JPS5826445B2 - How to build super large structures - Google Patents
[go: Go Back, main page]

JPS5826445B2 - How to build super large structures - Google Patents

How to build super large structures

Info

Publication number
JPS5826445B2
JPS5826445B2 JP4834179A JP4834179A JPS5826445B2 JP S5826445 B2 JPS5826445 B2 JP S5826445B2 JP 4834179 A JP4834179 A JP 4834179A JP 4834179 A JP4834179 A JP 4834179A JP S5826445 B2 JPS5826445 B2 JP S5826445B2
Authority
JP
Japan
Prior art keywords
lower structure
dock
submersible
purge
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP4834179A
Other languages
Japanese (ja)
Other versions
JPS55138509A (en
Inventor
正人 佐々木
秀之 春日
勝 大森
力 野村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kanadevia Corp
Original Assignee
Hitachi Shipbuilding and Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Shipbuilding and Engineering Co Ltd filed Critical Hitachi Shipbuilding and Engineering Co Ltd
Priority to JP4834179A priority Critical patent/JPS5826445B2/en
Publication of JPS55138509A publication Critical patent/JPS55138509A/en
Publication of JPS5826445B2 publication Critical patent/JPS5826445B2/en
Expired legal-status Critical Current

Links

Description

【発明の詳細な説明】 本発明は、海底油田用作業台等の超大型構造物を建造す
る方法に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method of constructing very large structures such as offshore oil field platforms.

海上作業台等の建造にあたって、従来ドックが使用され
ている。
Docks have traditionally been used to construct offshore work platforms.

また、大型構造物の場合下部構造体と上部構造体とに分
けて建造し、後に接合することが試みられている。
Furthermore, in the case of large structures, attempts have been made to construct a lower structure and an upper structure separately, and then to join them together later.

この接合にあたっては、下部構造体をドックの側部上面
に載せておき、上部構造体をパージでドック内に搬送す
る。
For this joining, the lower structure is placed on the upper surface of the side of the dock, and the upper structure is transported into the dock by purging.

ところが、超大型構造物の場合、下部構造体をドックの
側部上面で建造するにはクレーンの揚程が不足となる問
題がある。
However, in the case of very large structures, there is a problem in that the lifting height of the crane is insufficient to construct the lower structure on the top side of the dock.

本発明は、このような問題を解消した建造方法を提案す
るものであり、以下その一実施例を図面に基づいて説明
する。
The present invention proposes a construction method that solves these problems, and one embodiment thereof will be described below with reference to the drawings.

第1図、第2図は本発明方法を適用する構造物の一例を
示す。
1 and 2 show an example of a structure to which the method of the present invention is applied.

構造物1は海底油田用作業台として構成されたものであ
り、下部構造体2と上部構造体3からなる。
The structure 1 is constructed as a workbench for an offshore oil field, and consists of a lower structure 2 and an upper structure 3.

下部構造体2は、マッドマットを構成する4本の本体柱
4a〜4dと、これら本体柱4a〜4d間に配置された
中間部材5とで構成されている。
The lower structure 2 is composed of four main body pillars 4a to 4d forming a mud mat, and an intermediate member 5 arranged between these main body pillars 4a to 4d.

中間部材5は複数本の支柱6と、各本体柱4a〜4dお
よび支柱6間に接続される水平および傾斜方向の梁7か
らなる。
The intermediate member 5 consists of a plurality of columns 6 and horizontal and inclined beams 7 connected between each of the main body columns 4a to 4d and the columns 6.

本体柱4a〜4dは多数本の単位柱8と接続材9と外殻
部材とで構成されている。
The main body columns 4a to 4d are composed of a large number of unit columns 8, a connecting member 9, and an outer shell member.

上部構造体3は下部構造体2の本体柱4a〜4dおよび
支柱6に接続される複数本の支柱10と、水平および傾
斜方向の梁11とで構成されている。
The upper structure 3 includes a plurality of columns 10 connected to the main body columns 4a to 4d and columns 6 of the lower structure 2, and beams 11 in horizontal and inclined directions.

つぎに建造方法につき説明する。Next, the construction method will be explained.

まず、第3図A、Bに示すように、下部構造体2の一側
の側面枠2aをドック10内で横倒姿勢で組立てる。
First, as shown in FIGS. 3A and 3B, the side frame 2a on one side of the lower structure 2 is assembled in the dock 10 in a horizontal position.

対ノ本体柱4a、4bはドック10の長手方向に離れて
配置する。
The opposite main body pillars 4a and 4b are arranged apart from each other in the longitudinal direction of the dock 10.

下部構造体2はそれ自身の浮力では浮上できないので、
側面枠2aの下部にパージ11を配置しておく。
Since the lower structure 2 cannot float by its own buoyancy,
A purge 11 is arranged at the lower part of the side frame 2a.

この後、上方の本体柱4c。4dを配置し、下部構造体
2の全体を構築する。
After this, the upper main body column 4c. 4d to construct the entire lower structure 2.

(第3図0.D)。(Figure 3 0.D).

このとき、下部構造体2はドック10内にあるため、ド
ック10の側部上面10aで建造する場合と比べてクレ
ーンの揚程が低くて足りる。
At this time, since the lower structure 2 is located within the dock 10, the lifting height of the crane is sufficient compared to the case where the lower structure 2 is constructed on the side upper surface 10a of the dock 10.

クレーンの揚程が不足である場合は、上方の両車体柱4
c 、4dは下部構造体2の完成状態における位置より
も下方で組立て、その組立て完了後に所定位置までせり
上げる。
If the lifting height of the crane is insufficient, both upper vehicle body columns 4
c and 4d are assembled below the position of the lower structure 2 in the completed state, and raised to a predetermined position after the assembly is completed.

このせり上げは、上下の本体柱4a、4c間、4b、4
a間の梁7aを伸縮式とし、あるいは適宜のガイド装置
を用いること等により行なえる。
This elevation is between the upper and lower main body columns 4a, 4c, 4b, 4
This can be done by making the beam 7a between a telescopic and retractable, or by using an appropriate guide device.

12はせり上げ時等の安定を図るため設けられた仮支柱
である。
Reference numeral 12 denotes a temporary support provided to ensure stability when raising the tower.

下部構造体2が完成すると、これをバージ11でドック
10外の海上に導き、バージ11の下面に潜水パージ1
3を重ねる(第3図E)。
When the lower structure 2 is completed, it is guided to the sea outside the dock 10 by a barge 11, and a submersible purge 1 is installed on the underside of the barge 11.
Repeat 3 (Figure 3E).

このようにバージ11,13を2段重ねとすることによ
り、十分な浮力が得られ、下部構造体2の全体を水面よ
り上方へ高く持ち上げることができる。
By stacking the barges 11 and 13 in two tiers in this way, sufficient buoyancy can be obtained and the entire lower structure 2 can be lifted high above the water surface.

このように下部構造体2を高く持ち上げ、さらに水平方
向の向きを変えてバージ11.13を大梁し、該下部構
造体2をドック10の両側部上面10a上に配置する。
In this way, the lower structure 2 is lifted high, and the barge 11.13 is extended by changing the horizontal direction, and the lower structure 2 is placed on the upper surface 10a of both sides of the dock 10.

上部構造体3は他所で通常の建造法で完成させておき、
第3図Gのように他のドック14からバージ15に載せ
る。
The superstructure 3 was completed using normal construction methods elsewhere,
Load it onto the barge 15 from another dock 14 as shown in FIG. 3G.

このバージ15を下部構造体2のドック10へ移動させ
、そのまま下部構造体2に合わせ接合する(第3図H)
This barge 15 is moved to the dock 10 of the lower structure 2, and is directly aligned and joined to the lower structure 2 (Fig. 3H)
.

そのときの上下方向の位置合わせはバージ15のバラス
ト調整により行なう。
Vertical positioning at this time is performed by adjusting the ballast of the barge 15.

接合に必要な部材はクレーンにより塔載する。The parts necessary for joining will be loaded onto the tower using a crane.

このようにして超大型構造物1が完成する。In this way, the super large structure 1 is completed.

なお、下部構造体2のドック10内での建造にあたって
、クレーンの揚程が若干不足する場合は、第4図Aのよ
うに下方の本体柱4a、4bの下部40a、40bを未
建造状態としたまま下部構造体2の他め部分全体を建造
する。
In addition, when constructing the lower structure 2 in the dock 10, if the lifting height of the crane is slightly insufficient, the lower parts 40a and 40b of the lower main body columns 4a and 4b are left in an unbuilt state as shown in Fig. 4A. The entire other part of the lower structure 2 is constructed.

そして、下部構造体2を上記のように海上に搬出してド
ック10の側部上面10aに配置した後に、本体柱4a
Then, after the lower structure 2 is carried out to sea as described above and placed on the side upper surface 10a of the dock 10, the main body column 4a is
.

4bの未建造部分、40a、40bを完成させる。Complete the unbuilt portion of 4b, 40a, and 40b.

これにより上述の本体柱4c、4dのせり上げが不必要
となる。
This eliminates the need to raise the main body columns 4c and 4d as described above.

また、せり上げと併用することにより、より一層クレー
ンの揚程不足を補うことができる。
In addition, by using it in conjunction with lifting, it is possible to further compensate for the lack of lifting height of the crane.

本発明は以上説明したように実施することができ、これ
によると、下部構造体をドック内で建造し、ドック外の
水上で水平方向の向きを変えてドックの側面上部に載置
するので、クレーンの揚程不足の問題なく超大型の下部
構造体を建造することができ、かつ上部構造体との接合
が容易に行なえる。
The present invention can be carried out as described above, and according to this, the substructure is built inside the dock, changed its horizontal direction on the water outside the dock, and is placed on the upper side of the dock. A super-large lower structure can be constructed without the problem of insufficient lifting height of the crane, and it can be easily joined to the upper structure.

また、下方構造体の配置替えにあたっては潜水バージを
用いてバージを2段重ねとするため、下部構造体を容易
に持ち上げてドックの側部上面に載置することができる
Further, when rearranging the lower structure, a diving barge is used to stack the barges in two stages, so the lower structure can be easily lifted and placed on the upper surface of the side of the dock.

【図面の簡単な説明】[Brief explanation of drawings]

図面は本発明の実施例を示し、第1図は超大型構造物の
正面図、第2図は本体柱の底面図、第3図A−Hは建造
工程説明図、第4図A、Bは建造工程の一部の変形例の
説明図である。 1・・・・・・超大型建造物、2・・・・・・下部構造
体、3・・・・・・上部構造体、4a〜4d・・・・・
・本体柱、5・・・・・・中間部材、6・・・・・・支
柱、7,7a・・・・・・梁、8・・・・・・単位柱、
9・・・・・・接続材、10・・・・・・ドック、10
a・・・・・・側部上面、11・・・・・・バージ、1
3・・・・・・潜水パージ、14・・・・・・ドック、
15・・・・・・バージ、40a 。 40b・・・・・・未建造部分。
The drawings show an embodiment of the present invention, and Fig. 1 is a front view of a super large structure, Fig. 2 is a bottom view of the main body column, Fig. 3 A-H is an explanatory drawing of the construction process, and Fig. 4 A and B. is an explanatory diagram of a partial modification of the construction process. 1... Ultra-large building, 2... Lower structure, 3... Upper structure, 4a to 4d...
- Main body column, 5... Intermediate member, 6... Support column, 7, 7a... Beam, 8... Unit column,
9... Connection material, 10... Dock, 10
a... Side upper surface, 11... Barge, 1
3...Dive purge, 14...Dock,
15...Barge, 40a. 40b...Unbuilt part.

Claims (1)

【特許請求の範囲】[Claims] 1 上部構造体と下部構造体からなる超大型構造物の建
造方法であって、ドック内において潜水パージに乗せて
下部構造体を横倒姿勢で構築し、この下部構造体を上記
潜水パージでドック外の水上又は水中に搬出し、上記潜
水パージの下面に他の潜水パージを重ね、これら潜水パ
ージにより下部構造体を持ち上げて該ドック両側部上面
にまたがって載せ、この下部構造体に上部構造体を接合
することを特徴とする超大型構造物の建造方法。
1 A method of constructing a super-large structure consisting of an upper structure and a lower structure, in which the lower structure is built in a horizontal position by being placed on a submersible purge in a dock, and this lower structure is placed on a dock using the submersible purge. The submersible purge is carried out onto the water or underwater, another submersible purge is placed on top of the underside of the submersible purge, the lower structure is lifted up by these submersible purges and placed across the upper surface of both sides of the dock, and the upper structure is attached to the lower structure. A method of constructing a super large structure characterized by joining.
JP4834179A 1979-04-18 1979-04-18 How to build super large structures Expired JPS5826445B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4834179A JPS5826445B2 (en) 1979-04-18 1979-04-18 How to build super large structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4834179A JPS5826445B2 (en) 1979-04-18 1979-04-18 How to build super large structures

Publications (2)

Publication Number Publication Date
JPS55138509A JPS55138509A (en) 1980-10-29
JPS5826445B2 true JPS5826445B2 (en) 1983-06-02

Family

ID=12800687

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4834179A Expired JPS5826445B2 (en) 1979-04-18 1979-04-18 How to build super large structures

Country Status (1)

Country Link
JP (1) JPS5826445B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61180656U (en) * 1985-04-30 1986-11-11

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61180656U (en) * 1985-04-30 1986-11-11

Also Published As

Publication number Publication date
JPS55138509A (en) 1980-10-29

Similar Documents

Publication Publication Date Title
US2422168A (en) Marine tower and method of placing same
US3977346A (en) Deck structure and method for building same
WO2022199477A1 (en) Offshore floating-type wind power combined semi-submersible platform foundation
US4126011A (en) Method of fabrication of offshore structures and offshore structures made according to the method
US20020079278A1 (en) Elevated crane support system and method for elevating a lifting apparatus
JPH05503124A (en) Method and apparatus for constructing artificial islands and islands thus obtained
US5536117A (en) Offshore tower structure and method of installating the same
US5051037A (en) Tower with folding braces for fixed offshore platform
US4181452A (en) Oil-production platform and method of assembling and installing the same on a sea bed
US4112697A (en) Method of producing and installing offshore structures
JPS5826445B2 (en) How to build super large structures
US4824291A (en) Offshore tower structures
JP2606799B2 (en) Installation method of marine platform
CN115107939A (en) Offshore floating type wind power combined semi-submersible platform foundation and installation method thereof
GB2080860A (en) A process for mounting in relatively shallow or moderately deep water and installing at the work site a drilling and oil-production platform with base-weight.
KR20240162801A (en) Working platform for offshore
JPS61222892A (en) Semisubmersible type floating structure and construction method thereof
JPS5826444B2 (en) How to build super large structures
JPS61162617A (en) Method of building off-shore structure
JPS5921404B2 (en) How to build super large structures
JP7692456B2 (en) Construction method for floating offshore wind power generation facilities
US2591225A (en) Offshore platform
JPS5857355B2 (en) Construction method of semi-submerged floating structure
JP3268199B2 (en) Floating body launch equipment
SU1041393A1 (en) Shipbuilding complex