Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4545520B2 - Disability transfer compensation business processing system, computer, and program - Google Patents
[go: Go Back, main page]

JP4545520B2 - Disability transfer compensation business processing system, computer, and program - Google Patents

Disability transfer compensation business processing system, computer, and program Download PDF

Info

Publication number
JP4545520B2
JP4545520B2 JP2004234429A JP2004234429A JP4545520B2 JP 4545520 B2 JP4545520 B2 JP 4545520B2 JP 2004234429 A JP2004234429 A JP 2004234429A JP 2004234429 A JP2004234429 A JP 2004234429A JP 4545520 B2 JP4545520 B2 JP 4545520B2
Authority
JP
Japan
Prior art keywords
compensation
construction
screen
input
applicant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2004234429A
Other languages
Japanese (ja)
Other versions
JP2006053730A (en
Inventor
邦弘 前川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2004234429A priority Critical patent/JP4545520B2/en
Publication of JP2006053730A publication Critical patent/JP2006053730A/en
Application granted granted Critical
Publication of JP4545520B2 publication Critical patent/JP4545520B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

この発明は、コンピュータを使った情報処理技術に関し、とくに電力会社において行われている配電線路の支障移転業務に適用される、支障移転補償業務処理システム、コンピュータ、及びプログラムに関する。   The present invention relates to information processing technology using a computer, and more particularly to a trouble transfer compensation work processing system, a computer, and a program, which are applied to a trouble transfer work of a distribution line performed in an electric power company.

例えば、建造物の新築や増築などの工事に際し、その地権者等が、その工事の支障となる電信柱等の配電線路を移転させたいことがある。また、道路敷設工事や道路拡張工事等を実施する際に、地権者である公団等の事業者が、その工事の支障となる配電線路を移転させたいことがある。このような場合、地権者や事業者(以下、移転申込者と称する)は電力会社に配電線路の移転申込を行う。そしてこのような移転申込があると、電力会社では、配電線路の移転により生じる費用のうち、移転申込者に負担させる補償金の額を移転申込の内容に基づいて計算し、計算した補償金の見積書や請求書を発行して移転申込者に送付するのである。
特開2003−22385号公報
For example, in the case of construction such as new construction or extension of a building, the landowner or the like may want to relocate distribution lines such as telephone poles that hinder the construction. In addition, when carrying out road laying work, road expansion work, etc., companies such as public corporations that are landowners may want to relocate distribution lines that interfere with the work. In such a case, the landowner or business operator (hereinafter referred to as a relocation applicant) applies to the power company for relocation of the distribution line. And if there is such a transfer application, the electric power company will calculate the amount of compensation to be borne by the transfer applicant out of the expenses caused by the transfer of distribution lines, based on the details of the transfer application, An estimate or invoice is issued and sent to the transfer applicant.
JP 2003-22385 A

ところで、配電線路の移転に際しては、材料費、工事費、諸掛費、実費等、様々な費用が発生する。また、移転の種類については、配電線路を架空から架空に移転する場合、架空から地中に移転する場合、地中から地中に移転する場合等があり、補償金の計算方法は複雑である。このため、電力会社において取り扱われる多数の移転申込について、補償金を請求するまでの一連の業務を確実かつ効率よく遂行することは必ずしも容易ではなかった。   By the way, when the distribution line is moved, various costs such as material costs, construction costs, various costs, and actual costs are incurred. As for the type of relocation, there are cases where the distribution line is relocated from aerial to aerial, relocated from aerial to the ground, relocated from the ground to the ground, etc., and the compensation calculation method is complicated. . For this reason, it has not always been easy to reliably and efficiently perform a series of operations up to claiming compensation for a large number of transfer applications handled by electric power companies.

本発明は、このような事情に鑑みてなされたもので、配電線路の支障移転補償業務を確実かつ効率よく遂行することを可能とする支障移転補償業務処理システム、コンピュータ、及びプログラムを提供することを目的とする。   The present invention has been made in view of such circumstances, and provides a trouble transfer compensation work processing system, a computer, and a program that can reliably and efficiently perform trouble transfer compensation work for distribution lines. With the goal.

上記目的を達成するための本発明のうちの1つは、配電線路の支障移転補償業務に用いられる支障移転補償業務処理システムであって、CPU及びメモリを有する少なくとも1台のコンピュータを含み、前記CPUが前記メモリに記憶されているプログラムを実行することにより実現される、ユーザから支障移転の申込に関するデータである、申込者区分を含む申込データの入力を受け付けて、受け付けた前記申込データを記憶する申込処理部、ユーザから、前記支障移転の費用に対する申込者の負担割合である申込者負担割合と、工事補償金の計算に関する諸掛費と、諸掛費区分とを含んだデータである工事補償金データの入力を受け付けて工事補償金を計算する工事補償金処理部、見積書や請求書等の帳票を出力する請求処理部、各種マスタの維持管理に関する処理を行う維持管理処理部、月次経理処理に必要となる帳票を出力する月次経理処理部、を有し、支障移転における前記負担割合が記載された根拠文書、当該支障移転の事案と類似する過去事例、及び当該根拠文書において記述された条文又は項目の少なくともいずれかに関係する関係法令を対応づけたデータベースと通信可能に接続し、前記工事補償金処理部は、前記工事補償金データの入力を受け付ける画面として、第一種電気通信事業者との協定による移転であるか否かの入力欄を有する、配電線路を架空から架空に移転する場合に対応した第1の画面、前記支障移転の工事補償金の算定方式を地中工事として行うか否かの入力欄を有する、配電線路を架空から地中に移転する場合に対応した第2の画面、配電線路を地中から地中に移転する場合に対応した第3の画面、のうちのいずれかの画面をユーザに提示し、割合値又は前記支障移転による移転前後の配電線路の本数のいずれかの項目をユーザに選択させ、前記割合値が選択された場合には、受け付けた値を前記申込者負担割合とし、前記本数が選択された場合には、受け付けた値を前記負担割合の値に換算して前記申込者負担割合とし、前記第1の画面に、第一種電気通信事業者との協定による移転である旨の入力がされた場合には、前記申込者負担割合と、前記諸掛費に関する所定比率とに基づき前記工事補償金を計算し、前記第1の画面に、第一種電気通信事業者との協定による移転以外である旨の入力がされた場合には、前記申込者負担割合と、前記申込者区分と、前記諸掛費区分とに基づき前記工事補償金を計算し、前記第2の画面に、前記支障移転の工事補償金の算定方式を地中工事として行う旨の入力がされた場合には、当該地中線工事に関する所定の比率に基づき前記工事補償金を計算し、前記第2の画面に、前記支障移転の工事補償金の算定方式を地中工事として行わない旨の入力がされた場合には、前記申込者負担割合に基づき前記工事補償金を計算し、前記第3の画面に、前記諸掛費の入力がされた場合には、入力された前記諸掛費と、前記申込者負担割合に基づき前記工事補償金を計算し、前記第3の画面に、前記諸掛費区分の入力がされた場合には、入力された前記諸掛費区分と、前記申込者負担割合とに基づき前記工事補償金を計算し、前記維持管理処理部は、前記根拠文書、及び前記過去事例のうち少なくとも1つ以上をキーワードとする検索入力を受け付けて、前記キーワードに該当するレコードを前記データベースから取得することとする。 One of the present invention for achieving the above object is a trouble transfer compensation work processing system used for trouble transfer compensation work for distribution lines, and includes at least one computer having a CPU and a memory, The CPU accepts input of application data including an applicant category, which is data related to an application for trouble relocation, realized by executing a program stored in the memory, and stores the received application data Construction that is data including the application burden ratio, which is the burden ratio of the applicant for the cost of the trouble transfer, the various expenses related to the calculation of the construction compensation, and the various expenses classification Construction compensation processing unit that accepts compensation data input and calculates construction compensation, billing processing unit that outputs forms such as estimates and invoices, A maintenance management processing unit that performs processing related to maintenance management of the data, a monthly accounting processing unit that outputs a form necessary for monthly accounting processing, and a document on the basis of the above-mentioned burden ratio in the trouble transfer, the trouble The construction compensation processing unit is connected to a database that associates the past cases similar to the case of relocation and the related laws and regulations related to at least one of the clauses or items described in the rationale document. The first screen corresponding to the case where the distribution line is moved from aerial to aerial, which has an input field as to whether or not it is a transfer with an agreement with a first-class telecommunications carrier as a screen for accepting the input of construction compensation data screen, the trouble with the input field whether the calculation method performed as underground work construction compensation of transfer, the second screen a distribution line corresponding to the case of transfer in the ground from the overhead power distribution Any one of the third screens corresponding to the case where the road is transferred from the ground to the ground is presented to the user, and either the ratio value or the number of distribution lines before and after the relocation due to the above-mentioned trouble transfer When the user selects an item and the ratio value is selected, the accepted value is the applicant burden ratio, and when the number is selected, the received value is converted into the burden ratio value. The applicant burden ratio, and when the first screen indicates that the transfer is based on an agreement with a first-class telecommunications carrier, the applicant burden ratio and the various charges If the construction compensation is calculated based on a predetermined ratio related to expenses, and the first screen is entered to the effect that it is not a transfer under an agreement with a first-class telecommunications carrier, the applicant Based on the burden ratio, the applicant category, and the various expenses category If the calculation to calculate the construction compensation fee is made, and the second screen is input that the method for calculating the construction compensation fee for the obstacle relocation is to be performed as underground construction , When the construction compensation is calculated based on the ratio, and the second screen is input that the calculation method of the construction compensation for the troubled relocation is not performed as underground construction , the applicant burden ratio The construction compensation is calculated on the basis of the above, and when the various expenses are entered on the third screen, the construction compensation is based on the inputted various expenses and the applicant burden ratio. And the construction compensation is calculated on the basis of the inputted expenses category and the applicant burden ratio. the maintenance processing unit, the rationale document, and little of the past case Both accepts search input to keyword one or more, and obtaining a record corresponding to the keyword from the database.

本発明では、工事補償金データの入力を受け付ける画面として、配電線路を架空から架空に移転する場合、架空から地中に移転する場合、地中から地中に移転する場合の夫々に応じた画面をユーザに提示し、これら各画面の夫々に対応づけて用意されている計算式により工事補償金を計算するようにしている。このため、電力会社の担当者等のユーザは、工事補償金を確実かつ効率よく計算することができる。また、本システムによれば、移転申込の受付、工事補償金の計算、見積書や請求書等の帳票出力、マスタの維持管理、月次経理処理等の一連の支障移転補償業務が統括的に取り扱われるので、確実かつ効率よく支障移転補償業務を遂行することができる。   In the present invention, as a screen for accepting the input of construction compensation data, when the distribution line is moved from aerial to aerial, when relocating from aerial to underground, or depending on the case of relocating from underground to underground Is presented to the user, and the construction compensation is calculated by a calculation formula prepared in association with each of these screens. For this reason, a user such as a person in charge of the electric power company can calculate the construction compensation money reliably and efficiently. In addition, according to this system, a series of troubled relocation compensation operations such as acceptance of relocation applications, calculation of construction compensation, output of forms such as estimates and invoices, master maintenance, monthly accounting processing, etc. are integrated. Since it is handled, it is possible to carry out trouble transfer compensation work reliably and efficiently.

本発明のうちの1つは、上記の支障移転補償業務処理システムであって、前記申込処理部は、前記申込データの入力を受け付けるに際し、既に記憶している前記申込データの検索画面をユーザに提示し、前記検索画面により検索された前記申込データを、前記申込データを入力させるための画面に自動入力することとする。 One aspect of the present invention is the above-described trouble transfer compensation business processing system, wherein the application processing unit accepts an input of the application data and displays a search screen for the application data already stored. The application data presented and searched on the search screen is automatically input on a screen for inputting the application data.

本発明によれば、既存の申込データを流用して申込データを入力することが可能である。このため、ユーザの申込データの入力負荷が著しく軽減される。また、既存の申込データは、画面上でのエラーチェックやデータベース側のエラーチェックをパスしているので、これが流用されることで入力ミスも著しく減少することとなる。   According to the present invention, it is possible to input application data by diverting existing application data. For this reason, the input load of the user's application data is significantly reduced. Further, since the existing application data passes the error check on the screen and the error check on the database side, the input mistakes are remarkably reduced by diverting the application data.

本発明のうちの1つは、上記の支障移転補償業務処理システムであって、前記工事補償金処理部は、前記工事補償金データの入力を受け付けるに際し、既に記憶している前記工事補償金データの検索画面をユーザに提示し、前記検索画面により検索された前記工事補償金データを、前記工事補償金データの入力を受け付ける画面に自動入力することとする。 One of the present invention is the above-described trouble transfer compensation business processing system, wherein the construction compensation processing unit stores the construction compensation data already stored when receiving the construction compensation data. The search screen is presented to the user, and the construction compensation data retrieved by the search screen is automatically input on a screen that accepts input of the construction compensation data.

本発明によれば、既存の工事補償金データを流用して工事補償金データを入力することが可能である。このため、ユーザの工事補償金データの入力負荷が著しく軽減される。また、既存の工事補償金データは、画面上でのエラーチェックやデータベース側のエラーチェックをパスしているので、これが流用されることで入力ミスも著しく減少することになる。   According to the present invention, it is possible to input existing construction compensation data using existing construction compensation data. For this reason, the input load of the user's construction compensation data is remarkably reduced. Moreover, since the existing construction compensation data passes the error check on the screen and the error check on the database side, the input mistakes are remarkably reduced by using this.

本発明のうちの1つは、上記の支障移転補償業務処理システムに用いられるコンピュータであって、CPU及びメモリを有し、前記CPUが前記メモリに記憶されているプログラムを実行することにより実現される、ユーザから支障移転の申込に関するデータである、申込者区分を含む申込データの入力を受け付けて、受け付けた前記申込データを記憶する申込処理部、ユーザから、前記支障移転の費用に対する申込者の負担割合である申込者負担割合と、工事補償金の計算に関する諸掛費と、諸掛費区分とを含んだデータである工事補償金データの入力を受け付けて工事補償金を計算する工事補償金処理部、見積書や請求書等の帳票を出力する請求処理部、各種マスタの維持管理に関する処理を行う維持管理処理部、月次経理処理に必要となる帳票を出力する月次経理処理部、を有し、支障移転における前記負担割合が記載された根拠文書、当該支障移転の事案と類似する過去事例、及び当該根拠文書において記述された条文又は項目の少なくともいずれかに関係する関係法令を対応づけたデータベースと通信可能に接続し、前記工事補償金処理部は、前記工事補償金データの入力を受け付ける画面として、第一種電気通信事業者との協定による移転であるか否かの入力欄を有する、配電線路を架空から架空に移転する場合に対応した第1の画面、前記支障移転の工事補償金の算定方式を地中工事として行うか否かの入力欄を有する、配電線路を架空から地中に移転する場合に対応した第2の画面、配電線路を地中から地中に移転する場合に対応した第3の画面、のうちのいずれかの画面をユーザに提示し、割合値又は前記支障移転による移転前後の配電線路の本数のいずれかの項目をユーザに選択させ、前記割合値が選択された場合には、受け付けた値を前記申込者負担割合とし、前記本数が選択された場合には、受け付けた値を前記負担割合の値に換算して前記申込者負担割合とし、前記第1の画面に、第一種電気通信事業者との協定による移転である旨の入力がされた場合には、前記申込者負担割合と、前記諸掛費に関する所定比率とに基づき前記工事補償金を計算し、前記第1の画面に、第一種電気通信事業者との協定による移転以外である旨の入力がされた場合には、前記申込者負担割合と、前記申込者区分と、前記諸掛費区分とに基づき前記工事補償金を計算し、前記第2の画面に、前記支障移転の工事補償金の算定方式を地中工事として行う旨の入力がされた場合には、当該地中線工事に関する所定の比率に基づき前記工事補償金を計算し、前記第2の画面に、前記支障移転の工事補償金の算定方式を地中工事として行わない旨の入力がされた場合には、前記申込者負担割合に基づき前記工事補償金を計算し、前記第3の画面に、前記諸掛費の入力がされた場合には、入力された前記諸掛費と、前記申込者負担割合に基づき前記工事補償金を計算し、前記第3の画面に、前記諸掛費区分の入力がされた場合には、入力された前記諸掛費区分と、前記申込者負担割合とに基づき前記工事補償金を計算し、前記維持管理処理部は、前記根拠文書、及び前記過去事例のうち少なくとも1つ以上をキーワードとする検索入力を受け付けて、前記キーワードに該当するレコードを前記データベースから取得することとする。 One of the present invention is a computer used in the above-described obstacle transfer compensation business processing system, which has a CPU and a memory, and is realized by the CPU executing a program stored in the memory. The application processing unit that receives the application data including the applicant category, which is data related to the application for trouble transfer from the user, and stores the received application data, and the user's Construction compensation money that accepts input of construction compensation data that is data including application burden percentage, which is the burden percentage, various expenses related to the calculation of construction compensation money, and various expense categories. Necessary for processing unit, billing processing unit that outputs forms such as estimates and invoices, maintenance management processing unit that performs processing related to maintenance of various masters, monthly accounting processing A monthly accounting processing unit that outputs a report, and a rationale document that describes the percentage of burden in trouble transfer, past cases similar to the case of trouble transfer, and the clauses or items described in the evidence document The construction compensation processing unit is communicably connected to a database associated with the relevant laws and regulations related to at least one of the above, and the construction compensation processing unit, as a screen for accepting the input of the construction compensation data, The first screen corresponding to the case where the distribution line is relocated from aerial to aerial, with an entry field for whether or not the transfer is based on an agreement, whether or not to perform the calculation method of construction compensation for the relocation of obstacles as underground work One of the second screen corresponding to the case where the distribution line is moved from the aerial to the ground and the third screen corresponding to the case where the distribution line is moved from the ground to the ground. The screen is presented to the user, and the user is allowed to select either the ratio value or the number of distribution lines before and after the relocation due to the troubled transfer. When the number is selected, the received value is converted into the value of the burden ratio to be the applicant burden ratio, and the first screen displays the first type telecommunications carrier and If it is input that the transfer is based on the agreement, the construction compensation is calculated based on the applicant burden ratio and the predetermined ratio related to the various expenses, and the first screen displays the first In the event that an input indicating that the transfer is not based on an agreement with a seed telecommunications carrier is entered, the construction compensation is calculated based on the applicant burden ratio, the applicant category, and the various expenses category. The second screen shows the work compensation for the relocation . When it is input that the calculation method of gold is to be done as underground work, the construction compensation is calculated based on a predetermined ratio related to the underground work, and the above-mentioned trouble transfer is displayed on the second screen . When it is input that the calculation method of construction compensation is not to be carried out as underground construction, the construction compensation is calculated based on the applicant burden ratio, and the third screen displays When input is made, the construction compensation is calculated based on the input expenses and the applicant burden ratio, and the expenses are classified on the third screen. Calculating the construction compensation fee based on the inputted various expense categories and the applicant burden ratio, and the maintenance management processing unit is at least one of the basis document and the past case Search input with keyword as the keyword And obtaining relevant records from the database.

本発明のうちの1つは、上記のコンピュータに、前記申込処理部、前記工事補償金処理部、前記請求処理部、前記維持管理処理部、前記月次経理処理部、のうちの少なくともいずれかの機能を実現するプログラムであることとする。 One of the aspects of the present invention is that the computer includes at least one of the application processing unit, the construction compensation processing unit, the claim processing unit, the maintenance management processing unit, and the monthly accounting processing unit. It is assumed that the program realizes the above functions.

本発明によれば、配電線路の支障移転補償業務を確実かつ効率よく行うことが可能となる。   ADVANTAGE OF THE INVENTION According to this invention, it becomes possible to perform the trouble transfer compensation business of a distribution line reliably and efficiently.

以下、本発明の一実施形態にかかる支障移転補償業務処理システム(以下、補償業務処理システムと略記する)について説明する。補償業務処理システムは、配電線路の移転を希望する地権者や事業者等(以下、移転申込者と称する)からの配電線路の移転申込を受け付け、工事補償金を計算し、工事補償金についての見積書や請求書等を発行し、工事補償金の精算や実績報告をするといった一連の支障移転補償業務を支援するものである。図1に補償業務処理システム1の概略的な構成を示している。   Hereinafter, a trouble transfer compensation business processing system (hereinafter abbreviated as a compensation business processing system) according to an embodiment of the present invention will be described. Compensation work processing system accepts transfer application for distribution line from landowners and businesses (hereinafter referred to as transfer applicants) who wish to transfer distribution line, calculates construction compensation, It supports a series of trouble relocation compensation operations such as issuing estimates and invoices, and paying construction compensation and reporting results. FIG. 1 shows a schematic configuration of the compensation work processing system 1.

補償業務処理システム1は、電力会社の社内連絡用に敷設されたLAN(Local Area Network)やWAN(Wide Area Network)等の通信ネットワーク2を介して通信可能に接続された、少なくとも一台以上のクライアントコンピュータ3と、少なくとも一台以上のサーバコンピュータ4とを含んで構成されている。クライアントコンピュータ3は、電力会社の営業所、支社に設置されているコンピュータである。サーバコンピュータ4は、電力会社の総務部などの管理部門に設置されているコンピュータである。   The compensation business processing system 1 includes at least one or more communicably connected via a communication network 2 such as a LAN (Local Area Network) or a WAN (Wide Area Network) laid for in-house contact of a power company. The client computer 3 includes at least one server computer 4. The client computer 3 is a computer installed at a sales office or branch office of an electric power company. The server computer 4 is a computer installed in a management department such as the general affairs department of an electric power company.

クライアントコンピュータ3及びサーバコンピュータ4のハードウエアは、パーソナルコンピュータやオフィスコンピュータ、メインフレーム等である。クライアントコンピュータ3又はサーバコンピュータ4として用いられるコンピュータのハードウエア構成の一例を図2に示している。同図に示したコンピュータは、CPU21、RAM/ROM等のメモリ22、ハードディスク23、キーボードやマウスなどの入力装置24、ディスプレイなどの表示装置25、通信ネットワーク2に接続するための通信インタフェース26を備えている。   The hardware of the client computer 3 and the server computer 4 is a personal computer, an office computer, a main frame, or the like. An example of a hardware configuration of a computer used as the client computer 3 or the server computer 4 is shown in FIG. The computer shown in FIG. 1 includes a CPU 21, a memory 22 such as a RAM / ROM, a hard disk 23, an input device 24 such as a keyboard and a mouse, a display device 25 such as a display, and a communication interface 26 for connection to the communication network 2. ing.

クライアントコンピュータ3及びサーバコンピュータ4では、夫々、CPU21がメモリ22に記憶されているプログラムを実行することにより各種の機能が実現されている。図3にクライアントコンピュータ3及びサーバコンピュータ4において実行されるプログラムによって実現される各種の機能を示している。   In the client computer 3 and the server computer 4, various functions are realized by the CPU 21 executing programs stored in the memory 22. FIG. 3 shows various functions realized by programs executed in the client computer 3 and the server computer 4.

同図に示しているように、クライアントコンピュータ3においては、認証処理部31、メニュー処理部32、申込処理部33、工事補償金処理部34、帳票一覧処理部35、請求処理部36、維持管理処理部37、月次経理処理部38、マスタ作成部39、検索参照部40などの機能が実現されている。クライアントコンピュータ3において実現される上記機能は、サーバコンピュータ4において実現させるようにしたり、クライアントコンピュータ3及びサーバコンピュータ4の夫々で実行されるプログラムの連携によって実現されるようにしたりすることもできる。   As shown in the figure, in the client computer 3, the authentication processing unit 31, the menu processing unit 32, the application processing unit 33, the construction compensation processing unit 34, the form list processing unit 35, the billing processing unit 36, the maintenance management Functions such as a processing unit 37, a monthly accounting processing unit 38, a master creation unit 39, and a search reference unit 40 are realized. The functions realized in the client computer 3 can be realized in the server computer 4 or can be realized by cooperation of programs executed in the client computer 3 and the server computer 4 respectively.

サーバコンピュータ4ではデータベース41が動作している。データベース41は、データベースマネージメントソフトウエア(DBMS)によって管理されている。具体的には、申込データ42、工事補償金データ43、管理マスタ44、地区マスタ45、申込者マスタ46、工事補償金47、請求項データ48、等がデータベース21に管理されており、クライアントコンピュータ3において実現されている各種の機能は、通信ネットワーク2を介してこれらのデータやマスタにリアルタイムにアクセスすることができる。   A database 41 is operating on the server computer 4. The database 41 is managed by database management software (DBMS). Specifically, application data 42, construction compensation data 43, management master 44, district master 45, applicant master 46, construction compensation 47, claim data 48, and the like are managed in the database 21, and the client computer. Various functions implemented in 3 can access these data and the master in real time via the communication network 2.

次に、補償業務処理システム1の具体的な機能について詳述する。図4は、補償業務処理システム1の利用開始時に、認証処理部31がクライアントコンピュータ3の表示装置25に表示する画面(以下、認証画面400と称する)である。ユーザが社員証番号の入力欄401に社員証番号を、暗証番号の入力欄402に暗証番号を入力し、業務開始ボタン403をクリックすると、認証処理部31は入力された社員証番号と暗証番号を認証する。認証で問題が無ければ、メニュー処理部32が図5に示す画面(以下、メニュー画面500と称する)を表示する。同図に示しているように、メニュー画面500には、支障移転の申込処理に関するボタン群510、工事補償金処理に関するボタン群520、各種の帳票出力処理に関するボタン群530、補償金請求処理に関するボタン群540、維持管理処理に関するボタン群550、月次経理処理に関するボタン群560、マスタ作成処理に関するボタン群570が設けられている。ユーザがこのメニュー画面500に表示されているボタンの一つをクリックすれば、そのボタンに対応する各種の画面が表示される。   Next, specific functions of the compensation work processing system 1 will be described in detail. FIG. 4 is a screen (hereinafter referred to as an authentication screen 400) that the authentication processing unit 31 displays on the display device 25 of the client computer 3 at the start of use of the compensation service processing system 1. When the user inputs the employee ID number in the employee ID number input field 401 and the password in the password input field 402 and clicks the business start button 403, the authentication processing unit 31 inputs the employee ID number and the password. Authenticate. If there is no problem with the authentication, the menu processing unit 32 displays a screen shown in FIG. 5 (hereinafter referred to as a menu screen 500). As shown in the figure, the menu screen 500 includes a button group 510 relating to trouble transfer application processing, a button group 520 relating to construction compensation processing, a button group 530 relating to various forms output processing, and buttons relating to compensation claim processing. A group 540, a button group 550 related to maintenance management processing, a button group 560 related to monthly accounting processing, and a button group 570 related to master creation processing are provided. When the user clicks one of the buttons displayed on the menu screen 500, various screens corresponding to the button are displayed.

==移転申込==
図6は支障移転の申込処理に関するボタン群510のうち、申込データ入力ボタン511がクリックされた場合に申込処理部33によって表示される画面(以下、申込データ入力画面600と称する)である。電力会社の受付担当部門の職員等(以下、ユーザと称する)は、移転申込があると、申込データ入力画面600を利用してその移転申込の内容に関するデータ(以下、申込データと称する)を入力する。
== Relocation application ==
FIG. 6 shows a screen (hereinafter referred to as an application data input screen 600) displayed by the application processing unit 33 when the application data input button 511 is clicked in the button group 510 relating to the application process for trouble relocation. When there is a relocation application, a staff member in charge of the electric power company's reception department (hereinafter referred to as a user) uses the application data input screen 600 to input data relating to the details of the relocation application (hereinafter referred to as application data). To do.

図6に示す申込データ入力画面600のうち、処理区分の欄601には、ユーザにその入力が「新規」、「訂正」、「削除」のいずれであるのかを指定させるためのチェック欄が設けられている。次の受付番号の欄603には、移転申込者から受け付けた移転申込ごとに付与される受付番号が入力される。処理区分の欄601で「新規」が指定されている場合には、受付番号の欄603には受付番号が自動入力される。処理区分の欄601で「訂正」もしくは「削除」が指定されている場合には、受付番号はユーザが手動入力する。受付年月日の欄604には、移転申込者から移転申込を受け付けた年月日が入力される。受付年月日の欄604の右隣にある移転希望年月日の欄605には、移転申込者が希望する、支障移転工事の実施年月日が入力される。有償区分の欄606には、今回の支障移転が、有償で行われるのか、それとも無償で行われるのかを示す情報である有償区分(有償の場合は「1」、無償の場合は「0」)が入力される。無償決定年月日の欄607には、有償区分に無償を示す「0」が入力されていた場合における、無償工事が実施される年月日が入力される。無償完了年月日の欄608には、その無償工事が完了する年月日が入力される。地区コードの欄609には、その移転申込がどの地区に関するものであるのかを示す情報である地区コードが入力される。地区コードは、地区別にデータを集計する場合等に利用される。地区コードは、プルダウンメニューに表示される地区マスタ45の内容から選択することもできる。   In the application data input screen 600 shown in FIG. 6, the processing category column 601 includes a check column for allowing the user to specify whether the input is “new”, “correction”, or “deletion”. It has been. In the next reception number column 603, a reception number assigned to each transfer application received from the transfer applicant is entered. When “new” is designated in the process category column 601, the receipt number is automatically entered in the receipt number column 603. If “correction” or “deletion” is designated in the processing category column 601, the user manually inputs the receipt number. In the reception date field 604, the date of accepting the transfer application from the transfer applicant is entered. The desired transfer date column 605 to the right of the reception date column 604 is used to input the date of implementation of the troubled transfer work desired by the transfer applicant. In the paid category column 606, the paid category (“1” for paid, “0” for paid) is information indicating whether or not the current trouble transfer will be done for a fee or free of charge. Is entered. In the column 607 of the free-of-charge determination date, the date on which free-of-charge construction is performed when “0” indicating free of charge is input in the paid category is input. The date 608 of completion of the gratuitous construction is entered in the column 608 of the gratuitous completion date. In the district code column 609, a district code which is information indicating which district the transfer application relates to is input. The district code is used when collecting data by district. The district code can also be selected from the contents of the district master 45 displayed in the pull-down menu.

申込者コードの欄610には申込者コードが入力される。申込者コードはプルダウンメニューに表示される申込者マスタ46の内容から選択することもできる。申込者区分の欄611には、移転申込者が個人であるのか組織であるのかといった、移転申込者の属性を示す情報である申込者区分が入力される。申込者氏名の欄612には、移転申込者の氏名(申込者が組織である場合にはその組織の名称)が入力される。申込者住所の欄613には、移転申込者の住所や所在地が入力される。申込者電話番号の欄614には、移転申込者の電話番号が入力される。依頼番号の欄615には、各移転申込者が行った移転申込の夫々について付与される依頼番号が入力される。依頼年月日の欄616には移転申込者が支障移転工事を依頼した年月日が入力される。   The applicant code is entered in the applicant code column 610. The applicant code can also be selected from the contents of the applicant master 46 displayed in the pull-down menu. In the column 611 for the applicant category, an applicant category that is information indicating the attribute of the transfer applicant, such as whether the transfer applicant is an individual or an organization, is input. In the applicant name column 612, the name of the transfer applicant (if the applicant is an organization, the name of the organization) is entered. In the applicant address field 613, the address and location of the transfer applicant are entered. In the column 614 for the applicant's telephone number, the telephone number of the transfer applicant is entered. In the request number column 615, a request number assigned to each transfer application made by each transfer applicant is entered. In the request date column 616, the date on which the transfer applicant requested the troubled transfer work is entered.

支障場所の欄617には、配電線路の支障場所を特定する情報が入力される。申込理由の欄618には、移転申込の理由を示す情報である申込理由コードもしくは理由が入力される。支障物件の欄619には、移転対象となる支障物件のチェック欄及び支障物件の名称の入力欄が設けられている。ユーザは、該当する支障物件のチェック欄をチェックするか、もしくは支障物件の名称を手動入力する。担当者名の欄620には、当該移転申込を取り扱う担当者の名前が入力される。担当者電話番号の欄621には、担当者の電話番号が入力される。備考欄622には、支障物件の図面番号や注意事項などの所定事項が入力される。   In the trouble place column 617, information specifying the trouble place of the distribution line is input. In the application reason column 618, an application reason code or a reason, which is information indicating the reason for the transfer application, is entered. The troubled property column 619 is provided with a check column for a troubled property to be transferred and an input column for the name of the troubled property. The user checks the check box of the corresponding troubled property or manually inputs the name of the troubled property. In the person in charge name column 620, the name of the person in charge handling the transfer application is entered. The telephone number of the person in charge is entered in the person-in-charge telephone number field 621. In the remarks column 622, predetermined items such as a drawing number of the troubled property and precautions are input.

検索ボタン623は、申込データの入力を、既にサーバコンピュータ4のデータベース41に登録されている申込データ42を流用して行う場合にクリックされる。図7は検索ボタンがクリックされた場合に表示される画面(以下、申込データ検索画面700と称する)である。申込データ検索画面700には、検索条件として、有償区分を選択するチェック欄701、地区コードを入力する欄702、申込者氏名を入力する欄703、支障場所を入力する欄704が設けられている。ユーザがこれらのうちの少なくともいずれかの検索条件を指定して検索開始ボタン705をクリックすると、指定された検索条件に合致する申込データが申込データ表示欄706に表示される。申込データ表示欄706に表示されている申込データのうちの一つをユーザが選択した後、確定ボタン706がクリックされると、選択されている申込データの内容が申込データ入力画面600に自動入力される。このように、ユーザは既存の申込データを流用して申込データの入力を行うことができる。このため、ユーザの申込データの入力負荷が軽減される。また、既存の申込データは、入力時のエラーチェックやデータベース登録時のエラーチェックをパスしたデータであるので、これが流用されることで入力ミスも減少する。   The search button 623 is clicked when application data is input by applying application data 42 already registered in the database 41 of the server computer 4. FIG. 7 shows a screen displayed when the search button is clicked (hereinafter referred to as an application data search screen 700). The application data search screen 700 is provided with a check field 701 for selecting a paid category, a field 702 for inputting a district code, a field 703 for inputting an applicant name, and a field 704 for inputting a trouble location as search conditions. . When the user specifies at least one of these search conditions and clicks the search start button 705, application data that matches the specified search condition is displayed in the application data display field 706. When the user selects one of the application data displayed in the application data display field 706 and then clicks the confirm button 706, the contents of the selected application data are automatically input to the application data input screen 600. Is done. In this way, the user can input application data by diverting existing application data. For this reason, the input load of the user's application data is reduced. Further, since the existing application data is data that has passed the error check at the time of input and the error check at the time of database registration, input errors are reduced by diverting this.

申込データ検索画面700は、メニュー画面500に設けられている申込データ検索ボタン502をクリックすることによっても表示させることができる。   The application data search screen 700 can also be displayed by clicking an application data search button 502 provided on the menu screen 500.

申込データ入力画面600の所定欄に申込データを入力した後、申込データ入力画面600に設けられている登録ボタン624がクリックされると、入力されている内容が申込データとしてクライアントコンピュータ3からサーバコンピュータ4に送信されてデータベース41に登録される。削除ボタン625は、既にデータベース41に登録されている申込データを削除する場合にクリックされる。   After inputting application data in a predetermined field of the application data input screen 600, when a registration button 624 provided on the application data input screen 600 is clicked, the input content is transferred from the client computer 3 to the server computer as application data. 4 and registered in the database 41. The delete button 625 is clicked when the application data already registered in the database 41 is deleted.

図5のメニュー画面500の支障移転補償業務処理票No.1出力ボタン53は、データベース41に登録されている申込データ42が記載された帳票(以下、支障移転補償業務処理票No.1と称する)の出力指示をするためのボタンである。図8は、支障移転補償業務処理票No.1ボタン53がクリックされた場合に表示される画面(以下、支障移転補償業務処理票No.1出力画面800と称する)である。この画面の印刷ボタン802がクリックされると、申込処理部33は、受付番号の欄801に入力されている受付番号に対応する申込データに基づく支障移転補償業務処理票No.1を出力する。図9に支障移転補償業務処理票No.1の一例を示す。 In the menu screen 500 of FIG. The 1 output button 5 1 3 is a button for instructing output of a form (hereinafter referred to as trouble transfer compensation work processing form No. 1) in which the application data 42 registered in the database 41 is described. FIG. 8 shows the trouble transfer compensation work processing form No. This is a screen that is displayed when the 1 button 5 1 3 is clicked (hereinafter, referred to as a trouble transfer compensation work processing slip No. 1 output screen 800). When the print button 802 on this screen is clicked, the application processing unit 33 causes the trouble transfer compensation work process form No. 1 based on the application data corresponding to the reception number input in the reception number column 801. 1 is output. In FIG. An example of 1 is shown.

==工事補償金==
工事補償金の計算方法は、配電線路の移転の種類によって異なる。この補償業務処理システム1が取り扱うことができるのは、配電線路を架空から架空への移転、架空から地中への移転、地中から地中への移転である。図5のメニュー画面500の工事補償金処理に関するボタン群520には、上記の各種類に対応して、工事補償金データ入力(架空→架空)ボタン521、工事補償金データ入力(架空→地中)ボタン522、及び工事補償金データ入力(地中→地中)ボタン523、の3種類のボタンが設けられている。
== Construction compensation ==
The method of calculating construction compensation varies depending on the type of distribution line transfer. The compensation business processing system 1 can handle the transfer of distribution lines from aerial to aerial, from aerial to underground, and from underground to underground. The button group 520 related to the construction compensation processing on the menu screen 500 in FIG. 5 includes a construction compensation data input (aerial → aerial) button 521 and a construction compensation data input (aerial → underground) corresponding to each type described above. ) Button 522 and construction compensation data input (underground → underground) button 523 are provided.

<架空→架空>
図10は、工事補償金データ入力(架空→架空)ボタン521がクリックされた場合に工事補償金処理部34がクライアントコンピュータ3の表示装置25に表示する画面(以下、工事補償金データ入力(架空→架空)画面1000と称する)である。移転の種類が「架空→架空」である場合には、ユーザはこの画面を利用して工事補償金の計算に関するデータ(以下、工事補償金データと称する)を入力する。
<Fictional → Fictional>
FIG. 10 shows a screen (hereinafter referred to as construction compensation data input (aerial) for the construction compensation processing unit 34 to display on the display device 25 of the client computer 3 when the construction compensation data input (aerial → aerial) button 521 is clicked. → fictitious) screen 1000). When the type of relocation is “aerial → aerial”, the user uses this screen to input data related to calculation of construction compensation (hereinafter referred to as construction compensation data).

この画面の処理区分の欄1001には、「新規」、「訂正」、「削除」を指定させるチェック欄が設けられている。このうち受付番号の欄1002には、受付番号が入力される。受付番号はプルダウンメニューを利用して入力することもできる。枝番の欄1003には、受付番号に付帯させる枝番が入力される。枝番は一つの受付番号には複数の工事補償金データが対応づけられることがあるために必要である。処理区分の欄1001で「新規」が指定されている場合には、枝番の欄1003には、枝番FLGの欄1004の設定内容に応じた自動発番された枝番が自動入力される。枝番FLGの欄1004には、「無」、「有」、「完了」の三種類のフラグを指定できる。「無」のフラグは、移転申込者からの一回の申込のみで工事が完了する場合に指定される。「無」のフラグが指定されている場合には、枝番の欄1003には「00」が自動入力される。「有」のフラグは、移転申込者からの一回の申込によって複数回工事が発生する場合に指定される。このフラグは、例えば、見積書等を工事ごとに発行する必要がある場合に指定される。「有」のフラグが選択されている場合には、枝番の欄1003には「01」が自動入力される。「完了」のフラグは、複数回工事が発生する場合において、その工事が最後に行われる工事である場合に指定される。「完了」のフラグが指定されている場合には、枝番の欄1003には「99」が自動入力される。電力所工事の欄1005は、電力所における工事が発生する場合には「有」が、発生しない場合には「無」が入力される。   In the processing category column 1001 of this screen, a check column for designating “new”, “correction”, and “deletion” is provided. Among these, a reception number is entered in the reception number column 1002. The receipt number can also be entered using a pull-down menu. In the branch number column 1003, a branch number attached to the reception number is input. The branch number is necessary because a plurality of construction compensation data may be associated with one reception number. When “new” is designated in the processing category column 1001, the branch number automatically entered in accordance with the setting content of the branch number FLG column 1004 is automatically input to the branch number column 1003. . In the branch number FLG column 1004, three types of flags of “No”, “Yes”, and “Complete” can be designated. The “No” flag is specified when the construction is completed with only one application from the transfer applicant. When the “No” flag is designated, “00” is automatically input in the branch number column 1003. The “present” flag is designated when the construction is performed a plurality of times by one application from the transfer applicant. This flag is specified, for example, when it is necessary to issue an estimate or the like for each construction. When the “present” flag is selected, “01” is automatically input in the branch number column 1003. The “completed” flag is designated when the construction is performed a plurality of times and the construction is the last construction to be performed. When the “complete” flag is designated, “99” is automatically input in the branch number column 1003. In the power plant construction column 1005, “Yes” is entered when construction at the power plant occurs, and “None” is entered when it does not occur.

支障場所の欄1006には、データベース41に登録されている申込データ42の支障場所の内容が自動表示される。有償区分の欄1007には、工事が有償で行われるのか、無償で行われるのかを示す情報である有償区分を指定する。工事補償金の額がマイナスになる場合には、無償を示す有償区分が設定される。有償区分の欄1007の右隣に設けられている未集計上月の欄1008には、データベース41に登録されている、工事補償金の未収計上月が表示される。精算計上月の欄1009には、データベース41に登録されている工事補償金の精算計上月が表示される。工種の欄1010には、工事の種類を示す情報が入力される。この工種の欄1010には、例えば、「機能維持−架空配電線」、「修繕−架空外線」といった工事の種類に応じたコードが入力される。   In the trouble place column 1006, the contents of trouble places in the application data 42 registered in the database 41 are automatically displayed. In a paid category column 1007, a paid category, which is information indicating whether construction is performed for a fee or free of charge, is designated. If the amount of construction compensation is negative, a pay category indicating free of charge is set. In the uncounted first month column 1008 provided on the right side of the paid category column 1007, the construction compensation unaccrued month registered in the database 41 is displayed. In the settlement month column 1009, the settlement month of construction compensation registered in the database 41 is displayed. In the work type column 1010, information indicating the type of work is input. In this work type column 1010, for example, a code corresponding to the type of construction such as “function maintenance—overhead distribution line” and “repair—overhead line” is input.

工事票番号の欄1011、取付材料代の欄1012、取付請負代の欄1013、撤去材料代の欄1014、除却費の欄1015、実費加算代の欄1016は、工事補償金を計算するために必要となる明細額の入力欄である。この画面では、6件分に相当する入力欄が設けられている。   The column 1011 for the construction slip number, the column 1012 for the installation material fee, the column 1013 for the installation contract fee, the column 1014 for the removal material fee, the column 1015 for the retirement cost, and the column 1016 for the actual cost addition fee are used to calculate the construction compensation It is an input column for the required amount of detail. In this screen, there are input fields corresponding to six cases.

算定区分の欄1017には、工事補償金の計算に際して参照される情報である、算定区分が入力される。算定区分には、「地建との協定第3条(本数算出)」、「地建との協定第3条(直接入力)」、「公共補償基準要綱に従う場合」、「ほ場整備の場合」、「河川法による場合」、「第一種電気通信事業者との協定による場合」、「その他1(本数算出)」、「その他2(直接入力)」、がある。移転区分の欄1018には、配電線路の本数に換算して入力する算定区分が算定区分の欄1017に入力されていた場合に内容が入力される。移転区分の欄1018には、移転の前後における、道路内、道路外の夫々についての配電線路の具体的な本数が入力される。   In the calculation category column 1017, a calculation category, which is information referred to when calculating the construction compensation money, is entered. The calculation categories include “Article 3 (Establishment of the number of agreements) with local construction”, “Article 3 (direct input) with the local construction”, “In accordance with the Public Compensation Standards Summary”, “In the case of field maintenance” , “In case of river law”, “in case of agreement with first class telecommunications carrier”, “other 1 (number calculation)” and “other 2 (direct input)”. In the relocation category column 1018, the contents are entered when the calculation category to be input in terms of the number of distribution lines is entered in the calculation category column 1017. In the relocation category column 1018, the specific number of distribution lines for the inside and outside of the road before and after the relocation is input.

申込者負担割合の欄1019は、算定区分の欄1017に、申込者の負担割合を、配電線路の本数算出ではなく直接入力することを示す算定区分が入力されていた場合に内容が入力される。申込者負担割合の欄1019には、補償金の申込者の負担割合がパーセント(%)表記または分数表記で入力される。諸掛費区分の欄1020には、諸掛費区分を入力する。諸掛費区分には、諸掛費率として一定比率Aを指定する区分である「1」、諸掛費率として一定比率Bを指定する区分である「2」、ユーザにより直諸掛費を入力する「9」がある。消費税の欄1021には、消費税の有無を示す情報である消費税区分が入力される。 Applicant burden ratio column 1019 is entered when the calculation category indicating that the applicant's burden ratio is directly entered in the calculation category column 1017 rather than calculating the number of distribution lines is entered. . In the applicant burden ratio column 1019, the burden ratio of the applicant for compensation is entered in percent (%) notation or fraction notation. In the column 1020 for various expenses, the various expenses are entered. The handling costs costs classification is a classification that specify certain ratio A as handling costs expense ratio "1", a classification specifying a certain ratio B as handling costs expense ratio "2", direct handling costs costs by the user “9” is input. In the consumption tax column 1021, a consumption tax classification, which is information indicating whether or not there is a consumption tax, is input.

以上の入力を終えた後、ユーザが「計算」ボタンをクリックすると、入力された内容に基づいて、工事補償金データ入力(架空→架空)画面1000に対応づけられている計算式に従って、工事補償金処理部34が工事補償金を計算し、その計算結果が合計金額の欄1022に表示される。工事補償金データ入力(架空→架空)画面1000に対応付けられている上記計算式を次に示す。   When the user clicks the “Calculate” button after completing the above input, the work compensation is performed according to the calculation formula associated with the work compensation data input (imaginary → imaginary) screen 1000 based on the input content. The money processing unit 34 calculates the construction compensation money, and the calculation result is displayed in the total amount column 1022. The calculation formula associated with the construction compensation data input (imaginary → imaginary) screen 1000 is shown below.

まず材料費及び工事費を次式により求める。
材料費=取付材料費−撤去材料費
工事費=取付請負代+除却費
First, the material cost and the construction cost are obtained by the following equations.
Material cost = Mounting material cost-Removal material cost Construction cost = Installation contract fee + Retirement cost

次に、算定区分の欄1017に入力されている算定区分、申込データ入力画面600の申込者区分の欄611で入力された申込者区分、諸掛費区分の欄1020の欄に入力されている諸掛費区分に応じて、次式により諸掛費を求める。算定区分が「第一種電気通信事業者との協定による場合」である場合には、次式により諸掛費を求める。
諸掛費=((取付材料費+工事費)×一定比率B)
Next, the calculation category entered in the calculation category column 1017, the applicant category entered in the applicant category column 611 on the application data input screen 600, and the various costs category column 1020 are entered. The various expenses are calculated according to the following equation according to the various expenses categories. When the calculation category is “in the case of an agreement with a first-class telecommunications carrier”, various expenses are calculated by the following formula.
Various expenses = ((Mounting material cost + Construction cost) x Fixed ratio B)

また、算定区分が「第一種電気通信事業者との協定による場合」以外である場合には、申込者区分及び諸掛費区分に応じて次のようにして諸掛費を求める。まず、申込者区分が共架(第一種電気通信事業者)課税対象工事)であり、諸掛費区分が「1」である場合には、次式により諸掛費を求める。
諸掛費=((取付材料費+工事費)×一定比率A)
In addition, when the calculation category is other than “in the case of an agreement with a first-class telecommunications carrier”, various costs are calculated as follows according to the applicant category and various cost categories. First, if the applicant category is co-located (first-class telecommunications carrier) taxable construction) and the various expenses category is “1”, the various expenses are calculated by the following formula.
Various expenses = ((Mounting material cost + Construction cost) x Fixed ratio A)

また、申込者区分が共架(第一種電気通信事業者)課税対象工事)であり、諸掛費区分が「2」である場合には、次式により諸掛費を求める。
諸掛費=((取付材料費+工事費)×一定比率B)
Also, if the applicant category is co-located (first-class telecommunications carrier) taxable construction) and the various expenses category is “2”, the various expenses are calculated by the following formula.
Various expenses = ((Mounting material cost + Construction cost) x Fixed ratio B)

また、申込者区分が支障移転工事もしくは共架(その他)であり、諸掛費区分が「1」である場合には、次式により諸掛費を求める。
諸掛費=((材料費+工事費)×一定比率A)
また、申込者区分が支障移転工事もしくは共架(その他)であり、諸掛費区分が「2」である場合には、次式により諸掛費を求める。
諸掛費=((材料費+工事費)×一定比率B)
Also, if the applicant category is troubled transfer work or co-located (others) and the various expenses category is “1”, the various expenses are calculated by the following formula.
Various expenses = ((material cost + construction cost) x fixed ratio A)
Also, if the applicant category is troubled relocation work or co-located (others) and the various expenses category is “2”, the various expenses are calculated by the following formula.
Various expenses = ((material cost + construction cost) x fixed ratio B)

次に消費税の欄1021で、「有」が選択されている場合には、次式により消費税を求める。
消費税=(材料費+工事費+諸掛費)×消費税率
次に、次式により移転費用を求める。なお、実費は実加算分として求める。
移転費用=材料費+工事費+諸掛費+消費税+実費
そして、次式により工事補償金を求める。
工事補償金=移転費用×負担割合
Next, when “Yes” is selected in the consumption tax column 1021, the consumption tax is calculated by the following equation.
Consumption tax = (material cost + construction cost + various expenses) x consumption tax rate Next, the transfer cost is calculated by the following formula. Actual costs are calculated as actual additions.
Relocation cost = Material cost + Construction cost + Various costs + Consumption tax + Actual cost And calculate construction compensation by the following formula.
Construction compensation = transfer cost x share

ここで上記負担割合としては、算定区分の欄1017で直接入力による算定区分が指定されている場合には、申込者負担割合の欄1019に入力されている負担割合が採用される。また、算定区分の欄1017で、本数算出により負担割合を求める算定区分が入力されている場合には、上記負担割合は次式により求められる。すなわち、A=移転前の道路内の配電線路の本数、B=移転前の道路外の配電線路の本数、a=道路内から道路内に移転される配電線路の本数、b=道路内から道路外に移転される配電線路の本数、c=道路外から道路内に移転される配電線路の本数、d=道路外から道路外に移転される配電線路の本数とした場合、移転前後で配電線路の総本数に変化が無い場合には、
負担割合=0×((a+b)/(A+B))+(1/2)×(c/(A+B))+(d/(A+B))
とし、
また、移転前後で配電線路の総本数が変化する場合には、
負担割合=(B/(A+B))×(((a+c)/(a+b+c+d)×(1/2)+(b+d)/(a+b+c+d))
として負担割合を求める。
Here, when the calculation category by direct input is designated in the calculation category column 1017, the burden rate input in the applicant burden rate column 1019 is adopted as the above-described burden rate. In addition, in the calculation category column 1017, when the calculation category for obtaining the burden ratio by the number calculation is input, the burden ratio is obtained by the following equation. A = number of distribution lines in the road before relocation, B = number of distribution lines outside the road before relocation, a = number of distribution lines relocated from the road to the road, b = road from the road When the number of distribution lines transferred to the outside, c = number of distribution lines transferred from outside the road to the inside of the road, and d = number of distribution lines transferred outside the road to the outside of the road, the distribution lines before and after the transfer If there is no change in the total number of
Burden ratio = 0 × ((a + b) / (A + B)) + (1/2) × (c / (A + B)) + (d / (A + B))
age,
If the total number of distribution lines changes before and after the relocation,
Burden ratio = (B / (A + B)) × (((a + c) / (a + b + c + d) × (1/2) + (b + d) / (a + b + c + d))
Calculate the burden ratio.

工事補償金データ入力(架空→架空)画面1000に入力されたデータ(以下、工事補償金データと称する)、及び工事補償金処理部34によって求められた工事補償金は、工事補償金データ入力(架空→架空)画面1000の登録ボタン1025がクリックされることにより、工事補償金処理部34によってサーバコンピュータ4に送信され、申込データ入力画面600の受付番号の欄603に入力された受付番号に対応づけてデータベース41に登録される。   The data entered on the construction compensation data input (aerial → aerial) screen 1000 (hereinafter referred to as construction compensation data) and the construction compensation calculated by the construction compensation processing unit 34 are the construction compensation data input ( When the registration button 1025 on the (imaginary → imaginary) screen 1000 is clicked, it corresponds to the reception number transmitted to the server computer 4 by the construction compensation processing unit 34 and entered in the reception number column 603 of the application data input screen 600. Then, it is registered in the database 41.

検索ボタン1023は、工事補償金データの入力に際し、ユーザが既にサーバコンピュータのデータベース41に登録されている工事補償金データ43を流用する場合にクリックされる。図11はユーザが検索ボタンをクリックした場合に表示される画面(以下、工事補償金データ検索画面1100と称する)である。ユーザは、図7に示した申込データ検索画面700の場合と同様の操作を行うことにより工事補償金データを検索し、データベース41に登録されている工事補償金データ43を流用して工事補償金データを入力することができる。この工事補償金データ検索画面1100は、メニュー画面500に設けられている工事補償金データ検索ボタン524をクリックすることによっても表示させることができる。この場合には、工事補償金データ入力(架空→架空)画面1000も自動的に表示され、その工事補償金データ入力(架空→架空)画面1000の処理区分では、訂正のチェック欄が自動的に指定された状態となる。これによりユーザは、工事補償金データの訂正を簡便に行うことができる。削除ボタン1026は、既にデータベース41に登録されている工事補償金データ43を削除するためのボタンである。   The search button 1023 is clicked when the user uses the construction compensation data 43 already registered in the database 41 of the server computer when inputting construction compensation data. FIG. 11 shows a screen displayed when the user clicks the search button (hereinafter referred to as a construction compensation data search screen 1100). The user searches for construction compensation data by performing the same operation as in the application data search screen 700 shown in FIG. 7, and uses the construction compensation data 43 registered in the database 41 to construct the construction compensation money. Data can be entered. The construction compensation data search screen 1100 can also be displayed by clicking a construction compensation data search button 524 provided on the menu screen 500. In this case, the construction compensation data input (aerial → aerial) screen 1000 is also automatically displayed. In the processing category of the construction compensation data input (aerial → aerial) screen 1000, the correction check column is automatically displayed. It will be in the specified state. As a result, the user can easily correct the construction compensation data. The delete button 1026 is a button for deleting the construction compensation data 43 already registered in the database 41.

図5のメニュー画面500の支障移転補償業務処理票No.2出力ボタン525は、データベース41に登録されている工事補償金データ43の内容が記載された帳票(以下、支障移転補償業務処理票No.2と称する)を出力する場合にクリックされるボタンである。図12は、支障移転補償業務処理票No.2出力ボタン525がクリックされた場合に表示される画面(以下、支障移転補償業務処理票No.2出力画面1200と称する)である。印刷ボタン1202がクリックされると、工事補償金処理部34は、受付番号の欄1201に入力されている受付番号(枝番が付帯する場合もある)に対応する工事補償金データ43及び工事補償金47が記載された支障移転補償業務処理票No.2を出力する。支障移転補償業務処理票No.2の一例を図13に示す。   In the menu screen 500 of FIG. The 2 output button 525 is a button that is clicked when outputting a form in which the contents of the construction compensation data 43 registered in the database 41 are described (hereinafter referred to as trouble transfer compensation work processing form No. 2). is there. FIG. 12 shows the trouble transfer compensation work processing form No. This is a screen that is displayed when the 2 output button 525 is clicked (hereinafter referred to as a trouble transfer compensation work process slip No. 2 output screen 1200). When the print button 1202 is clicked, the construction compensation processing unit 34 performs the construction compensation data 43 and construction compensation corresponding to the receipt number (which may be accompanied by a branch number) input in the receipt number column 1201. Disability relocation compensation work processing slip No. 2 is output. Disability relocation compensation work processing slip No. An example of 2 is shown in FIG.

<架空→地中>
図14は、図5のメニュー画面500の工事補償金データ入力(架空→地中)ボタン522がクリックされた場合に工事補償金処理部34によって表示される画面(以下、工事補償金データ入力(架空→地中)画面1400と称する)である。配電線路の移転種類が「架空→地中」である場合、ユーザはこの画面を利用して工事補償金データを入力する。工事補償金データ入力(架空→地中)画面1400の画面構成は、工事補償金データ入力(架空→架空)画面1000と同様である。しかしながら、算定区分の欄1417に入力可能な算定区分が「地中工事(単独地中工事から変更)」、「その他1(本数算出)」、「その他2(直接入力)」に限定されている点、及び当該画面に対応づけられている工事補償金の計算式が異なる点で、工事補償金データ入力(架空→架空)画面1000とは異なる。工事補償金データ入力(架空→地中)画面1400に対応づけられている工事補償金の計式を次に示す。
<Fictional → Underground>
FIG. 14 shows a screen displayed by the construction compensation processing unit 34 when the construction compensation data input (aerial → underground ) button 522 on the menu screen 500 of FIG. Fictitious → underground) referred to as screen 1400). When the transfer type of the distribution line is “aerial → underground”, the user inputs construction compensation data using this screen. The construction of the construction compensation data input (aerial → underground) screen 1400 is the same as that of the construction compensation data input (aerial → aerial) screen 1000. However, the calculation categories that can be entered in the calculation category column 1417 are limited to “underground construction (change from single underground construction)”, “other 1 (number calculation)”, and “other 2 (direct input)”. This is different from the construction compensation data input (imaginary → imaginary) screen 1000 in that the calculation formula of construction compensation associated with the screen is different. The following is a formula for the construction compensation money associated with the construction compensation data input (imaginary → underground) screen 1400.

まず、算定区分の欄1417に入力されている算定区分に応じて、地中電線路移転工事費を次式により求める。
まず、算定区分が「地中工事(単独地中工事から変更)」である場合には、
地中電線路移転工事費=(取付材料費+取付請負代+(取付材料費+取付請負代)
×諸掛費率)×一定比率C
算定区分が「地中工事(単独地中工事から変更)」以外である場合には、
地中電線路移転工事費=(取付材料費+取付請負代+(取付材料費+取付請負代)
×諸掛費率)×負担割合
により地中電線路移転工事費を求める。
なお、上記負担割合は工事補償金データ入力(架空→架空)画面1000の場合と同様の計算式により求める。
First, in accordance with the calculation category entered in the calculation category column 1417, the underground cable transfer work cost is determined by the following equation.
First, if the calculation category is “Underground construction (changed from single underground construction)”
Underground cable transfer work cost = (Mounting material cost + Mounting contract fee + (Mounting material cost + Mounting contract fee)
× various expenses ratio) × constant ratio C
When the calculation category is other than “underground construction (change from single underground construction)”
Underground cable transfer work cost = (Mounting material cost + Mounting contract fee + (Mounting material cost + Mounting contract fee)
X Various expenses cost ratio) x Underground cableway relocation work cost is calculated according to the burden ratio.
Note that the above-described burden ratio is obtained by the same calculation formula as that in the case of the construction compensation data input (imaginary → imaginary) screen 1000.

次に、次式により移転費用を求める。
移転費用=取付材料費+取付請負代+(取付材料費+取付請負代)×諸掛費率+
除却費+除却費×諸掛費率−撤去材料費+実費加算代
次に、次式により工事補償金を求める。
工事補償金=地中電線路移転工事費+除却費+除却費×諸掛費率−撤去材料費+
実費加算代
以上のようにして架空から地中に移転する場合の工事補償金が求められることになる。
Next, the transfer cost is calculated by the following formula.
Relocation cost = Mounting material cost + Mounting contract fee + (Mounting material cost + Mounting contract fee) x Various costs +
Retirement costs + retirement costs x various expenses rate-removal material costs + actual costs addition fee Next, work compensation is calculated by the following formula.
Compensation for construction work = underground cable relocation work cost + retirement cost + retirement cost x various costs-removal material cost +
Additional cost for construction costs As mentioned above, construction compensation is required when moving from aerial to underground.

<地中→地中>
図15は、図5のメニュー画面500の工事補償金データ入力(地中→地中)ボタン523がクリックされた場合に工事補償金処理部34によって表示される画面(以下、工事補償金データ入力(地中→地中)画面1500と称する)である。
<Underground → Underground>
FIG. 15 is a screen displayed by the construction compensation processing unit 34 when the construction compensation data input ( underground → underground ) button 523 on the menu screen 500 in FIG. 5 is clicked (hereinafter, construction compensation data input). (Referred to as “underground → underground” screen 1500).

配電線路の移転の種類が「地中→地中」である場合、ユーザはこの画面を利用して工事補償金データを入力する。工事補償金データ入力(地中→地中)画面1500の画面構成は、工事補償金データ入力(地中→地中)画面1000と同様であるが、算定区分の欄1517に入力可能な算定区分が、「地権との協定第3条(本数算出)」、「地権との協定第3条(直接入力)」、「公共補償基準要綱に従う場合」、「ほ場整備の場合」、「河川法による場合」、「その他1(本数算出)」、「その他2(直接入力)」である点、及び、当該画面に対応づけられている工事補償金の計算式が異なる点で、工事補償金データ入力(架空→架空)画面1000の場合とは異なる。工事補償金データ入力(地中→地中)画面1500に対応づけられている工事補償金の計算式を次に示す。   When the type of distribution line transfer is “underground → underground”, the user inputs construction compensation data using this screen. The construction of the construction compensation data input (underground → underground) screen 1500 is the same as that of the construction compensation data input (underground → underground) screen 1000, but the calculation categories that can be entered in the calculation category column 1517. However, “Article 3 Agreement with Land Ownership (Calculation of Numbers)”, “Article 3 Agreement with Land Ownership (Direct Input)”, “In accordance with Public Compensation Standards Summary”, “In the Case of Field Maintenance”, “By River Law Case Compensation Data Input in that the calculation formula of the construction compensation associated with the screen is different from “Case”, “Other 1 (number calculation)”, “Other 2 (direct input)” This is different from the case of the (imaginary → imaginary) screen 1000. The calculation formula of the construction compensation money associated with the construction compensation data input (underground → underground) screen 1500 is shown below.

まず、材料費及び工事費を次式により求める。
材料費=取付材料費−撤去材料費
工事費=取付請負代+除却費
次に、諸掛区分の欄1520に入力されている諸掛区分に応じて、諸掛費を求める。
すなわち、諸掛費区分が「1」である場合には、
諸掛費=((材料費+工事費)×一定比率A)
諸掛費区分が、「2」である場合には、
諸掛費=((材料費+工事費)×一定比率B)
諸掛費区分が、「9」である場合には、
諸掛費=((材料費+工事費)×入力された諸掛費
として諸掛費を求める。
First, the material cost and the construction cost are obtained by the following equations.
Material cost = Mounting material cost−Removal material cost Construction cost = Mounting fee + Removal cost Next, the various costs are obtained according to the various categories entered in the column 1520 of the various categories.
That is, if the various expenses category is “1”,
Various expenses = ((material cost + construction cost) x fixed ratio A)
If the charge category is “2”,
Various expenses = ((material cost + construction cost) x fixed ratio B)
If the charge category is “9”,
Various expenses = ((material cost + construction cost) x input various expenses)

次に消費税の欄1521に「有」が入力されている場合には次式より消費税を求める。
消費税=(材料費+工事費+諸掛費)×消費税率
次に、次式により移転費用を求める。なお、実費は実加算分として求める。
移転費用=材料費+工事費+諸掛費+消費税+実費
そして、次式により工事補償金を求める。
工事補償金=移転費用×負担割合
Next, when “Yes” is entered in the consumption tax column 1521, the consumption tax is obtained from the following equation.
Consumption tax = (material cost + construction cost + various expenses) x consumption tax rate Next, the transfer cost is calculated by the following formula. Actual costs are calculated as actual additions.
Relocation cost = Material cost + Construction cost + Various costs + Consumption tax + Actual cost And calculate construction compensation by the following formula.
Construction compensation = transfer cost x share

なお、上記負担割合は、工事補償金データ入力(架空→架空)画面1000の場合と同様の計算式により求める。以上のようにして架空から地中に移転する場合の工事補償金が求められることになる。   It should be noted that the above-mentioned burden ratio is obtained by the same calculation formula as in the case of the construction compensation data input (imaginary → imaginary) screen 1000. As described above, construction compensation is required when moving from aerial to underground.

==請求処理==
図16は、工事補償金の見積書の発行、工事補償金の請求書の発行、工事補償金の承諾書の発行、工程管理、最終工事金額の入力に際して利用される画面(以下、請求データ入力画面1600と称する)である。この画面の受付番号の欄1601には、受付番号及び枝番が入力される。決定年月日の欄1602には、工事施工決定年月日が入力される。見積書発行年月日の欄1603には、見積書発行年月日が入力される。請求書発行年月日の欄1604には、請求書発行年月日が入力される。契約締結年月日の欄1605には、契約年月日が入力される。入金年月日の欄1606には、入金年月日が入力される。工事依頼年月日の欄1607には、工事依頼年月日が入力される。工事完了年月日の欄1608には、工事完了年月日が入力される。未収計上月の欄1609には、未収計上月が表示される。精算計上月の欄1610には、精算計上月が表示される。
== Billing process ==
FIG. 16 shows a screen used to issue a construction compensation estimate, issue a construction compensation invoice, issue a construction compensation consent form, process management, and enter the final construction amount (hereinafter, billing data entry). Screen 1600). In the reception number column 1601 of this screen, a reception number and a branch number are input. In the decision date field 1602, the construction decision date is entered. An estimate issuance date column is entered in the estimate issuance date column 1603. In the invoice issuance date column 1604, the invoice issuance date is entered. The contract date column 1605 is used to enter the contract date. In the deposit date field 1606, the deposit date is entered. In the construction request date column 1607, the construction request date is entered. In the construction completion date field 1608, the construction completion date is entered. In the non-accrual month column 1609, the non-accrual month is displayed. In the settlement month column 1610, the settlement month is displayed.

最終工事金額の欄1611には、6件分の工事票に対応する最終工事金額を入力することができる。最終工事金額の欄1611には、資材代1612、請負代1613、購入額1614、除却額1615、合計額1616、庫入額1617、除却額1618、設備除却費1619、資材代1620、請負代1621などの明細金額の入力欄が設けられている。   In the final construction amount column 1611, the final construction amount corresponding to six construction forms can be entered. In the final construction amount column 1611, there are a material cost 1612, a contract fee 1613, a purchase amount 1614, a retirement amount 1615, a total amount 1616, a storage amount 1617, a retirement amount 1618, an equipment retirement cost 1619, a material fee 1620, a contract fee 1621. And so on.

工事補償金の欄1622には、工事補償金データ入力(架空→架空)画面1000、工事補償金データ入力(架空→地中)画面1400、工事補償金データ入力(地中→地中)画面1500において計算され、データベース41に登録されている工事補償金47が表示される。   In the construction compensation column 1622, construction compensation data input (aerial → aerial) screen 1000, construction compensation data input (aerial → underground) screen 1400, construction compensation data input (underground → underground) screen 1500 The construction compensation 47 calculated in the above and registered in the database 41 is displayed.

修繕費資材代の欄1623、修繕費請負代の欄1624、設備除却費の欄1625、取替除却費の欄1626、架空電線路の欄1627、電気事業雑収益の欄1628、消費税の欄1629には、夫々、補償業務処理システム1によって自動振替された、工事補償金の精算振替内訳額が表示される。   Repair cost Material cost column 1623, Repair cost contract cost column 1624, Equipment retirement cost column 1625, Replacement / removal cost column 1626, Overhead electrical line column 1627, Electric utility miscellaneous revenue column 1628, Consumption tax column In 1629, the settlement amount of the construction compensation money automatically transferred by the compensation work processing system 1 is displayed.

登録ボタン1630は、請求データ入力画面1600に入力もしくは当該画面において求められたデータ(以下、請求データと称する)をサーバコンピュータ4のデータベース41に登録する場合にクリックされる。精算振替ボタン1631は、上記の精算振替内訳額を表示させる場合にクリックされる。印刷ボタン1632は、見積書、請求書、承諾書を印刷する場合にクリックされる。図17は印刷ボタン1632がクリックされた場合に表示される画面(以下、印刷物指定画面1700と称する)である。ユーザは、この画面のチェック欄1701から印刷したい印刷物を指定し、見積書発行年月日の欄1702や、請求書発行年月日の欄1703に年月日を入力し、印刷ボタン1705をクリックすることにより印刷物の印刷指示を行う。編集ボタン1706をクリックすると、請求データ入力画面1600が表示され、これにより請求データを編集することができる。なお、見積書、請求書、及び承諾書は、図5に示すメニュー画面500の見積書等出力ボタン542をクリックすることによっても出力することができる。見積書の一例を図18に、請求書の一例を図19に、承諾書の一例を図20に、夫々示している。印刷物指定画面1700では、複数種類の帳票を重複選択することも可能である。   A registration button 1630 is clicked when data entered in the billing data input screen 1600 or data obtained on the screen (hereinafter referred to as billing data) is registered in the database 41 of the server computer 4. The settlement transfer button 1631 is clicked when displaying the above settlement transfer breakdown amount. A print button 1632 is clicked when printing an estimate, an invoice, or a consent form. FIG. 17 shows a screen that is displayed when the print button 1632 is clicked (hereinafter referred to as a “printed material designation screen 1700”). The user designates a printed material to be printed from the check field 1701 on this screen, inputs the date in the date field 1702 of the estimate issuance date and the date field 1703 of the invoice issuance date, and clicks the print button 1705. By doing so, a print instruction for the printed matter is issued. When an edit button 1706 is clicked, a billing data input screen 1600 is displayed, whereby billing data can be edited. Note that the estimate, bill, and consent form can also be output by clicking the estimate etc. output button 542 on the menu screen 500 shown in FIG. FIG. 18 shows an example of an estimate, FIG. 19 shows an example of an invoice, and FIG. 20 shows an example of a consent form. On the printed material designation screen 1700, a plurality of types of forms can be selected in duplicate.

見積書、請求書、承諾書については、受付番号と枝番で特定される複数の帳票を一括して出力することもできる。図21は、図5に示すメニュー画面500の見積書/請求書/承諾書一括出力ボタン544をクリックすることにより表示される画面(以下、一括出力画面2100と称する)である。この画面に必要事項を入力し、印刷ボタン2109をクリックすることにより複数の帳票を一括して出力することができる。   For quotations, invoices, and acceptance forms, a plurality of forms specified by the reception number and branch number can be output at once. FIG. 21 is a screen (hereinafter referred to as a collective output screen 2100) that is displayed by clicking the estimate / invoice / approval collective output button 544 on the menu screen 500 shown in FIG. By inputting necessary items on this screen and clicking a print button 2109, a plurality of forms can be output collectively.

図22は、図5に示すメニュー画面500の見積書等出力ボタン542をクリックすることにより表示される、工事完了通知書の印刷指示を行う画面(以下、工事完了通知書印刷指示画面2200と称する)である。受付番号の欄2201には、受付番号及び枝番を入力する。完了通知書年月日の欄2202には、完了通知書年月日を入力する。印刷ボタン2203がクリックされると、完了通知書が出力される。完了通知書の一例を図23に示す。編集ボタン2204がクリックされると、請求データ入力画面1600が表示され、ユーザは請求データを編集することができる。   FIG. 22 shows a screen for instructing to print a construction completion notice sheet (hereinafter referred to as a construction completion notice printing instruction screen 2200), which is displayed by clicking the estimate sheet output button 542 on the menu screen 500 shown in FIG. ). In the reception number column 2201, a reception number and a branch number are input. In the completion notice date field 2202, the completion notice date is entered. When the print button 2203 is clicked, a completion notice is output. An example of the completion notice is shown in FIG. When an edit button 2204 is clicked, a billing data input screen 1600 is displayed, and the user can edit billing data.

<他所分見積書・請求書出力>
他の営業所や支店等の他店の担当する工事がある場合は、他店処分の工事補償金の見積書、請求書、承諾書を出力することができる。図24は図5に示すメニュー画面500の他所分見積書/請求書出力ボタン545をクリックすることにより表示される画面(以下、他所分見積書等印刷指示画面2400と称する)である。帳票区分の欄2401には、出力する帳票を選択するチェック欄が設けられている。受付番号の欄2402には、受付番号を入力する。見積書発行年月日の欄2403には、見積書発行年月日を入力する。請求書発行年月日の欄2404には、請求書発行年月日を入力する。支障場所の欄2405には、支障場所を入力する。申込理由の欄2406には申込理由を入力する。配電設備分の欄2407には、自店処分の工事補償金が表示される。ケーブル分の欄2408には、他店処分の工事補償金が表示される。諸掛費区分の欄2409には、諸掛費区分が入力される。負担割合の欄2410には、負担割合が入力される。材料費の欄2411、工事費の欄2412、諸掛費の欄2413、実費の欄2414、消費税の欄2415、地中負担額の欄2416には、夫々、工事により発生した他店処分の移転費用が入力される。合計の欄2417には、計算ボタン2318がクリックされることにより、上記各欄の入力内容の集計値が表示される。編集ボタン2419がクリックされると、請求データ入力画面1600が表示され、ユーザは請求データを編集することができる。印刷ボタン2420がクリックされると、他店処分の見積書、請求書、承諾書が出力される。
<Estimate / Invoice output for other locations>
When there is work in charge of other stores such as other sales offices or branches, it is possible to output a construction compensation fee estimate, invoice, and consent form for disposal at other stores. FIG. 24 shows a screen that is displayed by clicking the other part estimate / invoice output button 545 of the menu screen 500 shown in FIG. 5 (hereinafter referred to as a “other part estimate print instruction screen 2400”). The form classification field 2401 is provided with a check field for selecting a form to be output. In the reception number column 2402, a reception number is entered. An estimate issuance date column 2403 is used to enter the estimate issuance date. In the invoice issuance date column 2404, the invoice issuance date is entered. In the trouble place column 2405, the trouble place is entered. The reason for application is entered in the application reason field 2406. In the field 2407 for power distribution equipment, a construction compensation fee for own store disposal is displayed. In the cable column 2408, construction compensation for disposal at other stores is displayed. In the column 2409 of the various expenses category, the various expenses category is entered. In the burden ratio column 2410, a burden ratio is input. In the column 2411 for material costs, the column 2412 for construction costs, the column 2413 for various costs, the column 2414 for actual costs, the column 2415 for consumption tax, and the column 2416 for the underground burden, respectively Transfer costs are entered. When a calculation button 2318 is clicked in the total column 2417, the total value of the input contents of each column is displayed. When edit button 2419 is clicked on, billing data input screen 1600 is displayed, and the user can edit the billing data. When the print button 2420 is clicked, an estimate, invoice, and consent form for disposal at another store are output.

図25は、図5に示すメニュー画面500の振込依頼票出力補助ボタン546がクリックされた際に表示される画面(以下、振込依頼票出力補助画面2500と称する)である。ユーザが振込依頼票出力補助画面2500の受付番号の欄2501に受付番号(枝番が付帯することもある)を入力し、編集ボタン2502をクリックすると、振込依頼票及びこれに添付される明細書の内容が、表計算ソフト型式のデータとして出力される。ユーザはこのデータを自由に編集、加工して振込依頼票及び明細書を作成する。   FIG. 25 is a screen displayed when the transfer request form output auxiliary button 546 of the menu screen 500 shown in FIG. 5 is clicked (hereinafter referred to as a transfer request form output auxiliary screen 2500). When the user inputs a receipt number (may be attached with a branch number) in the receipt number column 2501 of the transfer request slip output auxiliary screen 2500 and clicks the edit button 2502, the transfer request slip and the description attached thereto Is output as spreadsheet software model data. The user freely edits and processes this data to create a transfer request slip and a statement.

振込依頼票は一括して出力することもできる。振込依頼票の一括出力は、図5に示すメニュー画面500の振込依頼票一括出力補助ボタン547をクリックすることにより表示される、図26に示す画面(以下、振込依頼票一括出力補助画面2600と称する)を利用して行う。受付番号の欄2601の欄には受付番号(枝番が付帯することもある)を入力する。支障場所の欄2602には、支障場所を入力する。申込理由の欄2603には申込理由を入力する。以上の入力の後に編集ボタン2610をクリックすると、振込依頼票及びこれに添付される明細書の内容が、表計算ソフト型式のデータとして出力される。また、他所分の振込依頼書を出力する場合には、図5に示すメニュー画面500の他所分振込依頼票出力補助ボタン548をクリックすることにより表示される、図27に示す画面(以下、他所分振込依頼票出力補助画面2700と称する)を利用する。   Transfer request forms can also be output in a batch. The batch output of the transfer request slip is displayed by clicking the transfer request slip batch output auxiliary button 547 on the menu screen 500 shown in FIG. 5 (hereinafter referred to as the transfer request slip batch output auxiliary screen 2600). To use. A reception number (a branch number may be attached) is entered in the reception number column 2601. In the trouble place column 2602, the trouble place is entered. The reason for application is entered in the application reason field 2603. When the edit button 2610 is clicked after the above input, the transfer request slip and the contents of the description attached thereto are output as spreadsheet software type data. In addition, when outputting a transfer request form for another location, a screen shown in FIG. 27 (hereinafter referred to as “other location”) is displayed by clicking the other location transfer request slip output auxiliary button 548 of the menu screen 500 shown in FIG. A sub-transfer request form output auxiliary screen 2700).

図5のメニュー画面500における維持管理処理に関するボタン群550には、管理マスタメンテナンスボタン551、地区マスタメンテナンスボタン552、計上日メンテナンスボタン553、データ削除ボタン554、配電地図連携ボタン55、が含まれている。ユーザは、これらのボタンをクリックすることにより表示される画面を利用して、各種マスタやデータベース41に登録されている各種データのメンテナンスを行うことができる。維持管理処理部37は、上記画面によって入力されたデータに基づいて、該当のマスタへのデータの新規登録、既に登録されているデータの変更や削除を行う。   5 includes a management master maintenance button 551, a district master maintenance button 552, an accounting date maintenance button 553, a data deletion button 554, and a distribution map link button 55. The user can perform maintenance of various data registered in the various masters and the database 41 by using a screen displayed by clicking these buttons. The maintenance management processing unit 37 performs new registration of data in the corresponding master, change or deletion of already registered data, based on the data input on the screen.

図5のメニュー画面500における月次処理に関するボタン群560には、諸未収入金振替表出力ボタン561、工事精算振替表出力ボタン562、諸未収入金一覧出力ボタン563、諸前受金一覧出力ボタン564、入金一覧表出力ボタン565、工事補償金総括表出力ボタン566、月次一括処理ボタン567、が含まれている。これらは月次経理処理に必要となる各種帳票を出力する際に利用される。   The button group 560 relating to monthly processing in the menu screen 500 of FIG. 5 includes various accounts receivable transfer table output button 561, construction settlement transfer table output button 562, various accounts receivable list output button 563, various accounts received list output button 564, payment A list output button 565, a construction compensation summary table output button 566, and a monthly collective processing button 567 are included. These are used when outputting various forms necessary for monthly accounting processing.

図5のメニュー画面500におけるマスタ作成処理に関するボタン群570は、申込者マスタ46のメンテナンスに際して利用される。図28は、申込者マスタメンテナンスボタン571がクリックされた場合に表示される画面(以下、申込者マスタメンテナンス画面2800と称する)である。処理区分の欄2801では、「新規」、「訂正」、「削除」のいずれかを選択する。申込者コードの欄2802には、申込者コードが入力される。申込者氏名の欄2803には、申込者の氏名(組織の場合は組織名称)が入力される。申込者住所の欄2804には、申込者の住所が入力される。電話番号の欄2805には、申込者の連絡先電話番号が入力される。依頼番号の欄2806には、依頼番号が入力される。郵便番号の欄2807には、申込者の郵便番号が入力される。見積書等申込者印字イメージの欄2808には、申込者名が入力される。登録ボタン2810がクリックされると、申込者マスタメンテナンス画面2800に入力された内容が、サーバコンピュータ4の申込者マスタ46に登録される。   The button group 570 related to the master creation process in the menu screen 500 of FIG. 5 is used for maintenance of the applicant master 46. FIG. 28 is a screen displayed when the applicant master maintenance button 571 is clicked (hereinafter referred to as an applicant master maintenance screen 2800). In the processing section field 2801, one of “new”, “correction”, and “deletion” is selected. In the applicant code field 2802, an applicant code is entered. In the applicant name field 2803, the name of the applicant (organization name in the case of an organization) is entered. In the applicant address field 2804, the address of the applicant is entered. In the telephone number column 2805, the contact telephone number of the applicant is entered. In the request number field 2806, a request number is entered. In the postal code column 2807, the postal code of the applicant is entered. The name of the applicant is entered in the column 2808 of the applicant print image such as an estimate. When the registration button 2810 is clicked, the contents input on the applicant master maintenance screen 2800 are registered in the applicant master 46 of the server computer 4.

以上に説明したように、上記補償業務処理システム1によれば、工事補償金データの入力を受け付ける画面として、配電線路を架空から架空に移転する場合、架空から地中に移転する場合、地中から地中に移転する場合の夫々に応じた画面をユーザに提示し、これら各画面の夫々に対応づけて用意されている計算式により工事補償金を計算するようにしている。このため、電力会社の担当者等のユーザは、工事補償金を確実かつ効率よく計算することができる。また、この補償業務処理システム1によれば、移転申込の受付、工事補償金の計算、見積書や請求書等の帳票出力、マスタの維持管理、月次経理処理等の一連の支障移転補償業務が統括的に取り扱われるので、確実かつ効率よく支障移転補償業務を遂行することができる。   As described above, according to the compensation work processing system 1, as a screen for accepting the input of construction compensation data, when transferring a distribution line from an aerial to an aerial, when transferring from an aerial to the ground, A screen corresponding to each of the cases when the user moves to the ground is presented to the user, and the construction compensation is calculated by a calculation formula prepared in association with each of these screens. For this reason, a user such as a person in charge of the electric power company can calculate the construction compensation money reliably and efficiently. In addition, according to this compensation business processing system 1, a series of trouble relocation compensation services such as acceptance of relocation application, calculation of construction compensation, output of forms such as estimate and invoice, maintenance of master, monthly accounting processing, etc. Is handled in a centralized manner, so that trouble transfer compensation work can be performed reliably and efficiently.

==検索参照機能==
電力会社の事業所や営業所における配電線路の支障移転業務の内容は、これを具体的に列挙すれば、(1)個人・私企業、又は道路事業者等の公共事業者からの支障移転申込の受付、(2)支障移転費用の算定、(3)支障移転費用及び当該費用の負担割合等についての移転申込者との協議、(4)上記(3)の協議において合意した内容についての契約締結、(5)移転補償金の受領などである。ここで上記(3)の移転申込者との協議にあたっては、移転申込者が個人・私企業である場合には業務取扱要則、本社の解明といった文書を、また、申込者が公共事業者である場合には、公共補償基準、公共事業者との協定・覚書、業務取扱要則、本社の解明といった文書を、夫々拠り所として方針決定する実務が行われている。
== Search reference function ==
The contents of trouble transfer work for distribution lines at power company offices and sales offices can be specifically listed as follows: (1) Application for trouble transfers from individuals, private companies, or public companies such as road operators , (2) Calculation of trouble transfer costs, (3) Discussion with transfer applicants regarding trouble transfer costs and the burden ratio of such expenses, etc. (4) Contract on the contents agreed upon in the discussion of (3) above Conclusion, (5) receipt of transfer compensation. When discussing with the transfer applicant in (3) above, if the transfer applicant is an individual / private company, documents such as business rules, elucidation of the head office, and the applicant must be a public company. In some cases, policies such as public compensation standards, agreements and memorandums with public enterprises, business handling rules, and elucidation of the headquarters are used to determine policies.

しかしながら、各種文書(以下、根拠文書と称する)に基づく上記方法による方針決定では、次のような理由により多大な労力と時間が費やされていることが少なくない。まず移転申込者との協議する必要のある多数の事項について、複数の上記根拠文書の該当条文や項目にあたる必要がある。また、根拠文書に定められてない事項であって、移転申込者と解釈の相違が生じているものについては、過去の類似事例を参考にして方針決定しなければならないことがある。また、環境用地部などの部門に解明を依頼する必要があることもある。そこで、以上の背景に鑑み、本実施形態の補償業務処理システム1においては、上記方針決定にかかる労力軽減と業務迅速化に寄与する仕組みを備えている。   However, in the policy determination based on the above method based on various documents (hereinafter referred to as the basis document), a great deal of labor and time are often spent for the following reasons. First, for many matters that need to be discussed with the applicant for relocation, it is necessary to correspond to the relevant articles and items in the above-mentioned rationale documents. In addition, regarding matters that are not defined in the rationale document and have a difference in interpretation from the applicant for transfer, it may be necessary to decide on a policy with reference to past similar cases. It may also be necessary to request a clarification from a department such as environmental land. Therefore, in view of the above background, the compensation work processing system 1 of the present embodiment includes a mechanism that contributes to labor reduction and speeding up of the above-described policy determination.

すなわち、まずサーバコンピュータ4のデータベース41には、上記根拠文書が登録されている(根拠文書49)。また、データベース41には、過去の支障移転に関する事例のうち、根拠文書に定められていない事項が生じ、又は、根拠文書に定められている事項であるが、移転申込者との間で解釈に相違を生じている事項についての双方の主張の内容や最終的な合意内容などの過去の事例に関するデータ(過去事例50)が登録されている。また、根拠文書49に含まれる条文や項目の記述から、道路法や河川法などの関係法令の条文を参照できるようにするために、データベース41には、上記関係法令(関係法令51)が格納されている。これらサーバコンピュータ4のデータベース41に格納されている根拠文書49、過去事例50、関係法令51と、クライアントコンピュータ3の表示装置25に表示される各種検索・一覧参照画面の関係を図29に示している。   That is, first, the rationale document is registered in the database 41 of the server computer 4 (evidence document 49). In addition, in the database 41, there are matters that are not specified in the evidence document among the cases related to past trouble transfers, or the matters that are specified in the evidence document, but they are interpreted by the transfer applicant. Data (past case 50) relating to past cases such as the contents of the claims of both sides and the final consensus contents regarding the matters causing the difference are registered. In addition, the database 41 stores the above-mentioned related laws and regulations (related laws and regulations 51) so that the texts of relevant laws and regulations such as the Road Law and River Law can be referred to from the descriptions of the texts and items included in the rationale document 49. Has been. FIG. 29 shows the relationship between the basis document 49, the past case 50, the related laws and regulations 51 stored in the database 41 of the server computer 4 and various search / list reference screens displayed on the display device 25 of the client computer 3. Yes.

図29において、根拠文書検索画面2910は、ユーザに根拠文書の内容を検索するためのキーワード(例えば、撤去費用)を入力させるための画面である。ユーザがこの画面にキーワードを設定した後、根拠文書検索画面2910に対して所定の操作入力を行うと、検索結果が記載された根拠文書一覧画面2911が表示される。一方、事例検索画面2920は、ユーザに過去事例50の内容を検索するためのキーワード(例えば、撤去費用)を入力させるための画面である。ユーザがこの画面にキーワードを設定した後、事例検索画面2920に対して所定の操作入力を行うと、検索結果が記載された事例一覧画面2921が表示される。   In FIG. 29, a ground document search screen 2910 is a screen for allowing the user to input a keyword (for example, removal cost) for searching the content of the ground document. After the user sets a keyword on this screen, when a predetermined operation input is made on the basis document search screen 2910, a basis document list screen 2911 on which the search result is described is displayed. On the other hand, the case search screen 2920 is a screen for allowing the user to input a keyword (for example, removal cost) for searching the contents of the past case 50. After the user sets a keyword on this screen, when a predetermined operation input is performed on the case search screen 2920, a case list screen 2921 on which the search result is described is displayed.

法令画面2930は、根拠文書一覧画面2911等に表記されている条文番号や項目番号をクリックすることによりクライアントコンピュータ3の表示装置25に自動的に表示される画面である。法令画面2930には、関係法令51から検索した上記条文番号に対応する条文や項目の内容が記載される。この機能によれば、ユーザは道路法や河川法などの関係法令の内容を適宜参照することができる。すなわち、以上の機能によれば、上記方針決定にかかる労力が軽減され、配電線路の支障移転業務の迅速化も図られることになる。また、過去事例について事業所間で情報を共有化することができるため、各事業所における問題意識の高揚も図られることになる。なお、以上に説明した機能のうちクライアントコンピュータ3において実現される機能は、図3に示す検索参照部40によって実現されている。   The statute screen 2930 is a screen that is automatically displayed on the display device 25 of the client computer 3 by clicking on the article number or item number written on the basis document list screen 2911 or the like. The law screen 2930 describes the text of the text and items corresponding to the text number retrieved from the related law 51. According to this function, the user can appropriately refer to the contents of related laws and regulations such as the road law and the river law. That is, according to the above function, the labor for determining the policy is reduced, and the troubled transfer work of the distribution line can be speeded up. In addition, since information on past cases can be shared between establishments, the awareness of problems at each establishment can be enhanced. Of the functions described above, the functions realized in the client computer 3 are realized by the search reference unit 40 shown in FIG.

ところで、以上の実施形態の説明は本発明の理解を容易にするためのものであり、本発明を限定するものではない。本発明はその趣旨を逸脱することなく、変更、改良され得ると共に本発明にはその等価物が含まれることは勿論である。   By the way, description of the above embodiment is for making an understanding of this invention easy, and does not limit this invention. It goes without saying that the present invention can be changed and improved without departing from the gist thereof, and that the present invention includes equivalents thereof.

本発明の一実施形態による、補償業務処理システム1の概略的な構成を示す図である。It is a figure showing a schematic structure of compensation service processing system 1 by one embodiment of the present invention. 本発明の一実施形態による、クライアントコンピュータ3又はサーバコンピュータ4として用いられるコンピュータのハードウエア構成の一例を示す図である。It is a figure which shows an example of the hardware constitutions of the computer used as the client computer 3 or the server computer 4 by one Embodiment of this invention. 本発明の一実施形態による、図3にクライアントコンピュータ3及びサーバコンピュータ4において実行されるプログラムによって実現される各種の機能を示す図である。FIG. 3 is a diagram illustrating various functions implemented by programs executed in the client computer 3 and the server computer 4 in FIG. 3 according to an embodiment of the present invention. 本発明の一実施形態による、認証画面400を示す図である。FIG. 6 illustrates an authentication screen 400 according to an embodiment of the present invention. 本発明の一実施形態による、メニュー画面500を示す図である。FIG. 6 illustrates a menu screen 500 according to one embodiment of the present invention. 本発明の一実施形態による、申込データ入力画面600を示す図である。FIG. 6 is a diagram illustrating an application data input screen 600 according to an embodiment of the present invention. 本発明の一実施形態による、申込データ検索画面700を示す図である。FIG. 6 is a diagram illustrating an application data search screen 700 according to an embodiment of the present invention. 本発明の一実施形態による、支障移転補償業務処理票No.1出力画面800を示す図である。According to one embodiment of the present invention, the obstruction relocation compensation business processing form No. FIG. 6 is a diagram showing a 1 output screen 800; 本発明の一実施形態による、支障移転補償業務処理票No.1を示す図である。According to one embodiment of the present invention, the obstruction relocation compensation business processing form No. FIG. 本発明の一実施形態による、工事補償金データ入力(架空→架空)画面1000を示す図である。It is a figure which shows the construction compensation data input (aerial → aerial) screen 1000 by one Embodiment of this invention. 本発明の一実施形態による、工事補償金データ検索画面1100を示す図である。It is a figure which shows the construction compensation data search screen 1100 by one Embodiment of this invention. 本発明の一実施形態による、支障移転補償業務処理票No.2出力画面1200を示す図である。According to one embodiment of the present invention, the obstruction relocation compensation business processing form No. It is a figure which shows the 2 output screen 1200. FIG. 本発明の一実施形態による、支障移転補償業務処理票No.2を示す図である。According to one embodiment of the present invention, the obstruction relocation compensation business processing form No. FIG. 本発明の一実施形態による、工事補償金データ入力(架空→地中)画面1400を示す図である。It is a figure which shows the construction compensation data input (aerial → underground) screen 1400 by one Embodiment of this invention. 本発明の一実施形態による、工事補償金データ入力(地中→地中)画面1500を示す図である。It is a figure which shows the construction compensation data input (underground-> underground) screen 1500 by one Embodiment of this invention. 本発明の一実施形態による、請求データ入力画面1600を示す図である。FIG. 10 illustrates a billing data entry screen 1600 according to one embodiment of the invention. 本発明の一実施形態による、印刷物指定画面1700を示す図である。It is a figure which shows the printed matter designation | designated screen 1700 by one Embodiment of this invention. 本発明の一実施形態による、見積書を示す図である。FIG. 4 is a diagram illustrating a quote according to one embodiment of the present invention. 本発明の一実施形態による、請求書を示す図である。FIG. 4 shows a bill according to one embodiment of the invention. 本発明の一実施形態による、承諾書を示す図である。FIG. 3 is a diagram showing a consent document according to an embodiment of the present invention. 本発明の一実施形態による、一括出力画面2100を示す図である。FIG. 10 is a diagram illustrating a batch output screen 2100 according to an embodiment of the present invention. 本発明の一実施形態による、工事完了通知書印刷指示画面2200を示す図である。It is a figure which shows the construction completion notice print instruction | indication screen 2200 by one Embodiment of this invention. 本発明の一実施形態による、完了通知書を示す図である。FIG. 6 is a diagram showing a completion notice according to an embodiment of the present invention. 本発明の一実施形態による、他所分見積書等印刷指示画面2400を示す図である。It is a figure which shows the print instruction | indication screen 2400, such as another part estimate according to one Embodiment of this invention. 本発明の一実施形態による、振込依頼票出力補助画面2500を示す図である。It is a figure which shows the transfer request form output assistance screen 2500 by one Embodiment of this invention. 本発明の一実施形態による、振込依頼票一括出力補助画面2600を示す図である。It is a figure which shows the transfer request form batch output assistance screen 2600 by one Embodiment of this invention. 本発明の一実施形態による、他所分振込依頼票出力補助画面2700を示す図である。It is a figure which shows the transfer request form output assistance screen 2700 for another place by one Embodiment of this invention. 本発明の一実施形態による、申込者マスタメンテナンス画面2800を示す図である。FIG. 10 illustrates an applicant master maintenance screen 2800, according to one embodiment of the present invention. 本発明の一実施形態による、サーバコンピュータ4のデータベース41に登録されている根拠文書49、過去事例50、関係法令51と、クライアントコンピュータ3の表示装置25に表示される各種検索・一覧参照画面の関係を示す図である。According to one embodiment of the present invention, the basis document 49, the past case 50, the related laws and regulations 51 registered in the database 41 of the server computer 4 and various search / list reference screens displayed on the display device 25 of the client computer 3 are displayed. It is a figure which shows a relationship.

符号の説明Explanation of symbols

1 補償業務処理システム
3 クライアントコンピュータ
31 認証処理部 32 メニュー処理部
33 申込処理部 34 工事補償金処理部
35 帳票一覧処理部 36 請求処理部
37 維持管理処理部 38 月次経理処理部
39 マスタ作成部
4 サーバコンピュータ
41 データベース 42 申込データ
43 工事補償金データ 46 申込者マスタ
47 工事補償金 48 請求データ
600 申込データ入力画面
700 申込データ検索画面
800 支障移転補償業務処理票No.1出力画面
900 支障移転補償業務処理票No.1
1000 工事補償金データ入力(架空→架空)画面
1100 工事補償金データ検索画面
1200 支障移転補償業務処理票No.2出力画面
1300 支障移転補償業務処理票No.2
1400 工事補償金データ入力(架空→地中)画面
1500 工事補償金データ入力(地中→地中)画面
DESCRIPTION OF SYMBOLS 1 Compensation business processing system 3 Client computer 31 Authentication processing part 32 Menu processing part 33 Application processing part 34 Construction compensation processing part 35 Form list processing part 36 Claim processing part 37 Maintenance management processing part 38 Monthly accounting processing part 39 Master preparation part 4 Server computer 41 Database 42 Application data 43 Construction compensation data 46 Applicant master 47 Construction compensation 48 Request data 600 Application data input screen 700 Application data search screen 800 1 Output screen 900 Trouble relocation compensation work process No. 1
1000 Construction compensation data input (aerial → aerial) screen 1100 Construction compensation data search screen 1200 2 Output screen 1300 Trouble relocation compensation work process No. 2
1400 Construction compensation data entry (aerial → underground) screen 1500 Construction compensation data entry (underground → underground) screen

Claims (5)

配電線路の支障移転補償業務に用いられる支障移転補償業務処理システムであって、
CPU及びメモリを有する少なくとも1台のコンピュータを含み、
前記CPUが前記メモリに記憶されているプログラムを実行することにより実現される、
ユーザから支障移転の申込に関するデータである、申込者区分を含む申込データの入力を受け付けて、受け付けた前記申込データを記憶する申込処理部、
ユーザから、前記支障移転の費用に対する申込者の負担割合である申込者負担割合と、工事補償金の計算に関する諸掛費と、諸掛費区分とを含んだデータである工事補償金データの入力を受け付けて工事補償金を計算する工事補償金処理部、
見積書や請求書等の帳票を出力する請求処理部、
各種マスタの維持管理に関する処理を行う維持管理処理部、
月次経理処理に必要となる帳票を出力する月次経理処理部、
を有し、
支障移転における前記負担割合が記載された根拠文書、当該支障移転の事案と類似する過去事例、及び当該根拠文書において記述された条文又は項目の少なくともいずれかに関係する関係法令を対応づけたデータベースと通信可能に接続し、
前記工事補償金処理部は、
前記工事補償金データの入力を受け付ける画面として、第一種電気通信事業者との協定による移転であるか否かの入力欄を有する、配電線路を架空から架空に移転する場合に対応した第1の画面、
前記支障移転の工事補償金の算定方式を地中工事として行うか否かの入力欄を有する、配電線路を架空から地中に移転する場合に対応した第2の画面、
配電線路を地中から地中に移転する場合に対応した第3の画面、
のうちのいずれかの画面をユーザに提示し、
割合値又は前記支障移転による移転前後の配電線路の本数のいずれかの項目をユーザに選択させ、前記割合値が選択された場合には、受け付けた値を前記申込者負担割合とし、前記本数が選択された場合には、受け付けた値を前記負担割合の値に換算して前記申込者負担割合とし、
前記第1の画面に、第一種電気通信事業者との協定による移転である旨の入力がされた場合には、前記申込者負担割合と、前記諸掛費に関する所定比率とに基づき前記工事補償金を計算し、
前記第1の画面に、第一種電気通信事業者との協定による移転以外である旨の入力がされた場合には、前記申込者負担割合と、前記申込者区分と、前記諸掛費区分とに基づき前記工事補償金を計算し、
前記第2の画面に、前記支障移転の工事補償金の算定方式を地中工事として行う旨の入力がされた場合には、当該地中線工事に関する所定の比率に基づき前記工事補償金を計算し、
前記第2の画面に、前記支障移転の工事補償金の算定方式を地中工事として行わない旨の入力がされた場合には、前記申込者負担割合に基づき前記工事補償金を計算し、
前記第3の画面に、前記諸掛費の入力がされた場合には、入力された前記諸掛費と、前記申込者負担割合に基づき前記工事補償金を計算し、
前記第3の画面に、前記諸掛費区分の入力がされた場合には、入力された前記諸掛費区分と、前記申込者負担割合とに基づき前記工事補償金を計算し、
前記維持管理処理部は、前記根拠文書、及び前記過去事例のうち少なくとも1つ以上をキーワードとする検索入力を受け付けて、前記キーワードに該当するレコードを前記データベースから取得する
ことを特徴とする支障移転補償業務処理システム。
A trouble relocation compensation work processing system used for trouble relocation compensation work for distribution lines,
Including at least one computer having a CPU and memory;
The CPU is implemented by executing a program stored in the memory.
An application processing unit that accepts input of application data including an applicant category, which is data relating to an application for trouble transfer from a user, and stores the received application data;
From the user, input of construction compensation data which is data including an applicant burden ratio which is a burden ratio of the applicant with respect to the cost of the trouble transfer, various expenses related to calculation of the construction compensation money, and various expenses categories. The construction compensation processing department that accepts and calculates construction compensation,
Billing processing unit that outputs forms such as quotations and invoices,
Maintenance management processing unit that performs processing related to maintenance of various masters,
Monthly accounting processing unit that outputs forms necessary for monthly accounting processing,
Have
A database that correlates the relevant documents related to at least one of the documents or items described in the evidence document, the past cases similar to the case of the problem transfer, and the evidence document describing the burden ratio in the problem transfer Connect to enable communication
The construction compensation processing section
The first screen corresponding to the case where the distribution line is moved from an aerial to an aerial, having an input field as to whether or not it is a transfer with an agreement with a first-class telecommunications carrier as a screen for accepting the input of the construction compensation data Screen,
A second screen corresponding to a case where the distribution line is relocated from aerial to underground, with an input field as to whether or not the calculation method of the construction compensation for the relocation is performed as underground work ;
The third screen corresponding to the case where the distribution line is moved from underground to underground,
Present one of the screens to the user,
When the user selects either the ratio value or the number of distribution lines before and after the relocation due to the trouble relocation, and the ratio value is selected, the accepted value is the applicant burden ratio, and the number is If selected, the received value is converted into the value of the burden ratio to be the applicant burden ratio,
When the first screen indicates that the transfer is based on an agreement with a first-class telecommunications carrier, the construction is based on the applicant burden ratio and a predetermined ratio related to the various expenses. Calculate compensation,
If the first screen indicates that the transfer is not based on an agreement with a first-class telecommunications carrier, the applicant burden ratio, the applicant category, and the various expenses category Calculate the construction compensation fee based on
When it is input on the second screen that the calculation method of the compensation fee for the relocation of obstacles will be performed as underground work, the construction compensation money is calculated based on a predetermined ratio related to the underground work. And
If it is input on the second screen that the calculation method of the construction reimbursement for troubled relocation is not performed as underground construction, the construction compensation is calculated based on the applicant burden ratio,
When the various expenses are input on the third screen, the construction compensation is calculated based on the input various expenses and the applicant burden ratio,
In the case where the charge category is input on the third screen, the construction compensation is calculated based on the charge cost category and the applicant burden ratio,
The maintenance management processing unit accepts a search input using at least one of the basis document and the past case as a keyword, and acquires a record corresponding to the keyword from the database. Compensation business processing system.
請求項1に記載の支障移転補償業務処理システムであって、
前記申込処理部は、前記申込データの入力を受け付けるに際し、既に記憶している前記申込データの検索画面をユーザに提示し、前記検索画面により検索された前記申込データを、前記申込データを入力させる画面に自動入力すること、
を特徴とする支障移転補償業務処理システム。
The trouble transfer compensation business processing system according to claim 1,
When the application processing unit accepts input of the application data, the application processing unit presents a search screen for the application data that has already been stored to the user, and causes the application data searched by the search screen to be input to the application data. Auto-filling the screen,
Disability transfer compensation business processing system characterized by.
請求項1に記載の支障移転補償業務処理システムであって、
前記工事補償金処理部は、前記工事補償金データの入力を受け付けるに際し、既に記憶している前記工事補償金データの検索画面をユーザに提示し、前記検索画面により検索された前記工事補償金データを、前記工事補償金データの入力を受け付ける画面に自動入力すること、
を特徴とする支障移転補償業務処理システム。
The trouble transfer compensation business processing system according to claim 1,
When receiving the input of the construction compensation data, the construction compensation processing section presents a search screen for the construction compensation data stored in advance to the user, and the construction compensation data retrieved by the search screen. Is automatically entered on the screen for accepting the input of the construction compensation data,
Disability transfer compensation business processing system characterized by.
請求項1に記載の支障移転補償業務処理システムに用いられるコンピュータであって、
CPU及びメモリを有し、
前記CPUが前記メモリに記憶されているプログラムを実行することにより実現される、
ユーザから支障移転の申込に関するデータである、申込者区分を含む申込データの入力を受け付けて、受け付けた前記申込データを記憶する申込処理部、
ユーザから、前記支障移転の費用に対する申込者の負担割合である申込者負担割合と、工事補償金の計算に関する諸掛費と、諸掛費区分とを含んだデータである工事補償金データの入力を受け付けて工事補償金を計算する工事補償金処理部、
見積書や請求書等の帳票を出力する請求処理部、
各種マスタの維持管理に関する処理を行う維持管理処理部、
月次経理処理に必要となる帳票を出力する月次経理処理部、
を有し、
支障移転における前記負担割合が記載された根拠文書、当該支障移転の事案と類似する過去事例、及び当該根拠文書において記述された条文又は項目の少なくともいずれかに関係する関係法令を対応づけたデータベースと通信可能に接続し、
前記工事補償金処理部は、
前記工事補償金データの入力を受け付ける画面として、第一種電気通信事業者との協定による移転であるか否かの入力欄を有する、配電線路を架空から架空に移転する場合に対応した第1の画面、
前記支障移転の工事補償金の算定方式を地中工事として行うか否かの入力欄を有する、配電線路を架空から地中に移転する場合に対応した第2の画面、
配電線路を地中から地中に移転する場合に対応した第3の画面、
のうちのいずれかの画面をユーザに提示し、
割合値又は前記支障移転による移転前後の配電線路の本数のいずれかの項目をユーザに選択させ、前記割合値が選択された場合には、受け付けた値を前記申込者負担割合とし、前記本数が選択された場合には、受け付けた値を前記負担割合の値に換算して前記申込者負担割合とし、
前記第1の画面に、第一種電気通信事業者との協定による移転である旨の入力がされた場合には、前記申込者負担割合と、前記諸掛費に関する所定比率とに基づき前記工事補償金を計算し、
前記第1の画面に、第一種電気通信事業者との協定による移転以外である旨の入力がされた場合には、前記申込者負担割合と、前記申込者区分と、前記諸掛費区分とに基づき前記工事補償金を計算し、
前記第2の画面に、前記支障移転の工事補償金の算定方式を地中工事として行う旨の入力がされた場合には、当該地中線工事に関する所定の比率に基づき前記工事補償金を計算し、
前記第2の画面に、前記支障移転の工事補償金の算定方式を地中工事として行わない旨の入力がされた場合には、前記申込者負担割合に基づき前記工事補償金を計算し、
前記第3の画面に、前記諸掛費の入力がされた場合には、入力された前記諸掛費と、前記申込者負担割合に基づき前記工事補償金を計算し、
前記第3の画面に、前記諸掛費区分の入力がされた場合には、入力された前記諸掛費区分と、前記申込者負担割合とに基づき前記工事補償金を計算し、
前記維持管理処理部は、前記根拠文書、及び前記過去事例のうち少なくとも1つ以上をキーワードとする検索入力を受け付けて、前記キーワードに該当するレコードを前記データベースから取得すること、
を特徴とするコンピュータ。
A computer used in the trouble transfer compensation business processing system according to claim 1,
CPU and memory
The CPU is implemented by executing a program stored in the memory.
An application processing unit that accepts input of application data including an applicant category, which is data relating to an application for trouble transfer from a user, and stores the received application data;
From the user, input of construction compensation data which is data including an applicant burden ratio which is a burden ratio of the applicant with respect to the cost of the trouble transfer, various expenses related to calculation of the construction compensation money, and various expenses categories. The construction compensation processing department that accepts and calculates construction compensation,
Billing processing unit that outputs forms such as quotations and invoices,
Maintenance management processing unit that performs processing related to maintenance of various masters,
Monthly accounting processing unit that outputs forms necessary for monthly accounting processing,
Have
A database that correlates the relevant documents related to at least one of the documents or items described in the evidence document, the past document similar to the case of the problem transfer, and the evidence document that describes the burden ratio in trouble transfer Connect to enable communication
The construction compensation processing section
The first screen corresponding to the case where the distribution line is moved from an aerial to an aerial, having an input field as to whether or not it is a transfer with an agreement with a first-class telecommunications carrier as a screen for accepting the input of the construction compensation data Screen,
A second screen corresponding to a case where the distribution line is relocated from aerial to underground, with an input field as to whether or not the calculation method of the construction compensation for the relocation is performed as underground work ;
The third screen corresponding to the case where the distribution line is moved from underground to underground,
Present one of the screens to the user,
When the user selects either the ratio value or the number of distribution lines before and after the relocation due to the trouble relocation, and the ratio value is selected, the accepted value is the applicant burden ratio, and the number is If selected, the received value is converted into the value of the burden ratio to be the applicant burden ratio,
When the first screen indicates that the transfer is based on an agreement with a first-class telecommunications carrier, the construction is based on the applicant burden ratio and a predetermined ratio related to the various expenses. Calculate compensation,
If the first screen indicates that the transfer is not based on an agreement with a first-class telecommunications carrier, the applicant burden ratio, the applicant category, and the various expenses category Calculate the construction compensation fee based on
When it is input on the second screen that the calculation method of the compensation fee for the relocation of obstacles will be performed as underground work, the construction compensation money is calculated based on a predetermined ratio related to the underground work. And
If it is input on the second screen that the calculation method of the construction reimbursement for troubled relocation is not performed as underground construction, the construction compensation is calculated based on the applicant burden ratio,
When the various expenses are input on the third screen, the construction compensation is calculated based on the input various expenses and the applicant burden ratio,
In the case where the charge category is input on the third screen, the construction compensation is calculated based on the charge cost category and the applicant burden ratio,
The maintenance management processing unit accepts a search input using at least one of the basis document and the past case as a keyword, and acquires a record corresponding to the keyword from the database;
A computer characterized by
請求項4に記載の前記コンピュータに、
前記申込処理部、前記工事補償金処理部、前記請求処理部、前記維持管理処理部、前記月次経理処理部、のうちの少なくともいずれかの機能を実現するプログラム。
The computer according to claim 4,
A program that realizes at least one of the functions of the application processing unit, the construction compensation processing unit, the billing processing unit, the maintenance management processing unit, and the monthly accounting processing unit.
JP2004234429A 2004-08-11 2004-08-11 Disability transfer compensation business processing system, computer, and program Expired - Fee Related JP4545520B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004234429A JP4545520B2 (en) 2004-08-11 2004-08-11 Disability transfer compensation business processing system, computer, and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004234429A JP4545520B2 (en) 2004-08-11 2004-08-11 Disability transfer compensation business processing system, computer, and program

Publications (2)

Publication Number Publication Date
JP2006053730A JP2006053730A (en) 2006-02-23
JP4545520B2 true JP4545520B2 (en) 2010-09-15

Family

ID=36031180

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004234429A Expired - Fee Related JP4545520B2 (en) 2004-08-11 2004-08-11 Disability transfer compensation business processing system, computer, and program

Country Status (1)

Country Link
JP (1) JP4545520B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111626787B (en) * 2020-05-29 2023-09-01 北京字节跳动网络技术有限公司 Resource issuing method, device, medium and equipment

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004038786A (en) * 2002-07-05 2004-02-05 Cross Culture Ltd Simple quote system and simple quote server
JP2004164045A (en) * 2002-11-11 2004-06-10 Hitachi Ltd Material order management system and method

Also Published As

Publication number Publication date
JP2006053730A (en) 2006-02-23

Similar Documents

Publication Publication Date Title
US6557007B1 (en) Automated convention processing system and method
US7664655B2 (en) Electronic service of process system and method for carrying out service of court papers
US20040186763A1 (en) System for real-time monitoring and cost management of construction projects
US20090319402A1 (en) Automated Invoice Processing Software and Services
US20030088487A1 (en) Travel expense reimbursement system and method
US8645225B1 (en) Organic supplier enablement based on a business transaction
EP1293921A1 (en) Qualification information management method and apparatus
JP2003186950A (en) Construction work management device and method
US20060129482A1 (en) Methods and systems for managing real estate property
JP2004302574A (en) Payment processing system and method
KR102391596B1 (en) Method and system for providing travel service and server performing the same
JP2004110577A (en) Batch billing system of traveling/transportation expenses to corporate organization or the like
JP2005216013A (en) Integrated job management system
JP4545520B2 (en) Disability transfer compensation business processing system, computer, and program
JP2004213247A (en) Public work information providing system
JP2005044040A (en) Transfer data management method and transfer data management program
WO2005091194A1 (en) Business activity support system
CN118037371A (en) Material Contract Mobile Image Settlement System
JP3202298U (en) Storage business management system
JP4805597B2 (en) Reform management method for apartments, etc.
JP4595723B2 (en) Security control system
JP2003288499A (en) Manpower dispatch system and manpower dispatch method
WO2001046854A1 (en) A system and method for inter-enterprise workflow and document management
JP4641153B2 (en) Collection agency system, collection agency device, collection agency method, and collection agency program
JP2002063296A (en) Work data processor, work data processing method and recording medium

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070706

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20091218

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100105

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100218

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100316

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100507

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100622

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100630

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130709

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4545520

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130709

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130709

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees