Viaduct replacement method Download PDF

Info

Publication number
JP4280208B2
JP4280208B2 JP2004193582A JP2004193582A JP4280208B2 JP 4280208 B2 JP4280208 B2 JP 4280208B2 JP 2004193582 A JP2004193582 A JP 2004193582A JP 2004193582 A JP2004193582 A JP 2004193582A JP 4280208 B2 JP4280208 B2 JP 4280208B2
Authority
JP
Japan
Prior art keywords
viaduct
pier
road
girder bridge
existing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2004193582A
Other languages
Japanese (ja)
Other versions
JP2006016788A (en
Inventor
充 柴沼
繁喜 兼田
達哉 上田
薫 山根
秀公 今西
茂男 青柳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maeda Corp
Original Assignee
Maeda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maeda Corp filed Critical Maeda Corp
Priority to JP2004193582A priority Critical patent/JP4280208B2/en
Publication of JP2006016788A publication Critical patent/JP2006016788A/en
Application granted granted Critical
Publication of JP4280208B2 publication Critical patent/JP4280208B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

本発明は、高架橋の架替工法に関する。   The present invention relates to a viaduct replacement method.

都市計画に則り、都市の健全な発展と秩序ある整備を図るために、都市施設の整備や市街地開発事業が行われる。
都市施設のうち高架橋や道路に関しては、現在および将来の状況を勘案して、適切な規模および配置とし、円滑な都市活動と良好な都市環境を確保することが必要である。
In accordance with city planning, urban facilities and urban development projects are carried out in order to ensure the sound development and orderly development of the city.
Of the urban facilities, viaducts and roads need to be appropriately sized and arranged in consideration of current and future situations, and ensure smooth urban activities and a good urban environment.

ところで、交通量の多い都市群では、交通渋滞による排気ガスや騒音に代表される環境の悪化で、付近住民や道路利用者に精神的・肉体的な負担を強いることがある。
また高架橋の架け替え工事を行う場合、当然のことながら現場では広範囲の交通規制が必要となり、現場道路の車線数を減少させる等の対応を余儀なくされ、これが交通渋滞の原因となっている。このため渋滞を緩和しかつ短期間で工事を完了することが要望されている。
By the way, in a city group with a large amount of traffic, the environmental deterioration represented by exhaust gas and noise caused by traffic congestion may impose a mental and physical burden on nearby residents and road users.
In addition, when constructing a viaduct replacement work, it is a matter of course that a wide range of traffic regulations are required at the site, and it is necessary to take measures such as reducing the number of lanes on the site road, which causes traffic congestion. For this reason, it is desired to alleviate the traffic jam and complete the construction in a short period of time.

本発明はこのような実情に鑑みて為されたものであり、その解決しようとする課題は、少なくとも渋滞を緩和しかつ高架橋の架け替え工事をこれまでよりも短期に終了することができる技術を提供することにある。   The present invention has been made in view of such a situation, and the problem to be solved is a technique that can alleviate at least traffic congestion and can complete the construction of a viaduct replacement in a shorter time than before. It is to provide.

前記した課題を解決するために、本発明、高架橋架替工法は、橋脚部分とこの橋脚部分に支持され車輌の通行路となる桁橋部分とを有する既存の高架橋の架替工法において、前記既存の高架橋に並列されると共に架け替え工事の施工に起因して生じ得る車輌通行止めを回避するための切回し用高架橋の橋脚部分を構築するステップと、この切回し用高架橋の橋脚部分から前記既存の高架橋の橋脚部分に向けて延びる延出部を構築するステップと、この延出部に切回し用高架橋の桁橋部分をスライド自在な状態で搭載して切回し用高架橋を構築するステップと、前記既存の高架橋をその橋脚部分を残して撤去するステップと、当該残された橋脚部分と前記延出部とを連結するステップと、当該連結された延出部に沿って前記切回し用高架橋の桁橋部分を既存の高架橋の前記残存する橋脚部分に向けてスライドするステップとを有する。   In order to solve the above-described problems, the present invention, the viaduct replacement method is an existing viaduct replacement method having a bridge pier portion and a girder bridge portion that is supported by the pier portion and serves as a passage for a vehicle. A step of constructing a pier portion of a turnover viaduct to avoid vehicle closure that may occur due to the construction of a replacement work, and the existing pier portion of the turnover viaduct A step of constructing an extension portion extending toward the bridge pier portion of the viaduct, a step of constructing a girder bridge portion of the viaduct for turning in the extending portion in a slidable state and constructing a viaduct for turning, and A step of removing the existing viaduct leaving the pier part, a step of connecting the remaining pier part and the extension part, and a girder of the viaduct for turning along the connected extension part And a step of sliding toward the pier the remaining portion of the portion of the existing viaduct.

したがって本発明によれば、既存の高架橋の架け替え前に切回し用高架橋を構築するので、既存の高架橋の撤去作業中も車輌は切回し用高架橋を通行する。よって、高架橋の撤去作業中に車輌通行止めにする必要がないため、掛け替え工事の施工中に渋滞を生じにくい。   Therefore, according to the present invention, since the turning viaduct is constructed before the existing viaduct is replaced, the vehicle passes through the turning viaduct even during the removal work of the existing viaduct. Therefore, it is not necessary to make the vehicle closed during the removal work of the viaduct, so that it is difficult for traffic congestion to occur during the construction work.

また、既存の高架橋のうち撤去されずに残された橋脚部分と切回し用高架橋の橋脚部分とが延出部で連結され、当該延出部に沿って、切回し用高架橋の桁橋部分を残存する橋脚部分に向けてスライドするので、既存の高架橋の掛け替えが簡単にできる。そればかりか、切回し用道路高架橋の桁橋部分を既存の高架橋の桁橋部分として利用するため、切回し用高架橋の実質上の撤去が不要になる。   In addition, of the existing viaduct, the bridge pier part that is left without being removed and the bridge pier part of the turning viaduct are connected by an extension part, and the girder bridge part of the turning viaduct is connected along the extension part. Because it slides toward the remaining pier part, the existing viaduct can be easily replaced. In addition, since the girder bridge part of the turning road viaduct is used as the existing girder bridge part of the viaduct, it is not necessary to substantially remove the turning viaduct.

よって本発明によれば、渋滞を防止するだけでなく、高架橋の架け替え工事をこれまで
よりも短期に終了することができる。また、切回し用高架橋の桁橋部分を既存の高架橋の桁橋部分として流用するから、大幅な工費削減ができる。
Therefore, according to the present invention, it is possible not only to prevent traffic jams, but also to complete the viaduct replacement work in a shorter time than before. In addition, since the girder bridge part of the turnover viaduct is used as the existing viaduct girder bridge part, the construction cost can be greatly reduced.

以下、本発明の実施の形態(以下、実施形態)を添付した図面を参照して説明する。
本発明に係る道路高架橋の架替工法は、都市部にある既存の高速道路高架橋の桁橋部分を新しくするための工法である。
Hereinafter, embodiments of the present invention (hereinafter, embodiments) will be described with reference to the accompanying drawings.
The road viaduct replacement method according to the present invention is a method for renewing an existing highway viaduct girder bridge portion in an urban area.

図1は本発明に係る架替工法の概念を説明するための全体斜視図であり、図1に正対してその向こう側から手前側に進むほど工事が進行していることを示す。
具体的には、図1のエリアIは本法による道路高架橋の架け替え工事を施工する前の状態を示し、エリアIIは切り回し道路高架橋を既存の道路高架橋の両サイドに構築し、かつ既存の道路高架橋の桁橋部分を地上に降下した状態を示している。またエリアIIIは、両サイドの切回し用道路高架橋の桁橋部分を既存の道路高架橋の桁橋部分に流用するために道路高架橋の中央にそれらを寄せる直前の状態を示し、エリアIVは切回し用道路高架橋の桁橋部分を中央に寄せた後の状態を示す。なお切回し用道路高架橋と既存の高速道路高架橋との分岐接合箇所は図示を省略する。
FIG. 1 is an overall perspective view for explaining the concept of the replacement method according to the present invention, and shows that the construction progresses from the far side to the near side as opposed to FIG.
Specifically, area I in Fig. 1 shows the state before construction of road viaduct replacement work according to this method, and area II is turned around to construct road viaducts on both sides of the existing road viaduct, and It shows the state that the girder bridge part of the road viaduct of the road is lowered to the ground. Area III shows the state immediately before bringing them to the center of the road viaduct in order to divert the girder bridge of the road bypass viaduct to both sides of the existing road viaduct. The state after the girder bridge part of the highway viaduct is moved to the center is shown. In addition, illustration of the branch joint portion between the turning road viaduct and the existing highway viaduct is omitted.

以下詳述する。
図1にあるように、符号1で示す高速道路高架橋は、既存のものであり、下部工である橋脚部分3と、橋脚部分3に支持され車輌の通行路となる上部工としての桁橋部分5とを有する。
This will be described in detail below.
As shown in FIG. 1, the highway viaduct denoted by reference numeral 1 is an existing one, and a bridge pier portion 3 as a substructure and a girder bridge portion as a superstructure that is supported by the pier portion 3 and serves as a passage for a vehicle. And 5.

本発明に係る既存の道路高架橋の架替工法では、上部工である桁橋部分5の撤去中でもそれまで高速道路高架橋1を通行していた車輌が完全な通行止めにならないよう、切回し用道路高架橋100を桁橋部分5の撤去前から高速道路高架橋1に並列に仮架設する。   In the replacement method of the existing road viaduct according to the present invention, the road viaduct for turning is used so that the vehicles that have been passing through the highway viaduct 1 until the girder bridge portion 5 that is the superstructure is not completely closed. 100 is temporarily installed in parallel with the highway viaduct 1 before the girder bridge portion 5 is removed.

そして、高速道路高架橋1の桁橋部分5を橋脚部分3から撤去した後に切回し用道路高架橋100の桁橋部分105を高速道路高架橋1の橋脚部分3に向けてスライドし、その後、橋脚部分3に取り付けて、桁橋部分105を切回し用道路高架橋100の新設上部工とするものである。   Then, after removing the girder bridge portion 5 of the highway viaduct 1 from the pier portion 3, the girder bridge portion 105 of the turning road viaduct 100 is slid toward the pier portion 3 of the highway viaduct 1, and then the pier portion 3 The girder bridge portion 105 is turned around to form a new superstructure for the road viaduct 100 for use.

図2〜図23を参照して、本工法の手順を順を追って説明する。
図2および図3は高速道路高架橋1の施工前の状態を示しており、それぞれ平面図および横断面図である。
With reference to FIGS. 2 to 23, the procedure of the present construction method will be described step by step.
2 and 3 show a state before construction of the highway viaduct 1, which is a plan view and a cross-sectional view, respectively.

上・下二車線5u・5dを有する高速道路高架橋1の桁橋部分5を中心にその両サイドには、それぞれ四車線からなる一般道の上・下車線11uおよび11dが敷設され、これら一般道の外側にはさらに歩道13u及び13dが敷設されている。   The upper and lower lanes 11u and 11d of four lanes are laid on both sides of the girder bridge portion 5 of the highway viaduct 1 having upper and lower two lanes 5u and 5d, respectively. Further, sidewalks 13u and 13d are laid on the outside.

図4及び図5は、周知のPCウェル工法により、新設する切回し用道路高架橋の橋脚基礎及び柱を歩道13u及び13dの一般道側に構築した状態を示す(なお、橋脚基礎及び柱を総称して橋脚部分とし符号103で示す)。また、それぞれ平面図および横断面図を示す。   4 and 5 show a state in which the bridge pier foundation and pillar of the newly constructed road viaduct for construction are constructed on the general road side of the sidewalks 13u and 13d by the well-known PC well construction method (note that the pier foundation and the pillar are generic names). And a pier portion is indicated by reference numeral 103). A plan view and a cross-sectional view are shown, respectively.

切回し用道路高架橋100の橋脚部分103を構築する場合、上・下車線を同時施工する。このとき一般道の上・下車線11uおよび11dは、それらの各歩道側二車線を通行止めにするが、工事の進捗状況に応じて、通行止めにする場合と、通行止めを解除またはこれから通行止めにする場合がある。すなわち、断面線の設定箇所によっては、図5の横断面図のように、一般道の下り車線11dのように歩道側二車線を通行止めにする場合と
、一般道の上り車線11uのように通行止めにしない場合とがあり得る。しかしこれらに限定されないことは勿論であり、状況に応じて一般道の下り車線11dまたは上り車線11uのいずれか一方を前面通行止めにし、他方を上下各二車線使用にすることもあり得る。
When constructing the pier part 103 of the turnover road viaduct 100, the upper and lower lanes are constructed simultaneously. At this time, the upper and lower lanes 11u and 11d of ordinary roads are closed to the two lanes on each side of the sidewalk. Depending on the progress of the construction, the road may be closed, and the road may be released or closed. There is. That is, depending on where the cross-section line is set, as shown in the cross-sectional view of FIG. 5, there are cases where the sidewalk-side two lanes are closed like the down road lane 11d on the general road and the road lanes 11u are closed like the general road. There is a case where it is not. However, the present invention is not limited to these. Of course, depending on the situation, either the down lane 11d or the up lane 11u of the general road may be closed to the front, and the other may be used in two lanes, upper and lower.

図6および図7は、切回し用道路高架橋の橋脚部分103に支持され橋脚部分103から高速道路高架橋1に向けて水平に延びる延出部としての鋼製梁104を構築している状態を示す。また、両図はそれぞれ平面図および横断面図を示す。   6 and 7 show a state in which a steel beam 104 is constructed as an extending portion that is supported by the pier portion 103 of the turning road viaduct and extends horizontally from the pier portion 103 toward the highway viaduct 1. . Moreover, both figures show a plan view and a cross-sectional view, respectively.

鋼製梁104は、これを仮受けする仮設の斜め支柱(以下、斜材)106によって、先端側が支持される。斜材106を設置することで、一般道11dまたは11uのうち斜材106が設置されている箇所では二車線分の車幅となる(図7参照)。   The steel beam 104 is supported at the distal end side by a temporary oblique column (hereinafter referred to as a diagonal member) 106 that temporarily receives the steel beam 104. By installing the diagonal member 106, the width of the two lanes becomes the vehicle width at the portion of the general road 11d or 11u where the diagonal member 106 is installed (see FIG. 7).

なお、図7の横断面に符号108で示すものは、鋼製梁104を構築するための梁材連結用足場である。梁材連結用足場108は斜材106とともに工事終了後撤去される。
鋼製梁104はクローラクレーン200で架設される。また片側ずつ施工され、施工されている側の一般道11dまたは11uは、全面通行止めとするが、反対側の一般道11uまたは11dを、片側一車線として利用する(図7では下り車線11dが片側一車線としたものを示す。)。
In addition, what is shown with the code | symbol 108 to the cross section of FIG. 7 is the scaffold for beam material connection for constructing the steel beam 104. FIG. The beam connecting scaffold 108 is removed together with the diagonal member 106 after the completion of the construction.
The steel beam 104 is installed by the crawler crane 200. In addition, the roads 11d or 11u on one side are constructed with one side being closed, but the other road 11u or 11d on the opposite side is used as one lane (in FIG. 7, the down lane 11d is on one side). Indicates a single lane.)

図8〜図10は、切回し用道路高架橋100の桁橋部分105を組み立てている状態を示す図である。桁橋部分105は、複数の鋼製箱桁105aを直列結合したものであり(図10参照)、例えば5メートル長の鋼製箱桁をクローラクレーン200を用いて組み立てて行く。当該組み立てを行うに当たり、鋼製箱桁105aを仮受支保工107で支える(図9,図10参照)。当該組み立てに当たり、桁橋部分105を鋼製梁104上にスライド自在になるよう搭載する。   FIGS. 8-10 is a figure which shows the state which has assembled the girder bridge part 105 of the highway bridge 100 for turning. The girder bridge portion 105 is formed by connecting a plurality of steel box girders 105 a in series (see FIG. 10). For example, a steel box girder having a length of 5 meters is assembled using the crawler crane 200. In performing the assembly, the steel box girder 105a is supported by the temporary support 107 (see FIGS. 9 and 10). In the assembly, the girder bridge portion 105 is mounted on the steel beam 104 so as to be slidable.

切回し用道路高架橋100の桁橋部分105は、将来本設として使用される。片側ずつ施工し、迂回路として片側を設置し終えたならば、切回し用道路高架橋100を開通し、高速道路高架橋1のルートを切り替える。図9では、下り線側を先に施工して、切回し用道路高架橋100を下り線の迂回路とし、高速道路高架橋1のうちそれまで下り線であった車線5dを上り線として利用している状態を示す。また高速道路高架橋1のうち、それまで上り線であった車線5uを通行止めとする。一般道にあっても、上り車線11uは全面通行止めとする。この影響を受けてそれまでの下り車線11dにあっては上り一車線および下り一車線として利用する。なお、状況に応じては、切回し用道路高架橋100を使用せず、高速道路高架橋1のうち施工されていない側の車線に上り車線と下り車線の両方を一車線ずつにする場合もあり得る。   The girder bridge portion 105 of the turnover road viaduct 100 will be used as a main building in the future. When construction is performed one side at a time and one side has been installed as a detour, the turning road viaduct 100 is opened and the route of the highway viaduct 1 is switched. In FIG. 9, the down line side is constructed first, the turning road viaduct 100 is used as the detour of the down line, and the lane 5d that has been the down line of the highway viaduct 1 is used as the up line. Indicates the state. In addition, the lane 5u, which was an up line until then, is closed on the highway viaduct 1. Even on ordinary roads, the entire up lane 11u is closed. Under this influence, the existing down lane 11d is used as an up lane and a down lane. Depending on the situation, there may be a case where both the up lane and the down lane of the highway viaduct 1 are not used but the lane on the side where the highway viaduct 1 is not constructed is used as one lane. .

切回し用道路高架橋100を上り側および下り側とも開通したら次に高速道路高架橋1を解体する。図11〜図16を参照して説明する。最初に一般道の交差点Cに差し掛かる高速道路高架橋1の解体について説明する。   After the turning road viaduct 100 is opened on both the up and down sides, the highway viaduct 1 is then dismantled. This will be described with reference to FIGS. First, the dismantling of the highway viaduct 1 that reaches the intersection C of a general road will be described.

高速道路高架橋1を解体するには、その上部工である桁橋部分5を撤去する。桁橋部分5の撤去をするにあたり、支保工50で桁橋部分5を仮受けする。支保工50のことをこの明細書では、上部工仮受用支保工50ということにする。   In order to dismantle the highway viaduct 1, the girder bridge portion 5 that is the superstructure thereof is removed. In removing the girder bridge portion 5, the support bridge 50 temporarily receives the girder bridge portion 5. The support 50 is referred to as a superstructure temporary support 50 in this specification.

上部工仮受用支保工50の組み立ておよび桁橋部分5の撤去作業は、交差点Cの全領域で行わず、工事進行方向における半分のエリアに分けて行う。図11〜図13は、工事の前半部分であり、図14〜図16は、工事の後半部分である。このようにすることで、交差点Cでの交差車輌の通行路52を確保し、全面通行止めを防止する(図13,15参照
)。
The assembly of the superstructure temporary support support 50 and the removal work of the girder bridge portion 5 are not performed in the entire area of the intersection C, but are performed in half areas in the construction progress direction. 11 to 13 are the first half of the construction, and FIGS. 14 to 16 are the second half of the construction. By doing in this way, the passage 52 of the crossing vehicle in the intersection C is ensured, and a full road closure is prevented (refer FIG. 13, 15).

また、上部工仮受用支保工50の組み立てには、クローラクレーン200を用いる。また、上部工仮受用支保工50にて支えられる桁橋部分5は、図示しないワイヤーソーにて解体し、その後ダンプ等で搬送する。なお、桁橋部分5には図12に示されているような張り出し部5aが設けられている場合があるが、これを先に撤去することで、張り出し部5aの下方に位置する一般道11dの車幅を撤去前よりも広げられる(図12及び図15参照)。張り出し部5aの撤去作業を行うために、図示しない張出部支保工を組み立ておき、これを足場にしてワイヤーソーで解体する。   The crawler crane 200 is used for assembling the superstructure temporary support 50. Further, the girder bridge portion 5 supported by the superstructure temporary support 50 is disassembled with a wire saw (not shown) and then conveyed by a dump or the like. The girder bridge portion 5 may be provided with an overhang portion 5a as shown in FIG. 12, but by removing this first, a general road 11d located below the overhang portion 5a. Is wider than before removal (see FIGS. 12 and 15). In order to remove the overhanging portion 5a, an unillustrated overhanging support is assembled, and this is used as a scaffold and disassembled with a wire saw.

次に桁橋部分5のうち交差点Cに差し掛かっていない部分の撤去作業について図17〜図19を参照して説明する。
この場合も、桁橋部分5に張り出し部5aがある場合は張り出し部5aを先に撤去して一般道の車幅を広げる。解体された張り出し部5aは、高速道路経由で搬出する。
Next, the removal work of the part of the girder bridge part 5 that does not reach the intersection C will be described with reference to FIGS.
Also in this case, when the girder bridge portion 5 has the overhanging portion 5a, the overhanging portion 5a is first removed to widen the vehicle width of the general road. The dismantled overhanging part 5a is carried out via a highway.

次に桁橋部分5の本体(以下特に断らない限り桁橋部分5という)を撤去する。この場合も上部工仮受用支保工50Aを組み立てて桁橋部分5を支えるが、多数のジャッキ55をその後設け、協働して支える(図18参照)。   Next, the main body of the girder bridge portion 5 (hereinafter referred to as the girder bridge portion 5 unless otherwise specified) is removed. Also in this case, the superstructure temporary support 50A is assembled to support the girder bridge portion 5, but a number of jacks 55 are then provided and supported in cooperation (see FIG. 18).

次に橋脚部分3と桁橋部分5との支点付近をワイヤーソーにて切断する。橋脚部分3から分断された桁橋部分5は、上部工仮受用支保工50Aおよびジャッキ55によって支えられるが、ジャッキ55だけでも十分支えられるように、ジャッキ55の設置本数および一基あたりのジャッキの能力が決定される。なお、ジャッキのみにて桁橋部分5を支持しないのは、ジャッキのワンストロークが、地上から桁橋部分5までの長さ寸法よりも遙かに短く、上部工仮受用支保工50Aの補助がなければ実質上、桁橋部分5を降下させることができないからである。   Next, the vicinity of the fulcrum between the pier part 3 and the girder bridge part 5 is cut with a wire saw. The girder bridge portion 5 divided from the pier portion 3 is supported by the superstructure temporary support support 50A and the jack 55, but the number of jacks 55 installed and the number of jacks per unit so that only the jack 55 can be sufficiently supported. Ability is determined. The reason why the girder bridge part 5 is not supported only by the jack is that the one stroke of the jack is much shorter than the length from the ground to the girder bridge part 5, and the support of the superstructure temporary support support 50A is not provided. Otherwise, the girder bridge portion 5 cannot be lowered substantially.

ジャッキ55で桁橋部分5を支持している間に上部工仮受用支保工50Aを少しずつ上から解体して行き、桁橋部分5を支える全ての上部工仮受用支保工50Aを予定寸法分(例えば30センチメートル位ずつ)解体し、桁橋部分5と上部工仮受用支保工50との間に前記予定寸法分の間隔ができたなら、桁橋部分5を支えているジャッキ55を降下して桁橋部分5と上部工仮受用支保工50との間の間隔を埋める。このように上部工仮受用支保工50Aとジャッキ55との組み合わせによる桁橋部分5の盛替えを少しずつ行いながら、桁橋部分5を地上まで降下させる(図18,図19参照)。   While supporting the girder bridge portion 5 with the jack 55, the upper work temporary support support 50A is dismantled little by little from the top, and all the upper work temporary support support works 50A supporting the girder bridge portion 5 are divided into the planned dimensions. After dismantling (for example, about 30 centimeters) and when there is an interval corresponding to the planned dimension between the girder bridge portion 5 and the superstructure support support 50, the jack 55 supporting the girder bridge portion 5 is lowered. Then, the gap between the girder bridge portion 5 and the superstructure temporary support 50 is filled. In this way, the girder bridge portion 5 is lowered to the ground while the refilling of the girder bridge portion 5 by the combination of the superstructure temporary support 50A and the jack 55 is performed little by little (see FIGS. 18 and 19).

降下された桁橋部分5は地上にてワイヤーソーにて切断しその後ダンプ等で搬送し処分する(図19参照)。
このようにして高速道路高架橋1を撤去するが、橋脚部分3は残す。桁橋部分5の撤去が完了したら、残された橋脚部分3と前記鋼製梁104とを連結する(図20,図21参照)。なお、橋脚部分3上においても桁橋部分105がスライドし易いように鋼製梁104を設置したりその他のスライド手段を設けてある。
The lowered girder bridge portion 5 is cut with a wire saw on the ground, and then conveyed and disposed of by a dump or the like (see FIG. 19).
In this way, the highway viaduct 1 is removed, but the pier 3 remains. When the removal of the girder bridge portion 5 is completed, the remaining pier portion 3 and the steel beam 104 are connected (see FIGS. 20 and 21). It should be noted that a steel beam 104 is installed on the pier part 3 so that the girder bridge part 105 can easily slide, and other sliding means are provided.

次に桁橋部分105を鋼製梁104に沿って高速道路高架橋1の橋脚部分3に向けてスライドする(図20,図21参照)。当該スライドは、上・下車線の片側ずつ行う。このとき、高速道路高架橋1および一般道11u・11dの全面通行止めを回避できるようにスライド対象でない桁橋部分の側は、片側一車線とする。なお、スライド側の一般道は施工側を全面通行止めにする(図21参照)。   Next, the girder bridge portion 105 is slid along the steel beam 104 toward the pier portion 3 of the highway viaduct 1 (see FIGS. 20 and 21). The slide is performed on each side of the upper and lower lanes. At this time, the side of the girder bridge portion that is not the object of sliding is a one-sided lane so that the entire roadway of the highway viaduct 1 and the general roads 11u and 11d can be closed. Note that the general road on the slide side is closed on the construction side (see FIG. 21).

上・下車線ともスライドを完了したら、斜材106およびその撤去用の足場109(図23参照)を撤去する(図22〜24参照)。また、それらのあった場所およびその周辺
の舗装をする。
When the sliding is completed in both the upper and lower lanes, the diagonal member 106 and the removal scaffold 109 (see FIG. 23) are removed (see FIGS. 22 to 24). Also, pave the place where they were and the surrounding area.

図25は高架橋の架替工法のフローチャートであり、ステップ1〜ステップ8を含む(図中符号Sはステップを意味する。)。
ステップ1は、既存の高架橋に並列される切回し用道路高架橋の橋脚部分103を構築するステップである(図4,5参照)。
FIG. 25 is a flowchart of the viaduct replacement method, and includes steps 1 to 8 (in the figure, symbol S means a step).
Step 1 is a step of constructing a pier portion 103 of a turning road viaduct parallel to an existing viaduct (see FIGS. 4 and 5).

ステップ2は、切回し用道路高架橋100の橋脚部分103から既存の高架橋である高速道路高架橋1の橋脚部分3に向けて延びる延出部としての鋼製梁104を構築するステップである(図6,7参照)。   Step 2 is a step of constructing a steel beam 104 as an extending portion extending from the pier portion 103 of the turning road viaduct 100 toward the pier portion 3 of the existing highway viaduct 1 (FIG. 6). , 7).

ステップ3は、鋼製梁104に切回し用道路高架橋100の桁橋部分105をスライド自在な状態で搭載して、切回し用道路高架橋100を構築するステップである(図8〜図10参照)。   Step 3 is a step in which the girder bridge portion 105 of the turning road viaduct 100 is slidably mounted on the steel beam 104 to construct the turning road viaduct 100 (see FIGS. 8 to 10). .

ステップ4は、高速道路高架橋1をその橋脚部分3を残して撤去するステップである。
ステップ5は、交差点Cにさしかかる高速道路高架橋1を解体するステップである(図11〜図16参照)。
Step 4 is a step of removing the highway viaduct 1 leaving its pier portion 3.
Step 5 is a step of dismantling the highway viaduct 1 approaching the intersection C (see FIGS. 11 to 16).

ステップ6は、交差点C以外の箇所で高速道路高架橋1をその橋脚部分3を残して撤去するステップである(図17〜図19参照参照)。
ステップ7は、残された橋脚部分3と鋼製梁104とを連結するステップである(図参照)。
Step 6 is a step of removing the highway viaduct 1 at a place other than the intersection C leaving the pier portion 3 (see FIGS. 17 to 19).
Step 7 is a step of connecting the remaining pier part 3 and the steel beam 104 (see the figure).

ステップ8は、連結された鋼製梁104に沿って、切回し用道路高架橋100の桁橋部分105を高速道路高架橋1の橋脚部分3に向けてスライドするステップである(図20〜図24参照)。   Step 8 is a step of sliding the girder bridge portion 105 of the turning road viaduct 100 toward the pier portion 3 of the highway viaduct 1 along the connected steel beam 104 (see FIGS. 20 to 24). ).

本実施形態に係る道路高架橋の架替工法によれば、切回し用道路高架橋100を既存の高速道路高架橋1の架け替え前に構築するので、高速道路高架橋1の撤去作業中も車輌は切回し用道路高架橋100を通行する。よって、車輌通行止めにする必要がない。よって渋滞を生じにくい。   According to the road viaduct replacement method according to the present embodiment, the turning road viaduct 100 is constructed prior to the replacement of the existing highway viaduct 1, so that the vehicle is turned around even during the removal of the highway viaduct 1. Pass through the public highway 100. Therefore, there is no need to make the vehicle closed. Therefore, it is difficult to cause traffic jams.

また、切回し用道路高架橋100の橋脚部分103と、高速道路高架橋1のうち撤去されずに残された橋脚部分103とが鋼製梁104で連結され、鋼製梁104に沿って切回し用道路高架橋100の桁橋部分105を高速道路高架橋1の残存する橋脚部分103に向けてスライドするので、高速道路高架橋1の掛け替えが簡単にできる。そればかりか、切回し用道路高架橋100の桁橋部分105を既存の高速道路高架橋1の桁橋部分105として利用するので、高速道路高架橋1の掛け替えが終了した後に切回し用道路高架橋100の実質上の撤去が不要になる。   Further, the pier portion 103 of the turning road viaduct 100 and the pier portion 103 which is left without being removed in the highway viaduct 1 are connected by a steel beam 104 and are turned along the steel beam 104. Since the girder bridge portion 105 of the highway viaduct 100 is slid toward the remaining pier portion 103 of the highway viaduct 1, the highway viaduct 1 can be easily replaced. In addition, since the girder bridge portion 105 of the turning road viaduct 100 is used as the girder bridge portion 105 of the existing highway viaduct 1, after the replacement of the highway viaduct 1 is finished, The above removal is unnecessary.

よって、本実施形態にあっては、渋滞を防止するだけでなく、高速道路高架橋1の架け替え工事をこれまでよりも短期に終了することができる。また、切回し用道路高架橋100の桁橋部分105を高速道路高架橋1の桁橋部分105として利用するから、大幅な工費削減ができる。   Therefore, in this embodiment, not only can traffic congestion be prevented, but the replacement work for the highway viaduct 1 can be completed in a shorter time than before. Moreover, since the girder bridge portion 105 of the turnover road viaduct 100 is used as the girder bridge portion 105 of the highway viaduct 1, the construction cost can be greatly reduced.

なお、本発明は上述の図示例にのみ限定されるものではなく、本発明の要旨を逸脱しない範囲内において種種変更を加え得ることは勿論である。例えば車線の数等、実施態様で例示したものに限られない。   In addition, this invention is not limited only to the above-mentioned illustration example, Of course, various changes can be added within the range which does not deviate from the summary of this invention. For example, the number of lanes is not limited to those exemplified in the embodiment.

本発明に係る道路高架橋の架替工法の概念を説明するための全体斜視図である。It is a whole perspective view for demonstrating the concept of the replacement method of the road viaduct concerning this invention. 本発明に係る高架橋の架替工法による高架橋掛け替え工事の施工前の高速道路高架橋およびその周辺の平面図である。It is a top view of the highway viaduct before construction of the viaduct replacement construction by the viaduct replacement method according to the present invention and its periphery. 図2のA−A線断面図である。It is the sectional view on the AA line of FIG. 本発明に係る高架橋の架替工法による高架橋掛け替え工事の施工開始後の平面図であって、切回し用道路高架橋の橋脚部分を構築している状態を示す平面図である。It is a top view after the construction start of the viaduct replacement work by the viaduct replacement method concerning this invention, Comprising: It is a top view which shows the state which has constructed the pier part of the road viaduct for turning. 図4のB−B線断面図である。It is the BB sectional view taken on the line of FIG. 橋脚部分に取り付けられる鋼製梁を斜材で支持している時の状態を示す平面図である。It is a top view which shows a state when the steel beam attached to a pier part is supported by the diagonal. 図6のC−C線断面図である。It is CC sectional view taken on the line of FIG. 鋼製梁に鋼製箱桁を設置している時の状態を示す平面図である。It is a top view which shows a state when installing the steel box girder in the steel beam. 図8のD−D線断面図である。It is the DD sectional view taken on the line of FIG. 図9の側面図である。FIG. 10 is a side view of FIG. 9. 一般道と高速度路高架橋との交差点部分における撤去状態を示す平面図である。It is a top view which shows the removal state in the intersection part of a general road and a high speed road viaduct. 図11のE−E線断面図である。It is the EE sectional view taken on the line of FIG. 図12の側面図である。It is a side view of FIG. 交差点にて撤去作業が半分ほど進行した状態での平面図である。It is a top view in the state where removal work progressed about half at the intersection. 図14のF−F線断面図である。It is the FF sectional view taken on the line of FIG. 図15の側面図である。FIG. 16 is a side view of FIG. 15. ジャッキダウンにより高速度路高架橋の桁橋部分を地面に降下させている状態を説明するための平面図である。It is a top view for demonstrating the state which has lowered | hung the girder bridge part of a high speed road viaduct to the ground by jackdown. 図17のG−G線断面図である。It is the GG sectional view taken on the line of FIG. 図18の側面である。It is a side surface of FIG. 切回し用道路高架橋の桁橋部分を高速道路高架橋の橋脚部分に向けてスライドする状態を説明するための図である。It is a figure for demonstrating the state which slides the girder bridge part of a turning road viaduct toward the pier part of a highway viaduct. 図20のH−H線断面図である。It is the HH sectional view taken on the line of FIG. 上・下車線の両側とも切回し用道路高架橋の桁橋部分をスライドさせた状態を示す平面図である。It is a top view which shows the state which slid the girder bridge part of the turning road viaduct on both sides of the upper and lower lanes. 図22のI−I線断面図である。It is the II sectional view taken on the line of FIG. 斜材およびその撤去用の足場を撤去して本法による高架橋の架け替え工事が完了した状態を示すI−I線断面図である。It is the II sectional view taken on the line which shows the state which removed the diagonal material and the scaffold for the removal, and the replacement work of the viaduct by this method was completed. 高架橋の架替工法のフローチャートである。It is a flowchart of the replacement construction method of a viaduct.

符号の説明Explanation of symbols

1 高速道路高架橋
3 橋脚部分
5 桁橋部分
5a 張り出し部
5d 下り車線
5u 上り車線
11d 一般道下り車線
11u 一般道上り車線
50 上部工仮受用支保工
50A 上部工仮受用支保工
52 交差車輌の通行路
55 ジャッキ
100 切回し用道路高架橋
103 橋脚部分
104 鋼製梁(延出部)
105 桁橋部分
105a 鋼製箱桁
106 斜材
107 仮受支保工
108 梁材連結用足場
109 斜材撤去用足場
200 クローラクレー
C 交差点
I エリア
II エリア
III エリア
IV エリア
DESCRIPTION OF SYMBOLS 1 Expressway viaduct 3 Bridge pier part 5 Girder bridge part 5a Overhang | projection part 5d Down lane 5u Up lane 11d General road down lane 11u General road up lane 50 Superstructure temporary acceptance support construction 50A Superstructure provisional acceptance support construction 52 Crossing vehicle passage 55 Jack 100 Road Bypass Via 103 103 Pier 104 Steel Beam (Extension)
105 Girder bridge portion 105a Steel box girder 106 Diagonal material 107 Temporary support work 108 Beam material connection scaffold 109 Diagonal material removal scaffold 200 Crawler clay C Intersection I Area II Area III Area IV Area

Claims (4)

橋脚部分とこの橋脚部分に支持され車輌の通行路となる桁橋部分とを有する既存の高架橋の架替工法において、
前記既存の高架橋に並列されると共に架け替え工事の施工に起因して生じ得る車輌通行止めを車輌を迂回させて回避するための切回し用高架橋の橋脚部分を構築するステップと、
この切回し用高架橋の橋脚部分から前記既存の高架橋の橋脚部分に向けて延びる延出部を構築するステップと、
この延出部に切回し用高架橋の桁橋部分をスライド自在な状態で搭載して切回し用高架橋を構築するステップと、
前記既存の高架橋をその橋脚部分を残して撤去するステップと、
当該残された橋脚部分と前記延出部とを連結するステップと、
当該連結された延出部に沿って前記切回し用高架橋の桁橋部分を既存の高架橋の前記残存する橋脚部分に向けてスライドするステップとを有する高架橋の架替工法。
In the existing viaduct replacement method, which has a pier part and a girder bridge part that is supported by this pier part and serves as a passage for vehicles,
Constructing a pier portion of a turnover viaduct for bypassing the vehicle and avoiding vehicle closure that may occur due to the construction of replacement work in parallel with the existing viaduct; and
Constructing an extension extending from the pier portion of the turnover viaduct toward the existing viaduct pier portion;
A step for constructing a viaduct for turning by mounting the girder bridge portion of the viaduct for turning in this extended state in a slidable state,
Removing the existing viaduct leaving its pier part; and
Connecting the remaining pier part and the extension part;
And a step of sliding the girder bridge portion of the turnover viaduct toward the remaining pier portion of the existing viaduct along the connected extension portion.
橋脚部分とこの橋脚部分に支持され車輌の通行路となる桁橋部分とを有する既存の道路高架橋の架替工法において、
前記既存の道路高架橋に並列されると共に架け替え工事の施工に起因して生じ得る車輌通行止めを車輌を迂回させて回避するための切回し用道路高架橋の橋脚部分を構築するステップと、
この切回し用道路高架橋の橋脚部分から前記既存の道路高架橋の橋脚部分に向けて延びる延出部を構築するステップと、
この延出部に切回し用道路高架橋の桁橋部分をスライド自在に搭載することで切回し用道路高架橋を構築するステップと、
前記既存の道路高架橋をその橋脚部分を残して撤去するステップと、
当該残された橋脚部分と前記延出部とを連結するステップと、
当該連結された延出部に沿って前記切回し用道路高架橋の桁橋部分を既存の道路高架橋の前記残存する橋脚部分に向けてスライドするステップとを有する道路高架橋の架替工法。
In an existing road viaduct replacement method having a pier part and a girder bridge part that is supported by this pier part and serves as a passage for vehicles,
Constructing a pier portion of a turnover road viaduct for bypassing the vehicle and avoiding vehicle closure that may occur due to the construction of the replacement work in parallel with the existing road viaduct; and
Constructing an extending portion extending from the pier portion of the turning road viaduct toward the pier portion of the existing road viaduct;
A step of constructing a road viaduct for turning by slidably mounting a girder bridge portion of the road for bypassing on the extension portion,
Removing the existing road viaduct leaving its pier part;
Connecting the remaining pier part and the extension part;
A method of replacing the road viaduct with a step of sliding the girder bridge portion of the turning road viaduct along the connected extension portion toward the remaining pier portion of the existing road viaduct.
請求項2に記載の道路高架橋の架替工法を既存の道路高架橋の上・下車線で行う道路高架橋の架替工法。   A method for replacing a road viaduct according to claim 2, wherein the method for replacing the road viaduct in the upper and lower lanes of an existing road viaduct is used. 前記既存の道路高架橋をその橋脚部分を残して解体するにあたり、桁橋部分をジャッキにて降下させ、地上にて前記桁橋部分を解体することを特徴とする請求項2または3に記載の道路高架橋の架替工法。   The road according to claim 2 or 3, wherein when the existing road viaduct is dismantled leaving its pier part, the girder bridge part is lowered with a jack and the girder bridge part is dismantled on the ground. Replacement method for viaduct.
JP2004193582A 2004-06-30 2004-06-30 Viaduct replacement method Expired - Fee Related JP4280208B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004193582A JP4280208B2 (en) 2004-06-30 2004-06-30 Viaduct replacement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004193582A JP4280208B2 (en) 2004-06-30 2004-06-30 Viaduct replacement method

Publications (2)

Publication Number Publication Date
JP2006016788A JP2006016788A (en) 2006-01-19
JP4280208B2 true JP4280208B2 (en) 2009-06-17

Family

ID=35791316

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004193582A Expired - Fee Related JP4280208B2 (en) 2004-06-30 2004-06-30 Viaduct replacement method

Country Status (1)

Country Link
JP (1) JP4280208B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5271497B2 (en) * 2007-01-05 2013-08-21 三菱重工業株式会社 Bridge
JP4959359B2 (en) * 2007-02-02 2012-06-20 三菱重工業株式会社 Bridge
CN102587234B (en) * 2012-03-01 2014-04-30 杭州市交通规划设计研究院 Double-deck viaduct bridge integrated with high-speed public traffic system
JP7296751B2 (en) * 2019-03-22 2023-06-23 株式会社横河ブリッジ Existing superstructure replacement method
CN111593681B (en) * 2020-06-12 2021-11-30 安徽省公路桥梁工程有限公司 Pier stud retaining cast-in-place box girder ecological dismantling system and construction method
JP7814923B2 (en) * 2021-12-27 2026-02-17 前澤化成工業株式会社 Water drainage piping device

Also Published As

Publication number Publication date
JP2006016788A (en) 2006-01-19

Similar Documents

Publication Publication Date Title
JP4280208B2 (en) Viaduct replacement method
JP2025061516A (en) Pier construction method and bridge construction method
JP4671912B2 (en) Bridge replacement method
JP3954905B2 (en) Three-dimensional crossing method of plane intersection and viaduct
KR100904987B1 (en) Arch bridge construction method using continuous extrusion method
JP4263935B2 (en) Construction method and elevated detour
JP2004285795A (en) Reconstruction method of flyover
JP2003268722A (en) Improvement work method for intersection and its adjacent part having bridge pier of viaduct on road median strip
JP2005090108A (en) Bridge erection method
JP6063795B2 (en) Bridge girder replacement method
JP4098581B2 (en) Overpass bridge construction method
RU2198976C2 (en) Overhead motor road of megapolis transport complex and method of control and relief of passenger, passenger-and-freight and freight traffic flows
CN222613970U (en) Frame dismantling reconstruction structure of existing bridge
JP3867008B2 (en) Construction method of viaduct
CN115478498B (en) A method for dismantling a highway cross-line farming bridge
JP3890529B2 (en) Bridge construction structure and bridge construction method
JP7296751B2 (en) Existing superstructure replacement method
JP2004285799A (en) Construction method for bridge side span of overpass
CN108239914B (en) Construction method of split box-shaped composite beam
JP2025034440A (en) Deck replacement method
Hossain et al. Roundabout Construction Using Precast Concrete in Virginia
JP2004285627A (en) Approach part structure and construction method of flyover
Fiori et al. Bridge superstructure lowering operation—US 60 widening, Mesa, Arizona
Brown Out of the Way
Searcy et al. West mesquite interchange at I-15

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070404

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090219

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090303

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090313

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120319

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4280208

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120319

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130319

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140319

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313532

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees