- JPS5840072B2 JPS5840072B2 JP56137799A JP13779981A JPS5840072B2 JP S5840072 B2 JPS5840072 B2 JP S5840072B2 JP 56137799 A JP56137799 A JP 56137799A JP 13779981 A JP13779981 A JP 13779981A JP S5840072 B2 JPS5840072 B2 JP S5840072B2
- Authority
- JP
- Japan
- Prior art keywords
- muddy water
- locking
- pipe
- locking box
- box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 56
- 238000000034 method Methods 0.000 claims description 12
- 239000003566 sealing material Substances 0.000 claims description 6
- 238000009412 basement excavation Methods 0.000 description 12
- 229910000831 Steel Inorganic materials 0.000 description 4
- 238000009434 installation Methods 0.000 description 4
- 238000007711 solidification Methods 0.000 description 4
- 230000008023 solidification Effects 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 239000003673 groundwater Substances 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 239000003795 chemical substances by application Substances 0.000 description 2
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 210000000078 claw Anatomy 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000003517 fume Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000004898 kneading Methods 0.000 description 1
- 235000019353 potassium silicate Nutrition 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000000565 sealant Substances 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- NTHWMYGWWRZVTN-UHFFFAOYSA-N sodium silicate Chemical compound [Na+].[Na+].[O-][Si]([O-])=O NTHWMYGWWRZVTN-UHFFFAOYSA-N 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Electric Cable Installation (AREA)
Description
【発明の詳細な説明】
本発明は、上下水道、電信電力用ケーブル等の用途に供
される管路の敷設方法に関する。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for laying conduits used for water supply, sewerage, telegraph and power cables, and the like.
従来、例えば上下水道用管路の敷設は、溝を掘削した後
、溝法面の崩壊を防ぐためにシートパイル、H型鋼等を
溝法面に沿って打ち込み、H型鋼にあってはさらに横矢
板をかけ渡し、掘削底にコンクリートのような材料から
成るベースを設け、このベース上にヒユーム管や鋼管を
順次配置して管路を形成し、その後開削箇所を埋め戻す
方法が採用されている。Conventionally, for example, when laying water and sewage pipelines, after excavating a trench, sheet piles, H-shaped steel, etc. were driven along the slope of the trench to prevent the slope from collapsing. A method is used in which a base made of a material such as concrete is installed at the bottom of the excavation, a pipe is formed by successively placing humid pipes and steel pipes on this base, and the excavated area is then backfilled.
しかし前記従来の敷設方法は、砂礫層のためにシートパ
イル等を打ち込めない場所、振動騒音を引き起こすため
にシートパイル等を打ち込むことが不適な場所、地下水
位が高く処理が困難な場所、地下水位を低下させること
ができない場所等では、敷設費の高騰を招く。However, the conventional laying method is difficult to install in places where sheet piles etc. cannot be driven due to a gravel layer, places where it is inappropriate to drive sheet piles etc. due to vibration noise, places where the groundwater level is high and it is difficult to treat the groundwater level. In places where it is not possible to lower the installation cost, the installation cost will rise.
また、管路形成後の土砂の埋め戻しが均質にできないた
め、管路の敷設の完全を期することが難しく、後日漏水
の原因となり、あるいは管路の破壊事故を誘発する原因
となっている。In addition, because the backfilling of the earth and sand after pipe formation cannot be made homogeneous, it is difficult to ensure that the pipes are completely laid, which can lead to water leaks at a later date or lead to pipe destruction accidents. .
さらにシートパイル等の引抜き撤去時の振動により管路
に悪影響を及ぼし、しかも抜き跡lこは空隙が生じるた
め、その後の自動車等の運行による振動で地表面が沈下
するという問題がある。Furthermore, vibrations caused when sheet piles and the like are pulled out and removed have an adverse effect on the pipeline, and since voids are created in the area where the sheet piles are pulled out, there is a problem in that the ground surface sinks due to subsequent vibrations caused by the operation of automobiles and the like.
そこで前記した従来の問題を解消するために、本出願人
は先に「管路の敷設方法」(特願昭56−2145号)
を提案している。Therefore, in order to solve the above-mentioned conventional problems, the present applicant has previously published a "method for laying pipes" (Japanese Patent Application No. 56-2145).
is proposed.
この「管路の敷設方法」では、泥水を満たしながら掘削
した溝内に両端開放の管体を順次に吊り下げて管体を継
ぎ足して成る管路を形成しかっこれを吊持する間に、前
記管路内を液密的に遮断すべく、前記溝内にロッキング
ボックスを挿入しかつ吊持して、該ロッキングボックス
の側部を前記管路の最外方に位置する管体の端部に係合
させ、次いで前記管路内の泥水の一部を該管路外に排出
し、これにより前記ロッキングボックスを前記管体の端
部に一層密に係合させるとともに前記ロッキングボック
スの前記管路内側の泥水圧とこれとは反対側の泥水圧と
の差によって前記管路を構成する管体に作用する軸方向
力により密に結合させ、その後前記管体を周辺地盤に支
持させるべく、前記溝孔内の泥水のうち少なくとも前記
管体を取り巻く泥水を固化させ、該泥水の固化後前配管
体の吊持を解きかつ前記ロッキングボックスを撤去する
ことにより、管路を敷設するよう2こしている。In this "pipeline laying method," pipes with both ends open are sequentially suspended in a trench excavated while filling with muddy water, and a pipe is formed by joining the pipes. In order to liquid-tightly shut off the inside of the pipe, a locking box is inserted into the groove and suspended, and the side of the locking box is attached to the outermost end of the pipe body of the pipe. and then draining a portion of the muddy water within the conduit out of the conduit, thereby causing the locking box to more closely engage the end of the conduit and the conduit of the locking box. In order to tightly connect the pipe bodies by an axial force acting on the pipe bodies constituting the pipe line due to the difference between the mud water pressure on the inside and the mud water pressure on the opposite side, the pipe bodies are then supported by the surrounding ground. Among the muddy water in the trench, at least the muddy water surrounding the pipe body is solidified, and after the muddy water has solidified, the front piping body is unsuspended and the locking box is removed, so that a pipe line can be laid. There is.
この方法によれば前記従来の問題点を解消することはで
きるが、ロッキングボックスの撤去後により生じる空間
を利用してバックホーのような掘削機械で未掘削地盤の
掘削を行う際、地盤のwIJにより生じる硼が管路内に
入るおそれがある。Although this method can solve the above conventional problems, when excavating unexcavated ground with an excavating machine such as a backhoe using the space created after the locking box is removed, the wIJ of the ground There is a risk that the resulting porosity may enter the pipe.
特に、管路の先端部付近に砺が付着すると、新たな管体
を管路に接続して管路を延長する際、接続が不可能とな
るばかりでなく、敷設作業の進行が阻害されることにも
なる。In particular, if rust adheres near the tip of the pipe, when connecting a new pipe to the pipe to extend the pipe, it will not only be impossible to connect, but also hinder the progress of the installation work. It also happens.
したがって本発明の目的は、前記したような管路敷設に
伴う不都合を解消する管路の敷設方法を提供することに
ある。Therefore, an object of the present invention is to provide a method for laying a pipe line that eliminates the above-mentioned inconveniences associated with laying a pipe line.
本発明の特徴とするところは、泥水を満たしながら掘削
した溝内に配置された両端開放の管体の先端部を、第1
および第2のロッキングボックスにより遮蔽して、その
後の泥水の固化を行うに際して、固化材を含む泥水が管
体内に浸入することを阻止しかつ泥水の固化後における
地盤の再掘削を容易にするための空間を確保し、管体の
先端部に接する第1のロッキングボックスを残して第2
のロッキングボックスを撤去することにより、前記空間
に泥水を満たしながら地盤を掘削したときに生じる硼が
管体内に入ることを防止する点にある。The feature of the present invention is that the tip of the pipe body, which is open at both ends, is placed in the trench excavated while filling with muddy water.
and a second locking box to prevent muddy water containing a solidification material from entering the pipe body during subsequent solidification of muddy water, and to facilitate re-excavation of the ground after solidification of muddy water. , leaving the first locking box in contact with the tip of the pipe body, and removing the second locking box.
By removing the locking box, it is possible to prevent porosity that is generated when the ground is excavated while filling the space with muddy water from entering the pipe body.
本発明が特徴とするところは、図示の実施例についての
以下の説明により、さらに明らかとなろつO
第1図を参照して、まず地盤を掘削して溝10を形成す
る。The features of the present invention will become more apparent from the following description of the illustrated embodiment. Referring to FIG. 1, first, a trench 10 is formed by excavating the ground.
地盤の掘削にはバックホー、クラムシェル等の掘削機械
を使用することができるが、溝10の法面の崩壊や地下
水位の低下を防止するために、地盤の掘削は泥水12を
満たしながら行う。Excavation machines such as backhoes and clamshells can be used to excavate the ground, but in order to prevent the slope of the trench 10 from collapsing and the groundwater level from lowering, the excavation is performed while filling the trench with muddy water 12.
溝10の形成後、ヒユーム管や鋼管のような両端開放の
管体を溝10内に配置する。After forming the groove 10, a tubular body with both ends open, such as a fume pipe or a steel pipe, is placed in the groove 10.
管体14の配置により溝10内に管路16が形成される
。A conduit 16 is formed within the groove 10 by the arrangement of the tube 14 .
管路16の形成に際しては、複数の管体14を予め地上
でつなぎ合わせた後、泥水12中に挿入することにより
行うことも可能であるが、図示の例のように泥水12中
に管体14を適宜の吊持手段18で吊持し、泥水12中
で管体14を相互に継ぎ足すことにより管路16を形成
することができる。When forming the pipe line 16, it is also possible to connect a plurality of pipe bodies 14 on the ground in advance and then insert them into the muddy water 12. The pipe line 16 can be formed by suspending the pipe bodies 14 with appropriate suspension means 18 and joining the pipe bodies 14 to each other in the muddy water 12.
また、図示していないが前記複数の管体14に代えて該
複数の管体14の長さに相当する1本の長尺な両端開放
の管体を溝10内に配置することもできる。Further, although not shown, instead of the plurality of tubes 14, one elongated tube with both ends open corresponding to the length of the plurality of tubes 14 may be arranged in the groove 10.
このようlこして泥水12が満たされた溝10内lこ管
体14を配置した後、第1のロッキングボックス20と
第2のロッキングボックス22とを同時にもしくは前後
して泥水12中に挿入する。After the pipe body 14 is placed in the groove 10 filled with the strained muddy water 12, the first locking box 20 and the second locking box 22 are inserted into the muddy water 12 at the same time or one after the other. .
泥水12中での第1および第2のロッキングボックス2
0,22の配置は、第1のロッキングボックス20の一
方の側28が管体14の開放端部である管路16の先端
部24に当接しかつ第2のロッキングボックス22が第
1のロッキングボックス20の一方の側28と反対の側
30に位置するようにする。First and second locking boxes 2 in muddy water 12
0,22 such that one side 28 of the first locking box 20 abuts the tip 24 of the conduit 16, which is the open end of the tube body 14, and the second locking box 22 contacts the first locking box 22. on one side 28 and on the opposite side 30 of box 20.
第1および第2のロッキングボックス20゜22の泥水
12中への挿入および泥水12中での前記配置は、例え
ばクレーン(図示せず)によりワイヤ26を介して第1
および第2のロッキングボックス20.22のそれぞれ
を吊持しつつ行うことができる。The insertion of the first and second locking boxes 20, 22 into the muddy water 12 and said positioning in the muddy water 12 are carried out by means of a crane (not shown), for example, in the first and second locking boxes 20, 22 via wires 26.
This can be carried out while suspending each of the locking boxes 20 and 22.
第1のロッキングボックス20の一方の側28と管体1
4の先端部24とを当接させるに際し、先端部24に対
する第1のロッキングボックス20の位置決めを一層容
易に行うためには、第1のロッキングボックス20を泥
水12中に挿入して泥水12中における前記位置決めが
完了した後、第2のロッキングボックス22を泥水12
中に挿入することが望ましい。One side 28 of the first locking box 20 and the tube body 1
4, in order to more easily position the first locking box 20 with respect to the tip 24, insert the first locking box 20 into the muddy water 12. After the positioning is completed, the second locking box 22 is removed from the muddy water 12.
It is desirable to insert it inside.
第4図ないし第1図1こ示す第1および第2のロッキン
グボックス20.22は、それぞれ鉄、鋼板を溶接して
箱状に形成され、第1および第2のロッキングボックス
20.22はそれぞれの後部および前部、すなわち第1
のロッキングボックス20の一方の側28と反対の側3
0および第2のロッキングボックス22の一方の側32
に設けられた少なくとも一対の雌雄の関係にあるスライ
ダのような保合手段34により分離可能に係合し、それ
ぞれが長手方向に摺動するようになっている。The first and second locking boxes 20.22 shown in FIGS. 4 to 1 are each formed into a box shape by welding iron or steel plates. the rear and front parts of the
One side 28 and the opposite side 3 of the locking box 20 of
0 and one side 32 of the second locking box 22
They are separably engaged by at least one pair of retaining means 34 such as male and female sliders provided therein, and each slides in the longitudinal direction.
第6図に示すように、第1のロッキングボックス20は
、第2のロッキングボックス22の一方の側32と平行
な平板状の反対の側30に対し、一方の側28が段階状
に形成され連続する上方の広幅の部分36と下方の小幅
の部分38との2部分で構成されている。As shown in FIG. 6, the first locking box 20 has one side 28 formed in a step-like manner with respect to the opposite side 30 which is flat and parallel to one side 32 of the second locking box 22. It is composed of two continuous parts: an upper wide part 36 and a lower narrow part 38.
小幅の部分38の前面は管路16の先端部24に当接す
る当接部40を有し、当接部40の中央には管体14の
先端部24の形状に相当する形状のシール材42が貼着
され、このシール材42を介して管路16の先端部24
が一層確実に遮蔽される。The front surface of the narrow portion 38 has an abutting portion 40 that abuts the tip 24 of the pipe 16, and a sealing material 42 having a shape corresponding to the shape of the tip 24 of the tube body 14 is provided at the center of the abutting portion 40. is pasted to the tip 24 of the conduit 16 via this sealant 42.
is more reliably shielded.
また、広幅の部分36の両端部44が下方へ伸び、シー
ル材42の上半分の外輪46に沿って該外輪、すなわち
当接部40の一部を取り囲んでいる。Further, both ends 44 of the wide portion 36 extend downward and surround a portion of the outer ring 46 of the upper half of the sealing material 42, that is, the contact portion 40.
したがって、後述するように、泥水12の固化後、第1
のロッキングボックス20を引き抜くと第3図に示すよ
うな管体14の先端部24近傍の上半分に非固化部分が
形成される。Therefore, as will be described later, after the muddy water 12 solidifies, the first
When the locking box 20 is pulled out, a non-solidified portion is formed in the upper half of the tube 14 near the tip 24 as shown in FIG.
この非固化部分は、泥水12中にあって管体14の先端
部24に他の管体14を接続して更に管路16を延長す
るに際し、固定された管路16に対する管体14の位置
決めに寄与する。This unsolidified portion is used for positioning the pipe 14 with respect to the fixed pipe 16 when connecting another pipe 14 to the tip 24 of the pipe 14 in the muddy water 12 to further extend the pipe 16. Contribute to
すなわち、特願昭56−102292号明細書に記載の
ように、管体の雄部から突出させた爪部材を他の管体の
雌部外周の一部すなわち前記非固化部分に当接させるこ
とにより、管体相互の位置決めを行うことができる。That is, as described in Japanese Patent Application No. 56-102292, a claw member protruding from a male part of a tube is brought into contact with a part of the outer periphery of the female part of another tube, that is, the non-solidified part. This allows mutual positioning of the tube bodies.
なお、第1のロッキングボックス20は、前記した他に
、該第1のロッキングボックス20の一方の側28を反
対の側30と同様に平板状とし、平板状の任意の部分を
管路16の先端部24に対する当接部としてもよい。In addition to the above, the first locking box 20 has one side 28 of the first locking box 20 in a flat plate shape similar to the opposite side 30, and any part of the flat plate can be connected to the pipe line 16. It may also be a contact portion for the tip portion 24.
さらに第1のロッキングボックス20の当接部にシール
材を配置してもよい。Furthermore, a sealing material may be placed at the abutting portion of the first locking box 20.
第1および第2のニラキングボックス20゜22を泥水
12中に挿入することにより前記したような第1のロッ
キングボックス20の一方の側28、すなわち当接部4
0をシール材42を介して管路16の先端部24に当接
させ、泥水12中における第1のロッキングボックス2
0の位置決めの完了後、第2のロッキングボックス22
を係合手段34を介して第1のロッキングボックス20
の反対の側301こ沿って配置した後泥水12を固化さ
せる。By inserting the first and second locking boxes 20° 22 into the muddy water 12, one side 28 of the first locking box 20 as described above, that is, the abutment portion 4
0 is brought into contact with the tip end 24 of the conduit 16 via the sealing material 42, and the first locking box 2 is placed in the muddy water 12.
0, the second locking box 22
the first locking box 20 via the engagement means 34
After being placed along the opposite side 301 of the muddy water 12, the muddy water 12 is solidified.
この泥水12の固化に先立ち、第1のロッキングボック
ス20を管路16の先端部24に密接させかつ管路16
を構成する管体相互を一層密に係合させるために、管路
16の後端部(図示せず)から管路16内の泥水12を
管路16が浮力により浮き上がらない程度に管路16外
に抜いてもよい。Prior to the solidification of this muddy water 12, the first locking box 20 is brought into close contact with the tip 24 of the pipe line 16, and
In order to more closely engage the pipe bodies constituting the pipe, the muddy water 12 in the pipe 16 is removed from the rear end (not shown) of the pipe 16 to the extent that the pipe 16 does not float up due to buoyancy. You can take it outside.
管路16内の泥水12の一部を抜くことにより、管路1
6内外の泥水圧の差圧で第1のロッキングボックス20
が先端部24に強く押しつけられ、これに伴って管体1
4相互間の接合の緩みが解消される。By removing a part of the muddy water 12 in the pipe 16, the pipe 1
6 The first locking box 20 is activated by the differential pressure between the inside and outside of the mud water pressure.
is strongly pressed against the tip 24, and as a result, the tube body 1
The loosening of the joints between the four parts is eliminated.
泥水12を固化するには、溝10内の泥水12をポンプ
(図示せず)により吸み出し、地上に設置した混練プラ
ント(図示せず)へ送り、該プラントで泥水12をセメ
ントや水ガラスその他の固化剤と混練し、固化泥水とし
て溝10の底部へ送り込み、固化泥水が管路16の上部
まで行き渡るようにする。To solidify the muddy water 12, the muddy water 12 in the trench 10 is sucked out by a pump (not shown) and sent to a kneading plant (not shown) installed on the ground, where the muddy water 12 is mixed with cement or water glass. It is mixed with other solidifying agents and sent to the bottom of the groove 10 as solidified muddy water, so that the solidified muddy water reaches the top of the pipe line 16.
この際、前記固化剤の添加量を調節して後記固化層50
の強度を調節することができる。At this time, the amount of the solidifying agent added is adjusted to form the solidified layer 50 described below.
The intensity can be adjusted.
これにより管路16の周辺が管路16の先端部24近傍
の上半分の非固化部分48(第3図)を残して固化され
、管路16は固化層50を介して周辺地盤52に支持さ
れる。As a result, the periphery of the pipe 16 is solidified leaving an unsolidified portion 48 (FIG. 3) in the upper half near the tip 24 of the pipe 16, and the pipe 16 is supported by the surrounding ground 52 via the solidified layer 50. be done.
目的に応じて、泥水12の全部と固化泥水とを置換する
ことも可能である。Depending on the purpose, it is also possible to replace all of the muddy water 12 with solidified muddy water.
管路16の先端部24には第1のロッキングボックス2
0が当接しているため、管路16内へ前記固化泥水が浸
入することはない。A first locking box 2 is provided at the tip 24 of the conduit 16.
0 are in contact with each other, the solidified mud water will not enter into the pipe line 16.
固化層50が自立可能な状態に達したら、第2のロッキ
ングボックス22を上方へ引き上げて撤去する。When the solidified layer 50 reaches a state where it can stand on its own, the second locking box 22 is pulled upward and removed.
この引き上げを後記空間54に泥水を供給しながら行え
ば、第1のロッキングボックス20が管路16の先端部
24から不用意に離れることはない。If this lifting is performed while supplying muddy water to the space 54 described later, the first locking box 20 will not be inadvertently separated from the tip 24 of the conduit 16.
第2のロッキングボックス22を撤去した後には、固化
層50に囲まれた空間54が生じ、この空間54に掘削
機械、例えばバックホーのバケツト56を挿入して未掘
削の地盤58を泥水60を満たしながら掘削することが
できる。After the second locking box 22 is removed, a space 54 surrounded by a solidified layer 50 is created, into which an excavation machine, for example a bucket 56 of a backhoe, is inserted to fill the unexcavated ground 58 with muddy water 60. It can be excavated while drilling.
また、前記空間54は第2のロッキングボックス22の
大きさを変え、あるいは複数のロッキングボックスを第
2のロッキングボックスとすることにより、その大きさ
を自由に定めることができる。Further, the size of the space 54 can be freely determined by changing the size of the second locking box 22 or by using a plurality of locking boxes as the second locking box.
未掘削地盤58を掘削して溝を更に延長するに際し、前
記掘削により生じル砺は、第1のロッキングボックス2
0が管路16の先端部24に当接して先端部24を遮蔽
しているので、管路16内に入り込むことはなく、した
がってまた管路16の先端部24近傍に堆積することも
ない。When the unexcavated ground 58 is excavated to further extend the trench, the groove created by the excavation is removed from the first locking box 2.
Since the 0 is in contact with and shields the tip 24 of the conduit 16, it will not enter the conduit 16 and therefore will not be deposited near the tip 24 of the conduit 16.
このことから、後に先端部24に他の管体を接続する場
合、砺のために管体を先端部24に嵌合できなくなるお
それは全くない。For this reason, when connecting another tube to the tip 24 later, there is no possibility that the tube will not be able to fit into the tip 24 due to the rust.
前記掘削が進行し、該掘削により生じる硼が管路16内
に入り込むおそれのない程簾まで溝が形成された後、ま
たは一定長さの溝の形成後に第1のロッキングボックス
20を上方へ引き上げて撤去する。After the excavation has progressed and a groove has been formed to the extent that there is no fear that the porosity produced by the excavation will enter the pipe line 16, or after a groove of a certain length has been formed, the first locking box 20 is pulled upward. and remove it.
前記第1のロッキングボックス20が密に接合している
場合には、前記引き上げに先立って管路16内へ泥水を
戻し、第1のロッキングボックス20に作用する泥水の
圧力差による力を解除すればよい。If the first locking boxes 20 are tightly connected, the muddy water is returned to the pipe 16 prior to the lifting to release the force due to the pressure difference of the muddy water acting on the first locking box 20. Bye.
本発明によれば、未掘削地盤の掘削により生じる硼が管
路内に入ることは全くなく、シたがって管路への新たな
管体の継ぎ足しの障害となることがなく、管路の敷設作
業を円滑に進行させることができる。According to the present invention, porosity produced by excavating unexcavated ground never enters the pipeline, and therefore does not become an obstacle to adding a new pipe body to the pipeline, making it easier to lay the pipeline. Work can proceed smoothly.
また本発明によれば、未掘削地盤の掘削開始の際、掘削
機械を挿入するための空間の大きさを自由に設定するこ
とができ、地盤の掘削を容易にすると共に、掘削作業の
促進に寄与する。Further, according to the present invention, when starting excavation of unexcavated ground, the size of the space for inserting the excavation machine can be freely set, which facilitates the excavation of the ground and promotes the excavation work. Contribute.
さらに本発明によれば、泥水と固化泥水とを置換して固
化層を形成する際、管路への固化泥水の浸入を阻止する
ことができるため、敷設後における管路内の流通が妨げ
られるようなことはない。Further, according to the present invention, when replacing muddy water with solidified muddy water to form a solidified layer, it is possible to prevent the solidified muddy water from entering the pipe, thereby preventing the flow within the pipe after installation. There is no such thing.
第1図は泥水中に第1および第2のロッキングボックス
を挿入した状態を示す縦断面図、第2図は第2のロッキ
ングボックスを引き抜いた後の状態を示す縦断面図、第
3図は第1のロッキングボックスを引き抜いた後の状態
を示す縦断面図、第4図は保合状態にある第1および第
2のロッキングボックスの正面図、第5図の係合状態に
ある第1および第2のロッキングボックスの側面図、第
6図は第5図の線6−6に沿って得た縦断面図、第7図
は係合状態にある第1および第20ツキングボツクスの
平面図である。
10:溝、12:泥水、14:管体、16:管路、20
:第1のロッキングボックス、22:第2のロッキング
ボックス、24:管路の先端部、34:係合手段、36
:広幅の部分、38:小幅の部分、40:当接部、42
:シール材、48:非固化部分、54:空間、58:未
掘削部分、60:泥水。Fig. 1 is a longitudinal sectional view showing the state in which the first and second locking boxes are inserted into muddy water, Fig. 2 is a longitudinal sectional view showing the state after the second locking box is pulled out, and Fig. 3 is a longitudinal sectional view showing the state after the second locking box is pulled out. 4 is a front view of the first and second locking boxes in the locked state, and FIG. 5 is a front view of the first and second locking boxes in the engaged state. 6 is a longitudinal cross-sectional view taken along line 6--6 of FIG. 5; FIG. 7 is a plan view of the first and twentieth locking boxes in engagement; FIG. It is. 10: Groove, 12: Muddy water, 14: Pipe body, 16: Pipeline, 20
: first locking box, 22: second locking box, 24: tip end of conduit, 34: engaging means, 36
: Wide part, 38: Narrow part, 40: Contact part, 42
: sealing material, 48: unsolidified part, 54: space, 58: unexcavated part, 60: muddy water.
Claims (1)
を配置した後、第1のロッキングボックスの一方の側が
前記管体の先端部に当接しかつ第2のロッキングボック
スが前記第1のロッキングボックスの前記一方の側と反
対の側に配置されるように前記第1および第2のロッキ
ングボックスを同時にまたは前後して前記泥水中に挿入
し、前記泥水の一部または全部を固化させた後、前記第
2のロッキングボックスを撤去し、該第2のロッキング
ボックスの撤去により生じる空間lこ泥水を満たしなが
ら地盤の掘削を行い、その後前記第1のロッキングボッ
クスを撤去することを含む、管路の敷設方法。 2 前記第1のロッキングボックスは前記一方の側に前
記管体の先端部と密接可能な当接部を備える、特許請求
の範囲第1項の敷設方法。 3 前記第1のロッキングボックスの一方の側の当接部
はシール材を備える、特許請求の範囲第2項の敷設方法
。 4 前記第1のロッキングボックスは連続する広幅の部
分と小幅の部分から成り、該小幅の部分は前記当接部を
有し、該当接部の一部が前記広幅の部分に取りまかれて
いる、特許請求の範囲第1項、2項または3項の敷設方
法。 5 前記第1および第2のロッキングボックスは互いに
分離可能に係合されている、特許請求の範囲第1項の敷
設方法。[Scope of Claims] 1. After placing a tubular body with both ends open in a trench excavated while filling muddy water, one side of the first locking box abuts the tip of the tubular body, and a second locking box is placed in the groove. the first and second locking boxes are inserted into the muddy water at the same time or one after the other so that the first and second locking boxes are disposed on the opposite side of the one side of the first locking box; After solidifying everything, remove the second rocking box, excavate the ground while filling the space created by the removal of the second rocking box with muddy water, and then remove the first rocking box. method of laying pipes, including 2. The laying method according to claim 1, wherein the first locking box is provided with an abutment part on the one side that can come into close contact with the tip end of the tube body. 3. The laying method according to claim 2, wherein the contact portion on one side of the first locking box is provided with a sealing material. 4. The first locking box consists of a continuous wide part and a narrow part, the narrow part has the abutting part, and a part of the abutting part is surrounded by the wide part. , the laying method according to claim 1, 2 or 3. 5. The laying method of claim 1, wherein the first and second locking boxes are separably engaged with each other.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP56137799A JPS5840072B2 (en) | 1981-09-03 | 1981-09-03 | How to lay pipes |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP56137799A JPS5840072B2 (en) | 1981-09-03 | 1981-09-03 | How to lay pipes |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS5839888A JPS5839888A (en) | 1983-03-08 |
| JPS5840072B2 true JPS5840072B2 (en) | 1983-09-02 |
Family
ID=15207114
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP56137799A Expired JPS5840072B2 (en) | 1981-09-03 | 1981-09-03 | How to lay pipes |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5840072B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH04118443U (en) * | 1991-04-03 | 1992-10-22 | 大同特殊鋼株式会社 | Vacuum heat treatment furnace |
| JP4656583B2 (en) * | 2006-07-21 | 2011-03-23 | ライト工業株式会社 | Tube burial method |
-
1981
- 1981-09-03 JP JP56137799A patent/JPS5840072B2/en not_active Expired
Also Published As
| Publication number | Publication date |
|---|---|
| JPS5839888A (en) | 1983-03-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPS6122698B2 (en) | ||
| KR102217329B1 (en) | Guide device for continuous excavation of casing | |
| JPS5840072B2 (en) | How to lay pipes | |
| CN116045077B (en) | Large-diameter direct-buried pipeline installation method | |
| KR20070081633A (en) | Underground order wall construction method and auxiliary casing | |
| JP3776987B2 (en) | Vertical shaft construction method using a manhole wall combined tubular body | |
| JPS5914667B2 (en) | How to lay pipes | |
| JP3418144B2 (en) | Connection method between human hole and pipe | |
| JP2004125100A (en) | Construction method for burying pipe | |
| JPH0634076A (en) | Subsidence preventive method for buried pipe conduit by civil engineering work sheet | |
| JPH11323887A (en) | Pipeline burial method and its equipment | |
| JP3454332B2 (en) | Groove backfill method | |
| JPH0529730B2 (en) | ||
| JP3292824B2 (en) | Burial method of pipe | |
| JP2873911B2 (en) | How to lay down a culvert by mud solidification | |
| JPH0663269B2 (en) | Pipe burying method | |
| JPS609179B2 (en) | Large diameter pipe buried turning method | |
| JP2953843B2 (en) | Pipe line laying method by non-cutting propulsion method | |
| JPH03279516A (en) | Laying for underground buried pipe | |
| RU2018578C1 (en) | Method for laying deep-seated horizontal drainage systems | |
| JPH07310861A (en) | How to lay underground pipes | |
| JPS5930861B2 (en) | Buried piping construction method | |
| JPS6120754B2 (en) | ||
| JPS63284324A (en) | Burying method of tube | |
| JPH1122860A (en) | Pipe connection device and pipe burial method in excavation trench |