Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4418337B2 - Floor forming method and floor forming structure - Google Patents
[go: Go Back, main page]

JP4418337B2 - Floor forming method and floor forming structure - Google Patents

Floor forming method and floor forming structure Download PDF

Info

Publication number
JP4418337B2
JP4418337B2 JP2004281876A JP2004281876A JP4418337B2 JP 4418337 B2 JP4418337 B2 JP 4418337B2 JP 2004281876 A JP2004281876 A JP 2004281876A JP 2004281876 A JP2004281876 A JP 2004281876A JP 4418337 B2 JP4418337 B2 JP 4418337B2
Authority
JP
Japan
Prior art keywords
plate
floor
deck
deck plate
floor forming
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2004281876A
Other languages
Japanese (ja)
Other versions
JP2005127128A (en
Inventor
隆司 森田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa House Industry Co Ltd
Original Assignee
Daiwa House Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co Ltd filed Critical Daiwa House Industry Co Ltd
Priority to JP2004281876A priority Critical patent/JP4418337B2/en
Publication of JP2005127128A publication Critical patent/JP2005127128A/en
Application granted granted Critical
Publication of JP4418337B2 publication Critical patent/JP4418337B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Description

本発明は,床形成方法および床形成構造に関する。さらに詳しくは,例えばコンクリートスラブ床を鉄骨躯体に形成するための床形成方法および床形成構造に関する。   The present invention relates to a floor forming method and a floor forming structure. More specifically, for example, the present invention relates to a floor forming method and a floor forming structure for forming a concrete slab floor into a steel frame.

従来より、図10に示すように、デッキプレート101にコンクリート102を打設してなるデッキ合成スラブ床を、鉄骨躯体103を用いての形成は、例えばデッキプレート101を鉄骨躯体103に焼抜き栓溶接してなすのが一般的とされる。なお、図中、符号104は鉄筋を示し、符号105は小口ふさぎを示し、符号106は幅調整板を示す。   Conventionally, as shown in FIG. 10, a deck composite slab floor formed by placing concrete 102 on a deck plate 101 is formed using a steel frame 103. It is generally done by welding. In the figure, reference numeral 104 represents a reinforcing bar, reference numeral 105 represents a forehead cover, and reference numeral 106 represents a width adjusting plate.

ところが、このような従来の手法による形成では、解体が容易ではなく、たとえ解体したとしても、鉄骨区体103に溶接の傷が付くため鉄骨躯体のリユース(再利用)、あるいはリデュースが困難になるといった問題がある。   However, the formation by such a conventional method is not easy to dismantle, and even if dismantled, the steel frame 103 is damaged by welding, so that it is difficult to reuse (reuse) or reduce the steel frame. There is a problem.

この問題を解決するために、デッキプレートと鉄骨区体に予め孔をあけておき、ボルト等で固定して形成することが考えられる。しかしながら、この手法では、現場における建方精度などの影響によって、両者の孔を合わせることが困難な場合が生じる。   In order to solve this problem, it is conceivable to form holes in the deck plate and the steel frame body in advance and fix them with bolts or the like. However, with this technique, there are cases where it is difficult to match the holes due to the effects of construction accuracy at the site.

また、鉄骨躯体と床とを工場で予めパネル化することも考えられるが、この場合は重量が大きくなって現場まで運搬するのが困難になるといった問題を生ずる。   In addition, it is conceivable that the steel frame and the floor are pre-panelized at the factory. However, in this case, there is a problem that the weight increases and it is difficult to transport to the site.

本発明はかかる従来技術の課題に鑑みなされたものであって、施工現場における工数を特に増大させることなく、鉄骨などの部材の再利用が容易な床形成方法および床形成構造を提供することを目的としている。   The present invention has been made in view of the problems of the prior art, and provides a floor forming method and a floor forming structure in which a member such as a steel frame can be easily reused without particularly increasing the number of man-hours at a construction site. It is aimed.

本発明の床形成方法は、デッキプレートにコンクリートを打設してなるデッキ合成スラブ床を形成する床形成方法であって、鉄骨などの躯体にデッキプレートを取り付ける材を一定間隔で並列配置にて着脱自在に設ける手順と、前記板材の間隙をハット状部材により覆う手順と、前記材にデッキプレートを溶接にて取り付ける手順とを含んでいたり、あるいは鉄骨などの躯体にデッキプレートを取り付ける板材を一定間隔で並列配置にて着脱自在に設ける手順と、前記板材にデッキプレートを溶接にて取り付ける手順と、前記板材の境界を跨ぐようにして解体補助材を配設する手順とを含んでいたりすることを特徴とする。 Floor forming method of the present invention is a floor forming method for forming a deck synthetic slab floor formed by Da設the concrete deck plate, a plate member for attaching the deck plate to the skeleton, such as steel in parallel regularly spaced attached to the procedure freely provided detachable, the procedure covered by the hat-shaped member a gap of the plate, or comprise a step of attaching by welding the deck plate to said plate member, or deck plate precursor, such as steel Te Including a procedure for removably providing plate members in parallel arrangement at regular intervals, a procedure for attaching a deck plate to the plate material by welding, and a procedure for disposing auxiliary material so as to straddle the boundary of the plate material characterized in that it Italy.

本発明の床形成方法においては、前記部材を工場にて鉄骨などの躯体に取り付けるのが好ましい。   In the floor formation method of this invention, it is preferable to attach the said member to housings, such as a steel frame, in a factory.

本発明の床形成構造は、デッキプレートにコンクリートを打設してなるデッキ合成スラブ床を形成する床形成構造であって、鉄骨などの躯体に一定間隔で並列配置にて着脱自在に設けられたデッキプレートを取り付ける材と、前記板材の間隙を覆うハット状部材と、前記材に溶接にて取り付けられたデッキプレートとを備えていたり、あるいは鉄骨などの躯体に一定間隔で並列配置にて着脱自在に設けられたデッキプレートを取り付ける板材と、前記境界を跨ぐようにして配設された解体補助材と、前記板材に溶接にて取り付けられたデッキプレートとを備えていたりすることを特徴とする。 The floor forming structure of the present invention is a floor forming structure for forming a deck composite slab floor formed by placing concrete on a deck plate, and is detachably provided in a parallel arrangement at regular intervals on a frame such as a steel frame. a plate member for attaching the deck plate, and the hat-shaped member which covers the gap between the plate, in a parallel regularly spaced leads and a deck plate attached by welding to the plate member, or the precursor of such steel It comprises a plate material to which a deck plate provided detachably is provided, a disassembly auxiliary material arranged so as to straddle the boundary, and a deck plate attached to the plate material by welding. To do.

本発明の床形成構造においては、前記部材が、例えば板材とされ、それが鉄骨などの躯体にボルト・ナット留めにて取り付けられているものとされる。   In the floor forming structure of the present invention, the member is, for example, a plate material, and is attached to a housing such as a steel frame with bolts and nuts.

また、本発明の床形成構造においては、ボルト・ナット留めの板材から突出している部分が、管材または筒条部材により覆われているのが好ましい。   Moreover, in the floor formation structure of this invention, it is preferable that the part which protrudes from the board | plate material of a volt | bolt and nut fastening is covered with the pipe material or the tube member.

本発明によれば、解体が容易な床を形成できるという優れた効果が得られる。   According to the present invention, an excellent effect is obtained that a floor that can be easily disassembled can be formed.

以下、添付図面を参照しながら本発明を実施形態に基づいて説明するが、本発明はかかる実施形態のみに限定されるものではない。   Hereinafter, although the present invention is explained based on an embodiment, referring to an accompanying drawing, the present invention is not limited only to this embodiment.

実施形態1
図1に本発明の実施形態1に係る床形成方法が適用された床形成構造の要部を斜視図により示す。
Embodiment 1
FIG. 1 is a perspective view showing a main part of a floor forming structure to which a floor forming method according to Embodiment 1 of the present invention is applied.

同図に示すように、この床形成構造Kは、H形鉄骨からなる鉄骨躯体1に、デッキ合成スラブ床2(図2参照、以下単に床という)を形成するための床形成構造とされ、鉄骨躯体1の上部フランジ1aに予め取り付けられるプレート3,3に、床2の構成部材であるデッキプレート4を例えば焼抜き栓溶接3dを施して取り付けて床2を形成するものとされる。   As shown in the figure, this floor forming structure K is a floor forming structure for forming a deck composite slab floor 2 (see FIG. 2, hereinafter simply referred to as a floor) on a steel frame 1 made of an H-shaped steel frame. It is assumed that the floor 2 is formed by attaching the deck plate 4 which is a constituent member of the floor 2 to the plates 3 and 3 which are attached in advance to the upper flange 1a of the steel frame 1 by performing, for example, the quenching plug welding 3d.

ここで、床2は、デッキプレート4の上にコンクリート2aを打設し、さらにその上に床仕上げ材2bを設けるようにして形成される。   Here, the floor 2 is formed by placing the concrete 2a on the deck plate 4 and further providing the floor finishing material 2b thereon.

プレート3および鉄骨躯体1の対応位置にはボルト挿通用透孔(不図示である)が設けられており、これに挿通されるボルト3a(ボルトは、中ボルト、高力ボルト、ワンサイドボルト等、特に限定を受けない)とナット3bにより、プレート3は予め工場において鉄骨躯体1に接合される。ここで、プレート3の長さは後述する解体手順のおける解体が円滑になされるように調整されている。つまり、解体時に切断されるデッキプレート4の山4a,4aの間隔にマッチするようその長さが調整されている。   Bolt insertion through holes (not shown) are provided at corresponding positions of the plate 3 and the steel frame 1, and bolts 3 a (the bolts are medium bolts, high strength bolts, one-side bolts, etc.) inserted through the holes. The plate 3 is previously joined to the steel frame 1 in the factory by the nut 3b. Here, the length of the plate 3 is adjusted so that the disassembly in the disassembly procedure described later can be performed smoothly. That is, the length is adjusted so as to match the interval between the peaks 4a, 4a of the deck plate 4 cut at the time of dismantling.

また、1つの鉄骨躯体1に取り付けられるプレート3同士の間隙3cは、ハット状プレート5の両裾を各プレート3に接合するようにして覆われるものとされる。ここで、図3に示すように、ハット状プレート5の高さ5aは、デッキプレート4の各山の高さと等しくされる。   Further, the gap 3c between the plates 3 attached to one steel frame 1 is covered so that both hems of the hat-shaped plate 5 are joined to each plate 3. Here, as shown in FIG. 3, the height 5 a of the hat-shaped plate 5 is equal to the height of each mountain of the deck plate 4.

また、デッキプレート4の形状は、溝広タイプでも溝狭タイプでもよく特に限定されない。小口形状も特に限定されない。   Further, the shape of the deck plate 4 may be either a wide groove type or a narrow groove type, and is not particularly limited. The shape of the fore edge is not particularly limited.

以下、実施形態1の床形成構造Kにおける施工手順と解体手順を説明する。   Hereinafter, the construction procedure and the dismantling procedure in the floor forming structure K of the first embodiment will be described.

1.施工手順
(1)プレート3にデッキプレート4を焼抜き溶接3dにより取り付ける。このとき、図4に示すように、デッキプレート4は、単純支持形式によって大梁として用いられる鉄骨躯体1間毎に支持される。なお、図中、符号11は柱を示し、符号12は小梁を示す。また、図2に示すように、焼抜き溶接3dが施される位置は、上方から見て鉄骨躯体1と重ならない位置に設定される。これによって、溶接の際に鉄骨躯体1に傷が付くのを確実に防止することができる。
1. Construction procedure (1) The deck plate 4 is attached to the plate 3 by the quenching welding 3d. At this time, as shown in FIG. 4, the deck plate 4 is supported for each steel frame 1 used as a large beam by a simple support method. In the figure, reference numeral 11 indicates a pillar, and reference numeral 12 indicates a beam. Moreover, as shown in FIG. 2, the position where the temper welding 3d is performed is set to a position that does not overlap the steel frame 1 when viewed from above. As a result, the steel frame 1 can be reliably prevented from being damaged during welding.

(2)ボルト3aの周りにコンクリート21が侵入しないように、プレート3上にボルト3aを囲うよう管材6を立設し、この管内に耐火および遮音性能に優れた材料(例:ロックウール)からなるつめもの(不図示である)を充填する。ここで、管材6は、鋼、樹脂、紙などを素材として形成することが可能である。また、管材6の軸長(プレート3からの高さ)は、コンクリート2aの厚みとほぼ等しくされる。   (2) A pipe 6 is erected on the plate 3 so as to surround the bolt 3a so that the concrete 21 does not enter around the bolt 3a, and a material excellent in fire resistance and sound insulation performance (eg, rock wool) is used in the pipe. Fill with a filling (not shown). Here, the tube material 6 can be formed using steel, resin, paper, or the like as a material. Moreover, the axial length (height from the plate 3) of the pipe material 6 is made substantially equal to the thickness of the concrete 2a.

(3)コンクリート2aを打設した後、床仕上げ材2bを取り付ける。   (3) After placing the concrete 2a, the floor finish 2b is attached.

2.解体手順
(1)図5に示すように、デッキプレート4の山4aの部分で床2(コンクリート2a、デッキプレート4)をコンクリートカッター等により切断する。なお、デッキプレート4の山4aの位置は、ボルト3aの配置から容易に知ることができる。
2. Dismantling Procedure (1) As shown in FIG. 5, the floor 2 (concrete 2a, deck plate 4) is cut by a concrete cutter or the like at the crest 4a of the deck plate 4. The position of the peak 4a of the deck plate 4 can be easily known from the arrangement of the bolts 3a.

(2)直交方向については、ハット状プレート5の山の部分で床2をコンクリートカッター等により切断する。   (2) About the orthogonal direction, the floor 2 is cut | disconnected with a concrete cutter etc. in the peak part of the hat-shaped plate 5. FIG.

(3)管材6内のつめものを取り出し、ボルト3aを緩めて抜き取る。   (3) Take out the nail in the pipe 6 and loosen and remove the bolt 3a.

(4)予め埋設しておいた金物(不図示である)にワイヤー等を係合させ、前記手順1,2で切断された床版を吊り上げて撤去する。   (4) Engage a wire or the like with a pre-embedded hardware (not shown), and lift and remove the floor slab cut in steps 1 and 2 above.

このように、実施形態1の床形成構造Kは、鉄骨躯体1に直接床2、より具体的にはデッキプレート4を取り付けるのではなく、ボルト接合により機械式に鉄骨躯体1に取り付けられるプレート3に、例えば焼抜き栓溶接によりデッキプレート4を取り付けて床2を設けるものとしたので、溶接による傷を鉄骨躯体1に与えることなく床2を構造躯体1に設けることが可能となる。したがって、解体後に補修作業等を要することなく鉄骨躯体1をリユースすることが可能となる。   As described above, the floor forming structure K of the first embodiment does not directly attach the floor 2, more specifically the deck plate 4, to the steel frame 1, but mechanically attaches the plate 3 to the steel frame 1 by bolting. In addition, since the floor 2 is provided by attaching the deck plate 4 by means of, for example, tempering plug welding, the floor 2 can be provided on the structural frame 1 without causing damage to the steel frame 1 by welding. Therefore, the steel frame 1 can be reused without requiring repair work after dismantling.

また、鉄骨躯体1のフランジ部1aに工場でプレート3をボルト接合しておくだけで、現場においてはデッキプレート4を従来通りの安価な焼抜き栓溶接で接合することができ、コスト上昇を抑えることができる。   Further, by simply bolting the plate 3 to the flange portion 1a of the steel frame 1 at the factory, the deck plate 4 can be joined at the site by the conventional inexpensive tempering plug welding, thereby suppressing an increase in cost. be able to.

また、床2より具体的にはコンクリートスラブを切断することで、床版自体をきれいに撤去することができ、解体の際の粉塵を抑えることができる。   Further, by cutting the concrete slab more specifically from the floor 2, the floor slab itself can be removed cleanly, and dust during dismantling can be suppressed.

また、撤去される床2(コンクリートスラブ)は板状であり、クラッシャにより壊した場合のようにサイズが不ぞろいのブロックにはならないので、効率よく撤去作業を行うことができる。   Further, the floor 2 (concrete slab) to be removed is plate-shaped, and does not become a block with irregular sizes as when broken by a crusher, so that the removal work can be performed efficiently.

実施形態2
図6および図7に本発明の実施形態2に係る床形成方法が適用された床形成構造K1の要部を断面図および平面図でそれぞれ示す。実施形態2は実施形態1を改変してなるものであって、プレート3の位置でデッキプレート4を切断することなく解体の容易性を確保してなるものとされる。
Embodiment 2
The principal part of the floor forming structure K1 to which the floor forming method according to Embodiment 2 of the present invention is applied is shown in FIG. 6 and FIG. 7 as a sectional view and a plan view, respectively. The second embodiment is obtained by modifying the first embodiment, and ensures the ease of disassembly without cutting the deck plate 4 at the position of the plate 3.

具体的には、床形成構造K1は、図6および図7に示すように、解体補助部材21をプレート3,3の境界部分にプレート3,3を跨ぐようにして梁(または小梁)20の長手方向に沿って配設してなるものとされる。また、プレート3を梁(または小梁)20にボルト・ナット接合しているボルト3aの位置は、図7に示すように、デッキプレート4の谷4bに一致させられている。図7中、黒丸は焼抜き栓溶接を示す。   Specifically, as shown in FIGS. 6 and 7, the floor forming structure K <b> 1 includes a beam (or small beam) 20 with the disassembly assisting member 21 straddling the plates 3 and 3 at the boundary between the plates 3 and 3. It shall be arrange | positioned along the longitudinal direction of this. Further, the position of the bolt 3a that joins the plate 3 to the beam (or small beam) 20 with bolts and nuts is made to coincide with the valley 4b of the deck plate 4 as shown in FIG. In FIG. 7, black circles indicate temper plug welding.

解体補助部材21は、図8に示すように、台形状の突出部23が対向させてデッキプレート4の谷4bのピッチに合わせて設けられた平板(図8(a)参照)22を、前記突出部23を下方に直角に折り曲げ成形してなるものとされる。平板22の水平部24はプレート3,3を跨ぐに足る幅を有するものとされ、また突出部23はデッキプレート4の山4aに水平部14内面を当接させた状態で、デッキプレート4の谷4bに密着状態で嵌め込まれるように形成されている。   As shown in FIG. 8, the disassembly assisting member 21 includes a flat plate (see FIG. 8A) 22 provided in accordance with the pitch of the valleys 4 b of the deck plate 4 with the trapezoidal protrusions 23 facing each other. The protruding portion 23 is formed by bending downward at a right angle. The horizontal portion 24 of the flat plate 22 has a width sufficient to straddle the plates 3 and 3, and the projecting portion 23 is in a state where the inner surface of the horizontal portion 14 is in contact with the mountain 4 a of the deck plate 4. It is formed so as to be fitted in the valley 4b in a close contact state.

以下、図9も参照しながら、実施形態2の床形成構造K1における施工手順と解体手順を説明する。   Hereinafter, the construction procedure and the disassembly procedure in the floor forming structure K1 of the second embodiment will be described with reference to FIG.

1.施工手順
(1)プレート3にデッキプレート4の中間部を焼抜き溶接により取り付ける。このとき、図9に示すように、デッキプレート4の中間部は、単純支持形式によって小梁に支持される。なお、デッキプレート4の谷のボルト3aに対応する箇所には、予め透孔4cが形成されている。
1. Construction procedure (1) Attach the middle part of the deck plate 4 to the plate 3 by means of quenching welding. At this time, as shown in FIG. 9, the intermediate portion of the deck plate 4 is supported by the small beam by the simple support type. A through hole 4c is formed in advance at a location corresponding to the valley bolt 3a of the deck plate 4.

(2)ボルト3aの周りにコンクリート2aが侵入しないように、プレート3上にボルト3aを囲うよう管材6を立設し、この管内に耐火および遮音性能に優れた材料(例:ロックウール)からなるつめもの(不図示である)を充填する。ここで、管材6は、鋼、樹脂、紙などを素材として形成することが可能である。また、管材6の軸長(プレート3からの高さ)は、コンクリート2aの厚みとほぼ等しくされる。   (2) A pipe 6 is erected on the plate 3 so as to surround the bolt 3a so that the concrete 2a does not enter around the bolt 3a, and a material excellent in fire resistance and sound insulation performance (eg, rock wool) is used in this pipe. Fill with a filling (not shown). Here, the tube material 6 can be formed using steel, resin, paper, or the like as a material. Moreover, the axial length (height from the plate 3) of the pipe material 6 is made substantially equal to the thickness of the concrete 2a.

(3)コンクリート2aを打設した後、床仕上げ材2bを取り付ける。   (3) After placing the concrete 2a, the floor finish 2b is attached.

2.解体手順
(1)デッキプレート4の山4aの部分で床2(コンクリート2a、デッキプレート4)をコンクリートカッター等により切断する(図5参照)。なお、デッキプレート4の山4aの位置は、ボルト3aの配置から容易に知ることができる。
2. Dismantling procedure (1) The floor 2 (concrete 2a, deck plate 4) is cut with a concrete cutter or the like at the crest 4a of the deck plate 4 (see FIG. 5). The position of the peak 4a of the deck plate 4 can be easily known from the arrangement of the bolts 3a.

(2)直交方向については、解体補助部材21の水平部24で床2をコンクリートカッター等により切断する。   (2) About the orthogonal direction, the floor 2 is cut with a concrete cutter or the like at the horizontal portion 24 of the disassembly assisting member 21.

(3)管材6内のつめものを取り出し、ボルト3aを緩めて抜き取る。   (3) Take out the nail in the pipe 6 and loosen and remove the bolt 3a.

(4)予め埋設しておいた金物(不図示である)にワイヤー等を係合させ、前記手順1,2で切断された床版を吊り上げて撤去する。   (4) Engage a wire or the like with a pre-embedded hardware (not shown), and lift and remove the floor slab cut in steps 1 and 2 above.

このように、実施形態2の床形成構造K1は、実施形態1と同様に、溶接による傷を梁20に与えることなく床2を構造躯体1に設けることが可能となる。したがって、解体後に補修作業等を要することなく梁20などの鉄骨躯体1をリユースすることが可能となる。   As described above, in the floor forming structure K1 of the second embodiment, the floor 2 can be provided on the structural housing 1 without causing the weld 20 to be damaged by welding as in the first embodiment. Therefore, it is possible to reuse the steel frame 1 such as the beam 20 without requiring repair work or the like after dismantling.

本発明は、鉄骨躯体に床を取り付ける場合に適用できる。   The present invention can be applied when a floor is attached to a steel frame.

本発明の実施形態1に係る床形成構造の要部を示す分解斜視図である。It is a disassembled perspective view which shows the principal part of the floor formation structure which concerns on Embodiment 1 of this invention. 同構造の断面図である。It is sectional drawing of the structure. 同構造に用いられるハット状フレームを示す斜視図である。It is a perspective view which shows the hat-shaped flame | frame used for the structure. 同構造の全体図である。It is a general view of the structure. 同構造の解体手順を模式的に示す図である。It is a figure which shows typically the disassembly procedure of the same structure. 本発明の実施形態2に係る床形成構造の要部を示す断面図である。It is sectional drawing which shows the principal part of the floor formation structure which concerns on Embodiment 2 of this invention. 同平面図である。It is the same top view. 同実施形態の解体補助部材の詳細図であって、同(a)は展開図を示し、同(b)は正面図を示す。It is detail drawing of the disassembly assistance member of the same embodiment, Comprising: The same (a) shows an expanded view, The same (b) shows a front view. 同実施形態の要部詳細断面図である。It is a principal part detailed sectional view of the embodiment. 従来の床形成構造を示す分解斜視図である。It is a disassembled perspective view which shows the conventional floor formation structure.

符号の説明Explanation of symbols

1 鉄骨躯体
2 床
3 プレート
3a ボルト
3b ナット
4 デッキプレート
5 ハット状プレート
6 管材
20 梁(または小梁)
21 解体補助部材
23 突出部
24 水平部
K 床形成構造
DESCRIPTION OF SYMBOLS 1 Steel frame 2 Floor 3 Plate 3a Bolt 3b Nut 4 Deck plate 5 Hat-shaped plate 6 Pipe material 20 Beam (or small beam)
21 Disassembly assistance member 23 Protrusion part 24 Horizontal part K Floor formation structure

Claims (7)

デッキプレートにコンクリートを打設してなるデッキ合成スラブ床を形成する床形成方法であって、
鉄骨などの躯体にデッキプレートを取り付ける材を一定間隔で並列配置にて着脱自在に設ける手順と、
前記板材の間隙をハット状部材により覆う手順と、
前記材にデッキプレートを溶接にて取り付ける手順
とを含んでいることを特徴とする床形成方法。
A floor forming method for forming a deck composite slab floor formed by placing concrete on a deck plate,
The procedure freely provided detachably in a parallel regularly spaced a plate member for attaching the deck plate to the skeleton, such as steel,
A procedure for covering the gap between the plate members with a hat-shaped member;
Floor forming method characterized in that it includes a procedure for attaching by welding the deck plate to said plate member.
デッキプレートにコンクリートを打設してなるデッキ合成スラブ床を形成する床形成方法であって、A floor forming method for forming a deck composite slab floor formed by placing concrete on a deck plate,
鉄骨などの躯体にデッキプレートを取り付ける板材を一定間隔で並列配置にて着脱自在に設ける手順と、A procedure for detachably attaching a plate material for attaching a deck plate to a frame such as a steel frame in a parallel arrangement at regular intervals;
前記板材にデッキプレートを溶接にて取り付ける手順と、Attaching the deck plate to the plate by welding;
前記板材の境界を跨ぐようにして解体補助材を配設する手順Procedure for disposing disassembly aid material across the boundary of the plate material
とを含んでいることを特徴とする床形成方法。The floor formation method characterized by including these.
前記板材を工場にて鉄骨などの躯体に取り付けることを特徴とする請求項1または2記載の床形成方法。 The floor forming method according to claim 1 or 2, wherein the plate material is attached to a frame such as a steel frame at a factory. デッキプレートにコンクリートを打設してなるデッキ合成スラブ床を形成する床形成構造であって、
鉄骨などの躯体に一定間隔で並列配置にて着脱自在に設けられたデッキプレートを取り付ける材と、前記板材の間隙を覆うハット状部材と、前記材に溶接にて取り付けられたデッキプレートとを備えてなることを特徴とする床形成構造。
A floor forming structure for forming a deck composite slab floor formed by placing concrete on a deck plate,
A plate member for attaching the deck plate detachably provided in a parallel arrangement at regular intervals precursor such as steel, and the hat-shaped member which covers the gap between the plate and the deck plate attached by welding to the plate member A floor forming structure characterized by comprising:
デッキプレートにコンクリートを打設してなるデッキ合成スラブ床を形成する床形成構造であって、A floor forming structure for forming a deck composite slab floor formed by placing concrete on a deck plate,
鉄骨などの躯体に一定間隔で並列配置にて着脱自在に設けられたデッキプレートを取り付ける板材と、前記境界を跨ぐようにして配設された解体補助材と、前記板材に溶接にて取り付けられたデッキプレートとを備えてなることを特徴とする床形成構造。A plate material to which a deck plate provided in a detachable manner in parallel arrangement at regular intervals is attached to a frame such as a steel frame, a disassembly auxiliary material arranged so as to straddle the boundary, and attached to the plate material by welding A floor forming structure comprising a deck plate.
前記板材が、鉄骨などの躯体にボルト・ナット留めにて取り付けられていることを特徴とする請求項4または5記載の床形成構造。 The floor forming structure according to claim 4 or 5 , wherein the plate member is attached to a housing such as a steel frame by bolts and nuts. ボルト・ナット留めの板材から突出している部分が、管材または筒条部材により覆われていることを特徴とする請求項4または5記載の床形成構造。 6. The floor forming structure according to claim 4 or 5 , wherein a portion protruding from the plate material of the bolt and nut fastening is covered with a pipe material or a tube member.
JP2004281876A 2003-09-29 2004-09-28 Floor forming method and floor forming structure Expired - Fee Related JP4418337B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004281876A JP4418337B2 (en) 2003-09-29 2004-09-28 Floor forming method and floor forming structure

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2003338837 2003-09-29
JP2004281876A JP4418337B2 (en) 2003-09-29 2004-09-28 Floor forming method and floor forming structure

Publications (2)

Publication Number Publication Date
JP2005127128A JP2005127128A (en) 2005-05-19
JP4418337B2 true JP4418337B2 (en) 2010-02-17

Family

ID=34655550

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004281876A Expired - Fee Related JP4418337B2 (en) 2003-09-29 2004-09-28 Floor forming method and floor forming structure

Country Status (1)

Country Link
JP (1) JP4418337B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112049303A (en) * 2020-08-26 2020-12-08 中国核电工程有限公司 Steel plate assembly at the bottom of floor slab and construction method thereof, floor slab and construction method thereof

Also Published As

Publication number Publication date
JP2005127128A (en) 2005-05-19

Similar Documents

Publication Publication Date Title
JP6129810B2 (en) Groundwork stand for outer wall panel and construction method
JP4202892B2 (en) Column removal beam reinforcement method and beam reinforcement structure in partition
JP2015105552A (en) Form support tool and slab construction method using the same
JP4418337B2 (en) Floor forming method and floor forming structure
JP5004918B2 (en) Formwork structure for decorative plate member
JP4528177B2 (en) Floor forming method and floor forming structure
JP6068510B2 (en) Deck plate support and slab construction method using it
JP2017061803A (en) Positioning jig for pillar anchor bolts and construction method for steel pillar legs
JP4109594B2 (en) Main girder and frame and construction method of temporary pier using them
JP6463284B2 (en) Steel ground cover mounting structure
JP2009150175A (en) Crack-inducing joint material, crack-inducing structure, and method for constructing concrete structure
JP4842093B2 (en) Flat plate construction method
JP6118202B2 (en) Column beam member construction method
JP2003268937A (en) Roof support hardware mounting structure
KR101064138B1 (en) Joint structure of rectangular tube for landscape structure and construction method using same
JP2002332645A (en) Foundation structure of ground traveling crane rail and method of laying foundation
CN107476571A (en) Exempt from the construction method of punching bamboo glue pattern plate
JP6327740B2 (en) Laying board laying method
JP5439002B2 (en) Expansion unit mounting structure, expansion unit mounting method and unit type building
JPH0932288A (en) Method and support for supporting filling material for filling gaps in pipe insertion holes
JP6463283B2 (en) Connection structure of precast concrete wall members
JP6216588B2 (en) Lining plate fixture
JP2009293223A (en) Segment and its manufacturing method
JP3101136U (en) Fixture for joist and flooring
JP2004125086A (en) Steel plate joining method and device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070922

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20071212

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090724

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090729

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090902

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20091117

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20091127

R150 Certificate of patent or registration of utility model

Ref document number: 4418337

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121204

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20151204

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees