeper body 41. On the other hand, when the acting force in the vertical direction generated when the train travels on the rail 5 repeatedly acts on the sleeper body 41, the direction in which the acting force acts and the longitudinal direction of the divel 43 become substantially the same direction. The acting force acts in a direction in which the dowel 43 is removed from the sleeper body 41. In this case, the portion of the diver 43 bent into a U shape prevents the diver 43 from moving in the direction in which it is removed from the sleeper body 41. Therefore, even if comprised in this way, there exists an effect similar to the said Example.

(2)また、例えば、ジベル43が、まくらぎ本体41を道床3上に並べて設置された際に前後側となる面からまくらぎ本体41の内部へ埋設するようにしてもよい。このようにすれば、レール5上を列車が走行する際に発生する上下方向の作用力がまくらぎ本体に繰り返し作用しても、その作用力が作用する方向とジベル43の長手方向とがほぼ直交するため、その作用力が、ジベル43がまくらぎ本体41から抜ける方向には作用しにくい。一方、レール5と縦梁6との温度伸縮の違いによって発生する前後方向の作用力がまくらぎ本体41に繰り返し作用すると、その作用力が作用する方向とジベル43の長手方向とがほぼ同じ方向となるため、その作用力は、ジベル43がまくらぎ本体41から抜ける方向に作用する。この場合、ジベル43におけるU字形に曲げられた部分が、ジベル43がまくらぎ本体41から抜ける方向に移動するのを防止する。したがって、このように構成しても上記実施例と同様の作用効果を奏する。   (2) Further, for example, when the sleeper main body 41 is installed side by side on the road bed 3, the diver 43 may be embedded in the sleeper main body 41 from the front and rear surfaces. In this way, even if the acting force in the vertical direction generated when the train travels on the rail 5 repeatedly acts on the sleeper body, the direction in which the acting force acts and the longitudinal direction of the dowel 43 are almost the same. Since they are orthogonal to each other, the acting force is unlikely to act in the direction in which the diver 43 is removed from the sleeper body 41. On the other hand, when the acting force in the front-rear direction generated by the difference in temperature expansion and contraction between the rail 5 and the longitudinal beam 6 is repeatedly applied to the sleeper body 41, the direction in which the acting force acts and the longitudinal direction of the dowel 43 are substantially the same direction. Therefore, the acting force acts in the direction in which the gibber 43 comes out of the sleeper body 41. In this case, the portion of the diver 43 bent into a U shape prevents the diver 43 from moving in the direction in which it is removed from the sleeper body 41. Therefore, even if comprised in this way, there exists an effect similar to the said Example.

(3)上記実施例では、U字形のジベル43を利用してまくらぎ本体41とフランジ部42とを連結しているが、これには限られず、まくらぎ本体41とフランジ部42とを強固に連結するものであれば他の構成でもよい。例えば、図3(a)に例示するように、スタッドジベル104を利用してまくらぎ本体102とフランジ部103とを連結するようにしてもよい。この場合、スタッドジベル104は、フランジ部103に溶接で取り付けてもよいし、ボルトとナットでフランジ部103と固定してもよい。また、図3(b)に例示するように、フック114を利用してまくらぎ本体112とフランジ部113とを連結するようにしてもよい。この場合、フック114は、フランジ部103に溶接で取り付けてもよいし、ボルトとナットでフランジ部103と固定してもよい。なお、スタッドジベル104およびフック114は連結部に該当する。また、スタッドジベル104における先端部分、およびフック114における先端部分は、抜け防止部に該当する。このように構成しても上記実施例と同様の作用効果を奏する。   (3) In the above embodiment, the sleeper main body 41 and the flange portion 42 are connected using the U-shaped gibber 43. However, the present invention is not limited to this, and the sleeper main body 41 and the flange portion 42 are firmly connected. Other configurations may be used as long as they are connected to the. For example, as illustrated in FIG. 3A, the sleeper main body 102 and the flange portion 103 may be coupled using a stud gibber 104. In this case, the stud dowel 104 may be attached to the flange portion 103 by welding, or may be fixed to the flange portion 103 with a bolt and a nut. Further, as illustrated in FIG. 3B, the sleeper main body 112 and the flange portion 113 may be coupled using a hook 114. In this case, the hook 114 may be attached to the flange portion 103 by welding, or may be fixed to the flange portion 103 with a bolt and a nut. Note that the stud gibber 104 and the hook 114 correspond to a connecting portion. Further, the tip end portion of the stud gibber 104 and the tip end portion of the hook 114 correspond to a drop prevention portion. Even if comprised in this way, there exists an effect similar to the said Example.

(4)上記実施例では、ジベル43をフランジ部42に溶接により取り付けているが、これには限られず、ボルトとナットなどで締結することによりジベル43をフランジ部42に取り付けてもよい。具体的には、図3(c)に例示するように、U字形のジベル124の端面からその内部に向けてボルト取付孔124aを設け、そのボルト取付孔124aの内壁にねじ山を形成する。一方、フランジ部113におけるジベル124が取り付けられる箇所には、ジベル124を取り付けた際にジベル124のボルト取付孔124aに連通するフランジ側ボルト貫通孔123aを設ける。さらに、フランジ部123のフランジ側ボルト貫通孔123aを貫通したボルト125を、ジベル124のボルト取付孔124aにねじ入れることにより、ジベル124をフランジ部123に取り付ける。このようにすれば、フランジ部123を、まくらぎ本体41から分離したりフランジ部123をまくらぎ本体41に取り付けたりすることを容易に行うことができる。   (4) In the above-described embodiment, the diver 43 is attached to the flange part 42 by welding. However, the present invention is not limited to this, and the diver 43 may be attached to the flange part 42 by fastening with a bolt and a nut. Specifically, as illustrated in FIG. 3C, a bolt mounting hole 124a is provided from the end face of the U-shaped dowel 124 toward the inside thereof, and a screw thread is formed on the inner wall of the bolt mounting hole 124a. On the other hand, a flange-side bolt through-hole 123 a that communicates with the bolt mounting hole 124 a of the diver 124 when the diver 124 is attached is provided at a location where the diver 124 is attached in the flange portion 113. Furthermore, the bolt 125 which penetrated the flange side bolt through-hole 123a of the flange portion 123 is screwed into the bolt mounting hole 124a of the dowel 124, thereby attaching the dowel 124 to the flange portion 123. In this way, it is possible to easily separate the flange portion 123 from the sleeper body 41 or attach the flange portion 123 to the sleeper body 41.

(5)上記実施例では、フランジ部42を長方形に形成しているがこれには限られず、フランジ部42をまくらぎ本体41に取り付けた際にまくらぎ本体41の左側面41aに合わさる部分と、その際にまくらぎ本体41の左側面41aには合わさらない部分とから構成される形状であれば様々な形状に構成してもよい。一例を挙げると、フランジ部を楕円形に形成するといった具合である。このようにしても、上記実施例と同様の作用効果を奏する。   (5) In the above embodiment, the flange portion 42 is formed in a rectangular shape, but the present invention is not limited to this, and when the flange portion 42 is attached to the sleeper body 41, a portion that fits the left side surface 41a of the sleeper body 41; In this case, various shapes may be used as long as the shape includes a portion that does not fit to the left side surface 41a of the sleeper body 41. For example, the flange portion may be formed in an elliptical shape. Even if it does in this way, there exists an effect similar to the said Example.

(6)上記実施例のまくらぎ4では、まくらぎ本体41の端部に一つのフランジ部42が取り付けられているが、これには限られず、まくらぎ本体41の端部に複数のフランジ部を取り付けるようにしてもよい。一例を挙げると、図3(a)に例示するフランジ部103を二分割した形状を有するフランジ部を、スタッドジベル104にてまくらぎ本体41に取り付けるといった具合である。このように構成しても上記実施例と同様の作用効果を奏する。   (6) In the sleeper 4 of the above embodiment, one flange portion 42 is attached to the end portion of the sleeper main body 41, but the present invention is not limited to this, and a plurality of flange portions are attached to the end portion of the sleeper main body 41. May be attached. As an example, a flange portion having a shape obtained by dividing the flange portion 103 illustrated in FIG. 3A into two parts is attached to the sleeper body 41 by the stud gibber 104. Even if comprised in this way, there exists an effect similar to the said Example.

(7)上記実施例ではまくらぎ4を有道床軌道100に適用した例を挙げたが、まくらぎ4を工事桁200に利用してもよい。具体的には、図4に示すように、まくらぎ4を利用した工事桁200は、並べて設置された複数のまくらぎ4と、複数のまくらぎ4の上面に締結された一対のレール5と、複数のまくらぎ4の両端部それぞれの近傍に設置された縦梁としての一対の主桁201と、を備えている。このうち、まくらぎ4の構成については、上記実施例において既に説明したのでここでは詳細な説明は省略する。一方、主桁201は、対向するまくらぎ4ごとに次のように構成されている。すなわち、主桁201には、フランジ部42に接するよう配された際に、フランジ部42のフランジ側貫通孔42cに連通する主桁側貫通孔(図示省略)が設けられている。そして、まくらぎ4と主桁201とは、平座金、フランジ部42のフランジ側貫通孔42c、主桁201の主桁側貫通孔、および平座金を順に貫通したボルトの先端にナットを取り付けることにより連結される。   (7) Although the sleeper 4 is applied to the bedded track 100 in the above embodiment, the sleeper 4 may be used for the construction beam 200. Specifically, as shown in FIG. 4, the construction girder 200 using the sleepers 4 includes a plurality of sleepers 4 installed side by side, and a pair of rails 5 fastened to the upper surfaces of the plurality of sleepers 4. And a pair of main girders 201 as vertical beams installed in the vicinity of both end portions of the plurality of sleepers 4. Among these, since the structure of the sleeper 4 has already been described in the above embodiment, detailed description thereof is omitted here. On the other hand, the main beam 201 is configured as follows for each of the facing sleepers 4. That is, the main girder 201 is provided with a main girder-side through hole (not shown) that communicates with the flange-side through hole 42c of the flange portion 42 when arranged so as to contact the flange portion 42. The sleeper 4 and the main girder 201 are attached with nuts at the ends of bolts that pass through the plain washer, the flange side through hole 42c of the flange portion 42, the main girder side through hole of the main girder 201, and the plain washer in order. It is connected by.

このように構成した工事桁200によれば、上述のまくらぎ4を使用しているので、その耐用年数が縮まるのを防ぐことができる。   According to the construction girder 200 thus configured, the sleeper 4 described above is used, so that it is possible to prevent the useful life from being shortened.

実施例の有道床軌道の構成を示す断面図である。It is sectional drawing which shows the structure of the bedded track | orbit of an Example. 実施例のまくらぎを示す平面図(a)、正面図(b)である。It is the top view (a) which shows the sleeper of an Example, and a front view (b). (a)は、まくらぎの別実施例(1)を示す平面図であり、(b)は、まくらぎの別実施例(2)を示す平面図であり、(c)は、フランジ部とジベルとを連結する構造の別実施例を示す平面図である。(a) is a top view which shows another example (1) of a sleeper, (b) is a top view which shows another example (2) of a sleeper, (c) is a flange part, a dowel, It is a top view which shows another Example of the structure which connects. 実施例のまくらぎを工事桁に用いた構成を示す断面図である。It is sectional drawing which shows the structure which used the sleeper of the Example for the construction girder. 従来の有道床軌道の構成を示す断面図である。It is sectional drawing which shows the structure of the conventional bedded track | orbit.

符号の説明Explanation of symbols

1…路盤、2…バラスト、3…道床、4,101,111…まくらぎ、5…レール、6…縦梁、41,102,112…まくらぎ本体、41a…左側面、41b…右側面、42,103,113,123…フランジ部、42a…フランジ本体、42b…取付部、42c,123a…フランジ側貫通孔、43,124…ジベル、43a…ジベル43におけるU字形状部分、43b…ジベル43の端面、71…ボルト、72…ナット、104…スタッドジベル、114…フック、124a…ボルト取付孔

DESCRIPTION OF SYMBOLS 1 ... Roadbed, 2 ... Ballast, 3 ... Roadbed, 4,101,111 ... Sleeper, 5 ... Rail, 6 ... Longitudinal beam, 41, 102, 112 ... Sleeper body, 41a ... Left side, 41b ... Right side, 42, 103, 113, 123 ... flange portion, 42a ... flange body, 42b ... mounting portion, 42c, 123a ... flange-side through-hole, 43, 124 ... gibel, 43a ... U-shaped portion in the gibel 43, 43b ... gibel 43 End surface of 71, bolt, 72, nut, 104, stud gibber, 114, hook, 124a, bolt mounting hole

Claims (6)

路盤上に設けられた道床の延長方向にその長手方向が直交するよう前記道床上に並べて設置されるまくらぎであって、
コンクリート製のまくらぎ本体と、
前記まくらぎ本体の長手方向における両端部それぞれから張り出した鍔部と、
前記まくらぎ本体に埋設された際に前記まくらぎ本体から抜けることを防止する抜け防止部と前記鍔部に取り付けるための取付部とを有し、その抜け防止部を前記まくらぎ本体に埋設させ、且つ前記取付部を前記鍔部に取り付けることにより、前記まくらぎ本体と前記鍔部とを連結する連結部と、
を備えることを特徴とするまくらぎ。
A sleeper installed side by side on the roadbed so that its longitudinal direction is perpendicular to the direction of extension of the roadbed provided on the roadbed,
A concrete sleeper body,
A collar that protrudes from both ends in the longitudinal direction of the sleeper body;
A detachment preventing portion that prevents the detachment from being removed from the sleeper main body when embedded in the sleeper main body, and an attachment portion for attaching to the collar portion, and the detachment prevention portion is embedded in the sleeper main body. And, by attaching the attachment part to the collar part, a connection part for coupling the sleeper body and the collar part,
A sleeper characterized by comprising.
請求項1記載のまくらぎにおいて、
前記抜け防止部は、前記まくらぎ本体の長手方向における端面から前記まくらぎ本体の内部へ埋設していることを特徴とするまくらぎ。
The sleeper according to claim 1,
The sleeper is embedded in the sleeper body from an end face in the longitudinal direction of the sleeper body.
請求項1または請求項2記載のまくらぎにおいて、
前記取付部は、前記鍔部に溶接で取り付けられていることを特徴とするまくらぎ。
In the sleeper according to claim 1 or claim 2,
The sleeper is characterized in that the attachment part is attached to the collar part by welding.
請求項1または請求項2に記載のまくらぎにおいて、
前記取付部には、その内部に向けて連結部側ボルト取付孔が設けられ、且つその連結部側ボルト取付孔の内部にはねじ山が形成されており、
一方、前記鍔部における前記連結部が取り付けられる箇所には、前記連結部を取り付けた際に前記連結部側ボルト取付孔に連通する鍔部側ボルト貫通孔が設けられており、
さらに、前記鍔部側ボルト貫通孔を貫通したボルトを、前記連結部側ボルト取付孔にねじ入れることにより、前記連結部を前記鍔部に取り付けることを特徴とするまくらぎ。
In the sleeper according to claim 1 or 2,
The mounting portion is provided with a connecting portion side bolt mounting hole toward the inside thereof, and a thread is formed inside the connecting portion side bolt mounting hole.
On the other hand, at the portion where the connecting portion is attached in the flange portion, a flange-side bolt through hole communicating with the connecting portion-side bolt mounting hole when the connecting portion is attached is provided,
Furthermore, the sleeper is characterized in that the connecting part is attached to the collar part by screwing a bolt penetrating the collar part side bolt through hole into the connecting part side bolt mounting hole.
路盤上に設けられた道床と、
複数の、前記道床上に並べて設置された、請求項1〜請求項4の何れかに記載のまくらぎと、
前記複数のまくらぎに取り付けられた一対のレールと、
前記複数のまくらぎ同士を連結するための一対の縦梁と、
を備え、前記複数のまくらぎがそれぞれ備える一対の鍔部を、前記一対の縦梁に取り付けることにより、前記一対の縦梁を介して前記複数のまくらぎ同士を連結したことを特徴とする有道床軌道。
A roadbed provided on the roadbed;
A plurality of sleepers according to any one of claims 1 to 4, which are installed side by side on the road bed,
A pair of rails attached to the plurality of sleepers;
A pair of longitudinal beams for connecting the plurality of sleepers;
The plurality of sleepers are connected to each other via the pair of vertical beams by attaching a pair of flanges respectively provided to the plurality of sleepers to the pair of vertical beams. Roadbed trajectory.
複数の、前記道床上に並べて設置された、請求項1〜請求項4の何れかに記載のまくらぎと、
前記複数のまくらぎ同士を連結するための縦梁としての一対の主桁と、
を備え、前記複数のまくらぎがそれぞれ備える一対の鍔部を、前記一対の主桁に取り付けることにより、前記一対の主桁を介して前記複数のまくらぎ同士を連結したことを特徴とする工事桁。
A plurality of sleepers according to any one of claims 1 to 4, which are installed side by side on the road bed,
A pair of main beams as longitudinal beams for connecting the plurality of sleepers;
The plurality of sleepers are connected to each other via the pair of main girders by attaching a pair of flanges respectively provided to the plurality of sleepers to the pair of main girders. digit.
JP2003356662A 2003-10-16 2003-10-16 Sleepers, roadbed tracks and construction girders Expired - Fee Related JP3850405B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003356662A JP3850405B2 (en) 2003-10-16 2003-10-16 Sleepers, roadbed tracks and construction girders

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003356662A JP3850405B2 (en) 2003-10-16 2003-10-16 Sleepers, roadbed tracks and construction girders

Publications (2)

Publication Number Publication Date
JP2005120696A JP2005120696A (en) 2005-05-12
JP3850405B2 true JP3850405B2 (en) 2006-11-29

Family

ID=34613838

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003356662A Expired - Fee Related JP3850405B2 (en) 2003-10-16 2003-10-16 Sleepers, roadbed tracks and construction girders

Country Status (1)

Country Link
JP (1) JP3850405B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103911918A (en) * 2014-04-21 2014-07-09 北京易科路通铁道设备有限公司 Demountable connection part of trapezoidal sleepers

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6026687B2 (en) * 2016-02-10 2016-11-16 神東塗料株式会社 Slab track filling layer forming bag
CN113417173B (en) * 2021-08-04 2022-11-01 杨清福 Track structure suitable for super-high-speed train

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103911918A (en) * 2014-04-21 2014-07-09 北京易科路通铁道设备有限公司 Demountable connection part of trapezoidal sleepers
CN103911918B (en) * 2014-04-21 2016-07-06 北京易科路通铁道设备有限公司 The dismantled and assembled connector of longitudinal beam type sleeper

Also Published As

Publication number Publication date
JP2005120696A (en) 2005-05-12

Similar Documents

Publication Publication Date Title
US4905896A (en) Railroad roadway for high speed rail-mounted vehicles
JP2008520867A (en) Bridge reinforcement method
JPS62296001A (en) Concrete crosstie
JP4675826B2 (en) Continuous structure of bridge joints
CN209798444U (en) A truss sleeper ballastless track for super-slope cog railway
JP4416337B2 (en) Construction method of the replacement composite floor slab girder bridge
JP3850405B2 (en) Sleepers, roadbed tracks and construction girders
CN115652708B (en) Three-dimensional reinforcement device and reinforcement method for ballastless track sleeper of high-speed railway
JP6046479B2 (en) Articulated track block and construction method for connecting track block supporting girder
KR20220007214A (en) Structure And Method For Constructing Track Of Mountain train
JP4037862B2 (en) Steel slab and method of reinforcing the same
JP2007170178A (en) Steel floor slab and its reinforcing method
JP5276801B2 (en) Labor-saving track reinforcement method
JP3280674B2 (en) Level crossing railway crossing
JPH09273102A (en) Sleeper
JP4118278B2 (en) Girder bridge repair structure
JP2021001450A (en) Wall balustrade reinforcement method and reinforcement structure
KR100622008B1 (en) Composite structure of integral shift bridge
JP4020918B2 (en) Bridge structure of girder bridge
KR102924629B1 (en) Composite sleeper for concrete track, and concrete track of embedded type having the same
JP6229827B2 (en) Resin fixed track and its construction method
KR102811408B1 (en) Rack track structure of mountain railway for combining general road, and construction method for the same
JP3356652B2 (en) Curved section-compatible joining device for ladder-type sleepers
JP2020133142A (en) Concrete floor slab structure and large vehicle parking lot structure
JP3791719B2 (en) Directly connected track construction method and track structure using construction girders

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060201

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060411

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060602

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060808

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060829

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090908

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100908

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100908

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110908

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120908

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130908

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees