JPS64532B2 - - Google Patents
[go: Go Back, main page]

JPS64532B2 - - Google Patents

Info

Publication number
JPS64532B2
JPS64532B2 JP59279167A JP27916784A JPS64532B2 JP S64532 B2 JPS64532 B2 JP S64532B2 JP 59279167 A JP59279167 A JP 59279167A JP 27916784 A JP27916784 A JP 27916784A JP S64532 B2 JPS64532 B2 JP S64532B2
Authority
JP
Japan
Prior art keywords
casing
pile
inner tube
inner pipe
hardening material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP59279167A
Other languages
Japanese (ja)
Other versions
JPS61158521A (en
Inventor
Kazuharu Fujito
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daido Konkuriito Kogyo Kk
Original Assignee
Daido Konkuriito Kogyo Kk
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daido Konkuriito Kogyo Kk filed Critical Daido Konkuriito Kogyo Kk
Priority to JP27916784A priority Critical patent/JPS61158521A/en
Publication of JPS61158521A publication Critical patent/JPS61158521A/en
Publication of JPS64532B2 publication Critical patent/JPS64532B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は現場打ちの造成くい工法に関するも
ので、構造物の支持等に利用する。
[Detailed Description of the Invention] [Industrial Field of Application] This invention relates to a construction method of piles cast on site, and is used for supporting structures, etc.

〔従来の技術〕[Conventional technology]

従来の造成くい工法としては、振動、騒音、あ
るいはベントナイト泥水等の廃棄物の出ない無公
害工法として、アースオーガーで所定深度まで掘
削し、ビツト先端よりモルタルを注入しながら、
注入管としての内管を引抜き、モルタルくいを造
成するPIP工法や、くい打設位置の土砂とビツト
先端から噴出されるセメントミルクとを混合して
ソイルセメントのくいを造成するMIP工法等が
広く知られている。
The conventional pile construction method is a non-polluting method that does not produce vibrations, noise, or waste such as bentonite mud, and excavates to a specified depth with an earth auger, and injects mortar from the tip of the bit.
Widely used methods include the PIP method, in which the inner pipe used as the injection pipe is pulled out to create a mortar pile, and the MIP method, in which soil cement piles are created by mixing the earth and sand at the pile placement location with cement milk spouted from the tip of the bit. Are known.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

しかし、従来の現場打ち造成くい工法において
は既製くいのような施工管理を行なうことが難し
いという問題がある。すなわち、既製くいの場合
は予めくいの強度が確認でき、またくい打ち機を
用いる場合は、打込み力と沈設量との関係等から
地盤およびくいの推定支持力を出すことも比較的
容易であるが、従来の造成くい工法では施工後の
調査により沈下量等をもとに推定するしか方法が
なく、またくい自体の強度も地上での配合試験で
は実際の強度が得られないため信頼性に乏しく、
無駄な使われ方をされている場合もある。
However, the conventional cast-on-site pile construction method has a problem in that it is difficult to perform construction management as with ready-made piles. In other words, in the case of ready-made piles, the strength of the piles can be confirmed in advance, and if a pile driver is used, it is relatively easy to calculate the estimated bearing capacity of the ground and piles from the relationship between the driving force and the amount of sinking. However, with the conventional pile pile construction method, the only way to estimate it is based on the amount of settlement, etc. through post-construction surveys, and the actual strength of the pile itself cannot be obtained through mixing tests on the ground, so it is not reliable. Scarce;
In some cases, it is being used wastefully.

この発明の造成くい工法は、このような問題点
を解決するために発明されたもので、造成くいの
施工にあたり、注入管としての内管をケーシング
に対し、上下方向に所定量移動可能とし、穿孔装
置の引抜き時にケーシング内で硬化材の注入を行
ないながら徐々に引抜き、品質の優れた信頼性の
高い造成くいを得ることを目的としている。
The construction pile construction method of the present invention was invented to solve these problems, and when constructing the construction pile, the inner pipe serving as the injection pipe can be moved by a predetermined amount in the vertical direction with respect to the casing. The purpose of this is to gradually pull out the casing while injecting a hardening material into the casing when the drilling device is pulled out, thereby obtaining a highly reliable formed pile of excellent quality.

〔問題点を解決するための手段〕[Means for solving problems]

この発明の造成くい工法は、内管12をケーシ
ング11に対し、油圧シリンダー27等により上
下方向に所定量移動可能に支持し、穿孔装置の引
抜き時に、内管12下端をケーシング11内へ引
込めた状態でモルタル等の硬化材2を圧入するも
ので、ケーシング11内へ硬化材2が注入される
ので、均一な注入が可能で、くい断面の縮小、硬
化材2の品質低下等が防げる。
In the pile construction method of the present invention, the inner pipe 12 is supported by a hydraulic cylinder 27 or the like so as to be movable in the vertical direction by a predetermined amount with respect to the casing 11, and when the drilling device is pulled out, the lower end of the inner pipe 12 is pulled into the casing 11. Since the hardening material 2 such as mortar is injected into the casing 11, uniform injection is possible, and reduction of the pile cross section and deterioration of the quality of the hardening material 2 can be prevented.

施工はまず外管としてのケーシング11と注入
管を兼ねた内管12とを一体として回転させなが
ら、リーダーマスト30に沿つて沈設することに
より穿孔を行なう。この穿孔時、内管12の下端
はケーシング11より突出し、先端のビツト18
等により掘削が行なわれる。硬化材2の注入は引
上げ時に行なわれ、前述のように、内管12をケ
ーシング11に対し所定量引上げ、ケーシング1
1と内管12を同時に引上げながら、注入を行な
う。
In construction, first, the casing 11 as an outer pipe and the inner pipe 12, which also serves as an injection pipe, are rotated as a unit and are sunk along the leader mast 30 to form a hole. During this drilling, the lower end of the inner tube 12 protrudes from the casing 11, and the bit 18 at the tip
Excavation is carried out by such methods. The hardening material 2 is injected at the time of lifting, and as described above, the inner tube 12 is pulled up a predetermined amount relative to the casing 11, and the casing 1 is
The injection is carried out while simultaneously pulling up the tube 1 and the inner tube 12.

〔実施例〕〔Example〕

以下、この発明の実施例を図面に基づいて説明
する。
Embodiments of the present invention will be described below based on the drawings.

第1図〜第3図は造成くい打設装置の一例を示
したもので、穿孔装置10を支持する支持フレー
ム20がリーダーマスト30に沿つて昇降するよ
うになつている。
1 to 3 show an example of a construction pile driving device, in which a support frame 20 supporting a drilling device 10 moves up and down along a leader mast 30.

この穿孔装置10は外管としてのケーシング1
1とモルタルの注入管を兼ねた内管12とを備
え、内管12の先端に第6図a,bまたは第7図
aに示すような開閉シユー14、掘削用ビツト1
8等を取り付けてある。なお、図中13はスタビ
ライザー、17は掘削土砂を側方へ押しやるヘツ
ドである。
This perforation device 10 has a casing 1 as an outer pipe.
1 and an inner pipe 12 which also serves as a mortar injection pipe, and at the tip of the inner pipe 12 there is an opening/closing shoe 14 as shown in FIGS.
8th grade is attached. In the figure, 13 is a stabilizer, and 17 is a head that pushes the excavated earth and sand to the side.

穿孔は支持フレーム20に固定した駆動モータ
ー21の回転をリングギヤー(図中22がリング
ギヤーボツクスを示す)を介してケーシング11
に伝え、ケーシング11とケーシング11に固定
した内管12とを一体として回転させて行なう。
なお、内管12は上端が支持フレーム20に設け
た油圧シリンダー27を介して支持され、スイベ
ルボツクス26とともにケーシング11に対し、
上下方向に所定量移動可能とされている。また、
図中16は連結チユーブであり、モルタル等の硬
化材2を内管12に送り込み、内管12の先端よ
り地盤1あるいはケーシング11内へ注入するよ
うになつている。
The drilling is performed by transmitting the rotation of a drive motor 21 fixed to a support frame 20 to the casing 11 via a ring gear (22 in the figure indicates a ring gear box).
This is done by rotating the casing 11 and the inner tube 12 fixed to the casing 11 as one body.
The upper end of the inner tube 12 is supported via a hydraulic cylinder 27 provided on the support frame 20, and the inner tube 12 is supported with a swivel box 26 against the casing 11.
It is possible to move a predetermined amount in the vertical direction. Also,
In the figure, reference numeral 16 denotes a connecting tube, in which a hardening material 2 such as mortar is fed into the inner tube 12 and injected into the ground 1 or the casing 11 from the tip of the inner tube 12.

内管12は第8図bに示すように油圧シリンダ
ー27を縮めると、支持フレーム20に対し下方
へ押し下げられ、第6図a〜eに示すように一番
下のスタビライザー13に設けた係止溝43とケ
ーシング11下端の係止部42が係合し、内管1
2がケーシング11に固定され、穿孔時一体とし
て回転する。また、内管12の上部は、角形鋼管
等からなる角形チユーブ15としてあり、ケリー
バーの役目をするようになつている。
When the hydraulic cylinder 27 is retracted as shown in FIG. 8b, the inner tube 12 is pushed downward with respect to the support frame 20, and as shown in FIGS. The groove 43 and the locking part 42 at the lower end of the casing 11 engage, and the inner tube 1
2 is fixed to the casing 11 and rotates as a unit during drilling. Further, the upper part of the inner tube 12 is a square tube 15 made of a square steel pipe or the like, and serves as a kelly bar.

穿孔装置10の昇降は鉛直に保持されたリーダ
ーマスト30の長手方向に平歯すなわちラツク3
1を設け、これとかみ合うピニオン25を支持フ
レーム20の上部に取り付け、駆動モーター24
により行なつている。また支持フレーム20には
ローラー23が取り付けられており、昇降時、リ
ーダーマスト30に形成されたガイド溝32内を
走行するようになつている。
The perforation device 10 is raised and lowered by means of spur teeth or racks 3 in the longitudinal direction of a leader mast 30 held vertically.
1, a pinion 25 that meshes with the pinion 25 is attached to the upper part of the support frame 20, and a drive motor 24 is installed.
This is done by Further, a roller 23 is attached to the support frame 20, and is adapted to run within a guide groove 32 formed in the leader mast 30 when moving up and down.

また、内管12の先端はヒンジ41を中心に、
三枚のシユー14が開閉する形式のものが一般的
であるが、第7図bのように先端に取付けたポイ
ント45を硬化材2の注入の際、地中に残置する
形式のもの等も利用できる。
In addition, the tip of the inner tube 12 is centered around the hinge 41,
Generally, a type in which three shoes 14 open and close is used, but there are also types in which a point 45 attached to the tip is left in the ground when the hardening material 2 is poured, as shown in Fig. 7b. Available.

第4図a〜iはこの発明の工法における施工の
様子の一例を示したもので、次のような手順で作
業を行なう。
Figures 4a to 4i show an example of the construction process according to the construction method of the present invention, and the work is carried out in the following steps.

a 油圧シリンダー27を縮め、ケーシング11
と内管12とを固定し、くい芯にセツトして鉛
直の確認をする。
a. Retract the hydraulic cylinder 27 and remove the casing 11.
and the inner pipe 12, set it on the stake and check the verticality.

b ケーシング11を回転させ、押圧力を加え、
先端土砂を側方へ強制的に移動させ、沈設す
る。
b Rotate the casing 11 and apply pressing force,
The soil at the tip is forcibly moved to the side and deposited.

c ケーシング11が所定深度に到達したら、ケ
ーシング11を固定し、内管12先端からモル
タル等の硬化材2を圧送注入し、硬化材2の注
入量に等しい長さ(0.5〜1.0m)だけ内管12
を引上げる。なお、モルタル等の硬化材2は予
め混合して練つたものを圧送する。
c When the casing 11 reaches a predetermined depth, fix the casing 11, pressure-inject the hardening material 2 such as mortar from the tip of the inner tube 12, and deepen the depth by a length (0.5 to 1.0 m) equal to the amount of hardening material 2 injected. tube 12
pull up. Note that the hardening material 2 such as mortar is mixed and kneaded in advance and then pumped.

d,e 硬化材2は定められた量を連続注入す
る。また、ケーシング11の引上げ速度は注入
体積よりも小さい量となる速度とし、注入した
硬化材2に対し、下向きの押圧力がかかるよう
にする。また、施工管理は注入圧力によつて行
なう。
d, e Curing material 2 is continuously injected in a predetermined amount. Further, the pulling speed of the casing 11 is set to be a speed smaller than the injection volume, so that a downward pressing force is applied to the injected hardening material 2. In addition, construction management will be conducted using injection pressure.

f,g 硬化材2の注入完了後、必要に応じ、鉄
筋篭4あるいはH形鋼、L形鋼等を挿入する。
f, g After the injection of the hardening material 2 is completed, reinforcing bar baskets 4 or H-shaped steel, L-shaped steel, etc. are inserted as necessary.

h 硬化材2の硬化によりくい3の造成が完了す
る。
h The construction of the stake 3 is completed by the hardening of the hardening material 2.

第5図a〜eは硬化材2の注入量と内管12お
よびケーシング11の引上長との関係を示したも
のである。
5A to 5E show the relationship between the injection amount of the hardening material 2 and the pulling length of the inner tube 12 and the casing 11.

すなわちaは内管12を油圧シリンダー27に
より、所定の高さ引上げた状態で、その引上げ高
さに等しい量の硬化材2を注入した場合、bはさ
らに内管12およびケーシング11を引上げなが
ら、引上長に等しい量の硬化材2を注入した場
合、c,dはそれぞれ引上長をbの80%、50%と
し、同量の硬化材2を注入した場合、eはケーシ
ングを引上げずに、そのまま同量の硬化材2を注
入した場合である。c,d,eのようにすれば、
くい3の先端または途中に拡大部を形成し、先端
支持力や周面摩擦力を増すこともできる。
That is, in a, when the inner tube 12 is pulled up to a predetermined height by the hydraulic cylinder 27, and an amount of hardening material 2 equal to the lifted height is injected, in b, while the inner tube 12 and the casing 11 are further pulled up, When an amount of hardening material 2 equal to the pulling length is injected, c and d have a pulling length of 80% and 50% of b, respectively, and when the same amount of hardening material 2 is injected, e does not pull up the casing. This is the case where the same amount of hardening material 2 is directly injected. If you do it like c, d, e,
It is also possible to form an enlarged portion at the tip or midway of the pile 3 to increase the tip support force and the circumferential surface friction force.

〔発明の効果〕〔Effect of the invention〕

この発明の造成くい工法では、内管をケーシン
グに対し、所定量移動可能とし、穿孔時には内管
下端をケーシングより突出して下端ビツトにより
掘削し、注入時には内管をケーシング内へ引込め
た状態とし、モルタル等の注入を徐々に引上げる
ケーシング内で行うため、ケーシングがスライデ
イングフオーム状となり亀裂から硬化材が流れて
いつたり、くい径の縮小がおこつたり、あるいは
硬化材の品質を落としたりすることがなく、信頼
性の高いくいの造成が可能となる。
In the pile construction method of this invention, the inner pipe is made movable by a predetermined amount relative to the casing, and when drilling, the lower end of the inner pipe protrudes from the casing and is excavated with a lower end bit, and during injection, the inner pipe is retracted into the casing. Because the injection of mortar, etc. is carried out inside the casing, which is gradually pulled up, the casing becomes a sliding form, and the hardened material flows through the cracks, reducing the diameter of the pile, or degrading the quality of the hardened material. This makes it possible to create highly reliable piles without having to do anything.

【図面の簡単な説明】[Brief explanation of drawings]

第1図はこの発明の実施例におけるくい打設装
置の正面図、第2図はその右側面図、第3図は第
2図の―断面図、第4図a〜hはくいの施工
手順の一例を示す断面図、第5図a,b,c,
d,eは硬化材注入量とケーシング引上長との関
係を示す断面図、第6図a,b,c,d,eはそ
れぞれくい打設装置先端部の正面図、底面図、横
断面図、スタビライザーの正面図、同じく横断面
図、第7図a,bはそれぞれ内管先端の一例を示
す正面図、縦断面図、第8図a,bは内管の昇降
の機構を示す正面図である。 1…地盤、2…硬化材、3…くい、4…鉄筋
篭、10…穿孔装置、11…ケーシング、12…
内管、13…スタビライザー、14…先端開閉シ
ユー、15…角形チユーブ、16…連結チユー
ブ、17…ヘツド、18…ビツト、20…支持フ
レーム、21…回転用駆動モーター、22…リン
グギヤーボツクス、23…ローラー、24…昇降
用駆動モーター、25…ピニオン、26…スイベ
ルボツクス、27…油圧シリンダー、30…リー
ダーマスト、31…ラツク、32…ガイド溝、4
1…ヒンジ、42…係止部、43…係止溝、44
…連結片、45…ポイント。
Fig. 1 is a front view of a pile driving device according to an embodiment of the present invention, Fig. 2 is a right side view thereof, Fig. 3 is a cross-sectional view of Fig. 2, and Figs. 4 a to h are pile construction procedures. A sectional view showing an example of FIG. 5 a, b, c,
d and e are cross-sectional views showing the relationship between hardening material injection amount and casing pull-up length, and Figures a, b, c, d, and e are front views, bottom views, and cross sections of the tip of the pile driving device, respectively. Figures 7a and 7b are front views and longitudinal sectional views showing an example of the tip of the inner tube, respectively, and Figures 8a and b are front views showing the mechanism for raising and lowering the inner tube. It is a diagram. DESCRIPTION OF SYMBOLS 1... Ground, 2... Hardened material, 3... Pile, 4... Rebar cage, 10... Drilling device, 11... Casing, 12...
Inner tube, 13... Stabilizer, 14... Tip opening/closing shoe, 15... Rectangular tube, 16... Connection tube, 17... Head, 18... Bit, 20... Support frame, 21... Rotation drive motor, 22... Ring gear box, 23 ...Roller, 24...Elevating drive motor, 25...Pinion, 26...Swivel box, 27...Hydraulic cylinder, 30...Leader mast, 31...Rack, 32...Guide groove, 4
1... Hinge, 42... Locking part, 43... Locking groove, 44
...Connection piece, 45...points.

Claims (1)

【特許請求の範囲】[Claims] 1 外管としてのケーシングと注入管を兼ねた内
管とを有する穿孔装置を、回転させながらリーダ
ーマストに沿つて所定深度まで沈設させ、引抜き
時に前記内管先端より硬化材を圧入して、硬化材
の硬化によりくいを造成する造成くい工法におい
て、前記内管をケーシングに対し上下方向に所定
量移動可能に支持し、穿孔時内管下端はケーシン
グより突出し、その下端ビツトにより掘削し、穿
孔装置の引抜き時に内管下端をケーシング内へ引
込めた状態で、ケーシング内に内管下端より硬化
材を注入しながら徐々に穿孔装置の引抜きを行う
ことを特徴とする造成くい工法。
1. A drilling device having a casing as an outer tube and an inner tube that also serves as an injection tube is sunk to a predetermined depth along the leader mast while rotating, and when pulled out, a hardening material is press-fitted from the tip of the inner tube to harden it. In the construction pile method, which creates piles by hardening the material, the inner pipe is supported so as to be movable in the vertical direction by a predetermined amount relative to the casing, and when drilling, the lower end of the inner pipe protrudes from the casing, and the lower end bit is used to excavate the pipe, and the drilling equipment A pile construction method characterized by gradually pulling out the drilling device while injecting a hardening material into the casing from the lower end of the inner pipe with the lower end of the inner pipe retracted into the casing.
JP27916784A 1984-12-28 1984-12-28 Pile constructing method Granted JPS61158521A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP27916784A JPS61158521A (en) 1984-12-28 1984-12-28 Pile constructing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP27916784A JPS61158521A (en) 1984-12-28 1984-12-28 Pile constructing method

Publications (2)

Publication Number Publication Date
JPS61158521A JPS61158521A (en) 1986-07-18
JPS64532B2 true JPS64532B2 (en) 1989-01-06

Family

ID=17607383

Family Applications (1)

Application Number Title Priority Date Filing Date
JP27916784A Granted JPS61158521A (en) 1984-12-28 1984-12-28 Pile constructing method

Country Status (1)

Country Link
JP (1) JPS61158521A (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5873617A (en) * 1981-09-22 1983-05-02 ドニエプロペトロフスキイ・インジエネルノ−ストロイテルニイ・インスチチユ−ト Apparatus and method for constructing tubular stake

Also Published As

Publication number Publication date
JPS61158521A (en) 1986-07-18

Similar Documents

Publication Publication Date Title
JP2009036010A (en) Method for constructing settlement settlement pile and settlement settlement pile
US20150299976A1 (en) Method for manufacturing a pile
JP3760343B2 (en) Drilling bottom stabilization method and construction method of underground building
JP3533981B2 (en) Construction method of screwed pile
JPS64532B2 (en)
JP4811176B2 (en) Construction method of ready-made piles
JPH0130972B2 (en)
JP3514183B2 (en) Embedded pile and its construction method
JP2005188237A (en) Columnar ground improving device and columnar ground improving construction method
JP4517236B2 (en) Pile hole drilling method
JP4872561B2 (en) Construction method of ready-made piles
JP4360745B2 (en) Construction method of ready-made piles
JP2874906B2 (en) Shaft construction method
JPH0133606B2 (en)
JP2958426B2 (en) Differential settlement correction method
JPS61134425A (en) Method of forming foundation pile
JPS61254716A (en) Setting of in-place concrete pile
JP6035355B2 (en) Low strength pipe burial method and excavation head used for it
KR0123886B1 (en) Basic construction pile construction method and device
JP2000017658A (en) Pitching-of-pile method of ready-made pile and its device
JPH08209687A (en) Partial casing pile method
JP4481662B2 (en) Pile setting method and blade plate
CN106761415B (en) A kind of constructing device and its construction method of profound cast-in-situ bored pile
JPH0782740A (en) Inside cutting machine for steel pipe pile, excavation for steel pipe pile used for inside cutting machine and hollow excavation piling foot protection method by means thereof
JPH0868051A (en) Method for embedding pile