Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4046215B2 - Buffer material compaction device - Google Patents
[go: Go Back, main page]

JP4046215B2 - Buffer material compaction device - Google Patents

Buffer material compaction device Download PDF

Info

Publication number
JP4046215B2
JP4046215B2 JP2002103397A JP2002103397A JP4046215B2 JP 4046215 B2 JP4046215 B2 JP 4046215B2 JP 2002103397 A JP2002103397 A JP 2002103397A JP 2002103397 A JP2002103397 A JP 2002103397A JP 4046215 B2 JP4046215 B2 JP 4046215B2
Authority
JP
Japan
Prior art keywords
vertical hole
buffer material
block member
compacting
compaction device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002103397A
Other languages
Japanese (ja)
Other versions
JP2003294892A (en
Inventor
啓司 藤原
清 雨宮
正明 小林
正和 千々松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Electric Power Co Holdings Inc
Original Assignee
Tokyo Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Electric Power Co Inc filed Critical Tokyo Electric Power Co Inc
Priority to JP2002103397A priority Critical patent/JP4046215B2/en
Publication of JP2003294892A publication Critical patent/JP2003294892A/en
Application granted granted Critical
Publication of JP4046215B2 publication Critical patent/JP4046215B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Processing Of Solid Wastes (AREA)

Description

【0001】
【発明が属する技術分野】
本発明は、縦孔内に廃棄物を埋設するために用いられる装置に関し、更に詳しくは、廃棄物と縦孔との間に充填される緩衝材料を締固める装置に関する。
【0002】
【従来の技術】
外部に漏れ出ることが憚られる廃棄物、例えば、放射性廃棄物などを処分する施設として、縦孔を利用することが提案されている。この処分施設は、放射性廃棄物を容器に入れてセメント等で固め、これを縦孔の中央に設置し、この放射性廃棄物と縦孔との間を緩衝材で隙間なく埋めて、この緩衝材料を可能な限り均一に締め固め、これにより、たとえ地震時に縦孔が変形するようなことがあったとしても、緩衝材が縦孔に追従して変形し、隙間が生じることがないように計画されている。ここで、緩衝材としては、例えば、ベントナイト等の粘性土を含む材料を使用することが考えられている。
【0003】
以上のような廃棄物の埋設工法は、例えば、直径1700cm、深さ500cm程度の縦孔を岩盤に形成し、当該縦孔に緩衝材料を投入して20cm程度の層厚にする。次いで、縦孔内に作業員が降りて表面を均し、コテなどの器具により緩衝材料の部分押えを繰り返しながら全面を押える。この緩衝材料の押え工程の後に、さらに、タンピングランマーなどの振動式締固め器具で緩衝材料を締め固めれば、第一層の締め固め工程が終了する。
次に、第一層の緩衝材料の上に型枠を載置し、この型枠の周りに緩衝材料を投入し、これを上記と同様に締め固める。これら型枠載置工程や緩衝材料の締固め工程を所定回数繰り返した後に、型枠を抜き取り、ここに廃棄物の入った容器を埋め込む。容器の上にさらに緩衝材料を投入し、これを上記と同様に締め固めれば廃棄物の埋設作業は終了する。
【0004】
なお、第一層の締め固め工程に引き続き、上記以外の工程を採用しても良く、例えば、締め固めた緩衝材料の上に型枠を載置せず、第一層と同様な作業を所定回数繰り返した後に、この締め固めた緩衝材料に縦孔を形成し、この縦孔に廃棄物の入った容器を埋め込み、この容器の上にさらに緩衝材料を投入し、これを上記と同様に締め固めることにより廃棄物容器を埋設することも可能である。
【発明が解決しようとする課題】
【0005】
上記廃棄物の埋設工法においては、緩衝材料の表面を均す工程、緩衝材料の表面を押える工程、および緩衝材料を締め固める工程は全て作業員が実施しているので平坦さの精度や密度の均一性が低くなると共に、施工時間が長くなり、さらに、作業員の靴により緩衝材料が踏まれるため表面が不均一に締め固められるという欠点がある。
【0006】
本発明の課題は、廃棄物を埋設する縦孔において、緩衝材料を比較的短い時間で高密度かつ均質な密度に締め固めることができる緩衝材締固め装置を提供することにある。
【0007】
【課題を解決するための手段】
本発明によれば、廃棄物を埋設する縦孔内で緩衝材料を締固める装置であって、縦孔内に投入された緩衝材料を敷き均し、敷き均らした緩衝材料を上方から押し固め、かつ押し固めた緩衝材料を締め固めるための押圧手段と、該押圧手段と縦孔内周面とのクリアランスに入り込み縦孔内周面に残された緩衝材料を縦孔内周面から掻き落すための掻き落し手段と、前記押圧手段と前記掻き落し手段とを支持するために縦孔外部に設けられた支持手段とを備えることを特徴とする緩衝材締固め装置が提供される。
【0008】
【発明の実施の形態】
本発明の緩衝材締固め装置において、前記押圧手段は、縦孔内で昇降、旋回、落下可能に設けられたブロック部材と、該ブロック部材に下端部が着脱可能に掛合し該ブロック部材を昇降させる昇降手段と、該ブロック部材を縦孔内で旋回させる旋回手段とを備えるように構成することができる。
【0009】
本発明の緩衝材締固め装置において、前記ブロック部材と前記昇降手段の下端部との掛合状態を解除するための手段は、高さ調整自在に設けることが好ましい。
【0010】
本発明の緩衝材締固め装置において、前記掻き落し手段は、縦孔内周面に当接した状態で旋回可能に設けられたブレードと、該ブレードを昇降させる昇降手段と、該ブレードを縦孔内で旋回させる旋回手段とを備えるように構成できる。
ここで、旋回手段は正逆両方向に回転可能なものを使用しても良く、この場合、ブレードも両方向に向けて配置することが好ましい。また、掻き落し手段を旋回させる旋回手段は、押圧手段を旋回させる旋回手段と同じものを使用するように構成しても良い。
【0011】
本発明の緩衝材締固め装置には、縦孔間を移動可能にする走行手段を設けても良い。廃棄物処理のための縦孔を数多く地盤に設けた場合、緩衝材締固め装置を一の縦孔から他の縦孔へ効率良く移動するために走行手段を設けることが好ましく、この走行手段は、特に限定されるものではないが、例えば、複数の縦孔に沿って軌道を敷設し、この軌道を走行する滑車を前記支持手段に設けると共に、この滑車を駆動・制御する駆動・制御手段を設けて構成することができる。また、これ以外では、前記支持手段に車輪を設け、この車輪を駆動・制御する駆動・制御手段を設けるように構成しても良い。
【0012】
本発明の緩衝材締固め装置では、前記縦孔の位置を認識するための手段を備え、該手段により前記押圧手段と前記掻き落し手段とが、あらかじめ設けた縦孔から外れることなく位置決めされるように構成しても良い。
さらに詳細に説明すれば、位置認識手段としては、CCDカメラなどの映像入力手段と、該CCDカメラの映像を画像処理して縦孔の輪郭線や中心点などを求める画像処理手段と、この画像処理手段及び映像入力手段を含む構成を制御するCPUなどの制御部とを備えるように構成しても良く、この位置認識手段で得た縦孔の位置データにより前記走行手段を制御して緩衝材締固め装置を移動させれば、前記押圧手段と前記掻き落し手段を縦孔上に位置決めすることが可能になる。
【0013】
本発明の緩衝材締固め装置では、前記緩衝材料を投入するための緩衝材導入手段を前記縦孔に挿脱自在に設けても良い。緩衝材導入手段としては、例えば、縦孔上方に配置されるホッパーと、このホッパーから縦孔内に延長する管体とを備えるように構成することが可能であり、この管体は撓曲可能なものを使用するか、あるいは伸縮可能なものを使用する。
【0014】
【実施例】
以下、本発明の好適な実施形態を添付図面を参照して説明する。
【0015】
図1は本発明の側面図であり、この緩衝材締固め装置1は、縦孔30内に投入された緩衝材料を敷き均し、且つ敷き均らした緩衝材料を上方から押し固めるブロック部材20と、緩衝材料の押し固め工程時にブロック部材20と縦孔内周面とのクリアランスに入り込み縦孔内周面に残される緩衝材料を縦孔内周面から掻き落すためのスクレーパー24c,24dと、ブロック部材20とスクレーパー24c,24dとを支持するために縦孔外部に設けられた支持フレーム11とを備える。
【0016】
ここで、前記支持フレーム11は、図1及び図4に示したように、一対の支柱11bを桁材11aで連結し、対向する桁材11aどうしを連結部材11dで連結し、支柱11bの下端に接地プレート11cが固定され、この接地プレート11cがアンカー(図示せず)により縦孔30の外周に固定される。なお、図示はしないが、緩衝材締固め装置1自体を縦孔間で走行移動可能に構成する場合には、接地プレート11cを設けず、支柱11bの下端にタイヤや滑車などの車輪を枢着し、必要に応じて、この滑車が走行するレールを敷設する。
【0017】
上記した支持フレーム11の桁材11aの上には、ベアリングを介して旋回盤15aが回転可能に固定され、この旋回盤15aの外周にラック15bが形成され、このラック15bと噛み合うピニオン(図示せず)を備えたモーター16が支持フレーム11上に取り付けられており、この構成により、モーター16が駆動するとピニオンからラック15bを介して回転力が伝わり、旋回盤15aは所定方向に回転駆動される。
【0018】
また旋回盤15aは中央に貫通孔を有し、この貫通孔に貫装された上方管14がブラケットなどの取付け具により旋回盤15aに固定される。この上方管14の内部には伸縮ジャッキ26が挿設され、上端に固定されて吊下げられており、この伸縮ジャッキ26の下端から出入するジャッキロッド25の下端には、後述する着脱部40が設けられる。
【0019】
上方管14の下端には下方管19の上端が挿入され、この挿入部分にはガイドローラを含むガイド部材27,28が取り付けられ、これにより、下方管19はその上端が上方管14の内部に挿入した状態で上下動するように導かれる。この下方管19の内部には前記ジャッキロッド25が延びており、ジャッキロッド25は着脱部40を介して下方管下部19aを着脱自在に支持する。また下方管19の下端には下方管下部19aが一体に連結され、この下方管下部19aにほぼ直交するようにブロック部材20が連結されている。このブロック部材20は、図5に示したように、下方管下部19aから両側に広がる扇状の平面形状を有し、下面は平らに形成されたものを使用する。
なお、下方管下部19aは省略することも可能であり、この場合、ブロック部材20は下方管19の下端に連結し、着脱部40をブロック部材20の上に形成する。
【0020】
旋回盤15aには、さらに、ほぼ垂直方向に延びるスリーブ24bが対向する2箇所に固定され、このスリーブ24bにスクレーパー支持杆24aが摺動可能に挿通され、スクレーパー支持杆24aの下端にスクレーパー24c,24dが固定され、スクレーパー支持杆24aの上端にワイヤー22が接続され、このワイヤー22はプーリー12aを介してウインチ21に巻取り・巻出し自在に巻回されている。スクレーパー24c,24dは、図5に示したように相互に逆方向に向けて設けられ、各スクレーパー24c,24dにはブレード24eが縦孔30の内周面に当接するように設けられている。またプーリー12aはプーリー取付具12bにより上方管14の上端部に固定され、ウインチ21は旋回盤15aに固定されている。
したがって、旋回盤15aが旋回操作されると、スクレーパー24c,24dのブレード24eは縦孔30の内周面に当接した状態で旋回し、内周面に残置された緩衝材料を掻き落す。またウインチ21が操作されると、ワイヤー22は巻き取り、あるいは巻き出されて、スクレーパー支持杆24aはスリーブ24b内で上下に摺動し、スクレーパー24c,24dは縦孔30内で昇降される。
【0021】
以上の構成において、下方管19、下方管下部19a及びブロック部材20は一体に連結されているため、これらの部材は、着脱部40における上下の掛合が解除されたとき、一緒に落下する。
着脱部40について、さらに詳細に説明すれば、図3は着脱部40を拡大して示した側面図であって、図2の断面からほぼ90°程度回転した方向から見たものである。図3において、ジャッキロッド25の下端には下方管19内面に沿って転動するローラー41bがブラケット41aを介して固定されており、このローラー41bによりジャッキロッド25は下方管19内面に接触することなく上下動可能に導かれる。またジャッキロッド25の下端にはキャッチブラケット42が連結され、このキャッチブラケット42にはリミット装置43、フックピン44、当接プレート42aが設けられている。
【0022】
このフックピン44はフック48aを着脱自在に掛合させるためのものである。リミット装置43は、フック48aとフックピン44の掛合と掛合解除を感知するためのセンサーであり、このリミット装置43からの信号が図示しない制御部に送られることにより、フック48aとフックピン44の掛合を感知した時には伸縮ジャッキ26の伸張が停止し、両部材の掛合解除を感知した時には伸縮ジャッキ26の収縮が停止するように制御される。当接プレート42aは、キャッチブラケット42とフック取付ブラケット45の衝突による損傷を防止するためのものである。
【0023】
一方、下方管下部19aの上面にはフック取付ブラケット45が固定され、フック取付ブラケット45には、バネ47と、当接プレート45aと、枢軸46により枢着されたフック48aとが設けられている。
フック48aには、下方管19の外部に突出するアーム48bが一体に形成され、アーム48bの先端にはローラー48cが枢着されており、このローラー48cに落下レベル調整部材13aの下端部13cが突き当たることにより、フック48aとフックピン44の掛合状態が解除される。バネ47は、アーム48bを上方に押し上げるように付勢する付勢手段であり、このバネ47の力はアーム48bからフック48aに伝わり、フック48aは常にフックピン44に掛合する位置に押し戻される。当接プレート45aは、当接プレート42aと当接することにより、キャッチブラケット42とフック取付ブラケット45の衝突による損傷を防止するためのものである。
【0024】
ここで、着脱部40における着脱作用について説明する。
フック48aがフックピン44に掛合した状態で伸縮ジャッキ26が収縮すると、下方管19、下方管下部19a及びブロック部材20は上方に引き上げられて、ローラー48cが落下レベル調整部材13aの下端部13cに突き当たる。これにより、アーム48bが図3の二点鎖線のように押し下げられて、フック48aはフックピン44から外れ、下方管19、下方管下部19a及びブロック部材20は落下する。そして、このとき、フック48aとフックピン44の掛合解除がリミット装置43により感知され、この感知信号を受けて制御部は伸縮ジャッキ26の収縮を停止する。
逆に、緩衝材料の上に落下した下方管19、下方管下部19a及びブロック部材20を引き上げる場合には、伸縮ジャッキ26を伸張してジャッキロッド25を下方に伸ばす。これにより、ジャッキロッド25下端のフックピン44はフック48aに突き当たり、バネ47の力に抗してフック48aを回動させ、さらに伸縮ジャッキ26が伸張してフックピン44が下方に通過してしまうと、フック48aはバネ47に付勢されて初期位置に戻る。そして、フック48aが初期位置に戻ったことをリミット装置43が感知すると、制御部は伸縮ジャッキ26の伸張を停止する。
【0025】
また緩衝材締固め装置1には、縦孔30の内部に緩衝材料を投入するためのホッパー18aが取付部材17により回動可能に固定され、ホッパー18aには撓曲可能な管体18bが接続される。ホッパー18aを適宜回動させると共に、管体18bを撓曲させることにより、管体18bは縦孔30から出し入れ可能になるものである。なお、管体は撓曲可能なものを使用する替わりに、伸縮可能なものを使用すれば、縦孔30からの出し入れは自在に行うことが可能になる。
【0026】
さらに、緩衝材締固め装置1には、棒状に形成された落下レベル調整部材13aが設けられており、これは旋回盤15aにほぼ垂直方向に設けられたスリーブ24bに挿通され、このスリーブ24bに設けられた止め具(図示せず)により所定高さで停止されるものである。また落下レベル調整部材13aの下端13cにはボルトが螺合されており、このボルトを螺合調整することによりボルトの突出長さが適宜調整される。したがって、落下レベル調整部材13aを高さ調整する際には、最初に、落下レベル調整部材13aのスリーブ24bにおける位置を固定することにより大雑把な高さを定め、次いで、下端13cのボルトを螺合調整することにより微調整を行う。
なお、落緩衝材締固め装置1には、下レベル調整部材13aのスリーブ24bにおける上下動と停止動作、および下端13cのボルトの螺合動作を自動的に行うための手段を設けても良く、この自動化のための手段としては、例えば、落下レベル調整部材13aにロータリーエンコーダーを内蔵し、旋回盤15aにモーターを取り付けて、このモーターで落下レベル調整部材13aを自動昇降させる構成としても良い。
【0027】
次に、緩衝材締固め装置1全体の動作について説明する。
緩衝材締固め装置1を所定の縦孔30から他の縦孔30に移動する場合には、ブロック部材20、スクレーパー24c,24d、落下レベル調整部材13a、管体18bを縦孔30から引き上げる。すなわち、ブロック部材20は伸縮ジャッキ26の収縮により上昇させ、スクレーパー24c,24dはウインチ21によるワイヤー22の巻取りにより引き上げ、落下レベル調整部材13a及び管体18bは手動により引き上げる。
【0028】
緩衝材締固め装置1を所定の縦孔30のうえに設置したら、管体18bを縦孔30内に入れて、ベントナイト等を含む緩衝材料をホッパー18aから管体18bを通して縦孔30の底に投入する。この緩衝材料は最下層の層厚に応じた容量が投入される。次に、伸縮ジャッキ26を伸張してブロック部材20を縦孔30内の所定深さまで降ろしたら、さらに、ブロック部材20を徐々下降させながら、モーター16を駆動させて旋回盤15aを回転あるいは回動させる。これにより、ブロック部材20は、緩衝材料がほぼ同じ高さになるように敷き均す。また、この緩衝材料の敷均し工程では、この工程の途中でウインチ21を操作してスクレーパー24c,24dを緩衝材料の表面付近まで降ろし、スクレーパー24c,24dをブロック部材20と共に回転させることにより、縦孔30の内周面に残置された緩衝材料を掻き落す。
【0029】
緩衝材料の敷均しが終了したら、次に、ブロック部材20により緩衝材料を押し固める工程を行う。この工程では、旋回盤15aの回転あるいは回動を停止した状態で、伸縮ジャッキ26を伸張してブロック部材20の下面で緩衝材料を押圧する。この押圧の後に、伸縮ジャッキ26を収縮してブロック部材20を引き上げ、旋回盤15aによりブロック部材20を20°程度回転させて、押圧されていない緩衝材料の上に位置をずらしてから、前記と同様にしてブロック部材20の下面で緩衝材料を押圧する。以下、これらの動作を繰り返し、緩衝材料の全面をブロック部材20により押し固める。
【0030】
緩衝材料の全面を押し固めたら、次に、所定高さからブロック部材20を落下させて緩衝材料を締め固める工程が実施される。この締め固め工程に先立ち、落下レベル調整部材13aの下端13cの高さは、ブロック部材20の落下高さに応じて適宜調整される。緩衝材料の締め固め工程では、伸縮ジャッキ26が収縮してブロック部材20が引き上げられ、落下レベル調整部材13aの下端13cで定められた高さまでブロック部材20が上昇すると、前記の如く、着脱部40におけるフック48aとフックピン44の掛合が解除され、下方管19、下方管下部19a及びブロック部材20が一体となって緩衝材料の上に落下する。この落下により、緩衝材料はブロック部材20の下面で締め固められる。ブロック部材20の落下後、伸縮ジャッキ26が伸張されると、着脱部40におけるフック48aとフックピン44は前記したように掛合される。そして、伸縮ジャッキ26を収縮してブロック部材20を引き上げると共に、旋回盤15aによりブロック部材20を20°程度回転させて、落下していない緩衝材料の上に位置をずらしてから、前記と同様にしてフック48aとフックピン44の掛合が解除されて、再び、下方管19、下方管下部19a及びブロック部材20は一体となって緩衝材料の上に落下する。以下、これらの動作を繰り返せば、緩衝材料の全面がブロック部材20により締め固められ、緩衝材料の締め固め工程は終了する。
以下、必要に応じて、緩衝材料の投入工程から緩衝材料の締め固め工程までを繰り返せば、縦孔30内の緩衝材料は、比較的短い時間で高密度かつ均質な密度に締め固めることができる。
【0031】
【発明の効果】
本発明の緩衝材締固め装置は、支持手段により支持された押圧手段と掻き落し手段とを備え、押圧手段により縦孔内に投入された緩衝材料が敷き均され、敷き均らした緩衝材料が上方から押し固められ、且つ、押し固めた緩衝材料が締め固められ、さらに、押圧手段と縦孔内周面とのクリアランスに入り込み縦孔内周面に残される緩衝材料が掻き落し手段により縦孔内周面から掻き落されるので、縦孔内に投入される緩衝材料は、従来の作業員による手作業に比べて、格段に短時間で高密度かつ均質な密度に締め固めることが可能になった。
【図面の簡単な説明】
【図1】本発明の緩衝材締固め装置の側面図である。
【図2】本発明の緩衝材締固め装置の縦断面図である。
【図3】ブロック部材におけるフック部分を拡大して示した側面図である。
【図4】図1におけるIV−IV線に沿った断面図である。
【図5】図1におけるV−V線に沿った断面図である。
【符号の説明】
1 緩衝材締固め装置
11 支持フレーム
13 落下レベル調整部材
15 旋回部
16 モーター
18 緩衝材料導入部
20 ブロック部材
21 ウインチ
22 ワイヤー
26 伸縮ジャッキ
24c,24d スクレーパー
26 伸縮ジャッキ
30 縦孔
40 ブロック着脱部
[0001]
[Technical field to which the invention belongs]
The present invention relates to an apparatus used for embedding waste in a vertical hole, and more particularly to an apparatus for compacting a buffer material filled between the waste and the vertical hole.
[0002]
[Prior art]
It has been proposed to use a vertical hole as a facility for disposing of waste that can leak to the outside, for example, radioactive waste. This disposal facility puts radioactive waste in a container, hardens it with cement, etc., installs it in the center of the vertical hole, and fills the space between this radioactive waste and the vertical hole with a cushioning material without any gaps. As a result, even if the vertical hole may be deformed during an earthquake, the cushioning material will follow the vertical hole and deform so that no gaps are created. Has been. Here, as the buffer material, for example, it is considered to use a material containing viscous soil such as bentonite.
[0003]
In the above-described waste embedding method, for example, a vertical hole having a diameter of about 1700 cm and a depth of about 500 cm is formed in the rock, and a buffer material is introduced into the vertical hole to obtain a layer thickness of about 20 cm. Next, an operator descends into the vertical hole, leveling the surface, and pressing the entire surface while repeating partial pressing of the buffer material with a tool such as a trowel. After the cushioning material pressing step, if the cushioning material is further compacted with a vibration compaction device such as a tamping rammer, the first layer compaction step is completed.
Next, a mold is placed on the first layer of cushioning material, and the cushioning material is placed around the mold, which is compacted in the same manner as described above. After repeating the mold placing process and the buffer material compacting process a predetermined number of times, the mold is taken out and a container containing waste is embedded therein. If a buffer material is further put on the container and it is compacted in the same manner as described above, the waste embedding operation is completed.
[0004]
In addition, the process other than the above may be adopted following the compaction process of the first layer. For example, the same work as the first layer is performed without placing the mold on the compacted cushioning material. After repeating a number of times, a vertical hole is formed in the compacted buffer material, a container containing waste is embedded in the vertical hole, and a buffer material is further placed on the container. It is also possible to embed waste containers by solidifying.
[Problems to be solved by the invention]
[0005]
In the above-mentioned waste burying method, the process of leveling the surface of the buffer material, the process of pressing the surface of the buffer material, and the process of compacting the buffer material are all carried out by the workers, so the accuracy and density of flatness There are disadvantages that the uniformity is lowered, the construction time is increased, and the cushioning material is stepped on by the worker's shoes, so that the surface is compacted unevenly.
[0006]
An object of the present invention is to provide a buffer material compaction device capable of compacting a buffer material to a high density and a uniform density in a relatively short time in a vertical hole in which waste is embedded.
[0007]
[Means for Solving the Problems]
According to the present invention, an apparatus for compacting a buffer material in a vertical hole in which waste is buried, the buffer material put into the vertical hole is leveled, and the leveled buffer material is compacted from above. And a pressing means for compacting the compacted buffer material, and a clearance between the pressing means and the inner peripheral surface of the vertical hole is entered, and the buffer material remaining on the inner peripheral surface of the vertical hole is scraped off from the inner peripheral surface of the vertical hole There is provided a buffer material compaction device comprising: scraping means for supporting the pressing means, and supporting means provided outside the vertical hole for supporting the scraping means.
[0008]
DETAILED DESCRIPTION OF THE INVENTION
In the shock absorber compaction device according to the present invention, the pressing means includes a block member that can be moved up and down, swiveled, and dropped in a vertical hole, and a lower end of the block member that is detachably engaged with the block member. The lifting / lowering means for turning and the turning means for turning the block member in the vertical hole can be provided.
[0009]
In the buffer material compaction device of the present invention, it is preferable that the means for releasing the engagement state between the block member and the lower end of the elevating means is provided so as to be adjustable in height.
[0010]
In the shock absorber compaction device according to the present invention, the scraping means includes a blade provided so as to be able to turn in a state in contact with the inner peripheral surface of the vertical hole, an elevating means for moving the blade up and down, and a vertical hole in the blade. And turning means for turning inside.
Here, the swivel means that can rotate in both forward and reverse directions may be used. In this case, it is preferable that the blades are also arranged in both directions. Further, the turning means for turning the scraping means may be configured to use the same turning means as for turning the pressing means.
[0011]
The shock absorber compaction device of the present invention may be provided with traveling means that can move between the vertical holes. When many vertical holes for waste disposal are provided in the ground, it is preferable to provide a traveling means to efficiently move the buffer material compaction device from one vertical hole to another, and this traveling means Although not particularly limited, for example, a track is laid along a plurality of vertical holes, a pulley that travels along the track is provided in the support means, and a drive / control unit that drives and controls the pulley is provided. It can be provided and configured. Other than this, a wheel may be provided on the support means, and a drive / control means for driving / controlling the wheel may be provided.
[0012]
In the buffer material compaction device of the present invention, a means for recognizing the position of the vertical hole is provided, and the pressing means and the scraping means are positioned by the means without detaching from the previously provided vertical hole. You may comprise as follows.
More specifically, as the position recognizing means, image input means such as a CCD camera, image processing means for obtaining the contour line and center point of the vertical hole by performing image processing on the image of the CCD camera, and this image And a control unit such as a CPU for controlling the configuration including the processing means and the video input means. The cushioning material is controlled by controlling the traveling means based on the position data of the vertical holes obtained by the position recognition means. If the compaction device is moved, the pressing means and the scraping means can be positioned on the vertical hole.
[0013]
In the cushioning material compaction device of the present invention, cushioning material introduction means for feeding the cushioning material may be provided in the vertical hole so as to be freely inserted and removed. As the buffer material introduction means, for example, a hopper disposed above the vertical hole and a tube body extending from the hopper into the vertical hole can be configured, and the tube body can be bent. Use something that can be stretched or that can be stretched.
[0014]
【Example】
Preferred embodiments of the present invention will be described below with reference to the accompanying drawings.
[0015]
FIG. 1 is a side view of the present invention, and the buffer material compacting device 1 is a block member 20 for leveling the buffer material put into the vertical holes 30 and for pressing the leveled buffer material from above. Scrapers 24c and 24d for entering the clearance between the block member 20 and the inner peripheral surface of the vertical hole and scraping the buffer material remaining on the inner peripheral surface of the vertical hole from the inner peripheral surface of the vertical hole during the step of compacting the buffer material; A support frame 11 provided outside the vertical hole is provided to support the block member 20 and the scrapers 24c and 24d.
[0016]
Here, as shown in FIGS. 1 and 4, the support frame 11 connects a pair of support columns 11b with a beam member 11a, connects opposite beam members 11a with a connection member 11d, and lowers the lower end of the support column 11b. The ground plate 11c is fixed to the outer periphery of the vertical hole 30 by an anchor (not shown). Although not shown, when the cushioning material compacting device 1 itself is configured to be movable between vertical holes, the grounding plate 11c is not provided, and a wheel such as a tire or a pulley is pivotally attached to the lower end of the column 11b. If necessary, a rail on which the pulley travels is laid.
[0017]
A swivel disk 15a is rotatably fixed on the beam member 11a of the support frame 11 via a bearing. A rack 15b is formed on the outer periphery of the swivel disk 15a, and a pinion (not shown) is engaged with the rack 15b. ) Is mounted on the support frame 11. With this configuration, when the motor 16 is driven, rotational force is transmitted from the pinion through the rack 15b, and the swivel board 15a is rotationally driven in a predetermined direction. .
[0018]
The swivel board 15a has a through hole in the center, and the upper pipe 14 inserted through the through hole is fixed to the swivel board 15a by an attachment such as a bracket. A telescopic jack 26 is inserted into the upper pipe 14 and is fixed to the upper end and suspended. A detachable section 40 (to be described later) is attached to the lower end of the jack rod 25 that enters and exits from the lower end of the telescopic jack 26. Provided.
[0019]
The upper end of the lower pipe 19 is inserted into the lower end of the upper pipe 14, and guide members 27 and 28 including guide rollers are attached to the insertion portion, whereby the lower pipe 19 has its upper end inside the upper pipe 14. It is guided to move up and down in the inserted state. The jack rod 25 extends inside the lower pipe 19, and the jack rod 25 detachably supports the lower pipe lower portion 19 a via the attaching / detaching portion 40. A lower pipe lower portion 19a is integrally connected to the lower end of the lower pipe 19, and a block member 20 is connected so as to be substantially orthogonal to the lower pipe lower portion 19a. As shown in FIG. 5, the block member 20 has a fan-like planar shape extending from the lower pipe lower portion 19a to both sides, and the lower surface is formed flat.
Note that the lower pipe lower portion 19 a can be omitted. In this case, the block member 20 is connected to the lower end of the lower pipe 19, and the detachable portion 40 is formed on the block member 20.
[0020]
Further, a sleeve 24b extending in a substantially vertical direction is fixed to the swivel board 15a at two opposing positions. A scraper support rod 24a is slidably inserted into the sleeve 24b, and a scraper 24c, 24d is fixed, and a wire 22 is connected to the upper end of the scraper support rod 24a. The wire 22 is wound around the winch 21 through the pulley 12a so as to be freely wound and unwound. As shown in FIG. 5, the scrapers 24 c and 24 d are provided in directions opposite to each other, and a blade 24 e is provided in each scraper 24 c and 24 d so as to contact the inner peripheral surface of the vertical hole 30. The pulley 12a is fixed to the upper end of the upper pipe 14 by a pulley fitting 12b, and the winch 21 is fixed to the swivel 15a.
Therefore, when the turning table 15a is turned, the blades 24e of the scrapers 24c and 24d are turned in contact with the inner peripheral surface of the vertical hole 30, and scrape the buffer material left on the inner peripheral surface. When the winch 21 is operated, the wire 22 is wound or unwound, the scraper support rod 24a slides up and down in the sleeve 24b, and the scrapers 24c and 24d are moved up and down in the vertical hole 30.
[0021]
In the above configuration, since the lower pipe 19, the lower pipe lower portion 19a and the block member 20 are integrally connected, these members fall together when the vertical engagement in the detachable portion 40 is released.
The attachment / detachment portion 40 will be described in more detail. FIG. 3 is an enlarged side view of the attachment / detachment portion 40, as viewed from a direction rotated about 90 ° from the cross section of FIG. In FIG. 3, a roller 41b that rolls along the inner surface of the lower pipe 19 is fixed to the lower end of the jack rod 25 via a bracket 41a, and the jack rod 25 comes into contact with the inner surface of the lower pipe 19 by this roller 41b. Without being guided up and down. A catch bracket 42 is connected to the lower end of the jack rod 25. The catch bracket 42 is provided with a limit device 43, a hook pin 44, and a contact plate 42a.
[0022]
The hook pin 44 is for detachably hooking the hook 48a. The limit device 43 is a sensor for detecting the engagement between the hook 48a and the hook pin 44 and the engagement release, and the signal from the limit device 43 is sent to a control unit (not shown) to detect the engagement between the hook 48a and the hook pin 44. The expansion of the expansion jack 26 is stopped when it is sensed, and the contraction of the expansion jack 26 is stopped when it is detected that both members have been released. The contact plate 42 a is for preventing damage due to the collision between the catch bracket 42 and the hook mounting bracket 45.
[0023]
On the other hand, a hook mounting bracket 45 is fixed to the upper surface of the lower pipe lower portion 19a. The hook mounting bracket 45 is provided with a spring 47, a contact plate 45a, and a hook 48a pivotally attached by a pivot 46. .
The hook 48a is integrally formed with an arm 48b projecting to the outside of the lower pipe 19, and a roller 48c is pivotally attached to the tip of the arm 48b. A lower end portion 13c of the drop level adjusting member 13a is attached to the roller 48c. By hitting, the hook 48a and the hook pin 44 are unlocked. The spring 47 is an urging means that urges the arm 48 b to push upward. The force of the spring 47 is transmitted from the arm 48 b to the hook 48 a, and the hook 48 a is always pushed back to a position where it is engaged with the hook pin 44. The contact plate 45a is for preventing damage due to collision between the catch bracket 42 and the hook mounting bracket 45 by contacting the contact plate 42a.
[0024]
Here, the attaching / detaching action of the attaching / detaching portion 40 will be described.
When the telescopic jack 26 contracts while the hook 48a is engaged with the hook pin 44, the lower tube 19, the lower tube lower portion 19a and the block member 20 are pulled upward, and the roller 48c hits the lower end portion 13c of the drop level adjusting member 13a. . Thereby, the arm 48b is pushed down like the two-dot chain line in FIG. 3, the hook 48a is detached from the hook pin 44, and the lower tube 19, the lower tube lower portion 19a and the block member 20 are dropped. At this time, the engagement between the hook 48a and the hook pin 44 is detected by the limit device 43, and the control unit stops the contraction of the telescopic jack 26 in response to the detection signal.
Conversely, when pulling down the lower pipe 19, the lower pipe lower portion 19 a and the block member 20 that have dropped onto the buffer material, the expansion jack 26 is extended to extend the jack rod 25 downward. As a result, the hook pin 44 at the lower end of the jack rod 25 abuts against the hook 48a, rotates the hook 48a against the force of the spring 47, and further the expansion jack 26 extends to pass the hook pin 44 downward. The hook 48a is biased by the spring 47 and returns to the initial position. When the limit device 43 senses that the hook 48a has returned to the initial position, the control unit stops the extension of the telescopic jack 26.
[0025]
Further, in the buffer material compacting device 1, a hopper 18a for putting the buffer material into the vertical hole 30 is rotatably fixed by the mounting member 17, and a flexible tube 18b is connected to the hopper 18a. Is done. The tube body 18b can be inserted and removed from the vertical hole 30 by rotating the hopper 18a as appropriate and bending the tube body 18b. In addition, instead of using a tube that can be bent, if a tube that can be expanded and contracted is used, the tube body can be freely inserted and removed from the vertical hole 30.
[0026]
Further, the shock absorber compaction device 1 is provided with a drop level adjusting member 13a formed in a rod shape, which is inserted into a sleeve 24b provided in a substantially vertical direction on the swivel board 15a. It is stopped at a predetermined height by a stopper (not shown) provided. Further, a bolt is screwed to the lower end 13c of the drop level adjusting member 13a, and the protruding length of the bolt is appropriately adjusted by adjusting the screw. Accordingly, when adjusting the height of the drop level adjusting member 13a, first, a rough height is determined by fixing the position of the drop level adjusting member 13a in the sleeve 24b, and then the bolt at the lower end 13c is screwed. Make fine adjustments by adjusting.
The falling buffer material compaction device 1 may be provided with means for automatically performing vertical movement and stopping operation of the sleeve 24b of the lower level adjusting member 13a and screwing operation of the bolt of the lower end 13c. As a means for this automation, for example, a configuration may be adopted in which a rotary encoder is built in the fall level adjustment member 13a, a motor is attached to the swivel 15a, and the fall level adjustment member 13a is automatically raised and lowered by this motor.
[0027]
Next, operation | movement of the buffer material compaction apparatus 1 whole is demonstrated.
When the buffer material compacting device 1 is moved from a predetermined vertical hole 30 to another vertical hole 30, the block member 20, the scrapers 24 c and 24 d, the drop level adjusting member 13 a, and the pipe body 18 b are pulled up from the vertical hole 30. That is, the block member 20 is raised by contraction of the expansion jack 26, the scrapers 24c and 24d are pulled up by winding the wire 22 by the winch 21, and the drop level adjusting member 13a and the pipe body 18b are pulled up manually.
[0028]
When the buffer material compacting device 1 is installed on the predetermined vertical hole 30, the pipe body 18b is put into the vertical hole 30, and the buffer material containing bentonite and the like is passed from the hopper 18a to the bottom of the vertical hole 30 through the pipe body 18b. throw into. The buffer material has a capacity corresponding to the thickness of the lowermost layer. Next, when the telescopic jack 26 is extended to lower the block member 20 to a predetermined depth in the vertical hole 30, the motor 16 is driven while the block member 20 is gradually lowered to rotate or rotate the turntable 15a. Let Thereby, the block member 20 is spread | laid and leveled so that a buffer material may become substantially the same height. Further, in the cushioning material leveling step, the scraper 24c, 24d is lowered to the vicinity of the surface of the buffer material by operating the winch 21 in the middle of the step, and the scrapers 24c, 24d are rotated together with the block member 20, The buffer material left on the inner peripheral surface of the vertical hole 30 is scraped off.
[0029]
When the cushioning material has been leveled, the block member 20 then presses and solidifies the cushioning material. In this step, in a state where the rotation or rotation of the swivel board 15a is stopped, the telescopic jack 26 is extended to press the buffer material on the lower surface of the block member 20. After this pressing, the telescopic jack 26 is contracted to pull up the block member 20, and the block member 20 is rotated about 20 ° by the swivel board 15a to shift the position on the non-pressed cushioning material. Similarly, the buffer material is pressed on the lower surface of the block member 20. Thereafter, these operations are repeated, and the entire surface of the buffer material is pressed by the block member 20.
[0030]
After the entire surface of the buffer material is pressed and hardened, a step of dropping the block member 20 from a predetermined height and compacting the buffer material is then performed. Prior to this compacting step, the height of the lower end 13c of the drop level adjusting member 13a is appropriately adjusted according to the drop height of the block member 20. In the buffer material compaction process, when the telescopic jack 26 contracts and the block member 20 is pulled up and the block member 20 rises to a height determined by the lower end 13c of the drop level adjusting member 13a, as described above, the detachable portion 40 The hook 48a and the hook pin 44 are released from each other, and the lower pipe 19, the lower pipe lower portion 19a, and the block member 20 are integrally dropped onto the buffer material. The buffer material is compacted on the lower surface of the block member 20 by the fall. When the telescopic jack 26 is extended after the block member 20 is dropped, the hook 48a and the hook pin 44 in the attaching / detaching portion 40 are engaged as described above. Then, the telescopic jack 26 is contracted to pull up the block member 20, and the block member 20 is rotated about 20 ° by the swivel board 15 a to shift the position on the buffer material that has not fallen, and then the same as described above. As a result, the hook 48a and the hook pin 44 are released from engagement, and the lower pipe 19, the lower pipe lower portion 19a, and the block member 20 fall together on the cushioning material. Hereinafter, if these operations are repeated, the entire surface of the buffer material is compacted by the block member 20, and the compaction process of the buffer material is completed.
In the following, if necessary, the buffer material in the longitudinal hole 30 can be compacted to a high density and a uniform density in a relatively short time by repeating the buffer material charging step to the buffer material compaction step as necessary. .
[0031]
【The invention's effect】
The cushioning material compaction device of the present invention includes a pressing means and a scraping means supported by the supporting means, and the cushioning material thrown into the vertical hole is leveled by the pressing means, and the cushioning material leveled is The buffer material pressed and compacted from above is compacted, and further, the buffer material that enters the clearance between the pressing means and the inner peripheral surface of the vertical hole is left in the vertical hole by the scraping means. Since it is scraped off from the inner peripheral surface, the buffer material thrown into the vertical hole can be compacted to a high density and a homogeneous density in a much shorter time than a manual operation by a conventional worker. became.
[Brief description of the drawings]
FIG. 1 is a side view of a buffer material compaction device of the present invention.
FIG. 2 is a longitudinal sectional view of the buffer material compaction device of the present invention.
FIG. 3 is an enlarged side view showing a hook portion of a block member.
4 is a cross-sectional view taken along line IV-IV in FIG.
5 is a cross-sectional view taken along line VV in FIG. 1. FIG.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Buffering material compaction apparatus 11 Support frame 13 Falling level adjustment member 15 Turning part 16 Motor 18 Buffering material introduction part 20 Block member 21 Winch 22 Wire 26 Telescopic jack 24c, 24d Scraper 26 Telescopic jack 30 Vertical hole 40 Block attaching / detaching part

Claims (5)

廃棄物を埋設する縦孔内で緩衝材料を締固める装置であって、縦孔内に投入された緩衝材料を敷き均し、敷き均らした緩衝材料を上方から押し固め、かつ押し固めた緩衝材料を締め固めるための押圧手段と、該押圧手段と縦孔内周面とのクリアランスに入り込み縦孔内周面に残された緩衝材料を縦孔内周面から掻き落すための掻き落し手段と、前記押圧手段と前記掻き落し手段とを支持するために縦孔外部に設けられた支持手段とを備えることを特徴とする緩衝材締固め装置。A device for compacting the buffer material in the vertical hole in which waste is buried, the buffer material put in the vertical hole is leveled, the buffer material that has been leveled is compressed from above, and the buffer is compacted A pressing means for compacting the material, and a scraping means for scraping the buffer material remaining in the inner peripheral surface of the vertical hole from the clearance between the pressing means and the inner peripheral surface of the vertical hole. A shock-absorbing material compacting device, comprising: a support means provided outside the vertical hole for supporting the pressing means and the scraping means. 前記押圧手段は、縦孔内で昇降、旋回、落下可能に設けられたブロック部材と、該ブロック部材に下端部が着脱可能に掛合し該ブロック部材を昇降させる昇降手段と、該ブロック部材を縦孔内で旋回させる旋回手段とを備えることを特徴とする請求項1記載の緩衝材締固め装置。The pressing means includes a block member that can be moved up and down, swiveled, and dropped in a vertical hole, a lifting means that detachably engages the lower end of the block member, and moves the block member vertically. The cushioning material compacting device according to claim 1, further comprising a swiveling means for swiveling in the hole. 前記昇降手段の下端部と前記ブロック部材との掛合状態を解除するための手段が高さ調整自在に設けられたことを特徴とする請求項2に記載の緩衝材締固め装置。The shock absorber compaction device according to claim 2, wherein means for releasing the engagement state between the lower end portion of the elevating means and the block member is provided so as to be adjustable in height. 前記掻き落し手段は、縦孔内周面に当接した状態で昇降、旋回可能に設けられたブレードと、該ブレードを昇降させる昇降手段と、該ブレードを縦孔内で旋回させる旋回手段とを備えることを特徴とする請求項1乃至3のいずれか一項に記載の緩衝材締固め装置。The scraping means includes a blade provided so as to be able to be raised and lowered while being in contact with the inner peripheral surface of the vertical hole, an elevating means for raising and lowering the blade, and a turning means for turning the blade within the vertical hole. The buffer material compaction device according to claim 1, further comprising: a shock absorber compaction device according to claim 1. 前記緩衝材料を投入するため前記縦孔に挿脱自在に設けられた緩衝材導入手段を備えることを特徴とする請求項1乃至4のいずれか一項に記載の緩衝材締固め装置。The buffer material compaction device according to any one of claims 1 to 4, further comprising a buffer material introduction unit that is detachably provided in the vertical hole for charging the buffer material.
JP2002103397A 2002-04-05 2002-04-05 Buffer material compaction device Expired - Fee Related JP4046215B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002103397A JP4046215B2 (en) 2002-04-05 2002-04-05 Buffer material compaction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002103397A JP4046215B2 (en) 2002-04-05 2002-04-05 Buffer material compaction device

Publications (2)

Publication Number Publication Date
JP2003294892A JP2003294892A (en) 2003-10-15
JP4046215B2 true JP4046215B2 (en) 2008-02-13

Family

ID=29242605

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002103397A Expired - Fee Related JP4046215B2 (en) 2002-04-05 2002-04-05 Buffer material compaction device

Country Status (1)

Country Link
JP (1) JP4046215B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4626873B2 (en) * 2006-03-03 2011-02-09 清水建設株式会社 Buffer construction device
JP4626874B2 (en) * 2006-06-26 2011-02-09 清水建設株式会社 Buffer construction device

Also Published As

Publication number Publication date
JP2003294892A (en) 2003-10-15

Similar Documents

Publication Publication Date Title
EP1005593B1 (en) Ground treatment
US12031287B2 (en) Systems and methods to provide pressed and aggregate filled concavities for improving ground stiffness and uniformity
CN111270649A (en) Slope protection construction all-in-one machine
JP4046215B2 (en) Buffer material compaction device
CN120006723A (en) A pile head breaking device and method based on the vacuum negative pressure principle of bored pile
CA2490356C (en) Drop mass compaction of soil
JP2010111999A (en) Tamping device
CN211775490U (en) Plastering equipment is built in room
CN116479851B (en) Building foundation soil layer borer surveys device
JP5775780B2 (en) Soil testing device, soil testing method and compaction density management method
CN210344716U (en) Positioning device for pipeline robot
CN217419590U (en) Anti device that floats of bored concrete pile steel reinforcement cage
JP2008266948A (en) Laying leveler and clay-based impermeable layer
CN220468898U (en) Building construction foundation soil slope reinforcing apparatus
CN113846845A (en) Constructional column concrete vibrating pouring equipment and pouring method thereof
CN114457787A (en) Anti device that floats of bored concrete pile steel reinforcement cage
JP3059700B2 (en) Ground density measuring device
CN119843598B (en) Dam slope stabilization device
CN219080274U (en) Compaction device for clay layer of pressure measuring pipe
CN219932163U (en) Monitoring instrument embedded platform for tunnel TBM construction process
CN212872480U (en) Building concrete damage detection equipment
CN208900119U (en) A kind of unstable rock ore body back production safety device
CN110578340A (en) Municipal manhole cover repairing device and method
JP3938702B2 (en) Rotating buried pile driving device
JP7101607B2 (en) Working equipment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050126

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060901

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20071023

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101130

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131130

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131130

Year of fee payment: 6

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees