Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6560139B2 - COMMUNICATION DEVICE, STARTUP METHOD, AND PROGRAM - Google Patents
[go: Go Back, main page]

JP6560139B2 - COMMUNICATION DEVICE, STARTUP METHOD, AND PROGRAM - Google Patents

COMMUNICATION DEVICE, STARTUP METHOD, AND PROGRAM Download PDF

Info

Publication number
JP6560139B2
JP6560139B2 JP2016026373A JP2016026373A JP6560139B2 JP 6560139 B2 JP6560139 B2 JP 6560139B2 JP 2016026373 A JP2016026373 A JP 2016026373A JP 2016026373 A JP2016026373 A JP 2016026373A JP 6560139 B2 JP6560139 B2 JP 6560139B2
Authority
JP
Japan
Prior art keywords
normality
power
time
normality confirmation
state
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016026373A
Other languages
Japanese (ja)
Other versions
JP2017147514A (en
Inventor
學 吉野
學 吉野
裕隆 氏川
裕隆 氏川
拓弥 原田
拓弥 原田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NTT Inc
NTT Inc USA
Original Assignee
Nippon Telegraph and Telephone Corp
NTT Inc USA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Telegraph and Telephone Corp, NTT Inc USA filed Critical Nippon Telegraph and Telephone Corp
Priority to JP2016026373A priority Critical patent/JP6560139B2/en
Publication of JP2017147514A publication Critical patent/JP2017147514A/en
Application granted granted Critical
Publication of JP6560139B2 publication Critical patent/JP6560139B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Small-Scale Networks (AREA)

Description

本発明は、通信装置、起動方法及びプログラムに関する。   The present invention relates to a communication device, an activation method, and a program.

ネットワーク機器には、加入者がネットワークへアクセスするために用いられるものがある。このようなネットワーク機器を用いたアクセスシステムとして、例えば、PON(Passive Optical Network;受動光ネットワーク)システムがある(例えば、非特許文献1参照)。PONシステムは、顧客宅内に設置するONU(Optical Network Unit;光回線終端装置)と、局舎に設置するOLT(Optical Line Terminal;光加入者線終端装置)と、複数ONUとOLTを接続する光ファイバ網とから構成される。   Some network devices are used by subscribers to access the network. As an access system using such a network device, for example, there is a PON (Passive Optical Network) system (see, for example, Non-Patent Document 1). The PON system includes ONUs (Optical Network Units) installed in customer premises, OLTs (Optical Line Terminals) installed in office buildings, and light that connects multiple ONUs and OLTs. It consists of a fiber network.

ネットワーク機器には、スリープ機能を有する通信装置が用いられる場合がある。スリープ機能を有する装置が起動状態からスリープ状態になるときには、装置の電源を停止することがある。スリープ状態の装置が再び電源を起動するときには、メモリチェックなど、装置の正常性の確認が行われる(例えば、非特許文献2参照)。   A network device may use a communication device having a sleep function. When a device having a sleep function goes from a start state to a sleep state, the power of the device may be stopped. When the device in the sleep state restarts the power supply, the normality of the device is checked, such as a memory check (see Non-Patent Document 2, for example).

"ITU-T G.989.1"、International Telecommunication Union,2013年"ITU-T G.989.1", International Telecommunication Union, 2013 "メモリ診断ツールの有効性を確認する ――IT管理者にとって必携のツールか?――"、[online]、アイティメディア株式会社、[平成27年12月16日検索]、インターネット〈URL:http://tokkyo.shinsakijun.com/information/newtech.html〉"Check the effectiveness of the memory diagnostic tool-an indispensable tool for IT managers?", [Online], IT Media Co., Ltd. [searched on December 16, 2015], Internet <URL: http : //tokkyo.shinsakijun.com/information/newtech.html>

装置がスリープ状態のために電源停止した後、再び起動する場合、起動時間が長いという問題がある。上述したように、この起動時間には、メモリチェック等、起動時に行う装置の正常性確認にかかる時間が含まれる。装置が通信機器である場合、正常性確認を行っている間は他の装置と通信できないため、通信の遅延などが発生し得る。   When the apparatus is restarted after being powered off due to the sleep state, there is a problem that the startup time is long. As described above, the activation time includes a time required for checking the normality of the apparatus at the time of activation, such as a memory check. When the device is a communication device, communication with other devices cannot be performed while the normality is being confirmed, which may cause a communication delay or the like.

上述の課題を鑑み、本発明は、起動時間を短くすることができる通信装置、起動方法及びプログラムを提供することを目的とする。   In view of the above-described problems, an object of the present invention is to provide a communication device, an activation method, and a program that can shorten the activation time.

本発明の一態様は、他装置との通信を行う通信部と、自装置の電源の状態を制御する制御部とを備え、前記制御部は、自装置の電源が停止状態から起動する際に、電源起動時の正常性確認処理を抑制する、通信装置である。   One aspect of the present invention includes a communication unit that communicates with another device and a control unit that controls a power state of the own device, and the control unit is configured to start up the power source of the own device from a stopped state. The communication device suppresses normality confirmation processing at power-on.

本発明の一態様は、上述した通信装置であって、前記制御部は、自装置の電源が停止状態から起動する際に、非運用部分の電源起動時の正常性確認処理を抑制する。   One aspect of the present invention is the communication device described above, wherein the control unit suppresses normality confirmation processing at the time of power activation of a non-operational part when the power of the own device is activated from a stopped state.

本発明の一態様は、上述した通信装置であって、前記制御部は、自装置の電源が停止状態から起動した後に、正常性確認処理を実行する。   One aspect of the present invention is the communication device described above, wherein the control unit executes normality confirmation processing after the power supply of the own device is started from a stopped state.

本発明の一態様は、上述した通信装置であって、前記制御部は、自装置の電源の状態を制御する状態制御部と、自装置の故障確率に関する情報と、自装置の通信のトラフィックに関する情報と、正常性確認の要否の確率計算の結果と、故障確率に応じた正常性確認の要否の確率計算とのうち少なくともいずれかに基づいて、電源起動時における正常性確認の要否を判断する判断部と、自装置の電源が停止状態から起動する際に、前記判断部による判断結果に従って電源起動時の正常性確認処理の実行又は抑制を行う正常性確認部とを有する。   One aspect of the present invention is the communication device described above, wherein the control unit is related to a state control unit that controls a power state of the own device, information on a failure probability of the own device, and communication traffic of the own device. Necessity of normality confirmation at power-up based on at least one of the information, the result of probability calculation of necessity of normality confirmation, and the probability calculation of necessity of normality confirmation according to failure probability And a normality confirmation unit that executes or suppresses normality confirmation processing at the time of power activation according to the determination result by the determination unit when the power supply of the own apparatus is started from a stopped state.

本発明の一態様は、上述した通信装置であって、自装置の故障確率に関する前記情報は、前記通信部が故障する確率、自装置において送信又は受信ができなかったフレームの数、或いは、要求帯域と自装置が通信を行った帯域との差分の情報である。   One aspect of the present invention is the communication device described above, wherein the information related to the failure probability of the own device includes the probability that the communication unit fails, the number of frames that could not be transmitted or received in the own device, or the request This is information on the difference between the band and the band with which the device communicates.

本発明の一態様は、上述した通信装置であって、前記判断部は、自装置が稼働した期間又は前記通信部が稼働した期間が、所定以上の故障確率となるまでの期間を超えたか否かによって、電源起動時の正常性確認の要否を判断する。   One aspect of the present invention is the communication device described above, wherein the determination unit determines whether a period during which the own device is operated or a period during which the communication unit is operated exceeds a predetermined failure probability. Therefore, it is determined whether or not normality confirmation is required at the time of power activation.

本発明の一態様は、上述した通信装置であって、前記判断部は、許容される通信停止時間を自装置の過去の通信のトラフィックに基づいて判断し、正常性確認を行ったときの起動時間が、許容される前記通信停止時間を超えるか否かによって、電源起動時の正常性確認の要否を判断する。   One aspect of the present invention is the communication device described above, wherein the determination unit determines an allowable communication stop time based on traffic of past communication of the own device, and is activated when normality confirmation is performed. Whether or not normality confirmation at the time of power activation is necessary is determined based on whether or not the time exceeds the allowable communication stop time.

本発明の一態様は、上述した通信装置であって、前記制御部は、自装置がスリープ状態であるときに自装置の電源を停止状態とし、自装置がスリープ状態から稼働状態となったときに自装置の電源を起動する。   One aspect of the present invention is the communication device described above, wherein the control unit stops the power supply of the own device when the own device is in the sleep state, and the own device enters the operating state from the sleep state. Start up the power of your device.

本発明の一態様は、上述した通信装置であって、前記通信装置は、受動光ネットワークにおける光加入者線終端装置又は光回線終端装置のいずれかである。   One aspect of the present invention is the communication device described above, wherein the communication device is either an optical subscriber line termination device or an optical line termination device in a passive optical network.

本発明の一態様は、他装置と通信する通信装置に用いられる起動方法であって、自装置の電源の状態を制御する状態制御過程と、自装置の電源が停止状態から起動する際に、電源起動時の正常性確認処理を抑制する正常性確認抑制過程と、を有する。   One aspect of the present invention is a startup method used for a communication device that communicates with another device, a state control process for controlling the power state of the own device, and when the power source of the own device is started from a stopped state. A normality confirmation suppressing process for suppressing normality confirmation processing at power-on.

本発明の一態様は、他装置と通信する通信装置に用いられるコンピュータを、自装置の電源の状態を制御する状態制御手段、自装置の電源が停止状態から起動する際に、電源起動時の正常性確認処理を抑制する正常性確認抑制手段、として機能させるためのプログラムである。   One aspect of the present invention is a state control unit that controls a power state of a self-device of a computer used in a communication device that communicates with another device. It is a program for functioning as normality confirmation suppression means for suppressing normality confirmation processing.

本発明によれば、通信装置の起動時間を短くすることができる。   According to the present invention, the activation time of the communication device can be shortened.

本発明の第1の実施形態におけるPONシステムの構成例を示す図である。It is a figure which shows the structural example of the PON system in the 1st Embodiment of this invention. 第2の実施形態におけるPONシステムの構成例を示す図である。It is a figure which shows the structural example of the PON system in 2nd Embodiment. 第4の実施形態におけるPONシステムの構成例を示す図である。It is a figure which shows the structural example of the PON system in 4th Embodiment. 同実施形態におけるOLTが実行する正常性確認要否判断処理を示す処理フローである。It is a processing flow which shows the normality confirmation necessity judgment process which OLT in the embodiment performs.

本発明の実施形態について図面を参照して詳細に説明する。   Embodiments of the present invention will be described in detail with reference to the drawings.

(第1の実施形態)
図1は、本発明の第1の実施形態によるPON(Passive Optical Network;受動光ネットワーク)システム1の構成を示す機能ブロック図であり、本実施形態と関係する機能ブロックのみを抽出して示してある。PONシステム1は、アクセスネットワークとして用いられる通信システムである。PONシステム1は、顧客宅内に設置されるONU(Optical Network Unit;光回線終端装置)2と、局舎に設置されるOLT(Optical Line Terminal;光加入者線終端装置)3とを備える。OLT3と、複数のONU2とは、光ファイバ網4を介して接続される。
(First embodiment)
FIG. 1 is a functional block diagram showing a configuration of a PON (Passive Optical Network) system 1 according to the first embodiment of the present invention. Only functional blocks related to this embodiment are extracted and shown. is there. The PON system 1 is a communication system used as an access network. The PON system 1 includes an ONU (Optical Network Unit) 2 installed in a customer premises and an OLT (Optical Line Terminal) 3 installed in a office building. The OLT 3 and the plurality of ONUs 2 are connected via the optical fiber network 4.

光ファイバ網4は、光ファイバを、光カプラ5−1及び光カプラ5−2により接続して構成される。光カプラ5−1は、複数のONU2それぞれとの間の光ファイバ6−1から受信した上り通信の光信号を多重して、光カプラ5−2との間の光ファイバ6−2に出力する。光カプラ5−2は、光ファイバ6−2から受信した上り通信の光信号を、OLT3との間の光ファイバ6−3に出力する。また、光カプラ5−2は、光ファイバ6−3から受信した下り通信の光信号を、光ファイバ6−2に出力する。光カプラ5−1は、光ファイバ6−2から受信した下り通信の光信号を、複数のONU2それぞれとの間の光ファイバ6−1に分岐して出力する。これにより、PONシステム1は、ONU2の配下に接続される顧客端末(図示せず)と、OLT3に接続されるネットワーク上の上位装置(図示せず)との間の通信を中継する。同図では、光カプラ5−2のONU側に単一の光ファイバ6−2が接続される構成を示したが、複数の光ファイバ6−2が接続されてもよく、光カプラと光ファイバの接続数は適宜増減してよく、例えば光カプラ5−2及び光ファイバ6−2を除いて光ファイバ6−3と光カプラ5−1が接続されてもよい。   The optical fiber network 4 is configured by connecting optical fibers by an optical coupler 5-1 and an optical coupler 5-2. The optical coupler 5-1 multiplexes the optical signal of the uplink communication received from the optical fiber 6-1 with each of the plurality of ONUs 2, and outputs the multiplexed optical signal to the optical fiber 6-2 with the optical coupler 5-2. . The optical coupler 5-2 outputs the upstream communication optical signal received from the optical fiber 6-2 to the optical fiber 6-3 between the OLT 3 and the optical coupler 5-2. The optical coupler 5-2 outputs the optical signal for downlink communication received from the optical fiber 6-3 to the optical fiber 6-2. The optical coupler 5-1 branches and outputs the optical signal for downlink communication received from the optical fiber 6-2 to the optical fiber 6-1 between each of the plurality of ONUs 2. Thereby, the PON system 1 relays communication between a customer terminal (not shown) connected under the control of the ONU 2 and a host device (not shown) on the network connected to the OLT 3. In the figure, a configuration in which a single optical fiber 6-2 is connected to the ONU side of the optical coupler 5-2 is shown, but a plurality of optical fibers 6-2 may be connected. For example, the optical fiber 6-3 and the optical coupler 5-1 may be connected except for the optical coupler 5-2 and the optical fiber 6-2.

本実施形態では、スリープ状態をとり得る通信装置がOLT3である場合を例に説明する。OLT3は、OSU(Optical Subscriber Unit;光加入者線終端装置)33と、制御部31とを備える。同図では、制御部31をOLT3に備える構成を示したが、OLT3の外部に備えていてもよい。外部とは例えば、制御システム、ONU、上位装置、又は他のOLT3内部等又はそれらの組み合わせである。制御部31を、複数のOLT3等のスリープ状態を取り得る通信装置や通信装置以外で共用してもよい。制御部31を共用すると、共用した機能部(例えば、制御部31)の駆動状態における電力消費を抑制しやすい。また、制御部31を外部に備えるとOLT3全体のスリープ状態への遷移が容易となる。   In the present embodiment, a case where the communication apparatus that can be in the sleep state is OLT 3 will be described as an example. The OLT 3 includes an OSU (Optical Subscriber Unit; optical subscriber line terminating device) 33 and a control unit 31. In the figure, the configuration in which the control unit 31 is provided in the OLT 3 is shown, but the control unit 31 may be provided outside the OLT 3. The external is, for example, a control system, an ONU, a host device, another OLT 3 internal, or a combination thereof. The control unit 31 may be shared by a communication device other than a communication device or a communication device that can take a sleep state, such as a plurality of OLTs 3. When the control unit 31 is shared, it is easy to suppress power consumption in the driving state of the shared function unit (for example, the control unit 31). In addition, when the control unit 31 is provided outside, the entire OLT 3 can easily transition to the sleep state.

OSU30は他装置との間の通信を行う通信部を構成する。OSU30は、光信号を終端する。OSU30は光送受信部301と信号処理部302とを備える。光送受信部301は、光ファイバ網4から受信した上り通信の光信号を電気信号に変換し、信号処理部302に出力する。また、光送受信部301は、下り通信の電気信号を光信号に変換し、光ファイバ網4に出力する。信号処理部302は、光送受信部301により電気信号に変換された上り通信の信号のフレームを、PONフレームから所望のフレームに変換し、上位装置と接続されるネットワークに出力する。また、信号処理部302は、上位装置と接続されるネットワークから受信した下り通信の信号のフレームをPONフレームに変換し、光送受信部301に出力する。なお、OSU30自体又はその一部機能は複数OSU30で一体であってもよい。   The OSU 30 constitutes a communication unit that performs communication with other devices. The OSU 30 terminates the optical signal. The OSU 30 includes an optical transmission / reception unit 301 and a signal processing unit 302. The optical transmission / reception unit 301 converts an optical signal for uplink communication received from the optical fiber network 4 into an electrical signal and outputs the electrical signal to the signal processing unit 302. The optical transceiver 301 converts the downlink communication electrical signal into an optical signal and outputs the optical signal to the optical fiber network 4. The signal processing unit 302 converts the frame of the uplink communication signal converted into the electrical signal by the optical transmission / reception unit 301 from the PON frame to a desired frame, and outputs the frame to a network connected to the host device. In addition, the signal processing unit 302 converts a frame of a downlink communication signal received from a network connected to the host device into a PON frame and outputs the PON frame to the optical transmission / reception unit 301. Note that the OSU 30 itself or some of its functions may be integrated into a plurality of OSUs 30.

制御部31は、各部の制御を行う。制御部31は、OLT3の状態をスリープ状態とするか、稼働状態とするかを制御する。制御部31は、OSU30を稼働状態からスリープ状態とする場合、OLT3が備える所定の機能部の電源、又は、OLT3全体の電源を停止状態とする。所定の機能部を停止状態とする場合、制御部31は、例えば、OSU30の信号処理部302への電源の供給を停止するよう制御してもよく、OSU30の光送受信部301への電源の供給を停止するよう制御してもよく、その両方への電源の供給を停止するよう制御してもよい。   The control unit 31 controls each unit. The control unit 31 controls whether the state of the OLT 3 is set to the sleep state or the operation state. When the OSU 30 is changed from the operating state to the sleep state, the control unit 31 stops the power supply of a predetermined functional unit included in the OLT 3 or the entire OLT 3. When the predetermined function unit is in a stopped state, for example, the control unit 31 may control to stop the supply of power to the signal processing unit 302 of the OSU 30, or supply of power to the optical transmission / reception unit 301 of the OSU 30. May be controlled to stop, or the supply of power to both of them may be stopped.

複数のOSU30の一部又は全体が一体となっている場合は、スリープ又は稼働状態とすべきOSU30の一部又は全体を遷移してもよいし、一部又は全体が一体となっているOSU30の全てをスリープとすべき場合、OSU30の全てをスリープ状態に遷移してもよい。   When some or all of the plurality of OSUs 30 are integrated, a part or all of the OSUs 30 that should be in the sleep or operating state may be transitioned, or the OSU 30 that is partly or entirely integrated may be changed. If all should be set to sleep, all of the OSUs 30 may transition to the sleep state.

OLT3全体の電源を停止状態とし、OLT3に制御部31を含む場合、制御部31はスリープ状態から、他の装置からの起動指示の受信、ユーザによる起動指示の入力、予め決められたデータの到着、予め決められた時間の経過、予め決められた時刻となったことの検出等の駆動状態に遷移させる所定の条件を検出し、駆動状態に遷移させる制御を開始するに要する機能は、コンデンサ等のバックアップバッテリ等を用いて電力供給なしにそれらの機能を稼働可能としている。OLT3全体の電源を停止状態としてもOLT3に制御部31を含まない場合、制御部31がOLT3を稼働状態に遷移させるためのバックアップバッテリ等は不要である。   When the power supply of the entire OLT 3 is stopped and the control unit 31 is included in the OLT 3, the control unit 31 receives a start instruction from another device, inputs a start instruction by a user, and arrives at predetermined data from the sleep state. Detecting a predetermined condition for transitioning to a driving state such as the detection of the passage of a predetermined time or the detection of a predetermined time, and the function required to start control for transitioning to the driving state is a capacitor or the like These functions can be operated without power supply using a backup battery or the like. If the control unit 31 is not included in the OLT 3 even when the power supply of the entire OLT 3 is stopped, a backup battery or the like for the control unit 31 to transition the OLT 3 to the operating state is unnecessary.

制御部31は、OLT3をスリープ状態から稼働状態に遷移する場合、スリープ状態のときに電源が停止状態であった機能部、又は、OLT3全体への電源を起動するよう制御する。これにより、制御部31は、電源を停止状態から供給状態へ遷移させる。このように制御部31は、自装置の電源の状態を制御する機能を有する。   When the OLT 3 transitions from the sleep state to the operating state, the control unit 31 performs control so as to start the power supply to the functional unit that is in the stop state or the entire OLT 3 in the sleep state. Thereby, the control part 31 changes a power supply from a stop state to a supply state. As described above, the control unit 31 has a function of controlling the state of the power supply of its own device.

次に、OLT3の動作を説明する。
OLT3の制御部31は、所定の機能部の電源を停止状態としたスリープ状態にあるときに、稼働状態へ遷移すべき所定のトリガを検出すると、電源が停止状態である機能部の電源を起動する。トリガは、他の装置からの起動指示の受信、ユーザによる起動指示の入力、予め決められたデータの到着、予め決められた時間の経過、予め決められた時刻となったことの検出など、任意とすることができる。
Next, the operation of the OLT 3 will be described.
When the control unit 31 of the OLT 3 is in a sleep state in which the power supply of a predetermined function unit is in a stopped state and detects a predetermined trigger that should be changed to the operation state, the power supply of the function unit in the power supply stop state is activated. To do. Trigger is optional, such as receiving a start instruction from another device, inputting a start instruction by the user, arrival of a predetermined data, elapse of a predetermined time, detection of a predetermined time, etc. It can be.

制御部31は、電源を起動すると、起動時の正常性確認処理を抑制する。これより、OLT3は、正常性確認を実行せずに起動する。
本実施形態は、正常性確認を実行せずに起動するため、従来よりも起動時間が短くなる効果を奏する。
When the power supply is activated, the control unit 31 suppresses normality confirmation processing at the time of activation. Thus, the OLT 3 starts without executing normality confirmation.
Since the present embodiment is activated without executing normality confirmation, there is an effect that the activation time is shorter than the conventional one.

(第2の実施形態)
本実施形態と、第1の実施形態との違いは、非運用部分の正常性確認を抑止するところにある。以下では、第1の実施形態との差分について説明する。
(Second Embodiment)
The difference between this embodiment and 1st Embodiment exists in the place which suppresses the normality check of a non-operation part. Below, the difference with 1st Embodiment is demonstrated.

本実施形態のPONシステムの構成は、図1に示す第1の実施形態のPONシステム1と同様である。また、OLT3の動作は、以下の点を除き、第1の実施形態と同様である。
本実施形態では、制御部31は、非運用部分の起動時の正常性確認処理を抑制する。これにより、OLT3は、非運用部分の正常性確認を実行せずに起動する。非運用部分とは、駆動状態にて運用に供しない又はその可能性が多い、メモリやFPGA(Field Programmable Gate Array)やCPU(central processing unit)コアや配線や処理機能部等や複数のOSU30の一部又は全体が一体の場合で信号導通していないOSU30に係る部分等のリソースである。これらのリソースは、例えば余剰や予備を信号不動通や何らかの不具合等により運用しない。非運用部分の識別は通信装置製造時やスリープ状態遷移前に定めてもよい。例えば、設計情報や、自装置又は他装置の過去の1乃至複数の駆動状態において運用に供さなかった又は運用に供した割合が予め定めた割合よりも低い等で定めてもよい。例えば、設計情報や、自装置又は他装置の過去の1乃至複数の駆動状態において運用に供さなかった又は運用に供した割合が予め定めた割合よりも低い等で定めてもよい。
The configuration of the PON system of this embodiment is the same as that of the PON system 1 of the first embodiment shown in FIG. The operation of the OLT 3 is the same as that of the first embodiment except for the following points.
In this embodiment, the control part 31 suppresses the normality confirmation process at the time of starting of a non-operation part. As a result, the OLT 3 starts without executing normality check of the non-operation part. The non-operating part is a memory, an FPGA (Field Programmable Gate Array), a CPU (central processing unit) core, a wiring, a processing function part, etc., or a plurality of OSUs 30 that are not used or frequently operated in a driving state. It is a resource such as a part related to the OSU 30 that is partially or wholly integrated and is not conducting signals. For these resources, for example, surplus and spare are not used due to signal immobility or some trouble. The identification of the non-operating part may be determined when the communication device is manufactured or before the sleep state transition. For example, it may be determined that the design information or the ratio of the apparatus or other apparatus that has not been used or operated in the past one or more drive states is lower than a predetermined ratio. For example, it may be determined that the design information or the ratio of the apparatus or other apparatus that has not been used or operated in the past one or more drive states is lower than a predetermined ratio.

本実施形態では、さらに、制御部31の内部又は外部に、記憶部と、判断部と、正常性確認部とのうち少なくともいずれかを備えていてもよい。この構成の一例を図2に示す。なお、これら追加で備える機能のいずれかもOLT3の外部に備えていてもよいし、複数のOLT3等のスリープ状態を取り得る通信装置や通信装置以外で共用してもよいし、スリープ状態でコンデンサ等のバックアップバッテリ等を用いて電力供給なしにそれらの機能を稼働可能としてもよい。   In the present embodiment, the control unit 31 may further include at least one of a storage unit, a determination unit, and a normality confirmation unit inside or outside the control unit 31. An example of this configuration is shown in FIG. Note that any of these additional functions may be provided outside the OLT 3, or may be shared by a plurality of communication devices other than the communication device such as the OLT 3 or a communication device other than the communication device. These functions may be operable without power supply using a backup battery or the like.

図2は、本実施形態のPONシステム1aの他の構成を示す機能ブロック図であり、本実施形態と関係する機能ブロックのみを抽出して示してある。同図において、図1に示す第1の実施形態によるPONシステム1と同一の部分には同一の符号を付し、その説明を省略する。同図に示すPONシステム1aと、図1に示す第1の実施形態のPONシステム1とが異なる点は、OLT3に代えてOLT3aを備える点である。OLT3aは、制御部31の外部に記憶部32を備え、制御部31の内部に判断部311と正常性確認部312を備える構成であるときの例を示す。   FIG. 2 is a functional block diagram showing another configuration of the PON system 1a of the present embodiment, and only functional blocks related to the present embodiment are extracted and shown. In this figure, the same parts as those in the PON system 1 according to the first embodiment shown in FIG. The difference between the PON system 1a shown in the figure and the PON system 1 of the first embodiment shown in FIG. 1 is that an OLT 3a is provided instead of the OLT 3. The OLT 3 a shows an example in which the storage unit 32 is provided outside the control unit 31 and the determination unit 311 and the normality confirmation unit 312 are provided inside the control unit 31.

判断部311は、以下の(1)から(5)の少なくともいずれかのタイミングで、非運用部分を判断する。
(1)所定の時刻到来。
(2)OSU30又は制御部31又はOLT3の少なくとも一部の製造又は実装又は駆動開始又は信号導通開始のいずれか又はその組み合わせ。
(3)OSU30又は制御部31又はOLT3の少なくとも一部の製造又は実装又は駆動開始又は信号導通開始又は前回判断のいずれか又はその組み合わせから、所定の時間又は所定の駆動時間又は所定のスリープ時間の少なくともいずれか又はその組み合わせの経過。なお、前回判断とは、前回の非運用部分の判断である。
(4)OSU30又は制御部31又はOLT3の少なくとも一部の製造又は実装又は駆動開始又は信号導通開始又は前回判断のいずれか又はその組み合わせから、所定の駆動状態への遷移とスリープ状態への遷移のいずれか又はその組み合わせの回数。なお、前回判断とは、前回の非運用部分の判断である。
(5)制御部31による電源の起動又はスリープ状態への遷移前。
The determination unit 311 determines a non-operational part at least at any one of timings (1) to (5) below.
(1) A predetermined time has arrived.
(2) Any or a combination of manufacturing or mounting, driving start, or signal conduction start of at least a part of the OSU 30, the control unit 31, or the OLT 3.
(3) From the manufacturing or mounting of at least a part of the OSU 30 or the control unit 31 or the OLT 3 or the start of driving, the start of signal conduction, the previous determination, or a combination thereof, a predetermined time, a predetermined driving time, or a predetermined sleep time. Progress of at least one or a combination thereof. The previous determination is a determination of the previous non-operational part.
(4) The transition to the predetermined driving state and the transition to the sleep state from the manufacturing or mounting of at least a part of the OSU 30 or the control unit 31 or the OLT 3 or the start of driving, the start of signal conduction, the previous determination, or a combination thereof The number of any or a combination. The previous determination is a determination of the previous non-operational part.
(5) Before the start of the power source by the control unit 31 or the transition to the sleep state.

正常性確認部312は、判断部311により非運用部分と判断された部分には正常性確認を実行せず、他の部分の正常性確認を実行する。   The normality confirmation unit 312 does not perform normality confirmation on the portion determined by the determination unit 311 as a non-operational portion, but performs normality confirmation on other portions.

記憶部32は、判断部311が非運用部分を判断するために用いる各種データ又は判断結果を記憶する。   The storage unit 32 stores various data or determination results used by the determination unit 311 to determine the non-operational part.

制御部31が電源を起動すると、判断部311は、記憶部32に記憶されているデータ、又は、OLT3a以外の他の装置から取得したデータに基づいて得られる情報を用いて、非運用部分か否かを判断する。非運用部分確認を行うか否かを判断に用いられるこの情報を、判断情報と記載する。
判断情報は、例えば、OSU30又はOLT3a等について想定される非運用に関する情報である。非運用部分又は非運用部分となる確率は、OLT3aの記憶部32に記憶されている統計データや、他の装置に蓄積されている統計データから得ることができる。統計データは、OSU30又はOLT3a等の設計情報、運用情報、電力消費情報、導通情報、故障情報、故障警報、OLT3が送受信した信号等に関する統計を示す。
When the control unit 31 activates the power supply, the determination unit 311 uses the data stored in the storage unit 32 or data obtained from other devices other than the OLT 3a to determine whether it is a non-operational part. Judge whether or not. This information used for determining whether or not to perform non-operation part confirmation is referred to as determination information.
The determination information is information regarding non-operation assumed for the OSU 30 or the OLT 3a, for example. The probability of becoming a non-operating part or a non-operating part can be obtained from statistical data stored in the storage unit 32 of the OLT 3a or statistical data accumulated in other devices. The statistical data indicates statistics related to design information, operation information, power consumption information, continuity information, failure information, failure alarm, signals transmitted / received by the OLT 3 and the like of the OSU 30 or the OLT 3a.

例えば、判断部311は、設計情報から設計上予め余剰や予備となる部分又は各部が予備となる確率から、非運用の部分又は各部が非運用となる確率を判断する。非運用となる確率の算出対象は、非運用となる可能性がある部分のみとしてもよい。例えば、判断部311は、運用情報によって、特に複数のOSU30を一体化している部分で非運用のOSU30に対応する非運用部分や、予備系である非運用部分から、非運用の部分又は各部が非運用となる確率を判断する。例えば、判断部311は、電力消費情報によって電力消費が他の部分或いは運用状態にある場合の所定の値と比べて少ない部分から、非運用の部分又は各部が非運用となる確率を判断する。また例えば、判断部311は、導通情報によって、導通のない部分から、非運用の部分又は各部が非運用となる確率を判断する。また例えば、判断部311は、故障情報や故障警報のある部分から、非運用の部分又は各部が非運用となる確率を判断する。判断部311は、統計データから得られた非運用の部分又は各部が非運用の確率が所定値以上である場合は、非運用部分と判断する。   For example, the determination unit 311 determines the probability that the non-operating part or each part will be non-operating from the probability that the surplus part or the spare part or each part will be reserved in advance from the design information. The calculation target of the probability of non-operation may be only a portion that may be non-operation. For example, the determination unit 311 determines whether the non-operating part or each part from the non-operating part corresponding to the non-operating OSU 30 or the standby non-operating part according to the operation information, particularly in the part where the plurality of OSUs 30 are integrated. Determine the probability of non-operation. For example, the determination unit 311 determines, based on the power consumption information, the probability that the non-operating part or each part will be non-operating from a part that is less than the predetermined value when the power consumption is in another part or in the operating state. Further, for example, the determination unit 311 determines the probability that the non-operating part or each unit will be non-operating from the non-conductive part based on the continuity information. Further, for example, the determination unit 311 determines the probability that the non-operating part or each part will be non-operating from the part with the failure information or the failure alarm. The determining unit 311 determines that the non-operating part or each part obtained from the statistical data is a non-operating part when the probability of non-operating of each part is a predetermined value or more.

上記では、非運用部分を、OLT3の判断部311が判断しているが、設定時や電源停止前に人手によってOLT3に設定してもよい。また、判断部311を、OLT3と接続される他の装置が備えてもよい。OLT3の正常性確認部312は、他の装置が備える判断部311から受信した非運用部分の判断結果に従って、非運用部分の正常性確認を抑止する。   In the above description, the non-operation part is determined by the determination unit 311 of the OLT 3, but may be manually set to the OLT 3 at the time of setting or before the power is stopped. Further, the determination unit 311 may be provided in another device connected to the OLT 3. The normality confirmation unit 312 of the OLT 3 suppresses the normality confirmation of the non-operation part according to the determination result of the non-operation part received from the determination unit 311 provided in another device.

本実施形態では、非運用部分の正常性確認を実行しないため、非運用部分の正常性確認を実行する場合よりも、起動時間は短くなる。また、運用に関係ない又は関係する可能性の低い部分の故障等の正常でない状態により、不要な起動停止による運用断や故障警報発出による運用システムへの負荷を軽減できる効果がある。さらに運用部分の正常性確認を行う場合、運用部分の正常性が失われた場合に、運用に関係する又は関係する可能性の高い部分の故障等の正常でない状態による運用が可能となる効果もある。   In this embodiment, since the normality check of the non-operation part is not executed, the activation time is shorter than when the normality check of the non-operation part is executed. In addition, there is an effect that it is possible to reduce a load on the operation system due to an operation interruption due to an unnecessary start / stop or a failure alarm issuance due to an abnormal state such as a failure of a portion which is not related to operation or is unlikely to be related. In addition, when checking the normality of the operational part, if the normality of the operational part is lost, there is also an effect that it is possible to operate in an abnormal state such as a failure of a part related to or likely to be related to the operation. is there.

(第3の実施形態)
本実施形態と、第1の実施形態と同様に起動時に正常性確認を抑止する。本実施形態と、第1の実施形態との違いは、運用中に正常性確認を実行するところにある。以下では、第1の実施形態との差分について説明する。
(Third embodiment)
Similar to the present embodiment and the first embodiment, normality confirmation is suppressed at the time of startup. The difference between the present embodiment and the first embodiment is that normality confirmation is performed during operation. Below, the difference with 1st Embodiment is demonstrated.

本実施形態のPONシステムの構成は、図1に示す第1の実施形態のPONシステム1と同様である。また、OLT3の動作は、以下の点を除き、第1の実施形態と同様である。
本実施形態では、OLT3の制御部31は、運用中に正常性確認を実行するよう制御する。正常性確認は運用部分のみでもよいし、非運用部分のみでもよい。また、制御部31は、正常性確認を実施した非運用部分に運用部分を適宜移動することにより、OLT3は、正常性確認済みの部分にて運用を行う。例えば、OLT3がメモリA及びメモリBを有し、当初メモリAが運用中、メモリBが非運用であったとする。この場合、メモリAの運用中にメモリBの正常性確認を実施し、その後、メモリAの内容をメモリBに移してメモリBで運用する。また、OLT3は、正常性確認後に運用部分を戻してもよい。例えば、OLT3がメモリA及びメモリBを有し、当初メモリAが運用中、メモリBが非運用であったとする。この場合、OLT3は、メモリBでの運用に切り替え、メモリAの正常性確認を実施し、その後に、メモリAでの運用に戻す。この場合、メモリBの正常性確認は必須ではない。運用中には正常性確認ができない確認方法を運用部分に対して行う場合は、運用部分を一旦非運用部分に移して確認するか、確認済みの非運用部分で運用することが望ましい。なお、非運用部分とその判断と装置構成と処理は第2の実施形態と同様でもよい。
The configuration of the PON system of this embodiment is the same as that of the PON system 1 of the first embodiment shown in FIG. The operation of the OLT 3 is the same as that of the first embodiment except for the following points.
In the present embodiment, the control unit 31 of the OLT 3 performs control to execute normality confirmation during operation. The normality check may be performed only on the operation part or only on the non-operation part. Further, the control unit 31 appropriately moves the operation part to the non-operation part in which the normality confirmation has been performed, so that the OLT 3 operates in the part in which the normality confirmation has been performed. For example, it is assumed that the OLT 3 has a memory A and a memory B, the memory A is initially in operation, and the memory B is not in operation. In this case, the normality of the memory B is checked during the operation of the memory A, and then the contents of the memory A are moved to the memory B and operated in the memory B. The OLT 3 may return the operation part after the normality confirmation. For example, it is assumed that the OLT 3 has a memory A and a memory B, the memory A is initially in operation, and the memory B is not in operation. In this case, the OLT 3 switches to the operation with the memory B, checks the normality of the memory A, and then returns to the operation with the memory A. In this case, the normality check of the memory B is not essential. When performing a verification method that does not allow normality confirmation during operation on the operation part, it is desirable to move the operation part to the non-operation part for confirmation, or to operate with the confirmed non-operation part. It should be noted that the non-operational part, its determination, device configuration, and processing may be the same as in the second embodiment.

本実施形態では、起動時に正常性確認を実行しないため、起動時間は短くなる。また、運用部分の正常性確認を行う場合、運用部分の正常性が失われた場合に、運用に関係する又は関係する可能性の高い部分の故障等の正常でない状態による運用を抑止しやすい効果もある。   In this embodiment, since the normality confirmation is not executed at the time of activation, the activation time is shortened. In addition, when checking the normality of the operation part, if the normality of the operation part is lost, it is easy to deter operation due to abnormal conditions such as failure of the part related to or likely to be related to the operation There is also.

(第4の実施形態)
図3は、本発明の第4の実施形態によるPONシステム1bの構成を示す機能ブロック図であり、本実施形態と関係する機能ブロックのみを抽出して示してある。同図において、図1に示す第1の実施形態のPONシステム1と同様の構成には同一の符号を付している。PONシステム1bは、アクセスネットワークとして用いられる通信システムである。PONシステム1bは、顧客宅内に設置されるONU2と、局舎に設置されるOLT3とを備える。OLT3bと、複数のONU2とは、光ファイバ網4を介して接続される。
(Fourth embodiment)
FIG. 3 is a functional block diagram showing a configuration of a PON system 1b according to the fourth embodiment of the present invention, and only functional blocks related to the present embodiment are extracted and shown. In the figure, the same reference numerals are given to the same components as those of the PON system 1 of the first embodiment shown in FIG. The PON system 1b is a communication system used as an access network. The PON system 1b includes an ONU 2 installed in a customer premises and an OLT 3 installed in a station building. The OLT 3 b and the plurality of ONUs 2 are connected via the optical fiber network 4.

光ファイバ網4は、光ファイバを、光カプラ5−1及び光カプラ5−2により接続して構成される。光カプラ5−1は、複数のONU2それぞれとの間の光ファイバ6−1から受信した上り通信の光信号を多重して、光カプラ5−2との間の光ファイバ6−2に出力する。光カプラ5−2は、光ファイバ6−2から受信した上り通信の光信号を、OLT3bとの間の光ファイバ6−3に出力する。また、光カプラ5−2は、光ファイバ6−3から受信した下り通信の光信号を、光ファイバ6−2に出力する。光カプラ5−1は、光ファイバ6−2から受信した下り通信の光信号を、複数のONU2それぞれとの間の光ファイバ6−1に分岐して出力する。これにより、PONシステム1bは、ONU2の配下に接続される顧客端末(図示せず)と、OLT3bに接続されるネットワーク上の上位装置(図示せず)との間の通信を中継する。同図では、光カプラ5−2のONU側に単一の光ファイバ6−2が接続される構成を示したが、複数の光ファイバ6−2が接続されてもよく、光カプラと光ファイバの接続数は適宜増減してよく、例えば光カプラ5−2及び光ファイバ6−2を除いて光ファイバ6−3と光カプラ5−1が接続されてもよい。   The optical fiber network 4 is configured by connecting optical fibers by an optical coupler 5-1 and an optical coupler 5-2. The optical coupler 5-1 multiplexes the optical signal of the uplink communication received from the optical fiber 6-1 with each of the plurality of ONUs 2, and outputs the multiplexed optical signal to the optical fiber 6-2 with the optical coupler 5-2. . The optical coupler 5-2 outputs the optical signal for uplink communication received from the optical fiber 6-2 to the optical fiber 6-3 with the OLT 3b. The optical coupler 5-2 outputs the optical signal for downlink communication received from the optical fiber 6-3 to the optical fiber 6-2. The optical coupler 5-1 branches and outputs the optical signal for downlink communication received from the optical fiber 6-2 to the optical fiber 6-1 between each of the plurality of ONUs 2. Thereby, the PON system 1b relays communication between a customer terminal (not shown) connected under the control of the ONU 2 and a host device (not shown) on the network connected to the OLT 3b. In the figure, a configuration in which a single optical fiber 6-2 is connected to the ONU side of the optical coupler 5-2 is shown, but a plurality of optical fibers 6-2 may be connected. For example, the optical fiber 6-3 and the optical coupler 5-1 may be connected except for the optical coupler 5-2 and the optical fiber 6-2.

本実施形態では、スリープ状態をとり得る通信装置がOLT3bである場合を例に説明する。OLT3bは、OSU30と、制御部37と、記憶部38とを備える。同図では、制御部37と記憶部38をOLT3bに備える構成を示したが、少なくともいずれか一方はOLT3bの外部に備えていてもよい。外部とは例えば、制御システム、ONU、上位装置、又は他のOLT3b内部等又はそれらの組み合わせである。制御部37を、これらの少なくともいずれか一方は複数のOLT3b等のスリープ状態を取り得る通信装置や通信装置以外で共用してもよい。制御部37を共用すると、共用した機能部(例えば、制御部37と記憶部38の一方又は両方)の駆動状態における電力消費を抑制しやすい。また、制御部37を外部に備えるとOLT3b全体のスリープ状態への遷移が容易となる。   In the present embodiment, an example will be described in which the communication device that can be in the sleep state is the OLT 3b. The OLT 3b includes an OSU 30, a control unit 37, and a storage unit 38. In the figure, a configuration in which the control unit 37 and the storage unit 38 are provided in the OLT 3b is shown, but at least one of them may be provided outside the OLT 3b. The external is, for example, a control system, an ONU, a host device, another OLT 3b, or a combination thereof. The control unit 37 may be shared by at least one of these devices other than a communication device or a communication device that can take a sleep state, such as a plurality of OLTs 3b. When the control unit 37 is shared, it is easy to suppress power consumption in the driving state of the shared functional unit (for example, one or both of the control unit 37 and the storage unit 38). In addition, when the control unit 37 is provided outside, the entire OLT 3b can easily transition to the sleep state.

OSU30は、他装置との間の通信を行う通信部を構成する。OSU30は、図1に示す第1の実施形態のOSU30と同様である。   The OSU 30 constitutes a communication unit that performs communication with other devices. The OSU 30 is the same as the OSU 30 of the first embodiment shown in FIG.

制御部37は、各部の制御を行う。制御部37は、状態制御部371と、判断部372と、正常性確認部373とを備える。
状態制御部371は、OLT3bの状態をスリープ状態とするか、稼働状態とするかを制御する。状態制御部371は、OLT3bを稼働状態からスリープ状態とする場合、OLT3bが備える所定の機能部の電源、又は、OLT3b全体の電源を停止状態とする。所定の機能部を停止状態とする場合、状態制御部371は、例えば、OSU30の信号処理部302への電源の供給を停止するよう制御してもよく、OSU30の光送受信部301への電源の供給を停止するよう制御してもよく、その両方への電源の供給を停止するよう制御してもよい。
The control unit 37 controls each unit. The control unit 37 includes a state control unit 371, a determination unit 372, and a normality confirmation unit 373.
The state control unit 371 controls whether the state of the OLT 3b is a sleep state or an operation state. When the OLT 3b is changed from the operating state to the sleep state, the state control unit 371 sets the power supply of a predetermined functional unit included in the OLT 3b or the power supply of the entire OLT 3b to the stop state. When the predetermined function unit is set to the stop state, the state control unit 371 may control the supply of power to the signal processing unit 302 of the OSU 30, for example, and may control the power supply to the optical transmission / reception unit 301 of the OSU 30. You may control to stop supply and you may control to stop supply of the power supply to both.

複数のOSU30の一部又は全体が一体となっている場合、状態制御部371は、スリープ状態又は稼働状態とすべきOSU30の一部又は全体の状態を遷移してもよいし、一部又は全体が一体となっているOSU30の全てをスリープとすべき場合、OSU30の全てをスリープ状態に遷移してもよい。   When some or all of the plurality of OSUs 30 are integrated, the state control unit 371 may change the state or part of the OSU 30 to be in the sleep state or the operating state, or part or all of When all the OSUs 30 that are integrated with each other should be set to sleep, all of the OSUs 30 may transition to the sleep state.

OLT3b全体の電源を停止状態とし、OLT3bに制御部37を含む場合、制御部37はスリープ状態から、他の装置からの起動指示の受信、ユーザによる起動指示の入力、予め決められたデータの到着、予め決められた時間の経過、予め決められた時刻となったことの検出等の駆動状態に遷移させる所定の条件を検出し、駆動状態に遷移させる制御を開始するに要する機能は、コンデンサ等のバックアップバッテリ等を用いて電力供給なしにそれらの機能を稼働可能としている。OLT3b全体の電源を停止状態としてもOLT3bに制御部37を含まない場合、制御部37がOLT3bを稼働状態に遷移させるためのバックアップバッテリ等は不要である。   When the power supply of the entire OLT 3b is stopped and the OLT 3b includes the control unit 37, the control unit 37 receives a start instruction from another device, inputs a start instruction by a user, and arrival of predetermined data from the sleep state. Detecting a predetermined condition for transitioning to a driving state such as the detection of the passage of a predetermined time or the detection of a predetermined time, and the function required to start control for transitioning to the driving state is a capacitor or the like These functions can be operated without power supply using a backup battery or the like. Even when the power supply of the entire OLT 3b is stopped, when the control unit 37 is not included in the OLT 3b, a backup battery or the like for the control unit 37 to transition the OLT 3b to the operating state is unnecessary.

状態制御部371は、OLT3bをスリープ状態から稼働状態に遷移する場合、スリープ状態のときに電源が停止状態であった機能部、又は、OLT3b全体への電源を起動するよう制御する。これにより、状態制御部371は、電源を停止状態から供給状態へ遷移させる。このように状態制御部371は、自装置の電源の状態を制御する機能を有する。   When the OLT 3b transitions from the sleep state to the operating state, the state control unit 371 controls to start the power supply to the functional unit in which the power supply is stopped or the entire OLT 3b in the sleep state. Thereby, the state control part 371 changes a power supply from a stop state to a supply state. As described above, the state control unit 371 has a function of controlling the power state of its own device.

判断部372は、以下の(1)から(5)の少なくともいずれかのタイミングで、電源起動時の正常性確認の要否を判断する。
(1)所定の時刻到来。
(2)OSU30又は制御部37又はOLT3bの少なくとも一部の製造又は実装又は駆動開始又は信号導通開始のいずれか又はその組み合わせ。
(3)OSU30又は制御部37又はOLT3bの少なくとも一部の製造又は実装又は駆動開始又は信号導通開始又は前回判断のいずれか又はその組み合わせから、所定の時間又は所定の駆動時間又は所定のスリープ時間の少なくともいずれか又はその組み合わせの経過。なお、前回判断とは、前回の正常性確認の要否の判断である。
(4)OSU30又は制御部37又はOLT3bの少なくとも一部の製造又は実装又は駆動開始又は信号導通開始又は前回判断のいずれか又はその組み合わせから、所定の駆動状態への遷移とスリープ状態への遷移のいずれか又はその組み合わせの回数。なお、前回判断とは、前回の正常性確認の要否の判断である。
(5)状態制御部371による電源の起動又はスリープ状態への遷移前。
The determination unit 372 determines whether or not it is necessary to check the normality at the time of power activation at at least one of the following timings (1) to (5).
(1) A predetermined time has arrived.
(2) Any or a combination of at least a part of the OSU 30, the control unit 37, or the OLT 3 b, or a drive start or a signal conduction start.
(3) From the manufacturing or mounting of at least a part of the OSU 30 or the control unit 37 or the OLT 3b, the start of driving, the start of signal conduction, the previous determination, or a combination thereof, a predetermined time, a predetermined driving time, or a predetermined sleep time. Progress of at least one or a combination thereof. The previous determination is a determination as to whether or not the previous normality check is necessary.
(4) The transition from the OSU 30 or the control unit 37 or the OLT 3b to the predetermined driving state and the transition to the sleep state from the manufacturing or mounting, the driving start, the signal conduction start, the previous determination, or a combination thereof. The number of any or a combination. The previous determination is a determination as to whether or not the previous normality check is necessary.
(5) Before power activation by the state control unit 371 or transition to the sleep state.

正常性確認部373は、判断部372により正常性確認が不要と判断された場合には正常性確認を実行せず、正常性確認が必要と判断された場合には正常性確認を実行する。電源起動時の正常性確認は、例えば、メモリチェックなど、正常性確認対象の機能部(図示しない機能部も含む)が正常に動作するかの確認動作を含む。   The normality confirmation unit 373 does not perform normality confirmation when the determination unit 372 determines that normality confirmation is unnecessary, and performs normality confirmation when it is determined that normality confirmation is necessary. The normality check at the time of power activation includes, for example, a check operation to check whether a normal function check target function unit (including a function unit not shown) operates normally, such as a memory check.

記憶部38は、判断部372が正常性確認の要否を判断するために用いる各種データ又は判断結果を記憶する。   The storage unit 38 stores various data or determination results used by the determination unit 372 to determine whether or not normality confirmation is necessary.

次に、OLT3bの動作を説明する。
図4は、スリープ状態から稼働状態へ遷移する際にOLT3bが実行する正常性確認要否判断処理を示す処理フローである。
OLT3bの状態制御部371は、所定の機能部の電源を停止状態としたスリープ状態にあるときに、稼働状態へ遷移すべき所定のトリガを検出すると、電源が停止状態である機能部の電源を起動する(ステップS10)。トリガは、他の装置からの起動指示の受信、ユーザによる起動指示の入力、予め決められたデータの到着、予め決められた時間の経過、予め決められた時刻となったことの検出など、任意とすることができる。
Next, the operation of the OLT 3b will be described.
FIG. 4 is a process flow showing normality confirmation necessity determination processing executed by the OLT 3b when the sleep state transits to the operation state.
When the state control unit 371 of the OLT 3b is in a sleep state in which the power supply of a predetermined function unit is in a stopped state, and detects a predetermined trigger that should be changed to an operation state, the state control unit 371 turns off the power supply of the function unit in the power supply stop state. Start (step S10). Trigger is optional, such as receiving a start instruction from another device, inputting a start instruction by the user, arrival of a predetermined data, elapse of a predetermined time, detection of a predetermined time, etc. It can be.

状態制御部371が電源を起動すると、判断部372は、記憶部38に記憶されているデータ、又は、OLT3b以外の他の装置から取得したデータに基づいて得られる情報を用いて、正常性確認を行うか否かを判断する(ステップS20)。正常性確認を行うか否かを判断に用いられるこの情報を、判断情報と記載する。
判断情報は、例えば、OSU30又はOLT3b等について想定される故障確率に関する情報である。故障確率は、OLT3bの記憶部38に記憶されている統計データや、他の装置に蓄積されている統計データから得ることができる。統計データは、OSU30又はOLT3b等の設計情報、運用情報、電力消費情報、導通情報、故障情報、故障警報、OLT3bが送受信した信号に関する統計を示す。
When the state control unit 371 activates the power supply, the determination unit 372 checks the normality using data stored in the storage unit 38 or information obtained from data acquired from another device other than the OLT 3b. It is determined whether or not to perform (step S20). This information used for determining whether or not to perform normality confirmation is referred to as determination information.
The determination information is information on the failure probability assumed for the OSU 30 or the OLT 3b, for example. The failure probability can be obtained from statistical data stored in the storage unit 38 of the OLT 3b or statistical data stored in another device. The statistical data indicates statistics regarding design information such as OSU 30 or OLT 3b, operation information, power consumption information, continuity information, failure information, failure alarm, and a signal transmitted / received by OLT 3b.

例えば、判断部372は、設計情報から設計上の使用頻度の多寡や処理の内容から故障又は故障確率を判断する。例えば、判断部372は、運用情報によって、特に複数のOSU30を一体化している部分で運用中のOSU30に対応する稼働状況や、予備系と運用系での稼働状況から故障又は故障確率を判断する。例えば、判断部372は、電力消費情報によって電力消費の累積が他の部分又は所定の値と比べて高い部分から、或いは、ある種のコンデンサのように電圧を印加しない期間の継続から、故障又は故障確率を判断する。また例えば、判断部372は、過去と比較して電力消費が所定の値を超過する増大又は減少、或いは、過去と比較して電力消費が所定の値を下回る増大又は減少から故障又は故障確率を判断する。また例えば、判断部372は、過去と比較して電力消費が所定の率を超過する増大率又は減少率から、或いは、過去と比較して電力消費が所定の率を下回る増大率又は減少率から、故障又は故障確率を判断する。また、例えば、判断部372は、導通情報に基づいて、時間当たりの導通あるいは累積の導通が所定の値より多いこと又は少ないことから故障又は故障確率を判断する。また、例えば、判断部372は、故障情報や故障警報の多寡や頻度と所定の値との比較から、故障又は故障確率を判断する。なお、これらは組み合わせて使用してもよいし、故障の確率は、連続的に増大又は減少するとのモデルを前提にしてもよいし、バスタブ曲線のように初期と稼働後所定の期間を経過後は大きいがその間の期間は故障の確率がするナイトのモデルを前提としてもよい。   For example, the determination unit 372 determines a failure or a failure probability from the amount of design use frequency and the content of processing from the design information. For example, the determination unit 372 determines a failure or a failure probability from the operation status corresponding to the OSU 30 currently operating in a portion where a plurality of OSUs 30 are integrated, and the operation status in the standby system and the operation system, based on the operation information. . For example, the determination unit 372 may detect a failure or a failure from a portion where the accumulation of power consumption is higher than other portions or a predetermined value according to the power consumption information, or from a continuation of a period in which no voltage is applied as in some types of capacitors. Determine failure probability. In addition, for example, the determination unit 372 calculates a failure or a failure probability from an increase or decrease in which power consumption exceeds a predetermined value compared to the past, or an increase or decrease in which power consumption falls below a predetermined value compared to the past. to decide. Further, for example, the determination unit 372 may determine whether the power consumption exceeds a predetermined rate compared to the past or an increase rate or decrease rate, or if the power consumption decreases below a predetermined rate compared to the past. Determine failure or failure probability. Further, for example, the determination unit 372 determines a failure or a failure probability from the fact that the continuity per hour or the cumulative continuity is greater or less than a predetermined value based on the continuity information. Further, for example, the determination unit 372 determines a failure or a failure probability from a comparison between failure information and the number and frequency of failure alarms and a predetermined value. These may be used in combination, or may be premised on a model in which the probability of failure increases or decreases continuously, or after a predetermined period of time has elapsed since the beginning and operation, as in the bathtub curve. However, it is possible to assume a knight model in which the probability of failure is in the period in between.

例えば、故障確率に関する情報として、OLT3bの通信部においてフレームの送信又は受信ができなかったフレーム落ちの発生回数を用いることができる。OLT3bに故障が発生した場合、データの送受信ができないため、フレーム落ちが発生することがある。つまり、フレーム落ちの発生回数が多いことにより、故障確率が高いと判断できる。判断部372は、統計データから得られたフレーム落ちの発生回数が所定数以上である場合は、正常性確認要と判断し(ステップS20:YES)、所定数に満たない場合は正常性確認不要と判断する(ステップS20:NO)。   For example, as the information regarding the failure probability, it is possible to use the number of occurrences of dropped frames that could not be transmitted or received by the communication unit of the OLT 3b. When a failure occurs in the OLT 3b, data cannot be transmitted / received, so that a frame drop may occur. That is, it can be determined that the failure probability is high due to the large number of frame dropping occurrences. The determination unit 372 determines that normality confirmation is necessary when the number of occurrences of frame loss obtained from the statistical data is equal to or greater than the predetermined number (step S20: YES), and normality confirmation is not necessary when the predetermined number is not reached. (Step S20: NO).

また、故障確率に関する情報として、ONU2から要求された帯域の総和と実際にOLT3bとONU2との間で導通した(送受信された)データ帯域との差分を用いてもよい。差分として、要求された帯域の総和に対する導通したデータ帯域の割合を用いてもよい。OLT3bに故障が発生した場合、データの送受信ができないため、要求された帯域よりも実際にデータを送受信できた帯域が低くなることがある。つまり、要求帯域と導通したデータ帯域との差分が大きいことにより、故障確率が高いと判断できる。判断部372は、統計データから求めたこの差分が所定以上である場合は、正常性確認要と判断し(ステップS20:YES)、求めた差分が所定未満である場合は、正常性確認不要と判断する(ステップS20:NO)。なお、ONU2から要求された帯域の総和に代えて、OLT3bがONU2から要求された帯域に対応して割り当てを行った帯域の総和を用いてもよい。   Further, as the information on the failure probability, a difference between the sum of the bands requested from the ONU 2 and the data band actually conducted (transmitted / received) between the OLT 3b and the ONU 2 may be used. As the difference, the ratio of the conducted data band to the sum of the requested bands may be used. When a failure occurs in the OLT 3b, data cannot be transmitted / received, so the bandwidth in which data can actually be transmitted / received may be lower than the requested bandwidth. That is, it can be determined that the failure probability is high because the difference between the requested bandwidth and the conducted data bandwidth is large. The determination unit 372 determines that normality confirmation is necessary when the difference obtained from the statistical data is greater than or equal to a predetermined value (step S20: YES). If the obtained difference is less than the predetermined value, the normality confirmation is not necessary. Judgment is made (step S20: NO). Instead of the total bandwidth requested from the ONU 2, the total bandwidth allocated by the OLT 3 b corresponding to the bandwidth requested from the ONU 2 may be used.

また、記憶部38に、稼働開始から故障確率が所定以上となるまでの期間を正常性確認不要期間として記憶しておく。さらに、記憶部38に、OLT3bが最初に稼働を開始した日時、及び、OSU30をOLT3bに挿入した日時の情報を記憶しておく。判断部372は、OLT3bが最初に稼働を開始してから、又は、OSU30をOLT3bに挿入したときからの稼働時間が、正常性確認不要期間を経過している場合には、正常性確認要と判断し(ステップS20:YES)、経過していない場合は、正常性確認不要と判断する(ステップS20:NO)。なお、OLT3bが最初に稼働を開始してから、又は、OSU30をOLT3bに挿入したときからの稼働時間は、電源が停止状態であった時間を含めた稼働時間でもよく、電源が停止状態であった時間を除いた稼働時間でもよい。   Further, a period from the start of operation until the failure probability becomes equal to or higher than a predetermined value is stored in the storage unit 38 as a normality confirmation unnecessary period. Furthermore, the storage unit 38 stores information on the date and time when the OLT 3b first started operation and the date and time when the OSU 30 was inserted into the OLT 3b. The determination unit 372 determines that the normality confirmation is necessary when the operation time after the OLT 3b first starts operation or when the operation time from when the OSU 30 is inserted into the OLT 3b has passed the normality confirmation unnecessary period. Judgment is made (step S20: YES), and if it has not elapsed, it is judged that normality confirmation is unnecessary (step S20: NO). The operating time after the OLT 3b starts operating for the first time or when the OSU 30 is inserted into the OLT 3b may be the operating time including the time when the power supply is stopped, and the power supply is stopped. It may be the operating time excluding the time.

また、スリープのために定期的に電源が停止状態となる場合、正常性確認が不要なスリープ回数を予め記憶部38に登録しておいてもよい。正常性確認が不要なスリープ回数は、正常性確認不要期間を、スリープが行われる時間間隔により除算して求められる。また、状態制御部371は、OLT3bがスリープした回数を示す情報を記憶部38に書き込んでおく。判断部372は、OLT3bのスリープ回数が、正常性確認が不要なスリープ回数を超えた場合は、正常性確認要と判断し(ステップS20:YES)、超えていない場合は、正常性確認不要と判断する(ステップS20:NO)。   Moreover, when the power supply is periodically stopped for sleep, the number of sleeps that do not require normality may be registered in the storage unit 38 in advance. The number of sleeps that does not require normality confirmation is obtained by dividing the normality confirmation unnecessary period by the time interval at which sleep is performed. In addition, the state control unit 371 writes information indicating the number of times the OLT 3b has gone to sleep in the storage unit 38. The determination unit 372 determines that normality confirmation is necessary if the number of sleeps of the OLT 3b exceeds the number of sleeps that do not require normality confirmation (step S20: YES), and if not, normality confirmation is not necessary. Judgment is made (step S20: NO).

正常性確認部373は、判断部372が正常性確認要と判断した場合は(ステップS20:YES)、電源起動時の正常性確認を実行する(ステップS30)。一方、判断部372が正常性確認不要と判断した場合(ステップS20:NO)、正常性確認部373は、電源起動時の正常性確認を抑止し、実行しない(ステップS40)。   When the determination unit 372 determines that the normality confirmation is necessary (step S20: YES), the normality confirmation unit 373 executes normality confirmation at the time of power activation (step S30). On the other hand, when the determination unit 372 determines that the normality confirmation is not necessary (step S20: NO), the normality confirmation unit 373 suppresses the normality confirmation at the time of power activation and does not execute the normality confirmation (step S40).

また、判断部372は、故障確率が十分小さいと判断される所定の条件を満たす場合、例えば、OLT3b全体の電源停止後の電源起動、又は、OSU30の抜き差し直後のみ正常性確認要と判断してもよい。複数回のOLT3b全体の電源停止の後、又は、OSU30の抜き差しを複数回行った後に、OLT3bが稼働した場合であっても、判断部372は、故障確率が十分小さいと判断される条件を満たす場合、さらに、複数回のOLT3b全体の電源停止、又は、OSU30の複数回の抜き差しが行われた後に、正常性確認要と判断してもよい。   Further, when satisfying a predetermined condition that the failure probability is determined to be sufficiently small, for example, the determination unit 372 determines that the normality check is necessary only after the power supply of the entire OLT 3b is turned off or immediately after the OSU 30 is inserted or removed. Also good. Even if the OLT 3b is operated after the entire power supply of the OLT 3b is stopped a plurality of times or after the OSU 30 is inserted and removed a plurality of times, the determination unit 372 satisfies the condition for determining that the failure probability is sufficiently small. In this case, it may be determined that the normality confirmation is required after the power supply of the entire OLT 3b is stopped a plurality of times or the OSU 30 is inserted and removed a plurality of times.

上記では、正常性確認の要否を、起動毎にOLT3bの判断部372が判断しているが、電源停止前に人手によってOLT3bに設定してもよい。また、判断部372を、OLT3bと接続される他の装置が備えてもよい。OLT3bの正常性確認部373は、他の装置が備える判断部372から受信した正常性確認有無の判断結果に従って、正常性確認を実行又は抑止する。   In the above description, whether or not normality confirmation is necessary is determined by the determination unit 372 of the OLT 3b every time it is activated, but may be manually set in the OLT 3b before the power is stopped. Further, the determination unit 372 may be provided in another device connected to the OLT 3b. The normality confirmation unit 373 of the OLT 3b executes or suppresses normality confirmation according to the determination result of the presence / absence of normality confirmation received from the determination unit 372 provided in another device.

(第5の実施形態)
本実施形態と、第4の実施形態との違いは、正常性確認の要否のいずれかを出力する関数の出力結果に従って、正常性確認の要否を決定するところにある。本実施形態では、正常性確認の要否のいずれかを算出する確率関数は、故障の統計情報とは必ずしも関連しない。以下では、第4の実施形態との差分について説明する。
本実施形態のPONシステムの構成は、図3に示す第4の実施形態のPONシステム1bと同様である。また、OLT3bの動作は、以下の点を除き、図4に示す第4の実施形態と同様である。
(Fifth embodiment)
The difference between the present embodiment and the fourth embodiment is that the necessity of normality confirmation is determined according to the output result of the function that outputs one of the necessity of normality confirmation. In the present embodiment, the probability function for calculating whether or not normality confirmation is necessary is not necessarily related to the failure statistical information. Hereinafter, differences from the fourth embodiment will be described.
The configuration of the PON system of this embodiment is the same as that of the PON system 1b of the fourth embodiment shown in FIG. The operation of the OLT 3b is the same as that of the fourth embodiment shown in FIG. 4 except for the following points.

図4のステップS20の処理において、判断部372は統計情報の代わりに、確率関数を用いた確率計算の値が所定の範囲に含まれるか否かによって正常性確認処理の要否を判断する。正常性確認要となる確率は、サービス上許容される確率等に応じてもよいし、その他の予め定めた値であってもよい。本実施形態は統計情報が十分にない場合等に適し、統計情報が蓄積した後は第4の実施形態の処理に変更するとしてもよい。確率計算としては、当該通信装置(OLT3b)に合致した分布に従う計算が望ましいが、乱数でも疑似乱数でも一様分布でもガウス分布でもその他任意の分布に従う計算であってよいし、確率計算は毎回計算せずに予め計算結果を保持していてもよい。   In the process of step S20 in FIG. 4, the determination unit 372 determines whether or not the normality confirmation process is necessary depending on whether or not the probability calculation value using the probability function is included in a predetermined range instead of the statistical information. The probability that the normality confirmation is required may be in accordance with a probability that is allowed in service, or may be another predetermined value. The present embodiment is suitable when there is not enough statistical information, and may be changed to the processing of the fourth embodiment after the statistical information is accumulated. As the probability calculation, calculation according to a distribution that matches the communication device (OLT3b) is desirable, but random number, pseudo-random number, uniform distribution, Gaussian distribution or other arbitrary distribution may be used, and probability calculation is calculated every time. The calculation result may be held in advance without.

(第6の実施形態)
本実施形態と、第4の実施形態との違いは、統計情報の代わりに、統計情報に従った確率計算で正常性確認の要否を決定するところにある。統計情報に従った確率計算では、正常性確認の要否のいずれかがでる確率が統計情報に従って変わる。以下では、第4の実施形態との差分について説明する。
本実施形態のPONシステムの構成は、図3に示す第4の実施形態のPONシステム1bと同様である。また、OLT3bの動作は、以下の点を除き、図4に示す第4の実施形態と同様である。
図4のステップS20の処理において、判断部372は統計情報の代わりに統計情報に応じた確率計算の値が所定の範囲に含まれるか否かによって正常性確認処理の実行と抑止を判断する。確率計算は、統計情報から故障確率が増大すればそれに応じて正常性確認を実施する確率が多い確率計算を用い、減少すればその反対となる確率計算を用いる。用いる確率計算は、第5の実施形態と同様でもよく、同様に確率計算は毎回計算せずに予め計算結果を保持していてもよい。
(Sixth embodiment)
The difference between this embodiment and the fourth embodiment is that the necessity of normality confirmation is determined by probability calculation according to statistical information instead of statistical information. In the probability calculation according to the statistical information, the probability that either of the necessity of normality confirmation is required changes according to the statistical information. Hereinafter, differences from the fourth embodiment will be described.
The configuration of the PON system of this embodiment is the same as that of the PON system 1b of the fourth embodiment shown in FIG. The operation of the OLT 3b is the same as that of the fourth embodiment shown in FIG. 4 except for the following points.
In the process of step S20 in FIG. 4, the determination unit 372 determines whether or not to execute the normality confirmation process depending on whether or not the probability calculation value corresponding to the statistical information is included in a predetermined range instead of the statistical information. The probability calculation uses a probability calculation that has a high probability of performing normality check according to the increase in the failure probability from the statistical information, and a probability calculation that is the opposite when the failure probability decreases. The probability calculation to be used may be the same as in the fifth embodiment. Similarly, the probability calculation may not be calculated every time and the calculation result may be held in advance.

(第7の実施形態)
本実施形態と、第4の実施形態との違いは、電源停止近傍の導通トラフィックに応じて正常性確認の要否を決定するところにある。以下では、第4の実施形態との差分について説明する。
(Seventh embodiment)
The difference between the present embodiment and the fourth embodiment is that the necessity of normality confirmation is determined according to the continuity traffic near the power stop. Hereinafter, differences from the fourth embodiment will be described.

本実施形態のPONシステムの構成は、図3に示す第4の実施形態のPONシステム1bと同様である。また、OLT3bの動作は、以下の点を除き、図4に示す第4の実施形態と同様である。
図4のステップS20の処理において、判断部372は、最後に電源停止状態となった時刻から所定時間遡った時刻までの期間である電源停止近傍に、OLT3bが送受信した信号のトラフィックである導通トラフィックを統計データから取得する。判断部372は、電源停止近傍の導通トラフィックに基づいて、許容されるスリープ時間を判断する。スリープしている時間は、通信が停止している時間である。そこで、例えば、5分おきにトラフィックが発生する場合、許容されるスリープ時間を5分、または、5分から所定時間減算した時間とする。判断部372は、正常性確認部373が正常性確認処理を行うことによってかかる起動時間が、許容されるスリープ時間を超過しない場合は、正常性確認要と判断し(ステップS20:YES)、正常性確認部373は、電源起動時の正常性確認を実行する(ステップS30)。一方、判断部372は、起動時間が、許容されるスリープ時間を超過する場合は、正常性確認不要と判断し(ステップS20:NO)、正常性確認部373による電源起動時の正常性確認の実行を抑止する(ステップS40)。
The configuration of the PON system of this embodiment is the same as that of the PON system 1b of the fourth embodiment shown in FIG. The operation of the OLT 3b is the same as that of the fourth embodiment shown in FIG. 4 except for the following points.
In the process of step S20 in FIG. 4, the determination unit 372 conducts traffic that is traffic of signals transmitted and received by the OLT 3b in the vicinity of the power supply stop, which is a period from the time when the power supply was last stopped to a time that is a predetermined time later. Is obtained from statistical data. The determination unit 372 determines the allowable sleep time based on the conduction traffic near the power stop. The sleep time is a time during which communication is stopped. Therefore, for example, when traffic occurs every 5 minutes, the allowable sleep time is 5 minutes or a time obtained by subtracting a predetermined time from 5 minutes. The determination unit 372 determines that normality confirmation is necessary if the activation time that is obtained by the normality confirmation unit 373 performing the normality confirmation process does not exceed the allowable sleep time (step S20: YES), and normal The property confirmation unit 373 performs normality confirmation at the time of power activation (step S30). On the other hand, when the activation time exceeds the allowable sleep time, the determination unit 372 determines that normality confirmation is not necessary (step S20: NO), and the normality confirmation unit 373 confirms normality when the power is activated. Execution is suppressed (step S40).

なお、電源停止近傍の導通トラフィックに代えて、又は、加えて、過去の導通トラフィックを用いて、起動時間が許容されるスリープ時間を判断してもよい。許容されるスリープ時間の判断に用いられる過去の導通トラフィックには、同じ曜日の同じ時間帯の導通トラフィックなどを用いることができる。   In addition, instead of or in addition to the continuity traffic in the vicinity of the power stop, the sleep time in which the startup time is allowed may be determined using the past continuity traffic. For the past conducted traffic used to determine the allowable sleep time, the conducted traffic of the same time zone on the same day of the week can be used.

上述した実施形態によれば、通信装置(例えば、OLT3、3a、3b)において、通信部は、他装置と通信し、状態制御部は、自装置がスリープ状態であるときに自装置の電源を停止状態とし、自装置がスリープ状態から稼働状態となったときに自装置の電源を起動する。
通信装置は、自装置の電源が停止状態から起動する際に、電源起動時の正常性確認処理を抑制する。
或いは、通信装置は、自装置の電源が停止状態から起動する際に、電源起動時の非運用部分の正常性確認処理を抑制する。
また、或いは、通信装置の判断部は、自装置の故障確率に関する情報と、自装置の通信のトラフィックに関する情報と、正常性確認の要否の確率計算の結果と、故障確率に応じた正常性確認の要否の確率計算の結果とのうち少なくともいずれかに基づいて、電源起動時の正常性確認の要否を判断する。自装置の故障確率に関する情報として、通信部が故障する確率、自装置において送信又は受信ができなかったフレームの数、或いは、要求帯域と自装置が通信を行った帯域との差分などを用いることができる。また、判断部は、自装置が稼働した期間又は通信部が稼働した期間が、所定以上の故障確率となるまでの期間を超えたか否かによって、電源起動時の正常性確認の要否を判断してもよい。また或いは、判断部は、許容される通信停止時間(スリープ時間)を自装置の過去の通信のトラフィックに基づいて判断し、正常性確認を行ったときの起動時間がその許容される通信停止時間(スリープ時間)を超えるか否かによって、正常性確認の要否を判断してもよい。通信装置の正常性確認部は、電源が停止状態から起動する際に、判断部による判断結果に従って、電源起動時の正常性確認の実行又は抑制を行う。
According to the above-described embodiment, in the communication device (for example, OLT 3, 3a, 3b), the communication unit communicates with other devices, and the state control unit turns on the power of the own device when the own device is in the sleep state. The power supply of the own device is activated when the own device is changed from the sleep state to the operating state.
The communication apparatus suppresses the normality confirmation process at the time of power activation when the power of the own apparatus is activated from a stopped state.
Alternatively, the communication apparatus suppresses the normality confirmation process for the non-operational part at the time of power activation when the power of the own apparatus is activated from the stopped state.
Alternatively, the determination unit of the communication device may include information on the failure probability of the own device, information on communication traffic of the own device, a result of probability calculation of necessity of normality confirmation, and normality according to the failure probability. Based on at least one of the results of the probability calculation of necessity of confirmation, the necessity of normality confirmation at the time of power activation is determined. As information regarding the failure probability of the own device, use the probability that the communication unit will fail, the number of frames that could not be transmitted or received by the own device, or the difference between the requested bandwidth and the bandwidth with which the own device communicated. Can do. In addition, the determination unit determines whether or not it is necessary to check the normality at the time of starting the power supply depending on whether the period during which the own device is operated or the period during which the communication unit is operated exceeds a predetermined failure probability. May be. Alternatively, the determination unit determines the allowable communication stop time (sleep time) based on the past communication traffic of the own device, and the start time when the normality check is performed is the allowable communication stop time. Whether or not normality confirmation is necessary may be determined based on whether or not (sleep time) is exceeded. The normality confirmation unit of the communication device performs or suppresses normality confirmation at the time of power activation according to the determination result by the determination unit when the power supply is activated from a stopped state.

以上、通信装置として光加入者線終端装置(OLT)を例示したが、通信装置は、光回線終端装置(ONU)であってもよいし、それ以外の通信装置であってもよい。通信装置がONUである場合は、対向装置をONUからOLTに置き換えれば同様である。また制御部31、37をOLTに備えてもよい。   As described above, the optical subscriber line termination device (OLT) is exemplified as the communication device. However, the communication device may be an optical line termination device (ONU) or other communication device. If the communication device is an ONU, the same applies if the opposite device is replaced from the ONU to the OLT. Moreover, you may provide the control parts 31 and 37 in OLT.

従来の通信装置は、省電力のためにスリープ状態となって電源を停止した後に、再び電源を起動したときに、メモリチェック等の正常性確認に時間を要し、起動時間が長いという問題があった。本実施形態では、電源を停止した通信装置が電源起動時に行うチェックを、通信装置の故障確率又はトラフィックに応じて抑止するため、電源を起動した際の起動時間を短くすることが可能となる。   The conventional communication device has a problem that it takes a long time to check normality such as a memory check when the power is turned on again after entering the sleep state for power saving and stopping the power. there were. In this embodiment, since the check performed by the communication device that has stopped the power supply when the power supply is started is suppressed according to the failure probability or traffic of the communication device, the start-up time when the power supply is started can be shortened.

上述した実施形態におけるOLT3の制御部31をコンピュータで実現するようにしてもよい。その場合、この機能を実現するためのプログラムをコンピュータ読み取り可能な記録媒体に記録して、この記録媒体に記録されたプログラムをコンピュータシステムに読み込ませ、実行することによって実現してもよい。なお、ここでいう「コンピュータシステム」とは、OSや周辺機器等のハードウェアを含むものとする。また、「コンピュータ読み取り可能な記録媒体」とは、フレキシブルディスク、光磁気ディスク、ROM、CD−ROM等の可搬媒体、コンピュータシステムに内蔵されるハードディスク等の記憶装置のことをいう。さらに「コンピュータ読み取り可能な記録媒体」とは、インターネット等のネットワークや電話回線等の通信回線を介してプログラムを送信する場合の通信線のように、短時間の間、動的にプログラムを保持するもの、その場合のサーバやクライアントとなるコンピュータシステム内部の揮発性メモリのように、一定時間プログラムを保持しているものも含んでもよい。また上記プログラムは、前述した機能の一部を実現するためのものであってもよく、さらに前述した機能をコンピュータシステムにすでに記録されているプログラムとの組み合わせで実現できるものであってもよく、FPGA等のプログラマブルロジックデバイスを用いて実現されるものであってもよい。   You may make it implement | achieve the control part 31 of OLT3 in embodiment mentioned above with a computer. In that case, a program for realizing this function may be recorded on a computer-readable recording medium, and the program recorded on this recording medium may be read into a computer system and executed. Here, the “computer system” includes an OS and hardware such as peripheral devices. The “computer-readable recording medium” refers to a storage device such as a flexible medium, a magneto-optical disk, a portable medium such as a ROM and a CD-ROM, and a hard disk incorporated in a computer system. Furthermore, the “computer-readable recording medium” dynamically holds a program for a short time like a communication line when transmitting a program via a network such as the Internet or a communication line such as a telephone line. In this case, a volatile memory inside a computer system serving as a server or a client in that case may be included and a program held for a certain period of time. Further, the program may be a program for realizing a part of the above-described functions, and may be a program capable of realizing the functions described above in combination with a program already recorded in a computer system. It may be realized using a programmable logic device such as an FPGA.

以上、この発明の実施形態について図面を参照して詳述してきたが、具体的な構成はこの実施形態に限られるものではなく、この発明の要旨を逸脱しない範囲の設計等も含まれる。   The embodiment of the present invention has been described in detail with reference to the drawings. However, the specific configuration is not limited to this embodiment, and includes designs and the like that do not depart from the gist of the present invention.

他の装置と通信する通信装置に利用可能である。   The present invention can be used for a communication device that communicates with other devices.

1、1a、1b…PONシステム
2…ONU
3、3a、3b…OLT
4…光ファイバ網
5−1、5−2…光カプラ
6−1、6−2、6−3…光ファイバ
30…OSU
31、37…制御部
32、38…記憶部
311、372…判断部
312、373…正常性確認部
301…光送受信部
302…信号処理部
371…状態制御部
1, 1a, 1b ... PON system 2 ... ONU
3, 3a, 3b ... OLT
4 ... Optical fiber network 5-1, 5-2 ... Optical couplers 6-1, 6-2, 6-3 ... Optical fiber 30 ... OSU
31 and 37 ... control units 32 and 38 ... storage units 311 and 372 ... determination units 312 and 373 ... normality confirmation unit 301 ... optical transmission and reception unit 302 ... signal processing unit 371 ... state control unit

Claims (9)

他装置との通信を行う通信部と、
自装置の電源の状態を制御する制御部とを備え、
前記制御部は、自装置の電源が停止状態から起動する際に、電源起動時の正常性確認処理を抑制し、
前記制御部は、
自装置の電源の状態を制御する状態制御部と、
自装置の故障確率に関する情報と、自装置の通信のトラフィックに関する情報と、正常性確認の要否の確率計算の結果と、故障確率に応じた正常性確認の要否の確率計算とのうち少なくともいずれかに基づいて、電源起動時における正常性確認の要否を判断する判断部と、
自装置の電源が停止状態から起動する際に、前記判断部による判断結果に従って電源起動時の正常性確認処理の実行又は抑制を行う正常性確認部とを有し、
自装置の故障確率に関する前記情報は、稼働状況、電力消費の累積、電圧を印加しない期間、電力消費、導通情報、故障情報及び故障警報の少なくともいずれかによる前記通信部が故障する確率、自装置において送信又は受信ができなかったフレームの数、或いは、要求帯域と自装置が通信を行った帯域との差分の情報であることを特徴とする通信装置。
A communication unit for communicating with other devices;
A control unit for controlling the power state of the own device,
The control unit suppresses normality confirmation processing at the time of power activation when the power source of the own device is activated from a stopped state,
The controller is
A state control unit for controlling the power state of the own device;
At least of the information on the failure probability of the own device, the information on the communication traffic of the own device, the result of probability calculation of necessity of normality confirmation, and the probability calculation of necessity of normality confirmation according to the failure probability Based on either, a determination unit that determines whether or not normality confirmation is necessary at the time of power activation,
A normality confirmation unit that performs or suppresses normality confirmation processing at the time of power activation according to the determination result by the determination unit when the power supply of the own device is activated from a stopped state;
The information related to the failure probability of the own device includes the operating status, the accumulation of power consumption, the period during which no voltage is applied, the power consumption, the continuity information, the failure information, and the probability that the communication unit will fail due to at least one of the failure alarm, The number of frames that could not be transmitted or received or the difference information between the requested bandwidth and the bandwidth with which the device communicated.
他装置との通信を行う通信部と、
自装置の電源の状態を制御する制御部とを備え、
前記制御部は、自装置の電源が停止状態から起動する際に、電源起動時の正常性確認処理を抑制し、
前記制御部は、
自装置の電源の状態を制御する状態制御部と、
自装置の故障確率に関する情報と、自装置の通信のトラフィックに関する情報と、正常性確認の要否の確率計算の結果と、故障確率に応じた正常性確認の要否の確率計算とのうち少なくともいずれかに基づいて、電源起動時における正常性確認の要否を判断する判断部と、
自装置の電源が停止状態から起動する際に、前記判断部による判断結果に従って電源起動時の正常性確認処理の実行又は抑制を行う正常性確認部とを有し、
前記判断部は、自装置が稼働した期間又は前記通信部が稼働した期間が、所定以上の故障確率となるまでの期間を超えたか否かによって、電源起動時の正常性確認の要否を判断することを特徴とする通信装置。
A communication unit for communicating with other devices;
A control unit for controlling the power state of the own device,
The control unit suppresses normality confirmation processing at the time of power activation when the power source of the own device is activated from a stopped state,
The controller is
A state control unit for controlling the power state of the own device;
At least of the information on the failure probability of the own device, the information on the communication traffic of the own device, the result of probability calculation of necessity of normality confirmation, and the probability calculation of necessity of normality confirmation according to the failure probability Based on either, a determination unit that determines whether or not normality confirmation is necessary at the time of power activation,
A normality confirmation unit that performs or suppresses normality confirmation processing at the time of power activation according to the determination result by the determination unit when the power supply of the own device is activated from a stopped state;
The determination unit determines whether it is necessary to check the normality at the time of starting the power supply based on whether the period during which the own apparatus is operated or the period during which the communication unit is operated exceeds a period until the failure probability exceeds a predetermined value. A communication device characterized by:
他装置との通信を行う通信部と、
自装置の電源の状態を制御する制御部とを備え、
前記制御部は、自装置の電源が停止状態から起動する際に、電源起動時の正常性確認処理を抑制し、
前記制御部は、
自装置の電源の状態を制御する状態制御部と、
自装置の故障確率に関する情報と、自装置の通信のトラフィックに関する情報と、正常性確認の要否の確率計算の結果と、故障確率に応じた正常性確認の要否の確率計算とのうち少なくともいずれかに基づいて、電源起動時における正常性確認の要否を判断する判断部と、
自装置の電源が停止状態から起動する際に、前記判断部による判断結果に従って電源起動時の正常性確認処理の実行又は抑制を行う正常性確認部とを有し、
前記判断部は、許容される通信停止時間を自装置の過去の通信のトラフィックに基づいて判断し、正常性確認を行ったときの起動時間が、許容される前記通信停止時間を超えるか否かによって、電源起動時の正常性確認の要否を判断することを特徴とする通信装置。
A communication unit for communicating with other devices;
A control unit for controlling the power state of the own device,
The control unit suppresses normality confirmation processing at the time of power activation when the power source of the own device is activated from a stopped state,
The controller is
A state control unit for controlling the power state of the own device;
At least of the information on the failure probability of the own device, the information on the communication traffic of the own device, the result of probability calculation of necessity of normality confirmation, and the probability calculation of necessity of normality confirmation according to the failure probability Based on either, a determination unit that determines whether or not normality confirmation is necessary at the time of power activation,
A normality confirmation unit that performs or suppresses normality confirmation processing at the time of power activation according to the determination result by the determination unit when the power supply of the own device is activated from a stopped state
The determination unit determines an allowable communication stop time based on the past communication traffic of the own device, and whether or not the startup time when the normality check is performed exceeds the allowable communication stop time. To determine whether or not normality confirmation is required at the time of power activation.
前記制御部は、自装置がスリープ状態であるときに自装置の電源を停止状態とし、自装置がスリープ状態から稼働状態となったときに自装置の電源を起動する、
ことを特徴とする請求項1から請求項のいずれか一項に記載の通信装置。
The control unit stops the power supply of the own device when the own device is in a sleep state, and starts the power supply of the own device when the own device is in an operation state from the sleep state.
The communication device according to any one of claims 1 to 3 , wherein the communication device is characterized in that:
前記通信装置は、受動光ネットワークにおける光加入者線終端装置又は光回線終端装置のいずれかである、
ことを特徴とする請求項1から請求項のいずれか一項に記載の通信装置。
The communication device is either an optical subscriber line termination device or an optical line termination device in a passive optical network.
The communication apparatus according to any one of claims 1 to 4 , wherein the communication apparatus is characterized in that:
他装置と通信する通信装置に用いられる起動方法であって、
自装置の電源の状態を制御する状態制御過程と、
自装置の電源が停止状態から起動する際に、電源起動時の正常性確認処理を抑制する正常性確認抑制過程と、
を有し、
自装置の故障確率に関する情報と、自装置の通信のトラフィックに関する情報と、正常性確認の要否の確率計算の結果と、故障確率に応じた正常性確認の要否の確率計算とのうち少なくともいずれかに基づいて、電源起動時における正常性確認の要否を判断する判断過程と、
自装置の電源が停止状態から起動する際に、前記判断過程による判断結果に従って電源起動時の正常性確認処理の実行又は抑制を行う正常性確認過程とをさらに有し、
自装置の故障確率に関する前記情報は、稼働状況、電力消費の累積、電圧を印加しない期間、電力消費、導通情報、故障情報及び故障警報の少なくともいずれかによる通信部が故障する確率、自装置において送信又は受信ができなかったフレームの数、或いは、要求帯域と自装置が通信を行った帯域との差分の情報であることを特徴とする起動方法。
An activation method used in a communication device that communicates with another device,
A state control process for controlling the power state of the device itself;
A normality check suppression process that suppresses normality check processing at the time of power supply startup when the power supply of the own device starts from a stopped state,
Have
At least of the information on the failure probability of the own device, the information on the communication traffic of the own device, the result of probability calculation of necessity of normality confirmation, and the probability calculation of necessity of normality confirmation according to the failure probability Based on either, the determination process to determine the necessity of normality check at power-on,
A normality confirmation process for performing or suppressing normality confirmation processing at the time of power activation according to the determination result of the determination process when the power supply of the own device is started from a stopped state;
The information relating to the failure probability of the own device is the operation status, the accumulation of power consumption, the period during which no voltage is applied, the power consumption, the continuity information, the probability of failure of the communication unit due to at least one of the failure information and the failure alarm , An activation method characterized by the number of frames that could not be transmitted or received, or information on the difference between the requested bandwidth and the bandwidth with which the device communicated.
他装置と通信する通信装置に用いられる起動方法であって、
自装置の電源の状態を制御する状態制御過程と、
自装置の電源が停止状態から起動する際に、電源起動時の正常性確認処理を抑制する正常性確認抑制過程と、
を有し、
自装置の故障確率に関する情報と、自装置の通信のトラフィックに関する情報と、正常性確認の要否の確率計算の結果と、故障確率に応じた正常性確認の要否の確率計算とのうち少なくともいずれかに基づいて、電源起動時における正常性確認の要否を判断する判断過程と、
自装置の電源が停止状態から起動する際に、前記判断過程による判断結果に従って電源起動時の正常性確認処理の実行又は抑制を行う正常性確認過程とをさらに有し、
前記判断過程において、自装置が稼働した期間又は他装置との通信を行う通信部が稼働した期間が、所定以上の故障確率となるまでの期間を超えたか否かによって、電源起動時の正常性確認の要否を判断することを特徴とする起動方法。
An activation method used in a communication device that communicates with another device,
A state control process for controlling the power state of the device itself;
A normality check suppression process that suppresses normality check processing at the time of power supply startup when the power supply of the own device starts from a stopped state,
Have
At least of the information on the failure probability of the own device, the information on the communication traffic of the own device, the result of probability calculation of necessity of normality confirmation, and the probability calculation of necessity of normality confirmation according to the failure probability Based on either, the determination process to determine the necessity of normality check at power-on,
A normality confirmation process for performing or suppressing normality confirmation processing at the time of power activation according to the determination result of the determination process when the power supply of the own device is started from a stopped state;
In the determination process, the normality at the time of starting the power supply depends on whether the period in which the own apparatus is operated or the period in which the communication unit that communicates with another apparatus is operated exceeds the period until the failure probability exceeds a predetermined value. An activation method characterized by determining whether confirmation is necessary.
他装置と通信する通信装置に用いられる起動方法であって、
自装置の電源の状態を制御する状態制御過程と、
自装置の電源が停止状態から起動する際に、電源起動時の正常性確認処理を抑制する正常性確認抑制過程と、
を有し、
自装置の故障確率に関する情報と、自装置の通信のトラフィックに関する情報と、正常性確認の要否の確率計算の結果と、故障確率に応じた正常性確認の要否の確率計算とのうち少なくともいずれかに基づいて、電源起動時における正常性確認の要否を判断する判断過程と、
自装置の電源が停止状態から起動する際に、前記判断過程による判断結果に従って電源起動時の正常性確認処理の実行又は抑制を行う正常性確認過程とをさらに有し、
前記判断過程において、許容される通信停止時間を自装置の過去の通信のトラフィックに基づいて判断し、正常性確認を行ったときの起動時間が、許容される前記通信停止時間を超えるか否かによって、電源起動時の正常性確認の要否を判断することを特徴とする起動方法。
An activation method used in a communication device that communicates with another device,
A state control process for controlling the power state of the device itself;
A normality check suppression process that suppresses normality check processing at the time of power supply startup when the power supply of the own device starts from a stopped state,
Have
At least of the information on the failure probability of the own device, the information on the communication traffic of the own device, the result of probability calculation of necessity of normality confirmation, and the probability calculation of necessity of normality confirmation according to the failure probability Based on either, the determination process to determine the necessity of normality check at power-on,
A normality confirmation process for performing or suppressing normality confirmation processing at the time of power activation according to the determination result of the determination process when the power supply of the own device is started from a stopped state;
In the determination process, the allowable communication stop time is determined based on the past communication traffic of the own device, and whether the start time when the normality confirmation is performed exceeds the allowable communication stop time. By means of this, a start-up method is characterized in that it is determined whether or not normality confirmation is required at the time of power-up.
他装置と通信する通信装置に用いられるコンピュータを、本願請求項1からのいずれか一項に記載の装置として機能させるためのプログラム。 The program for functioning the computer used for the communication apparatus which communicates with another apparatus as an apparatus as described in any one of Claim 1 to 5 of this application.
JP2016026373A 2016-02-15 2016-02-15 COMMUNICATION DEVICE, STARTUP METHOD, AND PROGRAM Active JP6560139B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016026373A JP6560139B2 (en) 2016-02-15 2016-02-15 COMMUNICATION DEVICE, STARTUP METHOD, AND PROGRAM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016026373A JP6560139B2 (en) 2016-02-15 2016-02-15 COMMUNICATION DEVICE, STARTUP METHOD, AND PROGRAM

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2019133146A Division JP6788075B2 (en) 2019-07-18 2019-07-18 Communication device, startup method and program

Publications (2)

Publication Number Publication Date
JP2017147514A JP2017147514A (en) 2017-08-24
JP6560139B2 true JP6560139B2 (en) 2019-08-14

Family

ID=59683289

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016026373A Active JP6560139B2 (en) 2016-02-15 2016-02-15 COMMUNICATION DEVICE, STARTUP METHOD, AND PROGRAM

Country Status (1)

Country Link
JP (1) JP6560139B2 (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010165007A (en) * 2009-01-13 2010-07-29 Mitsubishi Electric Corp Information processor
JP6295113B2 (en) * 2014-03-17 2018-03-14 ルネサスエレクトロニクス株式会社 Self-diagnosis device and self-diagnosis method

Also Published As

Publication number Publication date
JP2017147514A (en) 2017-08-24

Similar Documents

Publication Publication Date Title
US8687960B2 (en) Communication method, optical communication system, station-side optical-line terminal apparatus, and user-side optical-line terminal apparatus
JP5259021B2 (en) Communication system, station side communication device, user side communication device, communication method, and control device
JP4696759B2 (en) Optical termination system
PT1801984E (en) OPTICAL NETWORK USER TERMINAL AND CONTROL METHOD OF ELECTRICAL AND INFORMATION POWER CURRENT ON THE ELECTRICAL POWER STATE OF THE SAME
KR20090041163A (en) Power Saving Method of Optical Termination Device and Optical Line Terminal in Optical Access Network
CN102131132A (en) Energy-saving method and equipment for passive optical network (PON)
JP5066968B2 (en) Station-side terminator, subscriber-side terminator, communication system, control method for these devices, and program
CN101877611A (en) Method for reducing power consumption of passive optical network lines, optical network unit equipment and terminal
KR20150042630A (en) Control method for onu in sleep mode
CN112788441B (en) Mode control method, device, storage medium and equipment of optical network unit
US20080120677A1 (en) Method and system for ensuring continuous video services in a passive optical network
JP6560139B2 (en) COMMUNICATION DEVICE, STARTUP METHOD, AND PROGRAM
US20160301567A1 (en) System upgrade method and device
JP2019176529A (en) Communication device, method for activation, and program
US9191142B2 (en) Optical network unit having power saving function and power saving method thereof
US8335840B2 (en) Address distribution system and method and program for the same
KR20080103778A (en) Fiber termination with self diagnostics
CN106033993A (en) Optical line terminal interface device and its fault protection and energy saving method
KR20120050177A (en) Apparatus and method for remote power control based on ethernet or pon(passive optical network)
JP5456131B2 (en) Communication method, optical communication system, user side optical line terminator, station side optical line terminator
JP2016058806A (en) Onu, pon system, onu control method, and onu control program
JP2013150052A (en) Communication system and method for controlling power saving of communication system
JP3686852B2 (en) Remote device and remote device reset method
JP2025159381A (en) Optical terminal device, optical communication method, and optical communication program
US20070101390A1 (en) Method and apparatus for maintaining ONT video behavior during initial ONT deployments, ONT reboots, and loss of OLT conditions

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180222

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20181219

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190108

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190304

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190402

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190603

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190618

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190718

R150 Certificate of patent or registration of utility model

Ref document number: 6560139

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350