JPS5826446B2 - Shoring method for floating structures - Google Patents
Shoring method for floating structuresInfo
- Publication number
- JPS5826446B2 JPS5826446B2 JP12083779A JP12083779A JPS5826446B2 JP S5826446 B2 JPS5826446 B2 JP S5826446B2 JP 12083779 A JP12083779 A JP 12083779A JP 12083779 A JP12083779 A JP 12083779A JP S5826446 B2 JPS5826446 B2 JP S5826446B2
- Authority
- JP
- Japan
- Prior art keywords
- shoring
- frame
- float
- water
- formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Revetment (AREA)
Description
【発明の詳細な説明】
本発明は港湾における杭穴桟橋等の水上構造物を構築す
る際にその桟橋等の上部コンクリートを打設するための
支保工の方法に関する。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a shoring method for pouring concrete on the upper part of a pier when constructing a floating structure such as a pile hole pier in a harbor.
桟橋等の構築にあたってまず杭を水底に打設して、杭上
部の水上に突出させた部分に梁及び床版等の上部コンク
リートを打設するに際しては、コンクリート打込みのた
めの型枠をささえる支保工を杭に支持させて施す必要が
ある。When constructing a pier, etc., piles are first driven into the water bottom, and when placing upper concrete such as beams and slabs on the part of the top of the pile that protrudes above the water, supports are used to support the formwork for concrete pouring. It is necessary to support the work on piles.
この種の工事における従来の支保工は第1図イに示すよ
うに杭20にガセットプレート21を突設しテオキ、こ
れにブラケット22を固定し、そのブラケット22上に
支持枠23を組立てるか、あるいは第1図口に示すよう
にガセットプレート21に吊り筋24をもってブラケッ
ト22を吊り下げ、その上に支持枠23を組立てて、こ
の支持枠23と型枠間に支柱等を立てた後その上面に型
枠の組立を行っていた。Conventional shoring for this type of construction involves installing a gusset plate 21 protruding from a pile 20, fixing a bracket 22 to this, and assembling a support frame 23 on top of the bracket 22, as shown in Figure 1A. Alternatively, as shown in the opening in Figure 1, suspend the bracket 22 from the gusset plate 21 with the suspension bars 24, assemble the support frame 23 on top of it, erect a support etc. between the support frame 23 and the formwork, and then The formwork was being assembled.
しかしながら、上記作業は水上作業のため足場が悪く、
支保工組立作業はかなりの時間を必要とし、又その解体
作業においても、水面とその構築物底面との間の狭い場
所での作業となるので作業性も悪く、危険でもあった。However, the above work was carried out on water and the footing was poor.
Assembling the shoring requires a considerable amount of time, and dismantling the shoring requires work in a narrow space between the water surface and the bottom of the structure, making the work difficult and dangerous.
しかも、これらの作業は潮位、波浪に影響されるので作
業の時間的制約を受けるなどの問題があった。Moreover, since these operations are affected by tide levels and waves, there are problems such as being subject to time constraints.
また特に、大規模な桟橋の構築にあっては一箇所に使用
した支保工をコンクリートの固化後、支保工部材の個々
について解体してこれを次の箇所に移動して組立てて順
次桟橋を延長していくものであるが、その解体、移動、
組立に多くの労力を要することは工事の期間にも著しく
影響する等の問題があった。In particular, when constructing a large-scale pier, the shoring used in one location must be dismantled individually after the concrete has solidified, and then moved to the next location and reassembled to extend the pier in sequence. However, the dismantling, moving,
There were problems such as the large amount of labor required for assembly, which significantly affected the construction period.
本発明はこのような支保工を施すに際し、その設置、取
り外し及び移動を容易にしかも安全且つ迅速になし得る
とともに少ない労力によってなされ得る水上構築物の支
保工方法の提供を目的としたものであり、その要旨とす
るところは内部に注排水自在にして浮力調節自在なフロ
ート上に多数の縦部材を立設し、該各縦部材の上端に水
平枠体を固着して一体化させたフロート式支保工枠を水
面上に突出させた構築物支持杭間に曳航し、該フロート
式支保工枠を前記支持杭に対して所定の高さに取り外し
自在に固定し、該フロート式支保工i 枠の水平枠体上
に支持させて水上構築物の型枠を組み立てることを特徴
としてなる水上構築物の支保工方法に存する。The present invention aims to provide a method for shoring a floating structure that can be easily installed, removed, and moved safely, quickly, and with less labor when performing such shoring. Its gist is that it is a float-type support in which a number of vertical members are erected on a float whose buoyancy can be adjusted by freely pouring water into the interior, and a horizontal frame is fixed to the upper end of each vertical member. The construction frame is towed between the structure support piles that protrude above the water surface, and the floating type shoring frame is removably fixed to the support piles at a predetermined height, and the floating type shoring frame is horizontal. A method for shoring a floating structure is characterized by assembling the formwork of the floating structure by supporting it on a frame.
次に本発明の実施例を図面について説明する。Next, embodiments of the present invention will be described with reference to the drawings.
図中1は本発明方法に使用するフロート式支保工枠であ
る。1 in the figure is a float type shoring frame used in the method of the present invention.
この支保工枠1は底部に鋼管の両端を閉鎖した中空筒状
のフロート2,2を互いに平行配置に備えている。This shoring frame 1 has hollow cylindrical floats 2, 2, which are made of steel pipes with both ends closed, arranged in parallel to each other at the bottom.
このフロート2,2はポンプを使用して内部に注排水自
在となし、その浮力を調節できるようにしている。These floats 2, 2 can be freely filled with water using a pump, and their buoyancy can be adjusted.
又エアーホースを取り付けているのでここから圧縮空気
を封入することによっても浮力を調節できる。Also, since an air hose is attached, the buoyancy can be adjusted by filling in compressed air.
この両フロート2,2は横部材3,3・・・・・・をも
って連結されるとともにその上面に多数の縦部材4.4
・・・・・・が立設され、その縦部材4,4・・・・・
・の上端に水平枠体5が連結されている。Both floats 2, 2 are connected by horizontal members 3, 3..., and a large number of vertical members 4, 4 are provided on the upper surface thereof.
...... is erected, and its vertical members 4, 4...
- A horizontal frame 5 is connected to the upper end of the frame.
そしてこれらの部材は溶接、あるいはボルト締等により
外力に対しても一定形状を保持できるように一体化され
ている。These members are integrated by welding, bolting, etc. so that they can maintain a constant shape even against external forces.
また、フロート2,2は最大浮力の時各部材3゜4及び
水平枠体5等を搭載した状態で水面上に浮上するように
その浮力を設定している。Further, the buoyancy of the floats 2, 2 is set so that when the floats are at maximum buoyancy, they float above the water surface with each member 3.4, the horizontal frame 5, etc. mounted thereon.
又支保工として使用している際には支保玉枠自体の荷重
のほとんどをフロート2,2の浮力で受は持たせるよう
にして、かつフロート2,2が常に水中に没している状
態にフロート2,2の浮力を設定する。Also, when using it as a shoring, most of the load of the shoring frame itself is carried by the buoyancy of the floats 2, 2, and the floats 2, 2 are always submerged in the water. Set the buoyancy of floats 2 and 2.
このように構成されるフロート式支保工枠1を第3図に
示すように、水上に浮べあらかじめ水底下に打込まれて
水面上に突出させた杭6,6・・・・・・間に曳航する
。As shown in Fig. 3, the floating type shoring frame 1 constructed in this way is floating on the water and has piles 6, 6, . Tow.
そして、第4図に示すように杭6,6・・・・・・間の
所定位置でフロート2,2内に注水し、水平枠体5の上
面が構築物の型枠を施すに適当な高さに至るまで沈める
。Then, as shown in Fig. 4, water is poured into the floats 2, 2 at predetermined positions between the piles 6, 6, . Submerge it until it reaches the bottom.
この状態で杭6,6・・・・・・の上端より吊り筋7を
もって水平枠体5を固定して吊り下げるとともに縦部材
4,4・・・・・・と杭6間を上下方向及び水平方向に
移動しないように角材8もしくはジヤツキアップ装置を
もって固定する。In this state, the horizontal frame 5 is fixed and suspended from the upper ends of the piles 6, 6, . Fix it using a square piece 8 or a jack up device to prevent it from moving in the horizontal direction.
その後更にフロート2,2内に注水して最高潮位の時に
支保工全体に作用する浮力より支保工1の下向き荷重が
多少大となるようにフロート2,2の浮力を設定する。Thereafter, water is further poured into the floats 2, 2, and the buoyancy of the floats 2, 2 is set so that the downward load on the shoring 1 is somewhat larger than the buoyant force acting on the entire shoring at the highest water level.
これは最高潮位時になっても浮力によって支保工を押し
上げる力が働かないようにして、設置された支保工の水
平枠の上面位置が不動であるようにする。This prevents the force of pushing up the shoring due to buoyancy even at the highest water level, so that the upper surface position of the horizontal frame of the installed shoring remains unchanged.
このようにして支持枠1を杭6.6・・・・・・に支持
させた後、第5図に示すように従来と同様に支保工枠1
と構築物の型枠9との間に支柱10,10・・・・・・
を介在させ、支保工の設置を完成する。After supporting the support frame 1 on the piles 6, 6, . . . in this way, as shown in Fig. 5, the support frame 1 is
Supports 10, 10... are placed between the frame 9 of the structure and the
to complete the installation of shoring.
支保工設置後、型枠組立からコンクリート打設。After installing the shoring, formwork is assembled and concrete is poured.
養生、支保工撤去までの期間には支保工全体に作用する
浮力は潮位変化によって常に増減するが、減少した場合
には浮力減少分の荷重は吊筋7に受は持たせる。During the period from curing to removal of the shoring, the buoyant force acting on the entire shoring constantly increases or decreases depending on changes in the tide level, but when it decreases, the suspension bars 7 carry the load corresponding to the decrease in the buoyant force.
またこの支保工の取り外しに際しては支柱10゜10・
・・・・・を取り外し、型枠9を取り外した後フロート
2.2内に注水もしくは排水して構築物下面11に水平
枠体5が衝突しない程度の高さに支持枠1が浮ぶように
浮力調節した後、吊り筋7を切断し、次の設置箇所へ曳
航する。Also, when removing this support, the support should be 10°10.
After removing the formwork 9, pour water or drain water into the float 2.2 to create buoyancy so that the support frame 1 floats at a height that prevents the horizontal frame 5 from colliding with the lower surface 11 of the structure. After adjustment, the suspension bars 7 are cut and the vehicle is towed to the next installation location.
また上述の実施例では水平枠体5と構築物の型枠9との
間に支保工用の支柱10.10・・・・・・を介在させ
ているが、第6図に示すように支柱1o。Further, in the above embodiment, supporting columns 10, 10, etc. are interposed between the horizontal frame 5 and the formwork 9 of the structure, but as shown in FIG. .
10・・・・・・を用いることなく水平枠体5を型枠9
下面の角材12に直接当接させて型枠9を支持させても
よいものである。10... The horizontal frame body 5 is formed into a formwork 9 without using...
The formwork 9 may be supported by directly contacting the square material 12 on the lower surface.
なお図中りは最低潮位、Hは最高潮位を示す。Note that the mark in the figure indicates the lowest tide level, and the mark H indicates the highest tide level.
本発明は上述のように構成され、水上の構築物の支保工
を施す際にフロート式支保工枠を使用し。The present invention is configured as described above, and uses a float type shoring frame when shoring a structure on water.
その支持枠の上端に支保工用の水平枠体を一体化させて
備えておき、これを水上に浮べて移動させ、杭の所定高
さ位置に簡便に固定しあるいは取りはずしをするように
したことによって、従来方法に比べ、その位置決め、固
定及び取り外しに要する労力が著しく少なくなり、また
人力による危険な水上作業がなくなり、多少の波浪時に
も容易に作業がなし得られることとなり、工期の短縮化
、作業能率の向上及び作業の安全性の向上が達成される
ものである。A horizontal frame body for shoring is integrated and provided at the upper end of the support frame, and this can be moved by floating on the water and easily fixed at a predetermined height position of the pile or removed. Compared to conventional methods, the labor required for positioning, fixing, and removing is significantly reduced, and dangerous manual work on the water is no longer required, and the work can be done easily even when there are some waves, shortening the construction period. , improvements in work efficiency and work safety can be achieved.
第1図イ1口は従来の支保工における水平枠体の取り付
は状態を示す部分正面図、第2図は本発明に使用するフ
ロート式支保工枠の斜視図、第3図は本発明方法の支保
工枠固定前の状態を示す正面図、第4図は同支保工枠固
定後の状態を示す正面図、第5図は型枠組み立て後の状
態を示す正面図、第6図は更に他の例の型枠組み立て後
の状態を示す正面図である。
1・・・・・・フロート式支保工枠、2・・・・・・フ
ロート、4・・・・・・縦部材、5・・・・・・水平枠
体、6・・・・・・杭、7・・・・・・吊り筋、
9・・・・・・構築物底盤型枠、
10・・・・・・支柱、
11・・・・・・構築物下面、
12・・・・・・角材。Figure 1 A1 is a partial front view showing how the horizontal frame is installed in conventional shoring, Figure 2 is a perspective view of the float type shoring frame used in the present invention, and Figure 3 is the present invention. Fig. 4 is a front view showing the state before the shoring frame is fixed, Fig. 5 is a front view showing the state after the formwork is erected, and Fig. 6 is a front view showing the state before the shoring frame is fixed. It is a front view which shows the state after the formwork of still another example is erected. 1...Float type shoring frame, 2...Float, 4...Vertical member, 5...Horizontal frame, 6... Pile, 7... Hanging bar, 9... Bottom plate formwork of the structure, 10... Pillar, 11... Lower surface of the structure, 12... Square timber.
Claims (1)
に多数の縦部材を立設し、該各縦部材の上端に水平枠体
を固着して一体化させたフロート式支保工枠を水面上に
突出させた構築物支持杭間に曳航し、該フロート式支保
工枠を前記支持杭に対して所定の高さに取り外し自在に
固定し、該フロート式支保工枠の水平枠体上に支持させ
て水上構築物の型枠を組み立てることを特徴としてなる
水上構築物の支保工方法。1. A float-type shoring frame is constructed by erecting a number of vertical members on a float whose buoyancy can be freely adjusted by freely pouring water inside, and by fixing a horizontal frame to the upper end of each vertical member. The float type shoring frame is removably fixed at a predetermined height with respect to the support piles, and is supported on the horizontal frame of the float type shoring frame. A method for shoring a floating structure, characterized by assembling formwork for the floating structure.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP12083779A JPS5826446B2 (en) | 1979-09-21 | 1979-09-21 | Shoring method for floating structures |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP12083779A JPS5826446B2 (en) | 1979-09-21 | 1979-09-21 | Shoring method for floating structures |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS5646008A JPS5646008A (en) | 1981-04-27 |
| JPS5826446B2 true JPS5826446B2 (en) | 1983-06-02 |
Family
ID=14796178
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP12083779A Expired JPS5826446B2 (en) | 1979-09-21 | 1979-09-21 | Shoring method for floating structures |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5826446B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4630500B2 (en) * | 2001-08-28 | 2011-02-09 | 日鐵住金建材株式会社 | Floating girder for underwater / water structure support |
-
1979
- 1979-09-21 JP JP12083779A patent/JPS5826446B2/en not_active Expired
Also Published As
| Publication number | Publication date |
|---|---|
| JPS5646008A (en) | 1981-04-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| AU2009289381B2 (en) | Offshore station, foundation for an offshore station, and method for building an offshore station | |
| JP6792240B2 (en) | Scuttling prevention device for steel pipe piles, scuttling prevention structure and scuttling prevention method | |
| KR100854338B1 (en) | Mounted steel sheet pile curtain structure | |
| KR20090118682A (en) | Prefabricated Floating Unit | |
| JP3790452B2 (en) | Jacket structure | |
| JP2001348888A (en) | Method and device for constructing underwater foundation structure | |
| KR910001393B1 (en) | How to install the casing and its casing on the water floor | |
| JPH1193129A (en) | Pier superstructure construction method | |
| JPS5826446B2 (en) | Shoring method for floating structures | |
| JPH08158341A (en) | Joint structure of pile and beam and construction method of structure using it | |
| JPH0930487A (en) | Artificial island having half-floating structure | |
| WO1980002708A1 (en) | A method for performing underwater casting of concrete structures,and an apparatus for carrying out the method | |
| KR100884050B1 (en) | Foundation construction method for steel wells using steel pontoons | |
| KR102535841B1 (en) | Construction method of pier foundation using floating PC houses | |
| JPH0726531A (en) | Offshore pier construction method | |
| JP6792239B2 (en) | Scuttling prevention device for steel pipe piles and scuttling prevention method | |
| JP2868725B2 (en) | Seawall repair method | |
| JP7687088B2 (en) | Method for erecting inverted supports and pliers used for this purpose | |
| JPS5949962B2 (en) | Shoring method and equipment for construction of floating concrete structures | |
| JPS6149026A (en) | Construction work of structure such as caisson on sea | |
| JP2000064314A (en) | Construction method of foundation structure | |
| CN215906728U (en) | Floating type drilling construction platform | |
| JP2001303580A (en) | Temporary shuttering method and structure using caisson | |
| JPH11229404A (en) | Construction of bridge foundation in deep water | |
| JPH0213098B2 (en) |