Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPS6119554B2 - - Google Patents
[go: Go Back, main page]

JPS6119554B2 - - Google Patents

Info

Publication number
JPS6119554B2
JPS6119554B2 JP5741881A JP5741881A JPS6119554B2 JP S6119554 B2 JPS6119554 B2 JP S6119554B2 JP 5741881 A JP5741881 A JP 5741881A JP 5741881 A JP5741881 A JP 5741881A JP S6119554 B2 JPS6119554 B2 JP S6119554B2
Authority
JP
Japan
Prior art keywords
cable
drum
carriage
load
guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP5741881A
Other languages
Japanese (ja)
Other versions
JPS57170384A (en
Inventor
Terumichi Yamada
Yukinobu Yamada
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MARUKEN KOGYO KK
Original Assignee
MARUKEN KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MARUKEN KOGYO KK filed Critical MARUKEN KOGYO KK
Priority to JP5741881A priority Critical patent/JPS57170384A/en
Publication of JPS57170384A publication Critical patent/JPS57170384A/en
Publication of JPS6119554B2 publication Critical patent/JPS6119554B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Forklifts And Lifting Vehicles (AREA)

Description

【発明の詳細な説明】 技術分野 この発明は伐採された木材を集めるための架空
搬送装置に関するものである。
DETAILED DESCRIPTION OF THE INVENTION TECHNICAL FIELD This invention relates to an aerial transport device for collecting felled wood.

従来技術 従来、集材のための架空搬送装置としては、エ
ンドレスタイラーシステム、フオーリングブロツ
クシステム、ダブルエンドレスシステムが一般的
である。
Prior Art Conventionally, endless tyler systems, falling block systems, and double endless systems have been commonly used as aerial conveyance devices for collecting wood.

エンドレスタイラーシステムは、第1図に示す
ように元柱1と先柱2との間に架空索3が架設固
定され、その架空索3上にキヤリツジ4が走行可
能に支持され、一端を動力ウインチ5のドラム6
に巻付けた荷上索7がキヤリツジ4の二組の案内
滑車8を通過して先柱2に結着され、その両案内
滑車8間における荷上索7には荷掛フツク9が設
けられ、一部を前記動力ウインチ5の別のドラム
10に巻付けたエンドレス索111がキヤリツジ
4に固定されるとともに、多数の案内滑車12を
介して架空索3の側方を迂回するように周回さ
れ、さらに一端を動力ウインチ5のドラム13に
巻付けた引込索14が案内滑車12を介して架空
索3の側方を迂回し前記荷掛フツク9に結着され
たものである。
In the endless styler system, as shown in Fig. 1, an overhead cable 3 is installed and fixed between a base column 1 and a front column 2, a carriage 4 is movably supported on the aerial cable 3, and one end is connected to a power winch. 5 drum 6
A loading cable 7 wrapped around the carriage 4 passes through two sets of guide pulleys 8 and is tied to the front post 2, and a loading hook 9 is provided on the loading cable 7 between the guide pulleys 8. An endless cable 111, a part of which is wound around another drum 10 of the power winch 5, is fixed to the carriage 4 and is looped around the sides of the aerial cable 3 via a number of guide pulleys 12. Furthermore, a pull cable 14 having one end wrapped around the drum 13 of the power winch 5 is routed around the side of the aerial cable 3 via a guide pulley 12 and tied to the load hook 9.

このエンドレスタイラーシステムにおいては、
エンドレス索11を左右いずれかに周回移動させ
れば荷掛フツク9が元柱1側又は先柱2側へ移動
し、又、荷上索7を緩めるとともに、引込索14
を巻込めば荷掛フツク9が引下げられ、その逆に
荷上索7を巻込むとともに、引込索14を緩めれ
ば荷掛フツク9が引上げられる。
In this endless styler system,
If the endless cable 11 is moved around to either the left or right, the loading hook 9 moves to the main column 1 side or the leading column 2 side, and when the loading cable 7 is loosened, the pulling cable 14
When the load rope 7 is reeled in, the load hook 9 is pulled down, and conversely, when the load rope 7 is reeled in and the lead-in rope 14 is loosened, the load hook 9 is pulled up.

しかしながら以上に述べたエンドレスタイラー
システムは次のような欠陥がある。まず、このシ
ステムは4本もの索を必要とし、しかもそのうち
の2本は架空索3の側方を迂回させるため案内滑
車の設置個数もそれに応じて多くなり、索の架
設、撤収に多大の労力を要する。特に、エンドレ
ス索はそれ1本だけでも架設に手間のかかるもの
である。つまり、エンドレス索11はエンドレス
状態ではドラム10に巻付けることができないた
めに、ドラム10に巻付ける場合にはエンドレス
索の一部の構成ワイヤをほぐしてその一部を切断
開放し、ドラム10に巻付けた後に構成ワイヤを
撚つて再び切断開放部を接合することが必要にな
る。
However, the endless styler system described above has the following defects. First, this system requires as many as four cables, and two of them bypass the sides of the aerial cable 3, so the number of guide pulleys installed increases accordingly, and it takes a lot of effort to erect and remove the cables. It takes. In particular, it takes a lot of effort to erect just one endless cable. That is, since the endless cable 11 cannot be wound around the drum 10 in an endless state, when winding it around the drum 10, some of the constituent wires of the endless cable are unraveled, a part of which is cut open, and the endless cable is wrapped around the drum 10. After winding, it is necessary to twist the component wires and rejoin the cut openings.

しかもエンドレス索11の周長は一定であり、
たとえこのシステムを元柱1と先柱2との間の距
離が短いところに張替えても、エンドレス索11
のみは前記距離が長い場合と同様に大きく迂回さ
せなければならず、その手間には変りがない。
Moreover, the circumference of the endless cable 11 is constant,
Even if this system is re-strung in a place where the distance between the base pole 1 and the front pole 2 is short, the endless cable 11
As in the case where the distance is long, it is necessary to make a large detour, and the effort is the same.

又、特に近年は環境保全等の目的から皆伐より
も間伐のウエイトが大きくなり、索張り1回ごと
の伐採量が減少して索の張替えを数多く要求され
るが、以上のようなエンドレスタイラーシステム
を採用した場合には当然のことながらその張替え
には多大の困難をともなうことになる。
In addition, especially in recent years, thinning has become more important than clear-cutting for the purpose of environmental conservation, etc., and the amount of felling per rope has decreased, requiring many cable re-strings. Naturally, if this system is adopted, it will be very difficult to replace it.

さらに、このエンドレスタイラーシステムにお
いては、キヤリツジ4と最もキヤリツジ4側の案
内滑車12との間における引込索14が、キヤリ
ツジ4の走行にともなつて前記案内滑車12を中
心として回転するように進退するために、その案
内滑車12、前記元柱1及び先柱2を結ぶ三角形
の敷地内に障害物が存在するとキヤリツジ4の走
行に支障をきたし、スポツト的に伐採を行い残存
木が存在する間伐方法では不都合である。
Further, in this endless styler system, the pull cable 14 between the carriage 4 and the guide pulley 12 closest to the carriage 4 moves back and forth so as to rotate around the guide pulley 12 as the carriage 4 travels. Therefore, if there is an obstacle within the triangular site connecting the guide pulley 12, the base pillar 1, and the front pillar 2, it will hinder the movement of the carriage 4. Therefore, a thinning method in which trees are cut down in spots and there are remaining trees. That would be inconvenient.

又、前記フオーリングブロツクシステムは、第
2図に示すように架空索3及びキヤリツジ4と、
一端が動力ウインチ5のドラム6に巻付けられて
架空索3と平行に走行し、キヤリツジ4の案内滑
車8を経てそのキヤリツジ4に結着された引寄索
15と、一端において動力ウインチ5のドラム1
3に巻付けられ、架空索3の側方を迂回して他端
が荷掛フツク9に結着された引込索14とにより
構成されている。
Further, the falling block system includes an overhead cable 3 and a carriage 4, as shown in FIG.
A pull line 15 has one end wrapped around the drum 6 of the power winch 5 and runs parallel to the overhead cable 3, and is tied to the carriage 4 via the guide pulley 8 of the carriage 4; drum 1
3 and a pull-in cable 14 that bypasses the side of the aerial cable 3 and is tied to the load hook 9 at the other end.

このフオーリングブロツクシステムは、前記エ
ンドレスタイラーシステムに比較してエンドレス
索に相当するものが存在しないため、その分だけ
索の架設、、撤収が容易にはなつたが、依然とし
て引寄索15が架空索3の側方を迂回すること、
引込索14が案内滑車12を中心として回転する
ように進退することに関してはエンドレスタイラ
ーシステムと同様であり、間伐に使用することに
は適さない。
Compared to the endless styler system, this falling block system does not have anything equivalent to an endless rope, so it is easier to erect and take down the rope, but the towing rope 15 is still bypassing the side of cable 3;
It is similar to the endless styler system in that the pulling cable 14 moves forward and backward in a rotational manner around the guide pulley 12, and is not suitable for use in tree thinning.

ダブルエンドレスシステムは、第3図に示すよ
うに架空索3の外に2本のエンドレス索11,1
6を使用し、一方のエンドレス索11が前記エン
ドレスタイラーシステムと同様に索張りされ、他
のエンドレス索16が動力ウインチ5のドラム1
3に巻付けられるとともに、キヤリツジ4の駆動
滑車17に複数回巻付けられて、架空索3の側方
を迂回されたものであり、エンドレス索16の走
行により荷掛フツク9が出入れされるようにした
ものである。
The double endless system has two endless cables 11, 1 outside the aerial cable 3, as shown in FIG.
6, one endless line 11 is strung similarly to the endless tyler system, and the other endless line 16 is attached to the drum 1 of the power winch 5.
3 and around the drive pulley 17 of the carriage 4 multiple times to bypass the side of the aerial cable 3, and the loading hook 9 is taken in and out as the endless cable 16 runs. This is how it was done.

従つて、このダブルエンドレスシステムにおい
ては、キヤリツジ4の移動にともなつて、回転し
ながら進退する索は存在しないが、エンドレス索
が2本もあるため、索張りにはきわめて手間を要
し、前記と同様に間伐用には適さない。
Therefore, in this double endless system, there is no rope that moves forward and backward while rotating as the carriage 4 moves, but since there are two endless ropes, it is extremely labor-intensive to string the rope, and the above-mentioned Similarly, it is not suitable for thinning.

発明の目的 この発明の目的は以上に述べたような従来技術
に存する欠陥を解消するとともに、絡み合い等を
防止して効率の良い集材作業を可能にし得る架設
搬送装置を提供することにある。
OBJECTS OF THE INVENTION It is an object of the present invention to provide an erection conveyance device that eliminates the deficiencies of the prior art as described above, prevents entanglement, etc., and enables efficient timber collection work.

実施例 以下、この発明を具体化した一実施例を第4図
以下に基づいて説明する。動力ウインチ20はそ
れぞれエンジン21により正逆いずれの方向にも
積極回転される第1、第2、第3のドラム22,
23,24を有している。
Embodiment Hereinafter, an embodiment embodying the present invention will be described based on FIG. 4 and subsequent figures. The power winch 20 includes a first drum 22, a second drum 22, and a third drum 22, which are actively rotated by an engine 21 in either forward or reverse directions.
23 and 24.

一端において前記第1のドラム22に巻付けら
れた走行架空索25は、元柱26に取付けられた
案内滑車20及び先柱28に取付けられた案内滑
車29をそれぞれ経て走行可能に架設支持され、
その他端が後述するキヤリツジ30に結着されて
いる。そして、第1のドラム22が第4図及び第
5図の時計回り方向に回転することにより走行架
空索25が巻取られる。
The traveling overhead cable 25, which is wound around the first drum 22 at one end, is installed and supported so as to be able to travel via a guide pulley 20 attached to the base column 26 and a guide pulley 29 attached to the tip column 28, respectively,
The other end is tied to a carriage 30, which will be described later. Then, as the first drum 22 rotates in the clockwise direction in FIGS. 4 and 5, the traveling overhead cable 25 is wound up.

前記両案内滑車27,29間における走行架空
索25にはホイステイングキヤリツジ30(以下
単にキヤリツジという)が吊下されており、その
キヤリツジ30は前記第1のドラム22が時計回
り方向に回転して走行架空索25が矢印P方向に
走行することにより先柱28側に移動され、又、
第1のドラム22が反時計回り方向に回転して走
行架空索25が逆矢印P方向に走行することによ
り元柱26側に移動される。キヤリツジ30には
駆動滑車としての鼓形滑車31と二組の案内滑車
32,33が設けられている。又、第6図に示す
ようにキヤリツジ30には前記鼓形滑車31と同
軸上に巻取軸34が支持され、その外周には吊下
げロープ35が巻付けられている。その吊下げロ
ープ35はフリートアングル滑車42及び案内滑
車43を経て下方へ垂下され、その先端には荷掛
フツク36が設けられている。そして、前記巻取
軸34は前記鼓形滑車31と一体的に回転される
ようになつており、鼓形滑車31が第4図及び第
5図の時計回り方向に回転されることにより、巻
取軸34は吊下げロープ35を巻戻して荷掛フツ
ク36を引出す方向に回転される。
A hoisting carriage 30 (hereinafter simply referred to as a carriage) is suspended from the overhead cable 25 between the guide pulleys 27 and 29, and the hoisting carriage 30 rotates clockwise when the first drum 22 rotates. By traveling in the direction of arrow P, the traveling aerial cable 25 is moved to the front post 28 side, and
The first drum 22 rotates counterclockwise and the traveling overhead cable 25 travels in the direction of the reverse arrow P, thereby moving toward the base pillar 26 side. The carriage 30 is provided with an hourglass-shaped pulley 31 as a driving pulley and two sets of guide pulleys 32 and 33. Further, as shown in FIG. 6, a winding shaft 34 is supported on the carriage 30 coaxially with the hourglass-shaped pulley 31, and a hanging rope 35 is wound around the outer periphery of the winding shaft 34. The hanging rope 35 is suspended downward via a fleet angle pulley 42 and a guide pulley 43, and a load hook 36 is provided at its tip. The winding shaft 34 is rotated integrally with the hourglass-shaped pulley 31, and as the hourglass-shaped pulley 31 is rotated clockwise in FIGS. 4 and 5, the winding is performed. The handle shaft 34 is rotated in a direction to unwind the hanging rope 35 and pull out the load hook 36.

前記第2及び第3のドラム23,24には荷上
誘導索37の両端部がそれぞれ同じ巻方向で巻付
けられ、両ドラム23,24が時計方向に回転す
ることによりその荷上誘導索37が巻取られる。
この荷上誘導索37は案内滑車27に支持され中
間部において第4図に示すように前記鼓形滑車3
1に最低1回半巻付けられる。又、この荷上誘導
索37は前記鼓形滑車31から外され、第5図に
示すように前記キヤリツジ30の案内滑車32,
33に支持されて、走行架空索25の側方に位置
する案内滑車38上を周回される。
Both ends of a load guide rope 37 are wound around the second and third drums 23 and 24 in the same winding direction, and as both drums 23 and 24 rotate clockwise, the load guide rope 37 is wound around the second and third drums 23 and 24. is wound up.
This load guide cable 37 is supported by the guide pulley 27, and at the middle part, as shown in FIG.
1 can be wrapped at least once and a half times. Further, the load guide cable 37 is removed from the hourglass-shaped pulley 31, and as shown in FIG.
33 and revolves around a guide pulley 38 located on the side of the traveling overhead cable 25.

キヤリツジ30の一方の案内滑車32,33と
走行架空索25の側方の案内滑車38との間にお
いて、荷上誘導索37には補助キヤリツジ41が
吊下され、その補助キヤリツジ41には案内滑車
32又は33と案内滑車38との間の荷上誘導索
37に固定されるクランプ39と荷掛フツク40
とが設けられている。
An auxiliary carriage 41 is suspended from the load guiding rope 37 between the guide pulleys 32 and 33 on one side of the carriage 30 and the guide pulley 38 on the side of the traveling overhead cable 25. A clamp 39 and a load hook 40 are fixed to the load guide cable 37 between the guide pulley 38 and the guide pulley 32 or 33.
and is provided.

又、前記動力ウインチ20は巻戻し方向に回転
されるドラムの巻戻し力を他のドラムの巻取り力
として回収できるようになつており、この詳細に
ついては同一出願人による特開昭53−128846号公
報に記載されているのでそれを参照されたい。
Further, the power winch 20 is designed to recover the unwinding force of the drum rotated in the unwinding direction as the winding force of another drum, and details of this can be found in Japanese Patent Laid-Open No. 53-128846 by the same applicant. Please refer to the publication.

次に、以上のように構成された架空搬送装置の
作用を説明する。まず走行架空索25の直下又は
近傍の伐採材木を集材する場合には、第4図に示
すように荷上誘導索37の中間部をキヤリツジ3
0の鼓形滑車31に巻付ける。この状態で第1の
ドラム22を巻取り方向に回転させるとともに、
第2、第3のドラム23,24を巻戻し方向へ同
時に回転させれば、キヤリツジ30は先柱28側
に移動し、そのキヤリツジ30を所望の作業位置
に配置することができる。
Next, the operation of the aerial conveyance device configured as above will be explained. First, when collecting felled timber immediately below or in the vicinity of the traveling overhead cable 25, the middle part of the load guide cable 37 is moved to the carriage 3 as shown in FIG.
0 around the hourglass-shaped pulley 31. In this state, the first drum 22 is rotated in the winding direction, and
If the second and third drums 23 and 24 are simultaneously rotated in the rewinding direction, the carriage 30 moves toward the front post 28, and the carriage 30 can be placed at a desired working position.

このようにして、キヤリツジ30を作業位置に
配置した後に、第2のドラム23を巻戻し方向に
回転させるとともに、第3のドラム24を巻取り
方向に回転させて鼓形滑車31を時計方向に回転
させれば、荷掛フツク36が下降され、その荷掛
フツク36を走行架空索25の直下又は近傍の荷
上地点まで持つて行くことができる。
After the carriage 30 is placed in the working position in this way, the second drum 23 is rotated in the unwinding direction, the third drum 24 is rotated in the winding direction, and the hourglass pulley 31 is rotated clockwise. When rotated, the load hook 36 is lowered, and the load hook 36 can be carried to a load loading point directly below or in the vicinity of the traveling overhead cable 25.

その荷上地点で荷掛フツク36に木材を掛けた
後、前記とは逆に第2のドラム23を巻取り方向
に、第3のドラムを巻戻し方向にそれぞれ回転さ
せれば、荷掛フツク36が引上げられて、木材W
が吊下げられる。そして、その状態で第2、第3
のドラム23,24を巻取り方向に同寺に回転さ
せるとともに、第1のドラム22を巻戻し方向に
回転させることにより、キヤリツジ30を移動さ
せて木材Wを元柱26の方向に運搬することがで
きる。
After hanging the wood on the loading hook 36 at the loading point, the second drum 23 is rotated in the winding direction and the third drum is rotated in the unwinding direction, contrary to the above, and the loading hook 36 is hung. 36 is pulled up and the wood W
is suspended. Then, in that state, the second and third
By rotating the first drums 23 and 24 in the winding direction and rotating the first drum 22 in the unwinding direction, the carriage 30 is moved and the wood W is transported in the direction of the base pillar 26. I can do it.

特に、この搬送装置においては荷掛フツク36
を有する吊下げロープ35が巻取軸34に巻付け
られているためその吊下げロープ35が走行架空
索25や荷上誘導索37と絡み合うことはなく、
絡み合いにより集材作業に支障をきたしたりする
ことがない。又、前記のように吊下げロープ35
が巻取軸34に巻付けられているため、例えばキ
ヤリツジ41を高所に配置して揚程を大きくとつ
た場合でも荷掛フツク36部分に作業の邪魔にな
るバランスウエイトが不要になり、能率良く作業
を行うことができる。こげに対して、吊下げロー
プ35を巻取軸34に巻付けることなく、例えば
荷上誘導索37に結着した場合にはこの場合には
荷上誘導索37の巻取り、巻戻し操作により作業
が可能となる)、吊下げロープ35自体の重量に
よりその吊下げロープ35が結着部とフリートア
ングル滑車42との間で垂下がるため荷掛フツク
36を持上げる力が作用する。従つて、荷掛フツ
ク36を引出したり、引出し位置で保持するのが
困難となり、前記持上げ力拮抗する重量のバラン
スウエイトを荷掛フツク36の部分に設けること
が必要になる。ところが、このようにバランスウ
エイトを設けた場合はフツクを携行する山中歩行
等に多大の労力を要し、作業能率が著しく低下す
ることになる。
In particular, in this conveyance device, the loading hook 36
Since the hanging rope 35 having the above-mentioned structure is wound around the winding shaft 34, the hanging rope 35 does not become entangled with the traveling overhead cable 25 or the load guidance cable 37.
There is no possibility of tangles interfering with timber collection work. Also, as mentioned above, the hanging rope 35
is wound around the winding shaft 34, so even if the carriage 41 is placed at a high place to increase the lifting height, there is no need for a balance weight on the loading hook 36 that would interfere with the work, resulting in efficient operation. Able to perform work. In order to avoid burning, if the hanging rope 35 is tied to the load guide rope 37 without being wound around the winding shaft 34, in this case, the load guide rope 37 can be wound up and unwound. The weight of the hanging rope 35 itself causes the hanging rope 35 to hang down between the tie and the fleet angle pulley 42, so that a force is applied to lift the loading hook 36. Therefore, it becomes difficult to pull out the load hook 36 or to hold it in the pulled-out position, and it becomes necessary to provide the load hook 36 with a balance weight whose weight counteracts the lifting force. However, when the balance weight is provided in this way, it takes a lot of effort to carry the hook while walking in the mountains, and the work efficiency is significantly reduced.

次に、走行架空索25から離れた位置からの集
材を行うには、第5図に示すように、伐採地点の
近傍に案内滑車38を設けて、荷上誘導索37を
鼓形滑車31から外し、その荷上誘導索37をキ
ヤリツジ30の案内滑車32,33を経て前記案
内滑車38上に周回させる。又、案内滑車32又
は33と案内滑車38との間における荷上誘導索
37に荷掛フツク40を有する補助キヤリツジ4
1をクランプ39にて取付ける。
Next, in order to collect timber from a position away from the traveling aerial cable 25, as shown in FIG. Then, the load guide cable 37 is routed around the guide pulley 38 via the guide pulleys 32 and 33 of the carriage 30. Further, the auxiliary carriage 4 has a load hook 40 on the load guide cable 37 between the guide pulley 32 or 33 and the guide pulley 38.
1 with clamp 39.

このようにして第2、第3のドラム23,24
を巻取り又は巻戻し方向に回転させれば、木材W
を鼻上げ状態(木材の集行方向側が上がつた状
態)でキヤリツジ30の位置まで運ぶことがで
き、その木材が残存木の間に突込んだりすること
はない。
In this way, the second and third drums 23, 24
If you rotate it in the winding or unwinding direction, the wood W
The wood can be transported to the position of the carriage 30 in a nose-up state (the wood gathering direction side is up), and the wood will not get stuck between the remaining trees.

そして、木材がキヤリツジ30の下方に所定量
集積されたら、荷上誘導索37を再び鼓形滑車3
1に巻付けることにより、前記と同様にしてその
集積された木材を元柱側に運ぶことができる。
When a predetermined amount of wood has been accumulated below the carriage 30, the load guiding cable 37 is again connected to the hourglass pulley 3.
1, the accumulated wood can be transported to the main pillar side in the same manner as described above.

以上のように、この架空搬送装置においては走
行架空索25と荷上誘導索37との2本の索のみ
で広範囲にわたつて集材を行うことができるとと
もに、荷上誘導索37が走行架空索25の側方を
迂回されることなく、そのための案内滑車も不要
である。従つて、エンドレス索が存在しないこと
もプラスされて、索の架設、撤収は前記エンドレ
スタイラーシステム、ダブルエンドレスシステム
はもちろんのこと、フオーリングブロツクシステ
ムと比較してもきわめて容易である。
As described above, in this aerial conveyance device, timber can be collected over a wide range with only two ropes, the traveling overhead rope 25 and the load guide rope 37, and the load guide rope 37 is The cable 25 is not bypassed to the side, and a guide pulley for that purpose is not required. Therefore, in addition to the fact that there are no endless cables, the installation and removal of the cables is extremely easy compared to the aforementioned endless tyler system, double endless system, and even falling block system.

又、この架空搬送装置にはキヤリツジ30の移
動にともなつて回転する索も存在しないので、搬
送作業が残存木等の障害物の有無に左右されるこ
とはない。
Furthermore, since this aerial transport device does not include any cables that rotate as the carriage 30 moves, the transport work is not dependent on the presence or absence of obstacles such as remaining trees.

このため、前述したように索の架設、撤収が容
易なことと相俟つてこの架空搬送装置は間伐によ
る集材にきわめて有効に機能する。
Therefore, in combination with the fact that the cables can be easily erected and removed as described above, this aerial conveyance device functions extremely effectively in collecting wood from tree thinning.

なお、前記実施例のように、動力ウインチ20
として、巻戻し力を巻取り力として回収できるも
のを使用すれば、ブレーキ故障等に起因する危険
な事故等のおそれもなく、又、稼動のためのエネ
ルギー消費を少なくすることができる。
Note that, as in the above embodiment, the power winch 20
If the unwinding force can be recovered as the winding force, there is no risk of dangerous accidents caused by brake failure, etc., and the energy consumption for operation can be reduced.

発明の効果 以上実施例において例示したように、この発明
は2本の索のみを使用して集材を行い得るように
構成したので、索の架設、撤収がきわめて容易に
なるとともに、間伐集材に有効に機能する優れた
効果を発揮する。
Effects of the Invention As exemplified in the embodiments above, the present invention is configured to be able to collect wood using only two ropes, making it extremely easy to erect and take down the ropes, and It works effectively and exhibits excellent effects.

又、この発明は吊下げロープを巻取軸に巻付け
たもので、そのロープの絡み付きを防止できると
もに、バランスウエイトが不要になり、効率の良
い集材作業が可能となる効果もある。
In addition, this invention has the effect that a hanging rope is wound around a winding shaft, which prevents the rope from becoming tangled, eliminates the need for a balance weight, and enables efficient wood collection work.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はエンドレスタイラーシステムを示す全
体図、第2図はフオーリングブロツクシステムを
示す全体図、第3図はダブルエンドレスシステム
を示す全体図、第4図以下はこの発明を具体化し
た一実施例を示すものであつて、第4図は荷上誘
導索を鼓形滑車に巻付けた状態を示す全体図、第
5図は荷上誘導索を走行架空側方の案内滑車に周
回した状態を示す全体図、第6図はキヤリツジの
平面図である。 動力ウインチ……20、第1のドラム……2
2、第2のドラム……23、第3のドラム……2
4、走行架空索……25、元柱……26、案内滑
車……27,29,32,33,38、先柱……
28、キヤリツジ……30、鼓形滑車……31、
巻取軸……34、吊下げロープ……35、荷掛フ
ツク……36、荷上誘導索……37。
Figure 1 is an overall view of the endless styler system, Figure 2 is an overall view of the falling block system, Figure 3 is an overall view of the double endless system, and Figures 4 and below are an embodiment of the present invention. To show an example, Fig. 4 is an overall view showing a state in which the load guide cable is wrapped around an hourglass-shaped pulley, and Fig. 5 is a state in which the load guide cable is wrapped around a guide pulley on an imaginary side. FIG. 6 is a plan view of the carriage. Power winch...20, first drum...2
2. Second drum...23. Third drum...2
4. Traveling aerial cable...25, Main pillar...26, Guide pulley...27, 29, 32, 33, 38, Leading pillar...
28, Carriage...30, Drum-shaped pulley...31,
Take-up shaft...34, hanging rope...35, load hook...36, load guiding rope...37.

Claims (1)

【特許請求の範囲】 1 正逆いずれの方向にも積極回転される第1、
第2、第3のドラム22,23,24を有する動
力ウインチ20と、 一端部において前記第1のドラム22に巻付け
られるとともに、元柱26及び先柱28上の案内
滑車27,29により走行可能に架設支持された
走行架空索25と、 その走行架空索25に吊下され、走行架空索2
5の他端が結着されたキヤリツジ30と、 前記第2のドラム23に一端が、第3のドラム
24に他端がそれぞげ巻付けられた荷上誘導索3
7と よりなり、 前記キヤリツジ30には前記荷上誘導索37の
中間部分が巻付けられる駆動滑車31と、その駆
動滑車31と一体回転される巻取軸34と、その
巻取軸34に巻付けられるとともに、先端に荷掛
フツク36を有し、駆動滑車31の回転により出
入れされる吊下げロープ35と、荷上誘導索37
が走行架空索25の側方の案内滑車38上を周回
するように支持する二組の案内滑車32,33と
を設けたことを特徴とする集材のための架空搬送
装置。
[Claims] 1. A first, which is actively rotated in either forward or reverse directions.
A power winch 20 having second and third drums 22, 23, 24, which is wound around the first drum 22 at one end and is driven by guide pulleys 27, 29 on the base post 26 and the front post 28. A traveling overhead cable 25 that can be erected and supported, and a traveling overhead cable 2 that is suspended from the traveling overhead cable 25.
5, the other end of which is tied to the carriage 30, and the load guide cable 3, one end of which is wound around the second drum 23 and the other end of which is wound around the third drum 24.
7, and the carriage 30 includes a driving pulley 31 around which the intermediate portion of the load guiding rope 37 is wound, a winding shaft 34 that rotates integrally with the driving pulley 31, and a winding shaft 34 around the winding shaft 34. A hanging rope 35 is attached and has a load hook 36 at the tip and is moved in and out by the rotation of the drive pulley 31, and a load guiding rope 37.
An aerial transport device for collecting timber, characterized in that it is provided with two sets of guide pulleys 32 and 33 that support the traveling aerial cable 25 so as to orbit on a guide pulley 38 on the side thereof.
JP5741881A 1981-04-15 1981-04-15 Aerial conveyor for collecting wood Granted JPS57170384A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5741881A JPS57170384A (en) 1981-04-15 1981-04-15 Aerial conveyor for collecting wood

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5741881A JPS57170384A (en) 1981-04-15 1981-04-15 Aerial conveyor for collecting wood

Publications (2)

Publication Number Publication Date
JPS57170384A JPS57170384A (en) 1982-10-20
JPS6119554B2 true JPS6119554B2 (en) 1986-05-17

Family

ID=13055096

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5741881A Granted JPS57170384A (en) 1981-04-15 1981-04-15 Aerial conveyor for collecting wood

Country Status (1)

Country Link
JP (1) JPS57170384A (en)

Also Published As

Publication number Publication date
JPS57170384A (en) 1982-10-20

Similar Documents

Publication Publication Date Title
JP6732221B2 (en) Overhead wire collecting device and collecting method using the same
US3221897A (en) Load-lifting apparatus
CN102344092A (en) Single-rope double-suspension-point horizontal suspension arm retracting and folding mechanism
JPS6119554B2 (en)
WO2018080310A1 (en) Cableway system for forestry, and method for use of same
JP6277058B2 (en) TOWER YADA AND COLLECTION METHOD BY TOWER YADA
JPH07304594A (en) Overhead wire collecting device and method for collecting the same
RU2258662C2 (en) Method of replacement of wire rope in hoisting device
JP2913351B2 (en) Overhead hydraulic excavator
CN220283427U (en) Hoisting system for construction of large-span bridge steel box girder
JP2009273400A (en) Method and device for carrying out felled wood
JPH0661189B2 (en) Wood debranching method and overhead wire carrier for wood
JPH0547183Y2 (en)
JP2585936Y2 (en) Overhead line transport equipment for wood, etc.
JPH03289308A (en) Vehicle for laying cable
JP3472307B2 (en) Load operation device and load operation method
CN222273943U (en) Cableway type material collecting device
JPH0245104Y2 (en)
JP3016830U (en) Overhead wire collecting device with work machine
CN219436491U (en) Skid-mounted movable cabin structure
JP2015168579A (en) Gathering device
KR100491798B1 (en) alternative timber-gathering device using excavator
JP2565908Y2 (en) Overhead wire collecting equipment using hydraulic excavator
CN121990004A (en) Safety control device for coordinated timber collection via cableway and mechanical timber collection in reserve forests
JPS597355Y2 (en) Rope winding device for transporting hoisting equipment on large cranes, etc.