JPS5921404B2 - How to build super large structures - Google Patents
[go: Go Back, main page]

JPS5921404B2 - How to build super large structures - Google Patents

How to build super large structures

Info

Publication number
JPS5921404B2
JPS5921404B2 JP4833979A JP4833979A JPS5921404B2 JP S5921404 B2 JPS5921404 B2 JP S5921404B2 JP 4833979 A JP4833979 A JP 4833979A JP 4833979 A JP4833979 A JP 4833979A JP S5921404 B2 JPS5921404 B2 JP S5921404B2
Authority
JP
Japan
Prior art keywords
main body
columns
assemble
lower structure
intermediate members
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP4833979A
Other languages
Japanese (ja)
Other versions
JPS55138507A (en
Inventor
力 野村
秀之 春日
勝 大森
正人 佐々木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kanadevia Corp
Original Assignee
Hitachi Shipbuilding and Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Shipbuilding and Engineering Co Ltd filed Critical Hitachi Shipbuilding and Engineering Co Ltd
Priority to JP4833979A priority Critical patent/JPS5921404B2/en
Publication of JPS55138507A publication Critical patent/JPS55138507A/en
Publication of JPS5921404B2 publication Critical patent/JPS5921404B2/en
Expired legal-status Critical Current

Links

Description

【発明の詳細な説明】 本発明は、海底油田用作業台等の超大型構造物を建造す
る方法に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method of constructing very large structures such as offshore oil field platforms.

海上作業台等の建造にあたって、従来ドックが使用され
ている。
Docks have traditionally been used to construct offshore work platforms.

また、大型構造物の場合下部構造体と上部構造体とに分
けて建造し、後に接合することが試みられている。
Furthermore, in the case of large structures, attempts have been made to construct a lower structure and an upper structure separately, and then to join them together later.

しかし、海底油田用作業台の如き超大型構造物の場合、
下部構造体の高さ、幅とも非常に大であるため、通常の
ドックに入りきらず、またクレーンの揚程も不足であり
、通常の工法を採用することができない。
However, in the case of extremely large structures such as offshore oil field work platforms,
The height and width of the substructure are too large to fit into a normal dock, and the lifting height of the crane is insufficient, making it impossible to use normal construction methods.

本発明はこのような問題を解消する超大型構造物の建造
方法を提案するものであり、以下その一実施例を図面に
基づいて説明する。
The present invention proposes a method for constructing a super large structure that solves these problems, and one embodiment thereof will be described below with reference to the drawings.

第1図〜第3図は本発明方法を適用する構造物の一例を
示す。
1 to 3 show an example of a structure to which the method of the present invention is applied.

超大型構造物1は海底油田用作業台として構成されたも
のであり、下部構造体2と上部構造体3かもなる。
The ultra-large structure 1 is configured as a workbench for an offshore oil field, and also includes a lower structure 2 and an upper structure 3.

下部構造体2は、マッドマットを構成する4本の本体柱
4a〜4dと、これら本体柱4a〜4b間に配置された
中間部材5とで構成されている。
The lower structure 2 includes four main body pillars 4a to 4d forming a mud mat, and an intermediate member 5 disposed between these main body pillars 4a to 4b.

中間部材5は複数本の支柱6と、各本体柱4a〜4dお
よび支柱6間に接続される水平および傾斜力向の梁7か
らなる。
The intermediate member 5 consists of a plurality of columns 6 and horizontal and inclined beams 7 connected between each of the main column columns 4a to 4d and the columns 6.

本体柱4a二4dは多数の単位柱8と接続材9と外殻部
材とで構成されている。
The main body columns 4a and 4d are composed of a large number of unit columns 8, connecting members 9, and outer shell members.

上部構造体3は、下部構造体2の本体柱4a〜4dおよ
び支柱6に接続される複数本の支柱10と、水平および
傾斜方向の梁11とで構成されている。
The upper structure 3 includes a plurality of columns 10 connected to the main body columns 4a to 4d and columns 6 of the lower structure 2, and beams 11 in horizontal and inclined directions.

つぎに建造方法につき説明する。Next, the construction method will be explained.

まず、第4図A、Bに示すように、2本の本体柱4a、
4bをドック12の両側部上面13上において横倒姿勢
でそれぞれ組立てる。
First, as shown in FIGS. 4A and 4B, two main body columns 4a,
4b are assembled in a horizontal position on the upper surface 13 of both sides of the dock 12.

また、ドック12内に浮かべたパージ14の架台15上
で中間部材5の一部を側木体柱4a、4b間に組立てる
Further, a part of the intermediate member 5 is assembled between the side wooden body columns 4a and 4b on the stand 15 of the purge 14 floating in the dock 12.

なお中間部材5は他所である程度組み上った状態でバー
ジ14上に搬入してもよい。
Note that the intermediate member 5 may be assembled to some extent elsewhere and then transported onto the barge 14.

バージ14はこの後、下部構造体2が完成するまで配置
したままとする。
The barge 14 then remains in place until the lower structure 2 is completed.

この後、残りの2本の本体柱4c 、4dを上記本体柱
4a 、 4bの少し上方で組立てる(第4図C)。
Thereafter, the remaining two main body pillars 4c and 4d are assembled slightly above the main body pillars 4a and 4b (Fig. 4C).

このとき、上側の本体柱4c、4dは、下側の本体柱4
a、4bに対する下部構造体2完成状態の相対位置より
も下方とし、これにより揚程不足の問題なく小型のクレ
ーン装置により上方の本体柱4c、4dの組立てを行な
うことができる。
At this time, the upper main body columns 4c and 4d are the lower main body columns 4.
It is located below the relative position of the lower structure 2 in its completed state with respect to a and 4b, so that the upper main body columns 4c and 4d can be assembled using a small crane device without the problem of insufficient lifting height.

組立てが完了すると、上下の本体柱4a〜4d間に配置
したガイド装置26(第4図E)あるいは中間部材5の
完成部分を利用して、ジヤツキ装置(図示せず)により
上方の本体柱4c、4dを所定位置までせり上げる。
When the assembly is completed, the upper main body pillar 4c is moved by a jacking device (not shown) using the guide device 26 (FIG. 4E) placed between the upper and lower main body pillars 4a to 4d or the completed part of the intermediate member 5. , 4d to a predetermined position.

上下の本体柱4a 、4c間、4b 、4d間に設ける
ガイド兼用の梁16は、大径管16aとこれに内嵌する
小径管16bとで伸縮可能構造とすることが望ましい。
It is desirable that the beams 16 serving as guides provided between the upper and lower main body columns 4a, 4c and between 4b, 4d have an expandable structure with a large diameter tube 16a and a small diameter tube 16b fitted therein.

このとき、第4図りのように仮支柱17を用いて安定を
図ることが望ましい。
At this time, it is desirable to use a temporary support 17 to stabilize the structure as shown in the fourth diagram.

なお、上方の本体柱4c、4dはドック12から離れた
他の所で組立てを完成させておき、そして下方の本体柱
4a、4bの上方に組立てた後に所定位置にせり上げて
もよい。
Note that the upper main body columns 4c and 4d may be assembled at another location away from the dock 12, and then raised to a predetermined position after being assembled above the lower main body columns 4a and 4b.

せり上げが完了すると、第4図Fに示すように、残りの
中間部材5を配置し、かつ溶接する。
When the raising is completed, the remaining intermediate member 5 is placed and welded as shown in FIG. 4F.

中間部材5の配置には大型のクレーンを用いるが、本体
柱4a〜4dを組立てる場合と異なり、部材数が少な(
大重量の部材であるため、大型クレーンの有効な利用が
できる。
A large crane is used to arrange the intermediate members 5, but unlike when assembling the main body columns 4a to 4d, the number of members is small (
Since it is a heavy member, a large crane can be used effectively.

このようにして、下部構造体2が完成すると、バージ1
4を撤去する。
In this way, when the lower structure 2 is completed, the barge 1
4 will be removed.

上部構造体3は他所において通常の建造法で完成させて
おき、第4図Gのように他のドック18からバージ14
に載せる。
The superstructure 3 is completed using the normal construction method elsewhere, and the barge 14 is installed from another dock 18 as shown in FIG. 4G.
I'll put it on.

このバージ14を下部構造物2のドック12へ移動させ
、そのまま下部構造体2に合わせ接合する。
This barge 14 is moved to the dock 12 of the lower structure 2, and is directly aligned and joined to the lower structure 2.

このときの上下方向の位置合わせは、バージ14のバラ
スト調整により行なう。
Vertical positioning at this time is performed by adjusting the ballast of the barge 14.

接合に必要な中間部材はクレーンにより搭載する。Intermediate members necessary for joining will be loaded by crane.

このようにして構造物1が完成する。以上説明したよう
に、本発明の方法によると、超大型構造物を、既設のド
ックおよびクレーンを用いて良好に建造することができ
る。
In this way, structure 1 is completed. As explained above, according to the method of the present invention, a super large structure can be successfully constructed using an existing dock and crane.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は本発明の一実施例を示し、第1図は超大型構造物
の正面図、第2図は下部構造体の平面図、第3図は本体
柱の底面図、第4図A−Hは建造工程説明図である。 1・・・・・・超大型構造物、2・・・・・・下部構造
体、3・・・・・・上部構造体、4a〜4d・・・・・
・本体柱、5・・・・・・中間部材、6・・・・・・支
柱、7・・・・・・梁、8・・・・・・単位柱、9・・
・・・・接続材、12・・・・・・ドック、14・・・
・・・バージ、16・・・・・・梁、17・・・・・・
仮支柱、18・・・・・・ドック、26・・・・・・ガ
イド装置。
The drawings show one embodiment of the present invention, in which Fig. 1 is a front view of a super large structure, Fig. 2 is a plan view of a lower structure, Fig. 3 is a bottom view of a main body column, and Fig. 4 A-H. is an explanatory diagram of the construction process. 1... Ultra-large structure, 2... Lower structure, 3... Upper structure, 4a to 4d...
・Body column, 5... Intermediate member, 6... Support column, 7... Beam, 8... Unit column, 9...
...Connecting material, 12...Dock, 14...
...Barge, 16...Beam, 17...
Temporary support, 18...Dock, 26...Guide device.

Claims (1)

【特許請求の範囲】[Claims] 1 上部構造体と下部構造体からなり、下部構造体は複
数本の本体柱と、これら本体柱間に配置された中間部材
とで構成される超大型構造物の建造方法であって、ドッ
クの両側部上面において一部の本体柱をそれぞれ横倒姿
勢で組立てると共に、ドック内に浮かべたパージを介し
て中間部材の一部を両本体柱間に組立て、次いで一部の
本体柱に対する少し上方の位置に残りの本体柱を組立て
、そして上下の本体柱間にガイド装置を配設した状態で
、上方の本体柱をジヤツキ装置により所定位置までせり
上げ、その後に各本体柱間に残りの中間部材を組立て、
以って下部構造体を横倒姿勢で建造し、この下部構造体
の建造完了後に、他所で建造した上部構造体をパージを
介してドック内に横倒姿勢で移動させ、そしてパージの
バラスト調整により下部構造体に対して上部構造体の位
置合わせを行なったのち、側構造体を接合することを特
徴とする超大型構造物の建造方法。
1. A construction method for a super-large structure consisting of an upper structure and a lower structure, where the lower structure is composed of a plurality of main body columns and intermediate members placed between these main body columns. Assemble some of the main body columns on the upper surface of both sides in a horizontal position, assemble some of the intermediate members between the two main body columns via the purge floating in the dock, and then install a part of the intermediate members slightly above some of the main body columns. Assemble the remaining main body pillars in place, and with the guide device installed between the upper and lower main body pillars, raise the upper main body pillar to the specified position using the jacking device, and then assemble the remaining intermediate members between each main body pillar. Assemble the
Therefore, the lower structure is built in a horizontal position, and after the construction of this lower structure is completed, the upper structure built elsewhere is moved in a horizontal position into the dock via a purge, and the ballast adjustment for the purge is carried out. A method of constructing a super-large structure, which comprises aligning the upper structure with respect to the lower structure using a method, and then joining the side structures.
JP4833979A 1979-04-18 1979-04-18 How to build super large structures Expired JPS5921404B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4833979A JPS5921404B2 (en) 1979-04-18 1979-04-18 How to build super large structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4833979A JPS5921404B2 (en) 1979-04-18 1979-04-18 How to build super large structures

Publications (2)

Publication Number Publication Date
JPS55138507A JPS55138507A (en) 1980-10-29
JPS5921404B2 true JPS5921404B2 (en) 1984-05-19

Family

ID=12800636

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4833979A Expired JPS5921404B2 (en) 1979-04-18 1979-04-18 How to build super large structures

Country Status (1)

Country Link
JP (1) JPS5921404B2 (en)

Also Published As

Publication number Publication date
JPS55138507A (en) 1980-10-29

Similar Documents

Publication Publication Date Title
JPS5921404B2 (en) How to build super large structures
CN113513030A (en) Double-pile one-column joint construction method for solving height difference of reverse-construction floor
JPH02161043A (en) Joint structure of concrete pipe columns, concrete pipe columns and their construction method
CN214942741U (en) Roof supports bed-jig
JP3413584B2 (en) Construction method of frame structure
JP6618116B2 (en) Construction method of pier
JPH0932120A (en) Method of construction of structure
JPS58512A (en) Construction of large-size structure in dock
JPS5826445B2 (en) How to build super large structures
JPS631408B2 (en)
KR102895776B1 (en) A system for forming concrete slab with join-foam
JPH11182026A (en) Construction blocks for construction of temporary scaffolds
JPS5826444B2 (en) How to build super large structures
JP2546729Y2 (en) Jig for tower crane climbing
JPH081057B2 (en) How to build artificial ground
JP3026115B2 (en) Building construction method
JPS5926387A (en) Method of building semisubmerged type platform
JPH06101348A (en) How to build a tower
JPS587015A (en) Leg assembling method for high lift landing type elevating working platform
JPS5919226B2 (en) How to build a tank
JP2026012054A (en) Jacket structure assembly method
JPH05485B2 (en)
JPH0738570Y2 (en) Assembling support pillar for combined binding plate for temporary iron plate floor
JP3118471B2 (en) Beam-to-column connection method
JP2002021372A (en) Method for transferring large torii (japanese shrine gate)