Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7705336B2 - Progress management device, progress management method, and progress management program - Google Patents
[go: Go Back, main page]

JP7705336B2 - Progress management device, progress management method, and progress management program - Google Patents

Progress management device, progress management method, and progress management program Download PDF

Info

Publication number
JP7705336B2
JP7705336B2 JP2021189511A JP2021189511A JP7705336B2 JP 7705336 B2 JP7705336 B2 JP 7705336B2 JP 2021189511 A JP2021189511 A JP 2021189511A JP 2021189511 A JP2021189511 A JP 2021189511A JP 7705336 B2 JP7705336 B2 JP 7705336B2
Authority
JP
Japan
Prior art keywords
progress
actual
volume
judging
cost
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021189511A
Other languages
Japanese (ja)
Other versions
JP2022117427A (en
Inventor
厳裕 江守
剛光 上野
Original Assignee
株式会社オービック
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社オービック filed Critical 株式会社オービック
Publication of JP2022117427A publication Critical patent/JP2022117427A/en
Priority to JP2025108328A priority Critical patent/JP2025126295A/en
Application granted granted Critical
Publication of JP7705336B2 publication Critical patent/JP7705336B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、進捗管理装置、進捗管理方法、及び進捗管理プログラムに関する。 The present invention relates to a progress management device, a progress management method, and a progress management program.

例えば、工事の進捗管理を行う場合に、従来は、現場社員は出来高率を基にした数値により各状況を判断し、経理や経営は原価比例による数値を基に工事進捗及び収支状況を把握していた。従来、進捗管理を行うシステムとして、例えば、特許文献1がある。 For example, in the past, when managing the progress of construction work, on-site staff would judge each situation based on figures based on the rate of completion, while accounting and management would grasp the progress of construction work and the income/expense situation based on figures proportional to cost. For example, Patent Document 1 is an example of a conventional system for managing progress.

特開2017-174241号公報JP 2017-174241 A

しかしながら、特許文献1では、客観的に工事進捗状況と工事収支状況を把握することに関して何ら記載されていない。 However, Patent Document 1 does not state anything about objectively understanding the progress and balance of construction work.

本発明は、上記に鑑みてなされたものであって、客観的に案件の進捗状況と収支状況を把握することが可能な進捗管理装置、進捗管理方法、及び進捗管理プログラムを提供することを目的とする。 The present invention has been made in consideration of the above, and aims to provide a progress management device, a progress management method, and a progress management program that can objectively grasp the progress and income/expense status of a project.

上述した課題を解決し、目的を達成するために、本発明は、前記制御部は、案件を受注した場合に、原価比例ベースの数値を作成する原価処理手段と、前記案件を受注した場合に、出来高ベースの数値を作成する出来高処理手段と、前記原価比例ベースの数値と前記出来高ベースの数値を比較して、前記受注した案件の進捗状況と収支状況を把握する比較手段と、を備えたことを特徴とする。 In order to solve the above-mentioned problems and achieve the object, the present invention is characterized in that the control unit is provided with a cost processing means for creating a cost-proportional value when a project is accepted, a performance processing means for creating a performance-based value when the project is accepted, and a comparison means for comparing the cost-proportional value with the performance-based value to grasp the progress and income/expense situation of the accepted project.

また、本発明の一態様によれば、前記原価比例ベースの数値は、原価比例ベースの原価実績及び収益実績を含み、前記出来高ベースの数値は、出来高ベースの予測出来高及び実績出来高を含むことにしてもよい。 According to one aspect of the present invention, the cost-proportional figures may include actual costs and actual revenues on a cost-proportional basis, and the volume-based figures may include forecast volume and actual volume on a volume-based basis.

また、本発明の一態様によれば、前記比較手段は、工事進捗状況を、前記予測出来高と前記実績出来高を比較して判断し、前記予測出来高-前記実績出来高<0の場合は、案件が前倒しで進んでいると判断し、前記予測出来高-前記実績出来高=0の場合は、案件が予定通りのペースで進んでいると判断し、前記予測出来高-前記実績出来高>0の場合は、案件に遅れが発生していると判断することにしてもよい。 According to one aspect of the present invention, the comparison means may determine the progress of the construction work by comparing the predicted progress and the actual progress, and if the predicted progress - the actual progress is < 0, determine that the project is progressing ahead of schedule, if the predicted progress - the actual progress = 0, determine that the project is progressing at the scheduled pace, and if the predicted progress - the actual progress > 0, determine that the project is behind schedule.

また、本発明の一態様によれば、前記比較手段は、収支状況を、前記収益実績と前記実績出来高を比較して判断し、収益実績-実績出来高<0の場合は、収支状況が改善していると判断し、収益実績-実績出来高=0の場合は、予定通りの収支状況と判断し、収益実績-実績出来高>0の場合は、収支状況が悪化していると判断することにしてもよい。 According to one aspect of the present invention, the comparison means may determine the balance situation by comparing the actual revenue and the actual turnover, and if actual revenue - actual turnover < 0, determine that the balance situation is improving, if actual revenue - actual turnover = 0, determine that the balance situation is as planned, and if actual revenue - actual turnover > 0, determine that the balance situation is worsening.

また、本発明の一態様によれば、前記案件は、工事に関する案件を含むことにしてもよい。 According to one aspect of the present invention, the case may include a construction-related case.

また、上述した課題を解決し、目的を達成するために、本発明は、制御部を備えた情報処理装置で実行される進捗管理方法であって、前記制御部で実行される、案件を受注した場合に、原価比例ベースの数値を作成する原価処理行程と、前記案件を受注した場合に、出来高ベースの数値を作成する出来高処理工程と、前記原価比例ベースの数値と前記出来高ベースの数値を比較して、前記受注した案件の進捗状況と収支状況を把握する比較工程と、を含むことを特徴とする。 In order to solve the above-mentioned problems and achieve the objective, the present invention is a progress management method executed by an information processing device equipped with a control unit, characterized in that it includes a cost processing step executed by the control unit for creating a cost-proportional value when a case is accepted, a production volume processing step for creating a production volume-based value when the case is accepted, and a comparison step for comparing the cost-proportional value with the production volume-based value to grasp the progress status and income/expense status of the accepted case.

また、上述した課題を解決し、目的を達成するために、本発明は、制御部を備えた情報処理装置に実行させるための進捗管理プログラムであって、前記制御部において、案件を受注した場合に、原価比例ベースの数値を作成する原価処理行程と、前記案件を受注した場合に、出来高ベースの数値を作成する出来高処理工程と、前記原価比例ベースの数値と前記出来高ベースの数値を比較して、前記受注した案件の進捗状況と収支状況を把握する比較工程と、を実行させるための進捗管理プログラムであることを特徴とする。 In order to solve the above-mentioned problems and achieve the object, the present invention is characterized in that the progress management program is executed by an information processing device having a control unit, and causes the control unit to execute a cost processing step of creating a cost-proportional value when a case is accepted, a production volume processing step of creating a production volume-based value when the case is accepted, and a comparison step of comparing the cost-proportional value with the production volume-based value to grasp the progress status and income/expense status of the accepted case.

本発明によれば、客観的に案件の進捗状況と収支状況を把握することが可能になるという効果を奏する。 The present invention has the effect of making it possible to objectively grasp the progress and income/expense status of a project.

図1は、原価比例ベースの数値だけを利用した場合の課題を説明するための図である。FIG. 1 is a diagram for explaining the problems that arise when only figures proportional to cost are used. 図2は、出来高ベースの数値のみを利用した場合の課題を説明するための図である。FIG. 2 is a diagram for explaining the problems that arise when only volume-based figures are used. 図3は、本発明の改善方法を説明するための図である。FIG. 3 is a diagram for explaining the improvement method of the present invention. 図4は、本実施の形態に係る進捗管理装置の構成の一例を示すブロック図である。FIG. 4 is a block diagram showing an example of the configuration of the progress management device according to the present embodiment. 図5は、本実施の形態に係る進捗管理装置の制御部の全体の処理の概略を説明するためのフローを示す図である。FIG. 5 is a flowchart for explaining an outline of the overall processing of the control unit of the progress management device according to the present embodiment. 図6は、本実施の形態に係る進捗管理装置の制御部の処理の具体例を説明するための図である。FIG. 6 is a diagram for explaining a specific example of the process of the control unit of the progress management device according to the present embodiment. 図7は、本実施の形態に係る進捗管理装置の制御部の処理の具体例を説明するための図である。FIG. 7 is a diagram for explaining a specific example of the process of the control unit of the progress management device according to the present embodiment. 図8は、本実施の形態に係る進捗管理装置の制御部の処理の具体例を説明するための図である。FIG. 8 is a diagram for explaining a specific example of the process of the control unit of the progress management device according to the present embodiment. 図9は、本実施の形態に係る進捗管理装置の制御部の処理の具体例を説明するための図である。FIG. 9 is a diagram for explaining a specific example of the process of the control unit of the progress management device according to the present embodiment. 図10は、本実施の形態に係る進捗管理装置の制御部の処理の具体例を説明するための図である。FIG. 10 is a diagram for explaining a specific example of the process of the control unit of the progress management device according to the present embodiment.

本発明の実施形態を図面に基づいて詳細に説明する。なお、本発明は本実施形態により限定されるものではない。 An embodiment of the present invention will be described in detail with reference to the drawings. Note that the present invention is not limited to this embodiment.

[1.概要]
例えば、建設業では、1つの工事完成するまでに数年掛かる特性があるため、多くの企業において進捗管理や収益予測が課題となっている。建設業では、収益予測や進捗管理を、原価比例法を利用して行うが、原価が発生すれば作業が進捗していなくても売上が上がってしまうため、原価の発生状況によっては正しく判断することが難しいことがある。原価比例法以外の手法として、出来高を利用する方法もあるが、進捗状況を正しく掴むことはできるが、収支が悪化しているのかどうかをつかむことが難しい。
[1. Overview]
For example, in the construction industry, it takes several years to complete a single project, making progress management and revenue forecasting an issue for many companies. In the construction industry, revenue forecasts and progress management are carried out using the cost-proportional method, but if costs are incurred, sales will increase even if work is not progressing, so it can be difficult to make correct judgments depending on the circumstances of cost occurrence. As a method other than the cost-proportional method, there is also a method that uses the volume of work, but although it can accurately grasp the progress status, it is difficult to grasp whether the balance is deteriorating.

すなわち、従来は、現場社員は出来高率を基にした数値により各状況を判断し、経理や経営は原価比例による数値を基に工事進捗及び収支状況を把握していたが、出来高率は工事進捗を把握することには適しているが、収支状況を把握することに不適切であり、原価比例については、進捗状況・収支把握ともに現状を正しく表せていないことがあった。 In other words, in the past, on-site employees judged each situation based on figures based on the completion rate, while accounting and management understood the progress of construction and the income/expense situation based on figures proportional to cost. However, while the completion rate is suitable for understanding the progress of construction, it is inappropriate for understanding the income/expense situation, and the cost-proportional method sometimes does not accurately represent the current situation in terms of both progress and income/expense understanding.

そこで、本実施の形態では、工事等の案件について、出来高ベースに基づく数値と、原価比例ベースに基づく数値を比較することで、客観的・正確・容易に案件の進捗状況と収支状況を把握できるようにした。 Therefore, in this embodiment, by comparing figures based on a volume of work and figures based on a cost-proportional basis for construction projects and other such projects, it is possible to objectively, accurately, and easily grasp the progress and income/expense situation of a project.

図1及び図2を参照して、本発明の背景及び課題を具体的に説明する。図1を参照して、原価比例ベースの数値だけを利用した場合の課題を説明する。図1は、原価比例ベースの数値だけを利用した場合の課題を説明するための図である。図1(A)は、原価比例ベースの予算消化予測「A」の一例を示す図である。図1(B)は、原価実績及び収益実績[B]の一例を示す図である。以下の説明では、金額の単位を全て千円とし、その記載を省略する。 The background and problems of the present invention will be specifically explained with reference to Figures 1 and 2. With reference to Figure 1, the problems that arise when only cost-proportional figures are used will be explained. Figure 1 is a diagram for explaining the problems that arise when only cost-proportional figures are used. Figure 1(A) is a diagram showing an example of a cost-proportional budget consumption forecast "A". Figure 1(B) is a diagram showing an example of actual costs and actual revenues [B]. In the following explanation, all monetary units are in thousands of yen, and descriptions of these will be omitted.

以下の説明では、請負額を「100,000」、予算額を「80,000」とした場合の例を説明する。 The following explanation uses an example where the contract amount is "100,000" and the budget amount is "80,000".

図1(A)において、原価比例を利用する場合、予測値は予算の消化率(進捗率)予測をベースに算出する。図1(A)に示す例は、原価要素を材料費、外注費、労務費、経費として、1Q~4Qの消化率、消化金額、予測収益(=請負額×対象のQの消化金額合計÷予算合計額)を示している。 In Figure 1 (A), when using cost proportionality, the forecast value is calculated based on the forecast of the budget consumption rate (progress rate). The example shown in Figure 1 (A) shows the consumption rate, consumption amount, and forecast revenue (= contract amount x total consumption amount for the target Q / total budget amount) for 1Q to 4Q, with the cost elements being material costs, subcontract costs, labor costs, and expenses.

例えば、1Qの予測収益は、請負額「100,000」×1Qの消化金額計「25,000」÷予算合計「80,000」=「31,250」となる。 For example, the projected revenue for 1Q is the contract amount "100,000" x the total amount spent in 1Q "25,000" ÷ the total budget "80,000" = "31,250".

図1(B)は、図1(A)の原価比例ベースの予算消化予測に対する原価実績及び収益実績[B]の一例を示している。図1(B)において、予測と異なる点は、外注費の1Qの予測が消化率「20%」、消化金額「4,000」、1Qの収益の予測が「31,250」に対して、外注費の1Qの実績は、消化率「25%」、消化金額「5,000」、1Qの収益の実績は「32,250(=請負額「100,000」×1Qの消化金額計「25,000」÷予算合計「80,000」となっている。 Figure 1 (B) shows an example of actual costs and actual revenues [B] for the budget consumption forecast based on cost proportion in Figure 1 (A). In Figure 1 (B), the difference from the forecast is that the forecast for 1Q of outsourcing costs is a consumption rate of "20%", a consumption amount of "4,000", and a revenue forecast for 1Q of "31,250", while the actual results for 1Q of outsourcing costs are a consumption rate of "25%, a consumption amount of "5,000", and a revenue actual of "32,250" (= contract amount "100,000" x total consumption amount for 1Q "25,000" ÷ total budget "80,000").

また、外注費の4Qの予測が消化率「20%」、消化金額「4,000」、4Qの収益の予測が「16,250」に対して、外注費の4Qの実績は、消化率「15%」、消化金額「3,000」、4Qの収益の実績は「15,000」となっている。 In addition, the forecast for outsourcing expenses in the fourth quarter is a usage rate of 20%, a usage amount of 4,000, and a revenue forecast of 16,250, while the actual outsourcing expenses in the fourth quarter are a usage rate of 15%, a usage amount of 3,000, and a revenue forecast of 15,000.

2Qまでの上期収益を見ると、当初予測「52,500」より、実績「53,750」が上回っているため、一見順調なように見える。しかし、材料費については、現場の資材置き場に搬入したタイミング(1Q及び3Q)に一気に原価計上されているだけであり、作業自体が順調に進んでいるかを表してはいない。また、外注費については当初予定より多く発生しており、着手を早めたなど作業を前倒ししたことによるのか、作業進捗が遅れ外注を増員したのかについては判別することができない。 Looking at the first half revenue up to 2Q, the actual result of 53,750 is higher than the initial forecast of 52,500, so at first glance it looks like things are going well. However, material costs are simply recorded as costs all at once when they are delivered to the materials storage area on-site (1Q and 3Q), and do not indicate whether the work itself is progressing smoothly. In addition, outsourcing costs are higher than initially planned, and it is not possible to determine whether this is due to work being brought forward, such as starting earlier, or whether the work progress has been delayed and more outsourced staff have been added.

図2を参照して、出来高ベースの数値のみを利用した場合の課題を説明する。図2は、出来高ベースの数値のみを利用した場合の課題を説明するための図である。図2(A)は出来高ベースの予測[C]、図2(B)は出来高ベースの実績[D]を示している。 The issues that arise when only volume-based figures are used will be explained with reference to Figure 2. Figure 2 is a diagram for explaining the issues that arise when only volume-based figures are used. Figure 2 (A) shows a volume-based forecast [C], and Figure 2 (B) shows volume-based actual results [D].

図2(A)に示す例は、請負内容、請負本数、単価、金額について、1Q~4Qの出来高数、出来高金額を示している。図2(B)は、図2(A)の出来高ベースの予測に対する実績[D」の一例を示している。 The example shown in Figure 2 (A) shows the contract details, number of contracts, unit price, and amount, as well as the volume and amount of work completed from Q1 to Q4. Figure 2 (B) shows an example of actual results [D] against the volume-based forecast in Figure 2 (A).

図2(B)において、予測と異なる点は、請負内容(鋼管杭 φ600 t=9~10 L=6.5~13m)について、1Qの予測が出来高数「25」、出来高金額「25,000」に対して、1Qの実績は、出来高数「26」、出来高金額「26,000」となっており、また、4Qの予測が出来高数「21」、出来高金額「21,000」に対して、4Qの実績は、出来高数「20」、出来高金額「20,000」となっている。 In Figure 2 (B), the differences from the forecast are that for the contract details (steel pipe piles, φ600, t=9-10, L=6.5-13m), the forecast for 1Q was a volume of "25" and a volume amount of "25,000," whereas the actual results for 1Q were a volume of "26" and a volume amount of "26,000," and the forecast for 4Q was a volume of "21" and a volume amount of "21,000," whereas the actual results for 4Q were a volume of "20" and a volume amount of "20,000."

2Qまでの上期収益を見ると、当初予測「52,500」より、実績「53,500」が上回っているため、一見順調なように見える。しかし、原価の発生は全く考慮されていないため、予定通りの収支で進んでいるのか悪化しているのかは判別することができない。(1)の原価比例ベースの収益予測では、2Qまでの上期収益が「53,750」となっているが、出来高ベースでは「53,500」となっており、若干であるが上期収支が悪化している。 Looking at the first half of the year revenue up to 2Q, the actual result of 53,500 is higher than the initial forecast of 52,500, so at first glance it looks like things are going well. However, because no cost has been taken into account, it is impossible to tell whether the balance is progressing as planned or has deteriorated. In the cost-proportional revenue forecast in (1), first half revenue up to 2Q is 53,750, but on a volume basis it is 53,500, which means that the balance has deteriorated slightly for the first half.

このように、出来高ベースでは、工事進捗を把握することには適しているが、収支状況を把握することに不適切であり、原価比例ベースでは、進捗状況・収支把握ともに現状を正確に表せていない。 In this way, while a volume-of-production basis is suitable for understanding the progress of construction work, it is inappropriate for understanding the income and expenditure situation, and a cost-proportional basis does not accurately represent the current situation in terms of either progress or income and expenditure.

図3は、本発明の改善方法を説明するための図である。本発明では、工事毎に、上記の原価比例ベースの原価実績及び収益実績[B]、出来高ベースの予測出来高[C]、出来高ベースの実績出来高[D]の数値を組み合わせたKPIを計算することで、進捗状況及び収支状況を客観的に把握可能とする。以下、2Q予測を例に記載する。 Figure 3 is a diagram for explaining the improvement method of the present invention. In the present invention, by calculating KPIs for each construction project that combine the numerical values of the above-mentioned actual cost and actual revenue on a cost-proportional basis [B], projected volume on a volume basis [C], and actual volume on a volume basis [D], it is possible to objectively grasp the progress status and income/expense situation. The following describes the 2Q forecast as an example.

(1)工事進捗状況については、出来高ベースの予測出来高[C]と実績出来高[D]の合計金額を比較して判断する。 (1) The progress of the construction work is judged by comparing the total amount of the forecasted progress [C] and the actual progress [D] based on the amount of work completed.

i)[C]-[D]<0の場合は、予測出来高より実績出来高の方が多いため、工事が前倒しで進んでいると判断する。 i) If [C] - [D] < 0, the actual progress is greater than the forecast progress, so it is determined that the construction is progressing ahead of schedule.

ii)[C]-[D]=0の場合は、予測出来高と実績出来高が同じであるため、予定通りのペースで進んでいると判断する。 ii) If [C] - [D] = 0, the forecasted volume and actual volume are the same, so it is determined that progress is proceeding as planned.

iii)[C]-[D]>0の場合は、予測出来高より実績出来高が少ないため、工事の進捗に遅れが発生していると判断する。 iii) If [C] - [D] > 0, the actual volume is less than the forecast volume, so it is determined that there is a delay in the progress of the construction work.

(2)収支予測については、原価比例ベースの収益実績[B]と出来高ベースの実績出来高[D]の合計金額を比較して判断する。 (2) The income/expense forecast is determined by comparing the total amount of actual revenue [B] based on a cost-proportional basis and actual volume of work [D] based on volume of work.

i)[B]-[D]<0の場合は、予定より少ない原価発生で、より多くの出来高が上がっているため、収支が改善していると判断する。 i) If [B] - [D] < 0, it is determined that the balance of income and expenditure has improved because less costs have been incurred and more output has been achieved than planned.

ii)[B]-[D]=0の場合は、ちょうど原価発生に見合う分の出来高が上がっているため、予定通りの収支状況となっていると判断する。 ii) If [B] - [D] = 0, the increase in output is exactly equivalent to the cost incurred, so it is determined that the income/expense situation is as planned.

iii)[B]-[D]>0の場合は、出来高に対して、想定以上の原価が発生しているため、収支が悪化していると判断する。 iii) If [B] - [D] > 0, it is determined that the income statement is deteriorating because the costs incurred are higher than expected in relation to the volume of work.

各指標ともに、差額が大きければ大きいほど当初予定より乖離していることを表しており、早期に手を打つ必要がある案件の見極めにも効果がある。 For each indicator, the larger the difference, the greater the deviation from the initial plan, which is also effective in identifying projects that require early action.

本発明の進捗管理装置は、建設業はもとより、スクラッチ開発などを行うITベンダー等にも適用可能である。 The progress management device of the present invention can be applied not only to the construction industry, but also to IT vendors who conduct scratch development, etc.

[2.構成]
本実施の形態に係る進捗管理装置の構成の一例について、図4を参照して説明する。図4は、本実施の形態に係る進捗管理装置の構成の一例を示すブロック図である。
2. Configuration
An example of the configuration of the progress management device according to the present embodiment will be described with reference to Fig. 4. Fig. 4 is a block diagram showing an example of the configuration of the progress management device according to the present embodiment.

進捗管理装置100は、市販のデスクトップ型パーソナルコンピュータである。なお、進捗管理装置100は、デスクトップ型パーソナルコンピュータのような据置型情報処理装置に限らず、市販されているノート型パーソナルコンピュータ、PDA(Personal Digital Assistants)、スマートフォン、タブレット型パーソナルコンピュータなどの携帯型情報処理装置であってもよい。 The progress management device 100 is a commercially available desktop personal computer. Note that the progress management device 100 is not limited to a stationary information processing device such as a desktop personal computer, but may be a portable information processing device such as a commercially available notebook personal computer, a PDA (Personal Digital Assistant), a smartphone, or a tablet personal computer.

進捗管理装置100は、制御部102と通信インターフェース部104と記憶部106と入出力インターフェース部108と、を備えている。進捗管理装置100が備えている各部は、任意の通信路を介して通信可能に接続されている。 The progress management device 100 includes a control unit 102, a communication interface unit 104, a memory unit 106, and an input/output interface unit 108. Each unit included in the progress management device 100 is connected to each other so as to be able to communicate with each other via any communication path.

通信インターフェース部104は、ルータ等の通信装置及び専用線等の有線又は無線の通信回線を介して、進捗管理装置100をネットワーク300に通信可能に接続する。通信インターフェース部104は、他の装置と通信回線を介してデータを通信する機能を有する。ここで、ネットワーク300は、進捗管理装置100とサーバ200とを相互に通信可能に接続する機能を有し、例えばインターネットやLAN(Local Area Network)等である。 The communication interface unit 104 communicatively connects the progress management device 100 to the network 300 via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has a function of communicating data with other devices via the communication line. Here, the network 300 has a function of connecting the progress management device 100 and the server 200 so that they can communicate with each other, and is, for example, the Internet or a LAN (Local Area Network).

入出力インターフェース部108には、入力装置112及び出力装置114が接続されている。出力装置114には、モニタ(家庭用テレビを含む)の他、スピーカやプリンタを用いることができる。入力装置112には、キーボード、マウス、及びマイクの他、マウスと協働してポインティングデバイス機能を実現するモニタを用いることができる。なお、以下では、出力装置114をモニタ114とし、入力装置112をキーボード112またはマウス112として記載する場合がある。 An input device 112 and an output device 114 are connected to the input/output interface unit 108. The output device 114 may be a monitor (including a home television), a speaker, or a printer. The input device 112 may be a keyboard, a mouse, a microphone, or a monitor that works with a mouse to provide a pointing device function. In the following, the output device 114 may be referred to as the monitor 114, and the input device 112 may be referred to as the keyboard 112 or the mouse 112.

記憶部106には、各種のデータベース、テーブル、及びファイルなどが格納される。記憶部106には、OS(Operating System)と協働してCPU(Central Processing Unit)に命令を与えて各種処理を行うためのコンピュータプログラムが記録される。記憶部106として、例えば、RAM(Random Access Memory)・ROM(Read Only Memory)等のメモリ装置、ハードディスクのような固定ディスク装置、フレキシブルディスク、及び光ディスク等を用いることができる。また、記憶部106は、データファイル106aと、原価要素マスタ106bと、を備えている。 The storage unit 106 stores various databases, tables, files, and the like. The storage unit 106 records computer programs that work with the OS (Operating System) to give commands to the CPU (Central Processing Unit) to perform various processes. The storage unit 106 can be, for example, a memory device such as a RAM (Random Access Memory) or a ROM (Read Only Memory), a fixed disk device such as a hard disk, a flexible disk, or an optical disk. The storage unit 106 also includes a data file 106a and a cost element master 106b.

データファイル106aは、受注データ、予算データ、四半期別予算データ、原価比例ベースの予算消化予測データ、予測出来高データ(予測出来高ヘッダデータ、予測出来高明細データ)、出来高ベースの予測、原価集計データ、原価実績及び収益実績、出来高実績データ、出来高ベースの実績等の各種データを格納するためのファイルである。 Data file 106a is a file for storing various data such as order data, budget data, quarterly budget data, cost-proportional budget consumption forecast data, forecast volume data (forecast volume header data, forecast volume detail data), volume-based forecast, cost summary data, actual costs and revenues, actual volume data, volume-based actual results, etc.

受注データは、工事番号、請負金額を含んでいてもよい。予算データは、工事番号、原価要素CD、予算金額のデータを含んでいてもよい。四半期別予算データは、工事番号、原価要素CD、年度、四半期、出来高率のデータを含んでいてもよい。 The order data may include the construction number and contract amount. The budget data may include data on the construction number, cost element CD, and budget amount. The quarterly budget data may include data on the construction number, cost element CD, fiscal year, quarter, and completion rate.

原価比例ベースの予算消化予測は、原価要素、予算額、各四半期(1Q~4Q)の進捗率及び消化金額を含んでいてもよい。 The cost-proportional budget consumption forecast may include cost elements, budget amount, progress rate for each quarter (Q1-Q4), and consumption amount.

予測出来高データは、予測出来高ヘッダデータと、予測出来高明細データとで構成されていてもよい。予測出来高ヘッダデータは、工事事番号、SEQ、請負内容、請負本数、単価、金額のデータを含んでいてもよい。予測出来高明細データは、工事番号、SEQ、年度、四半期、出来高数のデータを含んでいてもよい。 The forecasted volume data may be composed of forecasted volume header data and forecasted volume detail data. The forecasted volume header data may include data on the construction number, SEQ, contract details, number of contracts, unit price, and amount. The forecasted volume detail data may include data on the construction number, SEQ, fiscal year, quarter, and volume.

出来高ベースの予測は、請負内容、請負本数、単価、金額、各四半期(1Q~4Q)の出来高数及び出来高金額を含んでいてもよい。 Volume-based forecasts may include contract details, number of contracts, unit price, amount, and volume and amount of volume for each quarter (1Q to 4Q).

原価集計データは、工事番号、原価要素CD、会計年月、原価要素コード、発生金額のデータを含んでいてもよい。 The cost summary data may include data on the construction number, cost element CD, accounting year and month, cost element code, and amount incurred.

原価実績及び収益実績は、各四半期(1Q~4Q)の原価要素、予算額、各四半期(1Q~4Q)の進捗率、消化金額及び収益金額を含んでいてもよい。 The actual cost and revenue may include cost elements, budget amounts, progress rates, amounts consumed, and revenue amounts for each quarter (1Q to 4Q).

出来高実績データは、工事番号、SEQ、年度、四半期、出来高数を含んでいてもよい。出来高ベースの実績は、請負内容、請負本数、単価、金額、各四半期(1Q~4Q)の出来高数及び出来高金額を含んでいてもよい。 The performance data may include the construction number, SEQ, fiscal year, quarter, and amount of work completed. Performance data based on performance may include the contract details, number of contracts, unit price, amount, and amount and amount of work completed for each quarter (1Q to 4Q).

原価要素マスタ106bは、原価要素CDと原価要素名を関連づけて登録したテーブル等で構成することができる(図7参照)。原価要素マスタ106bは、原価要素CDと原価要素名間で変換する際に参照される。 The cost element master 106b can be configured as a table in which cost elements CD and cost element names are associated and registered (see Figure 7). The cost element master 106b is referenced when converting between cost elements CD and cost element names.

制御部102は、進捗管理装置100を統括的に制御するCPU等である。制御部102は、OS等の制御プログラム・各種の処理手順等を規定したプログラム・所要データなどを格納するための内部メモリを有し、格納されているこれらのプログラムに基づいて種々の情報処理を実行する。制御部102は、機能概念的に、受注登録部102aと、原価処理部102bと、出来高処理部102cと、比較部102dと、画面表示制御部102eと、を備えている。 The control unit 102 is a CPU or the like that performs overall control of the progress management device 100. The control unit 102 has an internal memory for storing control programs such as an OS, programs that define various processing procedures, required data, etc., and executes various information processing based on these stored programs. In terms of function and concept, the control unit 102 includes an order registration unit 102a, a cost processing unit 102b, a performance processing unit 102c, a comparison unit 102d, and a screen display control unit 102e.

受注登録部102aは、案件を受注した場合に、例えば、モニタ114に表示される不図示の受注登録画面上でのオペレータの操作等に応じて、受注データを入力してデータファイル106aに登録する。 When an order is received, the order registration unit 102a inputs order data and registers it in the data file 106a, for example, in response to an operator's operation on an order registration screen (not shown) displayed on the monitor 114.

原価処理部102bは、受注データの対象の案件について、例えば、モニタ114に表示される不図示の原価登録画面上でのオペレータの操作等に応じて、原価比例ベースの数値を作成して、データファイル106aに登録する。原価比例ベースの数値は、原価比例ベースの原価実績及び収益実績を含むことにしてもよい。 The cost processing unit 102b creates a cost-proportional basis numerical value for the case that is the subject of the order data, for example, in response to an operator's operation on a cost registration screen (not shown) displayed on the monitor 114, and registers the value in the data file 106a. The cost-proportional basis numerical value may include actual costs and actual revenues on a cost-proportional basis.

出来高処理部102cは、受注データの対象の案件について、例えば、モニタ114に表示される不図示の出来高登録画面上でのオペレータの操作等に応じて、出来高ベースの数値を作成して、データファイル106aに登録する。出来高ベースの数値は、出来高ベースの予測出来高及び実績出来高を含むことにしてもよい。 The volume processing unit 102c creates volume-based figures for the cases that are the subject of the order data, for example, in response to the operator's operations on a volume registration screen (not shown) displayed on the monitor 114, and registers the figures in the data file 106a. The volume-based figures may include volume-based forecast volume and actual volume.

比較部102dは、例えば、モニタ114に表示される不図示の比較画面上でのオペレータの操作等に応じて、対象の案件について、原価比例ベースの数値と出来高ベースの数値を比較して、進捗状況と収支状況の判断結果を表示出力する。 The comparison unit 102d, for example, in response to an operator's operation on a comparison screen (not shown) displayed on the monitor 114, compares the cost-proportional value and the volume-based value for the target project, and displays and outputs the results of the progress and income/expenses judgment.

具体的には、比較部102dは、進捗状況については、予測出来高と実績出来高を比較して、予測出来高-実績出来高<0の場合は、案件が前倒しで進んでいると判断し、予測出来高-実績出来高=0の場合は、案件が予定通りのペースで進んでいると判断し、予測出来高-実績出来高>0の場合は、案件に遅れが発生していると判断して、その旨を表示出力してもよい。 Specifically, the comparison unit 102d may compare the predicted volume and the actual volume to determine the progress, and if the predicted volume - the actual volume < 0, determine that the project is progressing ahead of schedule, if the predicted volume - the actual volume = 0, determine that the project is progressing at the scheduled pace, and if the predicted volume - the actual volume > 0, determine that the project is behind schedule, and display a message to that effect.

比較部102dは、収支予測については、収益実績と実績出来高を比較して、収益実績-実績出来高<0の場合は、収支状況が改善していると判断し、収益実績-実績出来高=0の場合は、予定通りの収支状況と判断し、収益実績-実績出来高>0の場合は、収支状況が悪化していると判断して、その旨を表示出力してもよい。 The comparison unit 102d may compare the actual revenue and actual turnover for the income/expense forecast, and if actual revenue - actual turnover < 0, determine that the income/expense situation is improving, if actual revenue - actual turnover = 0, determine that the income/expense situation is as planned, and if actual revenue - actual turnover > 0, determine that the income/expense situation is worsening, and display and output this fact.

画面表示制御部102eは、モニタ114に表示する各種画面(例えば、受注登録画面、原価登録画面、出来高登録画面、比較画面等)の表示及びその入力を制御する。 The screen display control unit 102e controls the display and input of various screens (e.g., order registration screen, cost registration screen, output registration screen, comparison screen, etc.) displayed on the monitor 114.

[3.具体例]
図4~図10を参照して、本実施の形態における進捗管理装置100の処理の具体例を説明する。まず、図5を参照して、本実施の形態における進捗管理装置100の全体の処理の概略を説明する。図5は、本実施の形態における進捗管理装置100の全体の処理の概略を説明するためのフローを示す図である。
3. Specific Examples
A specific example of the processing of the progress management device 100 in this embodiment will be described with reference to Figures 4 to 10. First, an overview of the overall processing of the progress management device 100 in this embodiment will be described with reference to Figure 5. Figure 5 is a diagram showing a flow for explaining the overview of the overall processing of the progress management device 100 in this embodiment.

図5において、受注登録部102aは、受注登録処理を実行する(ステップS1)。具体的には、受注登録処理では、受注登録部102aは、案件を受注した場合に、例えば、モニタ114に表示される不図示の受注登録画面上でのオペレータの操作等に応じて、受注データを入力してデータファイル106aに登録する。 In FIG. 5, the order registration unit 102a executes the order registration process (step S1). Specifically, in the order registration process, when an order is received, the order registration unit 102a inputs order data and registers it in the data file 106a in response to, for example, an operator's operation on an order registration screen (not shown) displayed on the monitor 114.

原価処理部102bは、予算登録処理を実行する(ステップS2)。具体的には、予算登録処理では、原価処理部102bは、受注データの対象の案件について、例えば、モニタ114に表示される不図示の原価登録画面上でのオペレータの操作等に応じて、予算データ、四半期別予算データ、原価比例ベースの予算消化予測を入力して、データファイル106aに登録する。 The cost processing section 102b executes the budget registration process (step S2). Specifically, in the budget registration process, the cost processing section 102b inputs budget data, quarterly budget data, and a cost-proportional budget consumption forecast for the case that is the subject of the order data, for example, in response to an operator's operation on a cost registration screen (not shown) displayed on the monitor 114, and registers the data in the data file 106a.

出来高処理部102cは、出来高予測登録処理を実行する(ステップS3)。具体的には、出来高予測登録処理では、出来高処理部102cは、受注データの対象の案件について、例えば、モニタ114に表示される不図示の出来高登録画面上でのオペレータの操作等に応じて、予測出来高ヘッダデータ、予測出来高明細データ、出来高ベースの予測を入力して、データファイル106aに登録する。 The production volume processing unit 102c executes production volume forecast registration processing (step S3). Specifically, in the production volume forecast registration processing, the production volume processing unit 102c inputs forecast production volume header data, forecast production volume detail data, and production volume-based forecasts for the case that is the subject of the order data, for example, in response to an operator's operation on a production volume registration screen (not shown) displayed on the monitor 114, and registers them in the data file 106a.

原価処理部102bは、施工実施処理を実行する(ステップS4)。具体的には、施工実施処理では、原価処理部102bは、受注データの対象の案件について、例えば、モニタ114に表示される不図示の原価登録画面上でのオペレータの操作等に応じて、原価集計データ、原価比例ベースの原価実績及び収益実績を入力して、データファイル106aに登録する。 The cost processing section 102b executes the construction execution process (step S4). Specifically, in the construction execution process, the cost processing section 102b inputs the cost summary data, the actual cost on a cost proportional basis, and the actual revenue for the case that is the subject of the order data, for example, in response to the operator's operation on a cost registration screen (not shown) displayed on the monitor 114, and registers them in the data file 106a.

出来高処理部102cは、出来高実績登録処理を実行する(ステップS5)。具体的には、出来高実績登録処理では、出来高処理部102cは、受注データの対象の案件について、例えば、モニタ114に表示される不図示の出来高登録画面上でのオペレータの操作等に応じて、出来高実績データ、出来高ベースの実績を入力して、データファイル106aに登録する。 The production volume processing unit 102c executes the production volume record registration process (step S5). Specifically, in the production volume record registration process, the production volume processing unit 102c inputs production volume record data and production volume-based record data for the case that is the subject of the order data in response to, for example, the operator's operation on the production volume registration screen (not shown) displayed on the monitor 114, and registers them in the data file 106a.

比較部102dは、比較処理を実行する(ステップS6)。具体的には、比較処理では、比較部102dは、例えば、モニタ114に表示される不図示の比較画面上でのオペレータの操作等に応じて、対象の案件について、原価比例ベースの数値と出来高ベースの数値を比較して、進捗状況と収支状況の結果を表示出力する。 The comparison unit 102d executes a comparison process (step S6). Specifically, in the comparison process, the comparison unit 102d compares the cost-proportional value and the volume-based value for the target project in response to, for example, an operator's operation on a comparison screen (not shown) displayed on the monitor 114, and displays and outputs the results of the progress status and the income/expense status.

この場合、比較部102dは、進捗状況については、予測出来高と実績出来高を比較して、予測出来高-実績出来高<0の場合は、案件が前倒しで進んでいると判断し、予測出来高-実績出来高=0の場合は、案件が予定通りのペースで進んでいると判断し、予測出来高-実績出来高>0の場合は、案件に遅れが発生していると判断して、その旨を表示出力してもよい。 In this case, the comparison unit 102d may compare the predicted volume and the actual volume to determine the progress, and if the predicted volume - the actual volume < 0, determine that the project is progressing ahead of schedule, if the predicted volume - the actual volume = 0, determine that the project is progressing at the scheduled pace, and if the predicted volume - the actual volume > 0, determine that the project is behind schedule, and display a message to that effect.

また、比較部102dは、収支予測については、収益実績と実績出来高を比較して、収益実績-実績出来高<0の場合は、収支状況が改善していると判断し、収益実績-実績出来高=0の場合は、予定通りの収支状況と判断し、収益実績-実績出来高>0の場合は、収支状況が悪化していると判断して、その旨を表示出力してもよい。 The comparison unit 102d may also compare the actual revenue and actual turnover for the income/expense forecast, and if actual revenue - actual turnover < 0, determine that the income/expense situation is improving, if actual revenue - actual turnover = 0, determine that the income/expense situation is as planned, and if actual revenue - actual turnover > 0, determine that the income/expense situation is worsening, and display and output to that effect.

つぎに、図6~図10を参照して、本実施の形態における進捗管理装置100の制御部102の処理の具体例を説明する。図6~図10は、本実施の形態における進捗管理装置100の制御部102の処理の具体例を説明するための図である。 Next, a specific example of the processing of the control unit 102 of the progress management device 100 in this embodiment will be described with reference to Figures 6 to 10. Figures 6 to 10 are diagrams for explaining a specific example of the processing of the control unit 102 of the progress management device 100 in this embodiment.

(S1:受注登録処理)
図6を参照して、受注登録処理を説明する。図6は、受注登録処理を説明するための図である。受注登録部102aは、案件を受注した場合に、例えば、モニタ114に表示される不図示の受注登録画面上でのオペレータの操作等に応じて、受注データを入力してデータファイル106aに登録する。
(S1: Order registration process)
The order registration process will be described with reference to Fig. 6. Fig. 6 is a diagram for explaining the order registration process. When an order is received, the order registration unit 102a inputs order data in response to an operation by an operator on an order registration screen (not shown) displayed on the monitor 114, and registers the data in the data file 106a.

図6は、(1)受注データの例を示している。図6に示す(1)受注データの例では、1行目は、工事番号「100」、請負金額「100,000」、2行目は、工事番号「101」、請負金額「200,000」となっている。以下では、工事番号「100」、請負金額「100,000」について説明する。 Figure 6 shows an example of (1) order data. In the example of (1) order data shown in Figure 6, the first line has the construction number "100" and the contract amount "100,000", and the second line has the construction number "101" and the contract amount "200,000". The construction number "100" and the contract amount "100,000" will be explained below.

(S2:予算登録処理)
図7を参照して、予算登録処理を説明する。図7は、予算登録処理を説明するための図である。原価処理部102bは、受注データの対象の案件について、例えば、モニタ114に表示される不図示の原価登録画面上でのオペレータの操作等に応じて、予算データ、四半期別予算データ、原価比例ベースの予算消化予測を入力してデータファイル106aに登録する。
(S2: Budget registration process)
The budget registration process will be described with reference to Fig. 7. Fig. 7 is a diagram for explaining the budget registration process. The cost processing unit 102b inputs budget data, quarterly budget data, and a cost-proportional budget consumption forecast for a case that is the subject of the order data in response to, for example, an operator's operation on a cost registration screen (not shown) displayed on the monitor 114, and registers the input data in the data file 106a.

図7(A)は、(2)予算データの例を示している。図7(A)に示す(1)予算データの例では、1行目は、工事番号「100」、原価要素CD「100」、予算金額「20,000」、2行目は、工事番号「100」、原価要素CD「200」、予算金額「20,000」、3行目は、工事番号「100」、原価要素CD「300」、予算金額「20,000」、4行目は、工事番号「100」、原価要素CD「400」、予算金額「20,000」となっており、原価予算の合計は、「80,000」となっている。 Figure 7 (A) shows an example of (2) budget data. In the example of (1) budget data shown in Figure 7 (A), the first line has the construction number "100", cost element CD "100", and budget amount "20,000", the second line has the construction number "100", cost element CD "200", and budget amount "20,000", the third line has the construction number "100", cost element CD "300", and budget amount "20,000", and the fourth line has the construction number "100", cost element CD "400", and budget amount "20,000", with the total cost budget being "80,000".

図7(B)は原価要素マスタ106bの例を示している。図7(B)に示す原価要素マスタ106bの例では、1行目は、原価要素CD「100」、原価要素名「材料費」、2行目は、原価要素CD「200」、原価要素名「外注費」、3行目は、原価要素CD「300」、原価要素名「労務費」、4行目は、原価要素CD「400」、原価要素名「経費」となっている。原価要素マスタ106bは、原価要素CDと原価要素名を変換する場合に参照されるものであり、例えば、予算データと四半期別予算データの原価要素CDを、原価比例ベースの予算消化予測の「原価要素名」に変換する際に参照される。 Figure 7 (B) shows an example of the cost element master 106b. In the example of the cost element master 106b shown in Figure 7 (B), the first line has a cost element CD of "100" and a cost element name of "material cost", the second line has a cost element CD of "200" and a cost element name of "outsourcing cost", the third line has a cost element CD of "300" and a cost element name of "labor cost", and the fourth line has a cost element CD of "400" and a cost element name of "expense". The cost element master 106b is referenced when converting the cost element CD and the cost element name, for example, when converting the cost element CD of the budget data and the quarterly budget data to the "cost element name" of the budget consumption forecast based on a cost proportional basis.

図7(C)は下半期別予算データの例を示している。図7(C)に示す四半期別予算データの例では、1行目は、工事番号「100」、原価要素CD「100」、年度「2020」、四半期「1」、出来高率「50」となっている。 Figure 7 (C) shows an example of budget data by second half of the year. In the example of quarterly budget data shown in Figure 7 (C), the first line contains the construction number "100", cost element CD "100", fiscal year "2020", quarter "1", and completion rate "50".

図7(D)は、原価比例ベースの予算消化予測[A]の例を示している。図7(D)に示す原価比例ベースの予算消化予測[A]の例では、1行目は、原価要素「材料費」について、予算額「20,000」、1Qの進捗率「50%」、消化金額「10,000」、2Qの進捗率「0%」、消化金額「0」、3Qの進捗率「50%」、消化金額「10,000」、4Qの進捗率「0%」、消化金額「0」となっている。ここで、原価要素及び予算額は、(2)予算データから取得する。消化率は、(2)四半期別予算データの出来高率から取得する。消化金額は、(2)予算データに(3)四半期別予算データの出来高率(消化率)を乗じて算出する(例えば、1Qの材料費の消化金額は、20,000×50%=10,000となる)。 Figure 7 (D) shows an example of a cost-proportional budget consumption forecast [A]. In the example of a cost-proportional budget consumption forecast [A] shown in Figure 7 (D), the first line shows the following for the cost element "material cost": budget amount "20,000", progress rate for 1Q "50%", consumption amount "10,000", progress rate for 2Q "0%", consumption amount "0", progress rate for 3Q "50%", consumption amount "10,000", progress rate for 4Q "0%", consumption amount "0". Here, the cost elements and budget amount are obtained from (2) budget data. The consumption rate is obtained from the performance rate of the (2) quarterly budget data. The consumption amount is calculated by multiplying (2) budget data by the performance rate (consumption rate) of the (3) quarterly budget data (for example, the consumption amount of material cost for 1Q is 20,000 x 50% = 10,000).

また、予測収益は、1Q「31,250」、2Q「21,250」、3Q「31,250」、4Q「16,250」となっている。予測収益は、(1)請負データ×(3)四半期別予算データの該当するQの消化金額計÷(2)予算データの予算合計で算出する。例えば、1Qの予測収益は、請負額「100,000」×1Qの消化金額計「25,000」÷予算合計「80,000」=「31,250」となる。 In addition, the forecast revenue is 31,250 for 1Q, 21,250 for 2Q, 31,250 for 3Q, and 16,250 for 4Q. The forecast revenue is calculated by (1) contract data x (3) total amount spent for the corresponding Q in the quarterly budget data ÷ (2) total budget for the budget data. For example, the forecast revenue for 1Q is 100,000 contract amount x 25,000 total amount spent for 1Q ÷ 80,000 total budget = 31,250.

(S3:出来高予測登録処理)
図8を参照して、出来高予測登録処理を説明する。図8は、出来高予測登録処理を説明するための図である。出来高処理部102cは、受注データの対象の案件について、例えば、モニタ114に表示される不図示の出来高登録画面上でのオペレータの操作等に応じて、予測出来高ヘッダデータ、予測出来高明細データ、出来高ベースの予測を作成して、データファイル106aに登録する。
(S3: Production volume forecast registration process)
The production volume forecast registration process will be described with reference to Fig. 8. Fig. 8 is a diagram for explaining the production volume forecast registration process. The production volume processing unit 102c creates forecast production volume header data, forecast production volume detail data, and production volume-based forecasts for the case of the target of the order data in response to, for example, an operator's operation on a production volume registration screen (not shown) displayed on the monitor 114, and registers them in the data file 106a.

図8(A)は、(4)予測出来高ヘッダデータの例を示す図である。図8(A)に示す(4)予測出来高ヘッダデータの例では、1行目は、工事番号「100」、SEQ「1」、請負内容「鋼管杭 φ600 t=9~10 L=6.5~13m」、請負本数「95」、単価「1,000」、金額「95,000」となっている。 Figure 8 (A) is a diagram showing an example of (4) forecasted volume header data. In the example of (4) forecasted volume header data shown in Figure 8 (A), the first line contains the construction number "100", SEQ "1", contract details "Steel pipe pile φ600 t=9-10 L=6.5-13m", number of contracts "95", unit price "1,000", and amount "95,000".

図8(B)は、(5)予測出来高明細データの例を示す図である。図8(B)に示す(5)予測出来高明細データの例では、工事番号「100」、SEQ「1」、年度「2020」、四半期「1」、出来高数「25」となっている。 Figure 8 (B) is a diagram showing an example of (5) forecasted progress detail data. In the example of (5) forecasted progress detail data shown in Figure 8 (B), the construction number is "100", SEQ is "1", fiscal year is "2020", quarter is "1", and progress amount is "25".

図8(C)は、出来高ベースの予測[C]の例を示す図である。図8(C)に示す出来高ベースの予測[C]の例では、1行目は、請負内容「鋼管杭 φ600 t=9~10 L=6.5~13m」、請負本数「95」、単価「1,000」、金額「95,000」、1Qの出来高数「25」、出来高金額「25,000」、2Qの出来高数「25」、出来高金額「25,000」、3Qの出来高数「24」、出来高金額「24,000」、4Qの出来高数「21」、出来高金額「21,000」となっている。 Figure 8 (C) is a diagram showing an example of a volume-based forecast [C]. In the example of volume-based forecast [C] shown in Figure 8 (C), the first line shows the contract details "Steel pipe piles φ600 t=9-10 L=6.5-13m", number of contracts "95", unit price "1,000", amount "95,000", 1Q volume "25", volume amount "25,000", 2Q volume "25", volume amount "25,000", 3Q volume "24", volume amount "24,000", 4Q volume "21", volume amount "21,000".

ここで、請負内容、請負本数、単価、金額は、(4)予測出来高ヘッダデータから取得する。出来高数は、(5)予測出来高明細データから取得する。出来高金額は、(4)予測出来高ヘッダデータと(5)予測出来高明細データから計算する。 Here, the contract details, number of contracts, unit price, and amount are obtained from (4) forecasted volume header data. The volume is obtained from (5) forecasted volume detail data. The volume amount is calculated from (4) forecasted volume header data and (5) forecasted volume detail data.

1Qの出来高金額の合計は、「27,500」、2Qの出来高金額の合計は、「25,000」、3Qの出来高金額の合計は、「26,500」、4Qの出来高金額の合計は、「21,000」となっている。 The total trading volume for 1Q is 27,500, the total trading volume for 2Q is 25,000, the total trading volume for 3Q is 26,500, and the total trading volume for 4Q is 21,000.

(S4:施工実施処理)
図9を参照して、施工実施処理を説明する。図9は、施工実施処理を説明する。原価処理部102bは、受注データの対象の案件について、例えば、モニタ114に表示される不図示の原価登録画面上でのオペレータの操作等に応じて、原価集計データ、原価比例ベースの原価実績及び収益実績を入力して、データファイル106aに登録する。材料仕入や外注費計上などのデータから原価計算にて原価集計データを集計する。
(S4: Construction implementation process)
The construction execution process will be described with reference to Fig. 9. The construction execution process will be described with reference to Fig. 9. The cost processing section 102b inputs cost compilation data, actual costs proportional to costs, and actual revenues for the case of the order data in response to, for example, an operator's operation on a cost registration screen (not shown) displayed on the monitor 114, and registers the data in the data file 106a. The cost compilation data is compiled by cost calculation from data such as material purchases and subcontract cost.

図9(A)は、(6)原価集計データの例を示す図である。図9(A)に示す(6)原価集計データの例では、1行目は、工事番号「100」、原価要素CD「100」、会計年月「202004」、原価要素コード「100」、発生金額「3,000」となっている。 Figure 9 (A) is a diagram showing an example of (6) cost summary data. In the example of (6) cost summary data shown in Figure 9 (A), the first line contains the construction number "100", cost element CD "100", accounting year/month "202004", cost element code "100", and incurred amount "3,000".

図9(B)は、図7(D)の原価比例ベースの予算消化予測に対する原価実績及び収益実績[B]の例を示している。ここで、原価要素及び予算額は、(2)予算データから取得する。消化金額は、(6)原価集計データの各期の合計金額とする(例えば、1Qの材料費は、3,000+3,000+4000=10,000となる)。消化率は、消化金額を(2)予算データの予算額で割ったものである(例えば、1Qの材料費の消化率は、10,000÷20,000=50%となる)。 Figure 9 (B) shows an example of actual costs and actual revenues [B] for the budget consumption forecast based on cost proportion in Figure 7 (D). Here, the cost elements and budget amount are obtained from (2) budget data. The consumption amount is the total amount for each period in (6) cost aggregation data (for example, the material cost for 1Q is 3,000 + 3,000 + 4000 = 10,000). The consumption rate is the consumption amount divided by the budget amount in (2) budget data (for example, the consumption rate for material cost for 1Q is 10,000 ÷ 20,000 = 50%).

図9(B)において、予測と異なる点は、外注費の1Qの予測が消化率「20%」、消化金額「4,000」、1Qの収益の予測が「31,250」に対して、外注費の1Qの実績は、消化率「25%」、消化金額「5,000」、1Qの収益の実績は「32,250(=請負額「100,000」×1Qの消化金額計「25,000」÷予算合計「80,000」となっている。 In Figure 9 (B), the differences from the forecast are that the forecast for outsourcing costs in 1Q is a consumption rate of 20%, a consumption amount of 4,000, and a forecast for revenue in 1Q of 31,250, while the actual results for outsourcing costs in 1Q are a consumption rate of 25%, a consumption amount of 5,000, and a revenue actual of 32,250 (= contract amount of 100,000 x total consumption amount in 1Q of 25,000 ÷ total budget of 80,000).

また、外注費の4Qの予測が消化率「20%」、消化金額「4,000」、4Qの収益の予測が「16,250」に対して、外注費の4Qの実績は、消化率「15%」、消化金額「3,000」、4Qの収益の実績は「15,000」となっている。 In addition, the forecast for outsourcing expenses in the fourth quarter is a usage rate of 20%, a usage amount of 4,000, and a revenue forecast of 16,250, while the actual outsourcing expenses in the fourth quarter are a usage rate of 15%, a usage amount of 3,000, and a revenue forecast of 15,000.

(S5:出来高実績登録処理)
図10を参照して、出来高実績登録処理を説明する。図10は、出来高実績登録処理を説明するための図である。出来高処理部102cは、受注データの対象の案件について、例えば、モニタ114に表示される不図示の出来高登録画面上でのオペレータの操作等に応じて、出来高実績デーと、出来高ベースの出来高実績を入力して、データファイル106aに登録する。
(S5: Production volume record registration process)
The production volume record registration process will be described with reference to Fig. 10. Fig. 10 is a diagram for explaining the production volume record registration process. The production volume processing unit 102c inputs production volume record data and production volume record on a production volume basis for a case that is the subject of the order data in response to, for example, an operator's operation on a production volume registration screen (not shown) displayed on the monitor 114, and registers the data in the data file 106a.

図10(A)は、出来高実績データの例を示す図である。図10(A)に示す出来高実績データの例では、1行目は、工事番号「100」、SEQ「1」、年度「2020」、四半期「1」、出来高数「26」、2行目は、工事番号「100」、SEQ「2」、年度「2020」、四半期「1」、出来高数「0.5」となっている。 Figure 10 (A) is a diagram showing an example of actual progress data. In the example of actual progress data shown in Figure 10 (A), the first line shows the construction number "100", SEQ "1", year "2020", quarter "1", and progress "26", while the second line shows the construction number "100", SEQ "2", year "2020", quarter "1", and progress "0.5".

図10(B)は、図8(C)の出来高ベースの予測に対する実績[D]の一例を示している。ここで、請負内容、請負本数、単価、金額は、(4)予測出来高ヘッダデータから取得する。出来高数は、(7)出来高実績データから取得する。出来高金額は、(4)予測出来高ヘッダデータの単価に(7)出来高実績データの出来高数を乗算して算出する。 Figure 10 (B) shows an example of actual results [D] for the volume-based forecast in Figure 8 (C). Here, the contract details, number of contracts, unit price, and amount are obtained from (4) forecast volume header data. The volume amount is obtained from (7) actual volume data. The volume amount is calculated by multiplying the unit price in (4) forecast volume header data by the volume amount in (7) actual volume data.

図10(B)において、予測と異なる点は、請負内容(鋼管杭 φ600 t=9~10 L=6.5~13m)について、1Qの予測が出来高数「25」、出来高金額「25,000」に対して、1Qの実績は、出来高数「26」、出来高金額「26,000」となっており、また、4Qの予測が出来高数「21」、出来高金額「21,000」に対して、4Qの実績は、出来高数「20」、出来高金額「20,000」となっている。 In Figure 10 (B), the differences from the forecast are that for the contract details (steel pipe piles, φ600, t=9-10, L=6.5-13m), the forecast for 1Q was a volume of "25" and a volume amount of "25,000," whereas the actual results for 1Q were a volume of "26" and a volume amount of "26,000," and the forecast for 4Q was a volume of "21" and a volume amount of "21,000," whereas the actual results for 4Q were a volume of "20" and a volume amount of "20,000."

(S6:比較処理)
比較部102dは、例えば、モニタ114に表示される不図示の比較画面上でのオペレータの操作等に応じて、対象の案件について、原価比例ベースの数値と出来高ベースの数値を比較して、進捗状況と収支状況の結果を表示出力する。
(S6: Comparison process)
The comparison unit 102d compares the cost-proportional figures with the volume-based figures for the target project in response to, for example, an operator's operation on a comparison screen (not shown) displayed on the monitor 114, and displays and outputs the results of the progress and income/expense situation.

比較部102dは、進捗状況については、予測出来高[C]と実績出来高[D]を比較して、予測出来高[C]-実績出来高[D]<0の場合は、案件が前倒しで進んでいると判断し、予測出来高[C]-実績出来高[D]=0の場合は、案件が予定通りのペースで進んでいると判断し、予測出来高[C]-実績出来高[D]>0の場合は、案件に遅れが発生していると判断して、その旨を表示出力してもよい。なお、請負内容の合計で比較しても、請負内容毎に比較してもよい。 The comparison unit 102d may compare the predicted volume of work [C] and the actual volume of work [D] to determine the progress status. If the predicted volume of work [C] - the actual volume of work [D] is less than 0, it may determine that the project is progressing ahead of schedule. If the predicted volume of work [C] - the actual volume of work [D] is equal to 0, it may determine that the project is progressing at the planned pace. If the predicted volume of work [C] - the actual volume of work [D] is greater than 0, it may determine that the project is behind schedule, and may display and output this information. Note that the comparison may be made based on the total contract content or on a per-contract content basis.

上記の例(図8、図10)では、2Qまでの上期収益を見ると、予測出来高の合計「52,500」-実績出来高の合計「53,500」<0となっているため、例えば、「進捗状況について、2Qまでは案件が前倒しに進んでいる旨」を表示出力する。 In the above example (Figures 8 and 10), looking at the first half revenue up to 2Q, the total forecast volume "52,500" - the total actual volume "53,500" is < 0, so for example, the display will show "Regarding progress, projects are moving ahead of schedule up to 2Q."

また、比較部102dは、収支状況については、収益実績[B]と実績出来高[D]を比較して、収益実績[B]-実績出来高[D]<0の場合は、収支状況が改善していると判断し、収益実績[B]-実績出来高[D]=0の場合は、予定通りの収支状況と判断し、収益実績[B]-実績出来高[D]>0の場合は、収支状況が悪化していると判断して、その旨を表示出力してもよい。 The comparison unit 102d may also compare the income/expense situation with the actual revenue [B] and the actual turnover [D], and if the actual revenue [B] - actual turnover [D] is less than 0, determine that the income/expense situation is improving, if the actual revenue [B] - actual turnover [D] is equal to 0, determine that the income/expense situation is as planned, and if the actual revenue [B] - actual turnover [D] is greater than 0, determine that the income/expense situation is worsening, and display and output this fact.

上記の例(図9、図10)では、2Qまでの上期収益を見ると、収益実績の合計「53,750」-実績出来高の合計「53,500」>0となっているため、例えば、「収支状況について、2Qまでは収支状況が悪化している旨」を表示出力する。 In the above example (Figures 9 and 10), looking at the first half revenue up to 2Q, the total actual revenue "53,750" - the total actual volume "53,500" is > 0, so for example, the following message will be displayed: "Regarding the income/expense situation, the income/expense situation has worsened up to 2Q."

以上説明したように、本実施の形態によれば、案件を受注した場合に、原価比例ベースの数値を作成する原価処理部102bと、案件を受注した場合に、出来高ベースの数値を作成する出来高処理部102cと、原価比例ベースの数値と出来高ベースの数値を比較して、受注した案件の進捗状況と収支状況を把握する比較部102dと、を備えているので、客観的に案件の進捗状況と収支状況を把握することが可能となる。 As described above, according to this embodiment, there are provided a cost processing unit 102b that creates a cost-proportional value when a project is accepted, a production volume processing unit 102c that creates a production volume-based value when a project is accepted, and a comparison unit 102d that compares the cost-proportional value with the production volume-based value to grasp the progress and income/expense situation of the accepted project, making it possible to objectively grasp the progress and income/expense situation of the project.

[4.国連が主導する持続可能な開発目標(SDGs)への貢献]
本実施形態により、業務効率化や企業の適切な経営判断を推進することに寄与することができるので、SDGsの目標8及び9に貢献することが可能となる。
[4. Contribution to the United Nations-led Sustainable Development Goals (SDGs)]
This embodiment can contribute to improving business efficiency and promoting appropriate management decisions by companies, thereby making it possible to contribute to goals 8 and 9 of the SDGs.

また、本実施形態により、廃棄ロス削減や、ペーパレス・電子化を推進することに寄与することができるので、SDGsの目標12、13及び15に貢献することが可能となる。また、本実施形態により、統制、ガバナンス強化に寄与することができるので、SDGsの目標16に貢献することが可能となる。 In addition, this embodiment can contribute to reducing waste and promoting paperless and electronic systems, which can contribute to SDGs goals 12, 13, and 15.In addition, this embodiment can contribute to strengthening control and governance, which can contribute to SDGs goal 16.

[5.他の実施形態]
本発明は、上述した実施形態以外にも、特許請求の範囲に記載した技術的思想の範囲内において種々の異なる実施形態にて実施されてよいものである。
5. Other embodiments
The present invention may be embodied in various different embodiments other than those described above within the scope of the technical concept set forth in the claims.

例えば、実施形態において説明した各処理のうち、自動的に行われるものとして説明した処理の全部または一部を手動的に行うこともでき、あるいは、手動的に行われるものとして説明した処理の全部または一部を公知の方法で自動的に行うこともできる。 For example, among the processes described in the embodiments, all or part of the processes described as being performed automatically can be performed manually, or all or part of the processes described as being performed manually can be performed automatically using a known method.

また、本明細書中や図面中で示した処理手順、制御手順、具体的名称、各処理の登録データや検索条件等のパラメータを含む情報、画面例、データベース構成については、特記する場合を除いて任意に変更することができる。 In addition, the processing procedures, control procedures, specific names, registered data for each process, information including parameters such as search conditions, screen examples, and database configurations shown in this specification and drawings may be changed as desired unless otherwise specified.

また、進捗管理装置100に関して、図示の各構成要素は機能概念的なものであり、必ずしも物理的に図示の如く構成されていることを要しない。 Furthermore, with regard to the progress management device 100, each component shown in the figure is a functional concept, and does not necessarily have to be physically configured as shown in the figure.

例えば、進捗管理装置100が備える処理機能、特に制御部にて行われる各処理機能については、その全部または任意の一部を、CPUおよび当該CPUにて解釈実行されるプログラムにて実現してもよく、また、ワイヤードロジックによるハードウェアとして実現してもよい。尚、プログラムは、本実施形態で説明した処理を情報処理装置に実行させるためのプログラム化された命令を含む一時的でないコンピュータ読み取り可能な記録媒体に記録されており、必要に応じて進捗管理装置100に機械的に読み取られる。すなわち、ROMまたはHDD(Hard Disk Drive)などの記憶部などには、OSと協働してCPUに命令を与え、各種処理を行うためのコンピュータプログラムが記録されている。このコンピュータプログラムは、RAMにロードされることによって実行され、CPUと協働して制御部を構成する。 For example, the processing functions of the progress management device 100, particularly the processing functions performed by the control unit, may be realized in whole or in part by a CPU and a program interpreted and executed by the CPU, or may be realized as hardware using wired logic. The program is recorded on a non-transient computer-readable recording medium that contains programmed instructions for causing the information processing device to execute the processes described in this embodiment, and is mechanically read by the progress management device 100 as necessary. That is, a computer program is recorded in a storage unit such as a ROM or HDD (Hard Disk Drive) for working with the OS to give instructions to the CPU and perform various processes. This computer program is executed by being loaded into RAM, and works with the CPU to form the control unit.

また、このコンピュータプログラムは、進捗管理装置100に対して任意のネットワークを介して接続されたアプリケーションプログラムサーバに記憶されていてもよく、必要に応じてその全部または一部をダウンロードすることも可能である。 This computer program may also be stored in an application program server connected to the progress management device 100 via any network, and all or part of it may be downloaded as needed.

また、本実施形態で説明した処理を実行するためのプログラムを、一時的でないコンピュータ読み取り可能な記録媒体に格納してもよく、また、プログラム製品として構成することもできる。ここで、この「記録媒体」とは、メモリーカード、USB(Universal Serial Bus)メモリ、SD(Secure Digital)カード、フレキシブルディスク、光磁気ディスク、ROM、EPROM(Erasable Programmable Read Only Memory)、EEPROM(登録商標)(Electrically Erasable and Programmable Read Only Memory)、CD-ROM(Compact Disk Read Only Memory)、MO(Magneto-Optical disk)、DVD(Digital Versatile Disk)、および、Blu-ray(登録商標) Disc等の任意の「可搬用の物理媒体」を含むものとする。 In addition, the program for executing the processing described in this embodiment may be stored on a non-transitory computer-readable recording medium, and may also be configured as a program product. Here, the term "recording medium" refers to a memory card, a USB (Universal Serial Bus) memory, a SD (Secure Digital) card, a flexible disk, a magneto-optical disk, a ROM, an EPROM (Erasable Programmable Read Only Memory), an EEPROM (registered trademark) (Electrically Erasable and Programmable Read Only Memory), a CD-ROM (Compact Disk Read Only Memory), an MO (Magneto-Optical disk), a DVD (Digital Versatile This includes any "portable physical media" such as a Blu-ray Disc (registered trademark) and a Blu-ray (registered trademark) Disc.

また、「プログラム」とは、任意の言語または記述方法にて記述されたデータ処理方法であり、ソースコードまたはバイナリコード等の形式を問わない。なお、「プログラム」は必ずしも単一的に構成されるものに限られず、複数のモジュールやライブラリとして分散構成されるものや、OSに代表される別個のプログラムと協働してその機能を達成するものをも含む。なお、実施形態に示した各装置において記録媒体を読み取るための具体的な構成および読み取り手順ならびに読み取り後のインストール手順等については、周知の構成や手順を用いることができる。 A "program" is a data processing method written in any language or description method, and may be in any format, such as source code or binary code. Note that a "program" is not necessarily limited to a single configuration, but also includes a distributed configuration consisting of multiple modules or libraries, and a program that works in conjunction with a separate program, such as an OS, to achieve its function. Note that the specific configuration and reading procedure for reading a recording medium in each device shown in the embodiments, as well as the installation procedure after reading, can use well-known configurations and procedures.

記憶部に格納される各種のデータベース等は、RAM、ROM等のメモリ装置、ハードディスク等の固定ディスク装置、フレキシブルディスク、及び、光ディスク等のストレージ手段であり、各種処理やウェブサイト提供に用いる各種のプログラム、テーブル、データベース、及び、ウェブページ用ファイル等を格納する。 The various databases stored in the memory unit are storage devices such as RAM, ROM, etc., fixed disk devices such as hard disks, flexible disks, and optical disks, and store various programs, tables, databases, and web page files used for various processes and providing websites.

また、進捗管理装置100は、既知のパーソナルコンピュータまたはワークステーション等の情報処理装置として構成してもよく、また、任意の周辺装置が接続された当該情報処理装置として構成してもよい。また、進捗管理装置100は、当該装置に本実施形態で説明した処理を実現させるソフトウェア(プログラムまたはデータ等を含む)を実装することにより実現してもよい。 The progress management device 100 may be configured as an information processing device such as a known personal computer or workstation, or may be configured as the information processing device to which any peripheral device is connected. The progress management device 100 may be realized by implementing software (including programs or data, etc.) that causes the device to realize the processing described in this embodiment.

更に、装置の分散・統合の具体的形態は図示するものに限られず、その全部または一部を、各種の付加等に応じてまたは機能負荷に応じて、任意の単位で機能的または物理的に分散・統合して構成することができる。すなわち、上述した実施形態を任意に組み合わせて実施してもよく、実施形態を選択的に実施してもよい。 Furthermore, the specific form of distribution and integration of the devices is not limited to that shown in the figures, and all or part of them can be functionally or physically distributed and integrated in any unit depending on various additions or functional loads. In other words, the above-mentioned embodiments can be implemented in any combination, or the embodiments can be implemented selectively.

100 進捗管理装置
102 制御部
102a 受注登録部
102b 原価処理部
102c 出来高処理部
102d 比較部
102e 画面表示制御部
104 通信インターフェース部
106 記憶部
106a データファイル
106b 原価要素マスタ
108 入出力インターフェース部
112 入力装置
114 出力装置
200 サーバ
300 ネットワーク
REFERENCE SIGNS LIST 100 Progress management device 102 Control unit 102a Order registration unit 102b Cost processing unit 102c Output processing unit 102d Comparison unit 102e Screen display control unit 104 Communication interface unit 106 Storage unit 106a Data file 106b Cost element master 108 Input/output interface unit 112 Input device 114 Output device 200 Server 300 Network

Claims (4)

制御部を備えた進捗管理装置であって、
前記制御部は、
案件を受注した場合に、原価比例ベースの原価実績及び収益実績を作成する原価処理手段と、
前記案件を受注した場合に、出来高ベースの予測出来高及び実績出来高を作成する出来高処理手段と、
工事進捗状況を、前記予測出来高と前記実績出来高を比較して判断し、前記予測出来高-前記実績出来高<0の場合は、案件が前倒しで進んでいると判断し、前記予測出来高-前記実績出来高=0の場合は、案件が予定通りのペースで進んでいると判断し、前記予測出来高-前記実績出来高>0の場合は、案件に遅れが発生していると判断し、また、収支状況を、前記収益実績と前記実績出来高を比較して判断し、前記収益実績-前記実績出来高<0の場合は、収支状況が改善していると判断し、前記収益実績-前記実績出来高=0の場合は、予定通りの収支状況と判断し、前記収益実績-前記実績出来高>0の場合は、収支状況が悪化していると判断する比較手段と、
を備えたことを特徴とする進捗管理装置。
A progress management device including a control unit,
The control unit is
a cost processing means for creating actual costs and actual revenues on a cost-proportional basis when a project is accepted;
a production amount processing means for generating a production amount-based forecast production amount and a performance amount when the job is accepted;
a comparison means for judging the progress of the construction work by comparing the predicted progress with the actual progress, judging that the project is progressing ahead of schedule if the predicted progress - the actual progress < 0, judging that the project is progressing at the planned pace if the predicted progress - the actual progress = 0, and judging that the project is behind schedule if the predicted progress - the actual progress > 0, and judging the balance situation by comparing the actual revenue with the actual progress, judging that the balance situation is improving if the actual revenue - the actual progress < 0, judging that the balance situation is as planned if the actual revenue - the actual progress = 0, and judging that the balance situation is worsening if the actual revenue - the actual progress >0;
A progress management device comprising:
前記案件は、工事に関する案件を含むことを特徴とする請求項に記載の進捗管理装置。 The progress management device according to claim 1 , wherein the items include items related to construction work. 制御部を備えた情報処理装置が実行する進捗管理方法であって、
前記制御部が実行する
案件を受注した場合に、原価比例ベースの原価実績及び収益実績を作成する原価処理工程と、
前記案件を受注した場合に、出来高ベースの予測出来高及び実績出来高を作成する出来高処理工程と、
工事進捗状況を、前記予測出来高と前記実績出来高を比較して判断し、前記予測出来高-前記実績出来高<0の場合は、案件が前倒しで進んでいると判断し、前記予測出来高-前記実績出来高=0の場合は、案件が予定通りのペースで進んでいると判断し、前記予測出来高-前記実績出来高>0の場合は、案件に遅れが発生していると判断し、また、収支状況を、前記収益実績と前記実績出来高を比較して判断し、前記収益実績-前記実績出来高<0の場合は、収支状況が改善していると判断し、前記収益実績-前記実績出来高=0の場合は、予定通りの収支状況と判断し、前記収益実績-前記実績出来高>0の場合は、収支状況が悪化していると判断する比較工程と、
を含むことを特徴とする進捗管理方法。
A progress management method executed by an information processing device having a control unit,
The control unit executes :
A cost processing step for creating actual costs and actual revenues based on a cost-proportional basis when a project is accepted;
a volume processing step for creating a volume-based forecast volume and an actual volume when the order is received;
a comparison process for judging the progress of the construction work by comparing the forecasted progress with the actual progress, judging that the project is progressing ahead of schedule if the forecasted progress - the actual progress is < 0, judging that the project is progressing at the planned pace if the forecasted progress - the actual progress is = 0, judging that the project is delayed if the forecasted progress - the actual progress is > 0, and judging the balance situation by comparing the actual revenue with the actual progress, judging that the balance situation is improving if the actual revenue - the actual progress is < 0, judging that the balance situation is as planned if the actual revenue - the actual progress is = 0, and judging that the balance situation is worsening if the actual revenue - the actual progress is >0;
A progress management method comprising:
制御部を備えた情報処理装置に実行させるための進捗管理プログラムであって、
前記制御部
案件を受注した場合に、原価比例ベースの原価実績及び収益実績を作成する原価処理工程と、
前記案件を受注した場合に、出来高ベースの予測出来高及び実績出来高を作成する出来高処理工程と、
工事進捗状況を、前記予測出来高と前記実績出来高を比較して判断し、前記予測出来高-前記実績出来高<0の場合は、案件が前倒しで進んでいると判断し、前記予測出来高-前記実績出来高=0の場合は、案件が予定通りのペースで進んでいると判断し、前記予測出来高-前記実績出来高>0の場合は、案件に遅れが発生していると判断し、また、収支状況を、前記収益実績と前記実績出来高を比較して判断し、前記収益実績-前記実績出来高<0の場合は、収支状況が改善していると判断し、前記収益実績-前記実績出来高=0の場合は、予定通りの収支状況と判断し、前記収益実績-前記実績出来高>0の場合は、収支状況が悪化していると判断する比較工程と、
を実行させるための進捗管理プログラム。
A progress management program to be executed by an information processing device having a control unit,
The control unit,
A cost processing step for creating actual costs and actual revenues based on a cost-proportional basis when a project is accepted;
a volume processing step for creating a volume-based forecast volume and an actual volume when the order is received;
a comparison process for judging the progress of the construction work by comparing the forecasted progress with the actual progress, judging that the project is progressing ahead of schedule if the forecasted progress - the actual progress is < 0, judging that the project is progressing at the planned pace if the forecasted progress - the actual progress is = 0, judging that the project is delayed if the forecasted progress - the actual progress is > 0, and judging the balance situation by comparing the actual revenue with the actual progress, judging that the balance situation is improving if the actual revenue - the actual progress is < 0, judging that the balance situation is as planned if the actual revenue - the actual progress is = 0, and judging that the balance situation is worsening if the actual revenue - the actual progress is >0;
A progress management program for implementing the above.
JP2021189511A 2021-01-29 2021-11-22 Progress management device, progress management method, and progress management program Active JP7705336B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2025108328A JP2025126295A (en) 2021-01-29 2025-06-26 Progress management device, progress management method, and progress management program

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2021013756 2021-01-29
JP2021013756 2021-01-29

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2025108328A Division JP2025126295A (en) 2021-01-29 2025-06-26 Progress management device, progress management method, and progress management program

Publications (2)

Publication Number Publication Date
JP2022117427A JP2022117427A (en) 2022-08-10
JP7705336B2 true JP7705336B2 (en) 2025-07-09

Family

ID=82749826

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2021189511A Active JP7705336B2 (en) 2021-01-29 2021-11-22 Progress management device, progress management method, and progress management program
JP2025108328A Pending JP2025126295A (en) 2021-01-29 2025-06-26 Progress management device, progress management method, and progress management program

Family Applications After (1)

Application Number Title Priority Date Filing Date
JP2025108328A Pending JP2025126295A (en) 2021-01-29 2025-06-26 Progress management device, progress management method, and progress management program

Country Status (1)

Country Link
JP (2) JP7705336B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005032186A (en) 2003-07-11 2005-02-03 Shin Nippon Kogyo Kk Construction cost management system, construction cost management device, and storage medium of cost management program
JP2009157489A (en) 2007-12-25 2009-07-16 Canon Marketing Japan Inc Project progress management device and its control method, project progress management system, program and recording medium with the program recorded
JP2012098849A (en) 2010-11-01 2012-05-24 Katsuzo Honma Credibility evaluation method for construction progress level

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005032186A (en) 2003-07-11 2005-02-03 Shin Nippon Kogyo Kk Construction cost management system, construction cost management device, and storage medium of cost management program
JP2009157489A (en) 2007-12-25 2009-07-16 Canon Marketing Japan Inc Project progress management device and its control method, project progress management system, program and recording medium with the program recorded
JP2012098849A (en) 2010-11-01 2012-05-24 Katsuzo Honma Credibility evaluation method for construction progress level

Also Published As

Publication number Publication date
JP2022117427A (en) 2022-08-10
JP2025126295A (en) 2025-08-28

Similar Documents

Publication Publication Date Title
JP7569462B2 (en) Project management device, project management method, and project management program
JP2016184407A (en) Cost management device, cost management method, and cost management program
JP2024018999A (en) Business support device, business support method, and business support program
JP7654857B2 (en) Project management device, project management method, and project management program
JP7824209B2 (en) Accounting processing device, accounting processing method, and accounting processing program
JP2024044063A (en) Income and expenditure management device, income and expenditure management method, and income and expenditure management program
JP7705336B2 (en) Progress management device, progress management method, and progress management program
JP7602000B2 (en) Cost accounting device, cost accounting method, and cost accounting program
JP2025015582A (en) Asset management system, asset management method, and asset management program
JP7670604B2 (en) Dwelling unit sales management device, dwelling unit sales management method, and dwelling unit sales management program
JP7543197B2 (en) Sales simulation device, sales simulation method, and sales simulation program
JP2022155478A (en) Cost management device, cost management method, and cost management program
JP7733043B2 (en) Project management system, project management method, and project management program
JP7542027B2 (en) Output management device, output management method, and output management program
JP7280931B2 (en) Information processing device, information processing method, and information processing program
JP7733037B2 (en) Performance management device, performance management method, and performance management program
JP7754873B2 (en) Project management system, project management method, and project management program
JP7791133B2 (en) Landing prediction device, landing prediction method, and landing prediction program
JP7470000B2 (en) Profit and Loss Management Simulation Device, Profit and Loss Management Simulation Method, and Profit and Loss Management Simulation Program
JP7812824B2 (en) Cash flow planning device, cash flow planning method, and cash flow planning program
JP7674184B2 (en) Payment management device, budget payment management method, and budget payment management program
JP7565959B2 (en) Balance management device, balance management method, and balance management program
JP7812815B2 (en) Accounting management device, accounting management method, and accounting management program
JP7840840B2 (en) Outsourcing progress management device, outsourcing progress management method, and outsourcing progress management program
JP7636961B2 (en) Income and expenditure management device, income and expenditure management method, and income and expenditure management program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240517

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250128

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250129

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250331

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250603

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250627

R150 Certificate of patent or registration of utility model

Ref document number: 7705336

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150