JP5657346B2 JP2010247268A JP2010247268A JP5657346B2 JP 5657346 B2 JP5657346 B2 JP 5657346B2 JP 2010247268 A JP2010247268 A JP 2010247268A JP 2010247268 A JP2010247268 A JP 2010247268A JP 5657346 B2 JP5657346 B2 JP 5657346B2
Authority
JP
Japan
Prior art keywords
sleepers
rail
sleeper
basic
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2010247268A
Other languages
Japanese (ja)
Other versions
JP2012097502A (en
Inventor
守 津▲高▼
守 津▲高▼
博 久楽
博 久楽
江津夫 志手
江津夫 志手
修一 小沼
修一 小沼
勝則 横川
勝則 横川
崇吉 北原
崇吉 北原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Abe Nikko Kogyo Co Ltd
Kyushu Railway Co
Original Assignee
Abe Nikko Kogyo Co Ltd
Kyushu Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Abe Nikko Kogyo Co Ltd, Kyushu Railway Co filed Critical Abe Nikko Kogyo Co Ltd
Priority to JP2010247268A priority Critical patent/JP5657346B2/en
Publication of JP2012097502A publication Critical patent/JP2012097502A/en
Application granted granted Critical
Publication of JP5657346B2 publication Critical patent/JP5657346B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Railway Tracks (AREA)

Description

本発明は、組立式マクラギに関し、主としてレールの継目部分に敷設され、レールの接合とレールのマクラギへの固定を容易に行うことができる上に、レールの継目部分の落ち込みと継目部分の落ち込みによる騒音や振動の発生、さらには軌道狂い等といった車両の運行を阻害する要因を大幅に低減することができる。 The present invention relates to an assembly sleeper , which is mainly laid at the joint portion of the rail, and can be easily joined to the rail and fixed to the sleeper, and further, by the drop of the joint portion of the rail and the drop of the joint portion. Factors that hinder the operation of the vehicle, such as the generation of noise and vibrations, and even a track error, can be greatly reduced.

ごく一般的な鉄道軌道においては、レールの下に複数のマクラギが横に並べて敷設され、レールは各マクラギの上に犬釘などのレール締結金具によって固定されている。   In a very general railway track, a plurality of sleepers are laid side by side under the rails, and the rails are fixed on each sleeper by a rail fastening bracket such as a dog nail.

また、レール同士は端部を両側から継目板で挟み込み、ボルトとナット、ゆるみ止めのロックナットワッシャー等の継手金具によって締め付けることにより接合されている。
さらに、レールの継目部分は、マクラギの真上またはマクラギ間の中央で支えられており、前者は「支え継ぎ」、後者は「かけ継ぎ」として一般に知られている。
Also, the rails are joined by sandwiching the end portions from both sides with a joint plate and tightening them with joint fittings such as bolts and nuts, locking nut washers for preventing loosening.
In addition, the rail joints are supported directly above or between the sleepers, the former being commonly known as a "support joint" and the latter as a "joint".

前者の「支え継ぎ」は、レールの継目をマクラギの真上に配置して支えるため、レールの継目部分の落ち込みとこれによる騒音等の問題は低減されているが、レールを繋ぐ継手金具とレールをマクラギに固定するレール締結金具がマクラギの上で重なるため、これらの金具として特殊な金具を必要とするだけでなくレールの接合と固定が共に面倒であった。   The former "support joint" is arranged to support the rail joint directly above the sleeper, so that problems such as drop of the rail joint and noise due to this are reduced. Since the rail fastening brackets for fixing to the sleepers overlap on the sleepers, not only special brackets are required as these brackets, but also the joining and fixing of the rails are troublesome.

また、レールの継目部分には他の部分のマクラギよりかなり断面の大きいマクラギを敷設する必要があるため、その手配と敷設に余計な労力とコストが費やされ、さらに両側のマクラギに余計な負担がかかる等の課題があった。   In addition, it is necessary to lay a sleeper with a cross section that is considerably larger than the other sleepers at the joints of the rails, so that extra labor and cost are spent on the arrangement and laying, and an additional burden on the sleepers on both sides. There was a problem such as taking.

一方、後者の「かけ継ぎ」は、レールの継目をマクラギ間の中央で支えるため、レール同士を繋ぐ継手金具とレールをマクラギに固定するレール締結金具が重ならない。このため、通常の継手金具とレール締結金具を用いてレールの敷設をきわめて効率的に行うことができ、しかもレールの継目部分に作用する車両荷重をレール継目の両側のマクラギに分散できるため、通常サイズのマクラギを利用できる等のメリットもある。   On the other hand, in the latter “joint”, since the rail joint is supported at the center between sleepers, the joint fitting that connects the rails and the rail fastening bracket that fixes the rail to the sleepers do not overlap. For this reason, rails can be laid very efficiently using ordinary joint fittings and rail fastening brackets, and the vehicle load acting on the rail joints can be distributed to sleepers on both sides of the rail joints. There are also advantages such as the use of size sleepers.

特開2005−282269号公報JP 2005-282269 A 特開平9−268502号公報JP-A-9-268502

しかし、「かけ継ぎ」には、レールの継目部分がマクラギ間の中央で浮いた状態で支えられるため、レール継目部分の落ち込みとこれらに伴う騒音および振動の発生、さらには軌道狂いなどといった車両の運行を阻害する大きな課題があった。   However, because “joint” is supported with the rail joints floating in the center between sleepers, the rail joints drop, the noise and vibrations associated with them, and track misalignment, etc. There was a big problem that hindered operation.

本発明は、特に「かけ継ぎ」の有する課題を解決するためになされたもので、レール同士の接合とレールのマクラギへの締結を容易に行うことができる上に、レールの継目部分の落ち込み、これに伴う騒音および振動の発生、さらには軌道狂いなどといった車両の運行を阻害する要因を大幅に低減できる組立式マクラギを提供することを目的とするものである。 In particular, the present invention was made to solve the problem of "joint", and can easily join the rails to each other and fasten the rails to sleepers. It is an object of the present invention to provide an assembly type sleeper that can greatly reduce the factors that hinder the operation of the vehicle, such as the generation of noise and vibrations associated with this, as well as track deviation.

本発明は、レールの下に横に並べて敷設される複数の基本マクラギから構成され、前記基本マクラギは前記レールの下に横に敷設される横マクラギと、前記レールの下に縦に敷設される複数の縦梁とから一体に成形され、かつ隣接する基本マクラギの縦梁どうしが継手板と連結ボルトによって連結されてなるヒンジ構造によって接合されてなる組立式マクラギにおいて、前記継手板は縦梁内に配筋された補強筋に取り付けられていることを特徴とするものである。 The present invention is composed of a plurality of basic sleepers laid side by side under a rail, and the basic sleepers are laid vertically under the rail and a horizontal sleeper laid horizontally under the rail. In an assembly type sleeper, which is integrally formed from a plurality of vertical beams, and is joined by a hinge structure in which adjacent vertical sleepers are connected to each other by a connecting plate and a connecting bolt, the connecting plate is located in the vertical beam. It is characterized by being attached to a reinforcing bar arranged in the frame .

本発明は、主としてレールの継目部分に敷設される軌道マクラギであり、本発明によれば、レールの継目部分が縦梁によって直接支えられることにより、レールの継目部分の落ち込みとこれが要因で発生するとされる騒音や振動、さらには軌道狂い等といった車両の運行を阻害する要因を大幅に低減することができる。   The present invention is a track sleeper mainly laid on the joint portion of the rail. According to the present invention, when the rail joint portion is directly supported by the vertical beam, the rail joint portion falls and this is caused by the factor. It is possible to greatly reduce the factors that hinder the operation of the vehicle, such as the noise and vibration that are generated, and even the track error.

また、隣接する基本マクラギの縦梁どうしは、ヒンジ構造によって連結されていることにより、レールを介して縦梁に大きな車両荷重が作用したとしても、車両荷重による道床反力の縦梁に作用する曲げモーメントを大幅に低減することができるため、縦梁の断面を小さくすることができる。   Moreover, even if a large vehicle load is applied to the vertical beam via the rail, the adjacent vertical sleepers of the basic sleepers act on the vertical beam caused by the vehicle load even if a large vehicle load is applied to the vertical beam via the rail. Since the bending moment can be greatly reduced, the cross section of the longitudinal beam can be reduced.

さらに、レールの継目部分には通常、2本の基本マクラギを連結して井桁状に組み立てられた組立式を敷設するが、バラスト軌道などでマクラギが移動するおそれのある道床には、多数の基本マクラギを連結して梯子状に組み立てられたラダーマクラギとして敷設することもできる。   In addition, the rail joints are usually constructed by connecting two basic sleepers and assembled in a cross-girder shape, but there are many basics on the roadbed where the sleepers may move on ballast tracks. It can also be laid as ladder sleepers assembled in a ladder shape by connecting sleepers.

なお、基本マクラギの横マクラギと複数の縦梁はPC構造またはRC構造によって一体に成形することができ、また、横マクラギはPC構造またはRC構造によって成形し、縦梁は形鋼などの鋼材から形成することもできる。
また、基本マクラギは、人力でも敷設、運搬等の取り扱いが可能な範囲で寸法、重量等を考慮して成形することができる。
In addition, the horizontal sleeper of the basic sleeper and the plurality of vertical beams can be integrally formed by a PC structure or an RC structure, and the horizontal sleepers are formed by a PC structure or an RC structure, and the vertical beam is made of a steel material such as a shape steel. It can also be formed.
Further, the basic sleeper can be molded in consideration of dimensions, weight, etc. within a range that can be handled by human power such as laying and transporting.

また、隣接する基本マクラギの縦梁間の連結部は、継手板と連結ボルトによって連結することにより容易にヒンジ構造とすることができる。 The connecting portion between the longitudinal beams of adjacent base sleepers can easily hinge structure by connecting the joint plate and connecting bolt.

なお、継手板間に合成ゴム等からなる連結パッドを介在するのが望ましい。継手板は、基本マクラギの製造過程で取り付けてもよく(先付け)、また基本マクラギの製造後に取り付けてもよい(後付け)。 It is desirable to interpose a connecting pad made of synthetic rubber or the like between the joint plates. The joint plate may be attached during the manufacturing process of the basic sleeper (advanced) or after the basic sleeper is manufactured (retrofitted).

継手板を先付けする場合、継手板は縦梁のコンクリート内に配筋された補強筋に取り付けることができ、また、継手板を後付けする場合は、縦梁のコンクリート内に予め埋設したインサートナット(長ナット)に取付けボルトによって取り付けることができる。   When the joint plate is attached in advance, the joint plate can be attached to a reinforcing bar arranged in the concrete of the vertical beam, and when the joint plate is retrofitted, an insert nut embedded in the concrete of the vertical beam ( It can be attached to the long nut) with mounting bolts.

また、一方の継手板にガイドキーが突設され、他方の継手板に前記ガイドキーが係合するガイド孔が形成されていることで、縦梁どうしを連結する際に、継手板の位置合せを容易に行うことができる。 Further, projecting a guide key on one of the joint plate, that said guide key to the other joint plate has guide holes for engagement is formed, when connecting the vertical beams each other, the alignment of the joint plate Can be easily performed.

また、継手板が、縦梁内に配筋された補強筋に取り付けられていることにより、すなわち、継手板を先付けすることにより継手板を縦梁の先端部分(妻部分)のコンクリート型枠として利用することができる。 Further, the joint plate, by which is attached to reinforcement that is Haisuji vertically within the beam, i.e., as a concrete form of the distal end portion of the longitudinal beams a joint plate by tipping the joint plate (wife partial) Can be used.

また、継手板が、縦梁内に埋設されたインサートナットに螺合される取付けボルトによって取り付けられていることにより、すなわち、継手板を後付けすることにより、基本マクラギの運搬や保管等に際して継手板が干渉し合うことがないので、嵩張らず取り扱いが容易になる。 In addition, when the joint plate is attached by mounting bolts that are screwed into the insert nuts embedded in the longitudinal beam, that is, by attaching the joint plate later, the joint plate can be used for transportation and storage of basic sleepers. Since they do not interfere with each other, they are not bulky and easy to handle.

本発明によれば、本発明は、主としてレールの継目部分に敷設されるマクラギであり、本発明に係る組立式マクラギの敷設により、レールの継目部分が縦梁によって直接支えられることにより、レールの継目部分の落ち込みとこれが要因で発生するとされる騒音や振動、さらには軌道狂い等といった車両の運行を阻害する要因を大幅に低減することができる。   According to the present invention, the present invention is mainly sleepers laid on the joint portion of the rail, and the rail joint portion is directly supported by the vertical beam by the assembly of the sleeper according to the present invention. Factors that hinder the operation of the vehicle, such as the drop of the seam portion and the noise and vibration that are caused by this, as well as the track error, can be greatly reduced.

また、隣接する基本マクラギの縦梁どうしは、ヒンジ構造によって連結されていることにより、レールを介して縦梁に大きな車両荷重が作用したとしても、車両荷重による道床反力の縦梁に作用する曲げモーメントを大幅に低減することができ、これにより縦梁の断面を小さくすることができる。   Moreover, even if a large vehicle load is applied to the vertical beam via the rail, the adjacent vertical sleepers of the basic sleepers act on the vertical beam caused by the vehicle load even if a large vehicle load is applied to the vertical beam via the rail. The bending moment can be greatly reduced, and thereby the cross section of the longitudinal beam can be reduced.

組立式マクラギの一実施形態を示す平面図である。It is a top view which shows one Embodiment of an assembly-type sleeper. 図1に図示する組立式マクラギを示し、(a)は側面図、(b)は図1におけるイ−イ線断面図、(c)はロ−ロ線端面図である。1 is a side view, FIG. 1B is a cross-sectional view taken along the line II in FIG. 1, and FIG. 1C is an end view of the roll line. 図1に図示する組立式マクラギを構成する基本マクラギを示し、(a)は一部破断平面図、(b)は一部破断側面図である。The basic sleeper which comprises the assembly-type sleeper shown in FIG. 1 is shown, (a) is a partially broken plan view, (b) is a partially broken side view. 図3に図示する基本マクラギの拡大図である。FIG. 4 is an enlarged view of the basic sleeper illustrated in FIG. 3. 図1に図示する組立式マクラギを構成する基本マクラギの他の実施形態を示し、(a)は一部破断平面図、(b)は一部破断側面図である。FIG. 2 shows another embodiment of a basic sleeper constituting the assembly-type sleeper shown in FIG. 1, wherein (a) is a partially broken plan view and (b) is a partially broken side view. 図5に図示する基本マクラギの拡大図である。FIG. 6 is an enlarged view of the basic sleeper illustrated in FIG. 5. ガイド孔を有する継手板を示し、(a)はその正面図、(b)は(a)におけるハ−ハ線断面図である。The joint board which has a guide hole is shown, (a) is the front view, (b) is the ha-ha sectional drawing in (a). ガイド孔を有する継手板を示し、(a)はその正面図、(b)は(a)におけるニ−ニ線断面図である。The joint board which has a guide hole is shown, (a) is the front view, (b) is a knee line sectional view in (a).

図1〜図8は、本発明の組立式マクラギと組立式マクラギを構成する基本マクラギの一実施形態を示し、図において、組立式マクラギ1は、レールAの下に横に並べて敷設された二本の基本マクラギ2と基本マクラギ2どうしを連結する複数の連結ボルト3とから構成されている。   1 to 8 show an embodiment of the assembled sleeper of the present invention and a basic sleeper constituting the assembled sleeper. In the drawings, the assembled sleeper 1 is laid side by side under a rail A. FIG. The book consists of a basic sleeper 2 and a plurality of connecting bolts 3 that connect the basic sleepers 2 together.

基本マクラギ2は、レールAの下に真横に敷設された横マクラギ2aと、横マクラギ2aの両側に突設された複数の縦梁2bとから一体に成形されている。   The basic sleeper 2 is integrally formed from a horizontal sleeper 2a laid directly under the rail A and a plurality of vertical beams 2b protruding from both sides of the horizontal sleeper 2a.

縦梁2bはレールAの真下をレールAの長手方向に延び、横マクラギ2の片側に突設された各縦梁2b,2bの先端には継手板4がそれぞれ取り付けられている。   The vertical beam 2b extends directly below the rail A in the longitudinal direction of the rail A, and a joint plate 4 is attached to the end of each vertical beam 2b, 2b protruding from one side of the horizontal sleeper 2.

また、横マクラギ2aのレールAの敷設された位置にレール締結金具5,5がレールAの両側に対称に取り付けられ、レールAはレール締結金具5,5によって横マクラギ2aの上に固定されている。   Further, rail fastening brackets 5 and 5 are symmetrically attached to both sides of the rail A at the position where the rail A of the horizontal sleeper 2a is laid, and the rail A is fixed on the horizontal sleeper 2a by the rail fastening brackets 5 and 5. Yes.

また、縦梁2bの上には制振ロングパッド6(図1では対角線で表示)が取り付けられ、その両側に制振ロングパッドずれ止め用の突起2cがそれぞれ形成されている。そして、レールAの継目部分Bは縦梁2bの上に制振ロングパッド6を介して支えられている。   Further, a damping long pad 6 (indicated by a diagonal line in FIG. 1) is attached on the vertical beam 2b, and protrusions 2c for preventing the damping long pad are formed on both sides thereof. And the joint part B of the rail A is supported on the vertical beam 2b via the damping long pad 6.

なお、横マクラギ2aはPC構造によって成形され、その長手方向に複数のPC鋼材2dが挿通されている。また、各縦梁2bはRC構造によって成形され、その長手方向に複数の補強筋2eが配筋されている(図3参照)。そして、横マクラギ2aと各縦梁2bは一体に成形されている。   The lateral sleeper 2a is formed by a PC structure, and a plurality of PC steel materials 2d are inserted in the longitudinal direction thereof. Each vertical beam 2b is formed by an RC structure, and a plurality of reinforcing bars 2e are arranged in the longitudinal direction (see FIG. 3). The horizontal sleepers 2a and the vertical beams 2b are integrally formed.

継手板4は縦梁2bの先端に取り付けられ、その両側は縦梁2bの両側に対称に突出され、さらに継手板4の各コーナ部に連結ボルト3を挿通するボルト孔4aが形成されている。   The joint plate 4 is attached to the tip of the vertical beam 2b, and both sides of the joint plate 4 project symmetrically on both sides of the vertical beam 2b. Further, bolt holes 4a through which the connecting bolts 3 are inserted are formed in the corner portions of the joint plate 4. .

また、対向する継手板4,4のうちの片方の継手板4にはガイドキー4bが突設され、他方の継手板4にはガイドキー4bが貫通するガイド孔4cが形成されている。なお、ガイドキー4bとガイド孔4cはボルト孔4a,4a間に形成されている。   Further, a guide key 4b is protruded from one of the opposing joint plates 4 and 4, and a guide hole 4c through which the guide key 4b passes is formed in the other joint plate 4. The guide key 4b and the guide hole 4c are formed between the bolt holes 4a and 4a.

このように形成された2本の基本マクラギ2は、双方の縦梁2bの継手板4どうしを互いに突き合わせると共にガイド孔4cにガイドキー4bを貫通させ、横に並べて配置され、かつ継手板4,4間に連結パッド7が介在されている。   The two basic sleepers 2 formed in this way abut the joint plates 4 of the two vertical beams 2b with each other, pass the guide key 4b through the guide hole 4c, are arranged side by side, and the joint plate 4 , 4, a connecting pad 7 is interposed.

そして、双方の継手板4,4のボルト孔4aに高力ボルトからなる連結ボルト3が締め付けられている。以上の構成により、2本の基本マクラギ2は井桁状に組み立てられている。   And the connection bolt 3 which consists of a high strength volt | bolt is fastened by the bolt hole 4a of both the joint plates 4 and 4. FIG. With the above configuration, the two basic sleepers 2 are assembled in a cross beam shape.

このような構成において、レールAの継目部分Bは、縦梁2bに制振ロングパッド6を介して支えられていることにより、レールAの継目部分Bの落ちを防止することができる。   In such a configuration, the joint portion B of the rail A is supported by the longitudinal beam 2b via the damping long pad 6, so that the joint portion B of the rail A can be prevented from dropping.

また、レールAを介して縦梁2bに大きな車両荷重が作用したとしても、縦梁2bがヒンジ構造によって連結されていることにより、車両荷重による道床反力の縦梁2bに作用する曲げモーメントを大幅に低減することができ、これにより縦梁2bの断面を小さくすることができる。   Further, even if a large vehicle load acts on the vertical beam 2b via the rail A, the bending moment acting on the vertical beam 2b of the road floor reaction force due to the vehicle load can be reduced by connecting the vertical beam 2b with a hinge structure. This can greatly reduce the cross section of the vertical beam 2b.

図4と図6は、特に継手板4の取付け態様の詳細を示したものであり、図4は、基本マクラギ2の製造過程で、マクラギ成形型枠(図省略)内にコンクリートを打設する前、縦梁2bの型枠内に配筋された補強筋2eの端部に、縦梁2bの妻型枠を兼ねた継手板4が先付けされ、型枠内にコンクリートを打設すると同時に継手板4は縦梁2bの先端に一体的に取り付けられている。   FIG. 4 and FIG. 6 show details of the attachment mode of the joint plate 4 in particular. FIG. 4 shows the concrete in the sleeper forming mold (not shown) in the manufacturing process of the basic sleeper 2. The joint plate 4 that also serves as the end form of the vertical beam 2b is attached to the end of the reinforcing bar 2e that is arranged in the form of the vertical beam 2b. The plate 4 is integrally attached to the tip of the vertical beam 2b.

なお、継手板4にはねじ孔4dが形成され(図7参照)、このねじ孔に補強筋2eの端部を螺合することにより、継手板4は補強筋2eに先付けされている。   A screw hole 4d is formed in the joint plate 4 (see FIG. 7), and the joint plate 4 is pre-attached to the reinforcing bar 2e by screwing the end of the reinforcing bar 2e into the screw hole.

図6は、基本マクラギ2の製造過程で、マクラギ製造型枠内にコンクリートを打設する前、縦梁2bの型枠内にインサート(長ナット)8が取り付けられ、型枠内にコンクリートを打設して基本マクラギ2が成形された後、継手板4は縦梁2bの先端部にインサート8に螺合される取付けボルト9によって後付けされている。   FIG. 6 shows the manufacturing process of the basic sleeper 2 before the concrete is placed in the sleeper manufacturing formwork, before the insert (long nut) 8 is installed in the formwork of the vertical beam 2b, and the concrete is placed in the formwork. After the basic sleeper 2 is formed and the joint sleeper 2 is formed, the joint plate 4 is retrofitted by a mounting bolt 9 screwed into the insert 8 at the tip of the vertical beam 2b.

なお、インサート8は、縦梁2b内に配筋された補強筋2eに取り付けられている。また、継手板4には取付けボルト9が貫通するボルト孔4eと共に取付けボルト9のボルト頭部を収納するための凹部(座掘り)4fが形成されている(図8)。そして、取付けボルト9を締め付けた後、取付けボルト9が緩まないようにボルト頭部の周囲凹部4f内にモルタルや樹脂などの充填材10が充填されている。   The insert 8 is attached to the reinforcing bar 2e arranged in the vertical beam 2b. In addition, the joint plate 4 is formed with a recess (sink) 4f for housing the bolt head of the mounting bolt 9 together with a bolt hole 4e through which the mounting bolt 9 passes (FIG. 8). Then, after the mounting bolt 9 is tightened, a filler 10 such as mortar or resin is filled in the peripheral recess 4f of the bolt head so that the mounting bolt 9 is not loosened.

さらに、縦梁2bと継手板4との間には接着樹脂を塗布したり、あるいは緩衝材(図省略)を介在することにより、縦梁2bのこば欠け等のコンクリート部分の局部的な破損が未然に防止されている。   Further, by applying an adhesive resin between the vertical beam 2b and the joint plate 4 or by interposing a cushioning material (not shown), local damage to the concrete portion such as a chipped portion of the vertical beam 2b is caused. Has been prevented.

なお、複数の基本マクラギ2を横に並べ、互いに連結してラダーマクラギを形成することができる。   A plurality of basic sleepers 2 can be arranged side by side and connected to each other to form a ladder sleeper.

本発明は、レール間の接合とレールの固定を容易に行うことができる上に、レールの継目部分の落ち込みとこれに伴う騒音および振動の発生、さらには軌道狂いなどの車両の運行を阻害する要因を除去することができる。   The present invention makes it possible to easily connect the rails and fix the rails, and also inhibits the operation of the vehicle such as the drop of the joint portion of the rails, the generation of noise and vibration accompanying the rails, and the track error. Factors can be removed.

1 組立式マクラギ
2 基本マクラギ
2a 横マクラギ
2b 縦梁
2c 制振ロングパッドずれ止め用の突起
2d PC鋼材
2e 補強鉄筋
3 継手板連結用の連結ボルト
4 継手板
4a 連結ボルト挿通用のボルト孔
4b ガイドキー
4c ガイド孔
4d 補強筋端部螺合用のねじ孔
4e 取付けボルト貫通用のボルト孔
4f 凹部(座掘り)
5 レール締結金具
6 制振ロングパッド
7 連結パッド
8 インサートナット(長ナット)
9 継手板取付用の取付けボルト
10 充填材
DESCRIPTION OF SYMBOLS 1 Assembling type sleeper 2 Basic sleeper 2a Horizontal sleeper 2b Longitudinal beam 2c Protrusion 2d for damping long pad prevention PC steel 2e Reinforcing bar 3 Joint bolt for connecting joint plate 4 Joint plate 4a Bolt hole 4b for connecting bolt insertion Key 4c Guide hole 4d Screw hole 4e for reinforcing bar end screwing Bolt hole 4f for mounting bolt penetration Recessed portion (sinking)
5 Rail fastening bracket 6 Damping long pad 7 Connecting pad 8 Insert nut (long nut)
9 Mounting bolt for fitting plate 10 Filling material

Claims (3)

レールの下に横に並べて敷設される複数の基本マクラギから構成され、前記基本マクラギは前記レールの下に横に敷設される横マクラギと、前記レールの下に縦に敷設される複数の縦梁とから一体に成形され、かつ隣接する基本マクラギの縦梁どうしが継手板と連結ボルトによって連結されてなるヒンジ構造によって接合されてなる組立式マクラギにおいて、前記継手板は縦梁内に配筋された補強筋に取り付けられていることを特徴とする組立式マクラギ。 It is composed of a plurality of basic sleepers laid side by side under the rail, the basic sleepers being a horizontal sleeper laid horizontally under the rail and a plurality of vertical beams laid vertically under the rail In the assembly type sleeper, in which the vertical beams of adjacent basic sleepers are joined together by a hinge structure in which the vertical plates of the basic sleepers are connected to each other by a connection bolt , the joint plates are arranged in the vertical beam. A built-up sleeper, which is attached to a reinforcing bar. レールの下に横に並べて敷設される複数の基本マクラギから構成され、前記基本マクラギは前記レールの下に横に敷設される横マクラギと、前記レールの下に縦に敷設される複数の縦梁とから一体に成形され、かつ隣接する基本マクラギの縦梁どうしが継手板と連結ボルトによって連結されてなるヒンジ構造によって接合されてなる組立式マクラギにおいて、前記継手板は縦梁内に埋設されたインサートナットに螺合された取付けボルトによって取り付けられていることを特徴とする組立式マクラギ。 It is composed of a plurality of basic sleepers laid side by side under the rail, the basic sleepers being a horizontal sleeper laid horizontally under the rail and a plurality of vertical beams laid vertically under the rail In the assembly type sleeper in which the longitudinal beams of the adjacent basic sleepers are joined together by a hinge structure in which the joint plates are connected to each other by a connection bolt, the joint plate is embedded in the longitudinal beam. An assembly type sleeper, which is attached by a mounting bolt screwed into an insert nut . 請求項1または2記載の組立式マクラギにおいて、一方の継手板にガイドキーが突設され、他方の継手板に前記ガイドキーが係合するガイド孔が形成されていることを特徴とする組立式マクラギ。 3. The assembly type sleeper according to claim 1 , wherein a guide key projects from one joint plate and a guide hole is formed in the other joint plate to engage the guide key. Sleepers.
JP2010247268A 2010-11-04 2010-11-04 Assembled sleepers Expired - Fee Related JP5657346B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010247268A JP5657346B2 (en) 2010-11-04 2010-11-04 Assembled sleepers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010247268A JP5657346B2 (en) 2010-11-04 2010-11-04 Assembled sleepers

Publications (2)

Publication Number Publication Date
JP2012097502A JP2012097502A (en) 2012-05-24
JP5657346B2 true JP5657346B2 (en) 2015-01-21

Family

ID=46389719

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010247268A Expired - Fee Related JP5657346B2 (en) 2010-11-04 2010-11-04 Assembled sleepers

Country Status (1)

Country Link
JP (1) JP5657346B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158378B (en) * 2019-05-12 2024-03-29 中铁二院工程集团有限责任公司 Medium-low speed magnetic levitation track structure with variable track gauge
JP7297254B2 (en) * 2019-10-07 2023-06-26 戸田建設株式会社 Water stop structure of precast concrete wall body and construction method thereof
CN114541479B (en) * 2021-12-31 2024-06-11 四川省铁路建设有限公司 Small curve radius existing rail transit non-stop in-situ reinforcing structure and construction method
JP7673356B2 (en) 2022-01-13 2025-05-09 公益財団法人鉄道総合技術研究所 Ladder sleepers
CN115522413B (en) * 2022-09-30 2025-08-26 浙江亚磊型钢冷拔有限公司 A subway trapezoidal sleeper connected to a square steel structure

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5025A (en) * 1847-03-20 Horatio allen
DE2155479A1 (en) * 1971-01-05 1972-07-20 Schubert, Egon, Dipl.-Ing., Wien Railway superstructure with cross sleepers
JP3831065B2 (en) * 1997-05-30 2006-10-11 住友金属工業株式会社 Connection structure of vertical sleepers
JP3959570B2 (en) * 1998-03-27 2007-08-15 西日本旅客鉄道株式会社 Sleeper and track structure using the sleeper
JPH11336001A (en) * 1998-05-22 1999-12-07 West Japan Railway Co Sleeper and track structure using it
BE1013396A3 (en) * 2000-04-17 2001-12-04 Composite Damping Material Nv Sleeper AND IN MEANS OF LATTER ENGINEERED RAILWAY.
JP4709592B2 (en) * 2005-06-30 2011-06-22 積水化学工業株式会社 Pillow structure
JP2008031653A (en) * 2006-07-26 2008-02-14 West Japan Railway Co Pc sleeper joint
JP3987875B1 (en) * 2006-11-27 2007-10-10 東海旅客鉄道株式会社 Sleeper structure and sleeper structure manufacturing method

Also Published As

Publication number Publication date
JP2012097502A (en) 2012-05-24

Similar Documents

Publication Publication Date Title
JP5657346B2 (en) Assembled sleepers
KR102012883B1 (en) Aseismatic Reinforcement Steel Frame with Friction Slip Brace and Aseismatic Reinforcement Method using thereof
JP5824424B2 (en) Track slab restraint structure, restraint jig, and method for forming race slab restraint structure
JP5436358B2 (en) Vehicle track support method using vertical sleepers and track position support tool used therefor
KR102771748B1 (en) Segmental expansion joint with reinforced connection and construction method
KR101330177B1 (en) Deck panel using reinforced strand
CN109235151A (en) Elastic long sleeper buried-type ballastless track structure on a kind of Railway Steel Truss Girder Bridges
JP5129022B2 (en) Fixing device for track deck
JP4224419B2 (en) Sleeper tree connection structure, sleeper tree repair method
JP4136959B2 (en) "How to build underground structures and installation girder"
JP3997876B2 (en) Construction method of composite floor slab
JP3356652B2 (en) Curved section-compatible joining device for ladder-type sleepers
KR102323489B1 (en) Railroad crossing
KR20180116841A (en) Construction Method for Elastic Support Layer between Track and Substructure
JP6463283B2 (en) Connection structure of precast concrete wall members
JP2008031653A (en) Pc sleeper joint
JP4657059B2 (en) Sleeper tree connection structure and method for manufacturing sleeper tree connection structure
JP5525884B2 (en) Reinforcement joint structure and method for constructing the joint structure
JP2003328302A (en) Sleeper connection splicer
JP6886876B2 (en) Vertical sleeper structure and track for vehicles
JP2018150674A (en) Walkway and its installation method
JP4554743B2 (en) Pavement structure outside track gauge and pavement method outside track gauge
JP6513620B2 (en) Track structure and construction method of track structure
KR200235668Y1 (en) Pre-Casted Structure for Transportation
JP6259507B1 (en) Construction girder mounting device and construction girder mounting method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20131030

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20140521

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140812

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20141010

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20141028

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20141126

R150 Certificate of patent or registration of utility model

Ref document number: 5657346

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees