JPH0130972B2 - - Google Patents
[go: Go Back, main page]

JPH0130972B2 - - Google Patents

Info

Publication number
JPH0130972B2
JPH0130972B2 JP27916684A JP27916684A JPH0130972B2 JP H0130972 B2 JPH0130972 B2 JP H0130972B2 JP 27916684 A JP27916684 A JP 27916684A JP 27916684 A JP27916684 A JP 27916684A JP H0130972 B2 JPH0130972 B2 JP H0130972B2
Authority
JP
Japan
Prior art keywords
casing
pile
hardening material
inner tube
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP27916684A
Other languages
Japanese (ja)
Other versions
JPS61158520A (en
Inventor
Kazuharu Fujito
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daido Konkuriito Kogyo Kk
Original Assignee
Daido Konkuriito Kogyo Kk
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daido Konkuriito Kogyo Kk filed Critical Daido Konkuriito Kogyo Kk
Priority to JP27916684A priority Critical patent/JPS61158520A/en
Publication of JPS61158520A publication Critical patent/JPS61158520A/en
Publication of JPH0130972B2 publication Critical patent/JPH0130972B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/54Piles with prefabricated supports or anchoring parts; Anchoring piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は現場打ちの造成くい工法に関するも
ので、構造物の支持等に利用する。
[Detailed Description of the Invention] [Industrial Field of Application] This invention relates to a construction method of piles cast on site, and is used for supporting structures, etc.

〔従来の技術〕[Conventional technology]

従来の造成くい工法としては、振動、騒音、あ
るいはベントナイト泥水等の廃棄物の出ない無公
害工法として、アースオーガーで所定深度まで掘
削し、ビツト先端よりモルタルを注入しながら、
注入管としての内管を引抜き、モルタルくいを造
成するPIP工法や、くい打設位置の土砂とビツト
先端から噴出されるセメントミルクとを混合して
ソイルセメントのくいを造成するMIP工法等が
広く知られている。
The conventional pile construction method is a non-polluting method that does not produce vibrations, noise, or waste such as bentonite mud, and excavates to a specified depth with an earth auger, and injects mortar from the tip of the bit.
Widely used methods include the PIP method, in which the inner pipe used as the injection pipe is pulled out to create a mortar pile, and the MIP method, in which soil cement piles are created by mixing the earth and sand at the pile placement location with cement milk spouted from the tip of the bit. Are known.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

しかし、従来の現場打ち造成くい工法において
は既製くいのような施工管理を行なうことが難し
いという問題がある。すなわち、既製くいの場合
は予めくいの強度が確認でき、またくい打ち機を
用いる場合は、打込み力と沈設量との関係等から
地盤およびくいの推定支持力を出すことも比較的
容易であるが、従来の造成くい工法では施工後の
調査により沈下量等をもとに推定するしか方法が
なく、またくい自体の強度も地上での配合試験で
は実際の強度が得られないため信頼性に乏しく、
無駄な使われ方をされている場合もある。
However, the conventional cast-on-site pile construction method has a problem in that it is difficult to perform construction management as with ready-made piles. In other words, in the case of ready-made piles, the strength of the piles can be confirmed in advance, and if a pile driver is used, it is relatively easy to calculate the estimated bearing capacity of the ground and piles from the relationship between the driving force and the amount of sinking. However, with the conventional pile pile construction method, the only way to estimate it is based on the amount of settlement, etc. through post-construction surveys, and the actual strength of the pile itself cannot be obtained through mixing tests on the ground, so it is not reliable. Scarce;
In some cases, it is being used wastefully.

この発明の造成くい工法は、このような問題点
を解決するために発明されたもので、造成くいの
施工にあたり、穿孔装置の沈設速度を制御しなが
ら、このときの装置にかかる押圧力および回転抵
抗から、くいの推定支持力を算定するよう構成し
造成くいの施工においても十分な施工管理を可能
とし、信頼性の高い造成くいを得ることを目的と
している。
The construction pile construction method of this invention was invented to solve these problems, and when constructing the construction pile, it controls the sinking speed of the drilling device while controlling the pressing force and rotation applied to the device at this time. The system is designed to calculate the estimated bearing capacity of piles from the resistance, and enables sufficient construction management during the construction of piles, with the aim of obtaining highly reliable piles.

〔問題点を解決するための手段〕[Means for solving problems]

この発明の造成くい工法では、まず外管として
のケーシング11と注入管を兼ねた内管12とを
一体として回転させながら、リーダーマスト30
に沿つて所定深度まで沈設する。なお、通常内管
12先端に掘削用のビツト18を設け、土砂はヘ
ツド17により側方へ押しやる方式を採用する。
そして、引抜き時に内管12の先端よりモルタル
等の硬化材2を圧入して、硬化材2の硬化により
くい3を造成する。
In the pile construction method of this invention, first, while rotating the casing 11 as an outer pipe and the inner pipe 12 which also serves as an injection pipe as one,
It will be sunk to a specified depth along the Note that a digging bit 18 is usually provided at the tip of the inner pipe 12, and a method is adopted in which the earth and sand are pushed laterally by the head 17.
Then, at the time of drawing out, a hardening material 2 such as mortar is press-fitted from the tip of the inner tube 12 to create a hardening material 3 due to hardening of the hardening material 2.

沈設時は、内管12およびケーシング11の上
部を支持する支持フレーム20を、駆動装置によ
り、リーダーマスト30に沿つて強制的に走行さ
せ、下向きに一定の速度で沈設して行く。このと
き昇降用および回転用の駆動装置にかかる負荷か
ら内管12およびケーシング11に作用する押圧
力と回転抵抗を連続的に測定し、このようにして
施工管理を行うことにより、くい3造成位置ごと
の地盤強度を推定し、施工時に直ちにくい3の支
持力等を算定することができる。
During sinking, the support frame 20 that supports the inner tube 12 and the upper part of the casing 11 is forcibly moved along the leader mast 30 by a drive device, and is sunk downward at a constant speed. At this time, the pressing force and rotational resistance acting on the inner pipe 12 and casing 11 are continuously measured from the load applied to the lifting and rotating drive devices, and by controlling the construction in this way, the pile 3 construction position is determined. By estimating the ground strength for each area, it is possible to immediately calculate the bearing capacity of pile 3 at the time of construction.

〔実施例〕〔Example〕

以下、この発明の実施例を図面に基づいて説明
する。
Embodiments of the present invention will be described below based on the drawings.

第1図〜第3図はこの発明において使用する造
成くい打設装置の一例を示したもので、穿孔装置
10を支持する支持フレーム20がリーダーマス
ト30に沿つて昇降するようになつている。
1 to 3 show an example of a pile driving device used in the present invention, in which a support frame 20 supporting a drilling device 10 is moved up and down along a leader mast 30.

この穿孔装置10は外管としてのケーシング1
1とモルタルの注入管を兼ねた内管12とを備
え、内管12の先端に第8図a,bまたは第9図
aに示すような開開シユー14、掘削用ビツト1
8等を取り付けてある。なお、図中13はスタビ
ライザー、17は掘削土砂を側方へ押しやるヘツ
ドである。
This perforation device 10 has a casing 1 as an outer pipe.
1 and an inner pipe 12 which also serves as a mortar injection pipe, and at the tip of the inner pipe 12 there is an opening shoe 14 as shown in FIGS. 8a, b or 9a, and an excavation bit 1.
8th grade is attached. In the figure, 13 is a stabilizer, and 17 is a head that pushes the excavated earth and sand to the side.

穿孔は支持フレーム20に固定した駆動モータ
ー21の回転をリングギヤー(図中22がリング
ギヤーボツクスを示す)を介してケーシング11
に伝え、ケーシング11とケーシング11に固定
した内管12とを一体として回転させて行なう。
なお、内管12は上端が支持フレーム20に設け
た油圧シリンダー27を介して支持され、スイベ
ルボツクス26とともにケーシング11に対し、
上下方向に所定量移動可能とされている。また、
図中16は連結チユーブであり、モルタル等の硬
化材2を内管12に送り込み、内管12の先端よ
り地盤1あるいはケーシング11内へ注入するよ
うになつている。
The drilling is performed by transmitting the rotation of a drive motor 21 fixed to a support frame 20 to the casing 11 via a ring gear (22 in the figure indicates a ring gear box).
This is done by rotating the casing 11 and the inner tube 12 fixed to the casing 11 as one body.
The upper end of the inner tube 12 is supported via a hydraulic cylinder 27 provided on the support frame 20, and the inner tube 12 is supported with a swivel box 26 against the casing 11.
It is possible to move a predetermined amount in the vertical direction. Also,
In the figure, reference numeral 16 denotes a connecting tube, in which a hardening material 2 such as mortar is fed into the inner tube 12 and injected into the ground 1 or the casing 11 from the tip of the inner tube 12.

内管12は油圧シリンダー12を縮めると、支
持フレーム20に対し下方へ押し下げられ、第8
図a〜eに示すように一番下のスタビライザー1
3に設けた係止溝43とケーシング11下端の係
止部42が係合し、内管12がケーシング11に
固定され、穿孔時一体として回転する。また、内
管12の上部は、角形鋼管等から角形チユーブ1
5としてあり、ケリーバーの役目をするようにな
つている。
When the hydraulic cylinder 12 is retracted, the inner tube 12 is pushed downward with respect to the support frame 20, and the eighth
The bottom stabilizer 1 as shown in Figures a-e
The locking groove 43 provided in the inner tube 3 engages with the locking portion 42 at the lower end of the casing 11, and the inner tube 12 is fixed to the casing 11 and rotates as a unit during drilling. In addition, the upper part of the inner tube 12 is made of a rectangular tube 1 made of a rectangular steel pipe or the like.
5, and is designed to serve as a kelly bar.

穿孔装置10の昇降は鉛直に保持されたリーダ
ーマスト30の長手方向に平歯すなわちラツク3
1を設け、これとかみ合うピニオン25を支持フ
レーム20の上部に取り付け、駆動モーター24
により行なつている。また支持フレーム20には
ローラー23が取り付けられており、昇降時リー
ダーマスト30に形成されたガイド溝32内を走
行するようになつている。
The drilling device 10 is raised and lowered by a straight teeth or rack 3 in the longitudinal direction of a leader mast 30 held vertically.
1, a pinion 25 that meshes with the pinion 25 is attached to the upper part of the support frame 20, and a drive motor 24 is installed.
This is done by Further, a roller 23 is attached to the support frame 20, and is configured to run within a guide groove 32 formed in the leader mast 30 during elevation.

また、内管12の先端はヒンジ41を中心に、
三枚のシユー14が開閉する形式のものが一般的
であるが、第9図bのように先端に取付けたポイ
ント45を硬化材2の注入の際、地中に残置する
形のもの等も利用できる。
In addition, the tip of the inner tube 12 is centered around the hinge 41,
Generally, the type has three shoes 14 that open and close, but there are also types where the point 45 attached to the tip is left in the ground when the hardening material 2 is injected, as shown in Figure 9b. Available.

第4図a〜iはこの発明の工法における施工の
様子の一例を示したもので、次のような手順で作
業を行なう。
Figures 4a to 4i show an example of the construction process according to the construction method of the present invention, and the work is carried out in the following steps.

(a) 油圧シリンダ27を縮め、ケーシング11と
内管12とを固定し、くい芯にセツトして鉛直
の確認をする。
(a) Retract the hydraulic cylinder 27, fix the casing 11 and the inner pipe 12, set it on the pile core, and check the verticality.

(b) ケーシング11を回転させ、押圧力を加え、
先端土砂を側方へ強制的に移動させ、沈設す
る。
(b) Rotate the casing 11 and apply pressing force,
The soil at the tip is forcibly moved to the side and deposited.

(c) ケーシング11が所定深度に到達したら、ケ
ーシング11を固定し、内管12先端からモル
タル等の硬化材2を圧送注入し、硬化材2の注
入量に等しい長さ(0.5〜1.0m)だけ内管12
を引上げる。なお、モルタル等の硬化材2は予
め混合して練つたものを圧送する。
(c) When the casing 11 reaches a predetermined depth, fix the casing 11 and inject the hardening material 2 such as mortar under pressure from the tip of the inner tube 12 to a length (0.5 to 1.0 m) equal to the amount of hardening material 2 injected. Only inner tube 12
pull up. Note that the hardening material 2 such as mortar is mixed and kneaded in advance and then pumped.

(d) 硬化材2を圧送し、注入圧力が定められた圧
力になるまで、ケーシング11と内管12を停
止させ、コブ状の拡大部3′を造成する。
(d) The hardening material 2 is pumped, the casing 11 and the inner tube 12 are stopped until the injection pressure reaches a predetermined pressure, and a knob-shaped enlarged portion 3' is created.

(e) 硬化材2を圧送するとともに注入量に等しい
長さだけケーシング11と内管12を引上げ
る。
(e) While pumping the hardening material 2, the casing 11 and inner tube 12 are pulled up by a length equal to the injection amount.

(f)、(g) 同様に(c)〜(e)の作業を繰り返し、くい3
の造成を行なつて行く。
(f), (g) Repeat steps (c) to (e) in the same way, and
We will continue to create.

(h) 複数のコブ状の拡大部3′を有するくい3が
造成される。
(h) A pile 3 having a plurality of knob-like enlarged portions 3' is created.

(i) 硬化材2が硬化する前に、必要に応じ鉄筋籠
4を挿入する。
(i) Before the hardening material 2 hardens, reinforcing bar cages 4 are inserted as necessary.

なお、以上の作業において、拡大部3′の位置
および仕上り径は土質の種類とケーシング11の
引上げ長さ(0.2〜1.0m)と硬化材2の注入量と
注入圧力によつて管理する。
In the above work, the position and finished diameter of the enlarged portion 3' are controlled by the type of soil, the length of the casing 11 pulled up (0.2 to 1.0 m), the amount of hardening material 2 injected, and the injection pressure.

第6図は上記実施例における施工管理のための
グラフを概念的に示したものである。
FIG. 6 conceptually shows a graph for construction management in the above embodiment.

ケーシング11の沈設時は、昇降用駆動モータ
ー24により、一定速度で支持フレーム20を降
下させ、このときの駆動モーター24の電流また
は電圧の変化から負荷が求まり、第6図のグラフ
に示すような形で各深さでの押圧力の変化がわか
る。また同様に回転用駆動モーター21における
電流または電圧の変化から回転抵抗がグラフの形
で示される。これら押圧力および回転抵抗から、
各深さでの地盤強度および土質が推定でき、施工
時に直ちにくい3の強度、性能を判断するための
データーとなる。
When sinking the casing 11, the support frame 20 is lowered at a constant speed by the lifting drive motor 24, and the load is determined from the change in current or voltage of the drive motor 24 at this time, and the load is determined as shown in the graph of FIG. The shape shows the change in pressing force at each depth. Similarly, the rotational resistance is shown in the form of a graph from changes in current or voltage in the rotational drive motor 21. From these pressing forces and rotational resistance,
The ground strength and soil quality at each depth can be estimated, providing data for immediately determining the strength and performance of pile 3 during construction.

またケーシング11の引上げ時は硬化材2の注
入量(l/min)と注入圧力(Kgf/cm2)との関
係から引上げ速度を調節し、ケーシング11に対
し、下向きに所定の押圧力を加えた状態で硬化材
2の注入を行なうことができる。これにより、硬
化材2を十分に行きわたらせるとともに、くい3
の性能、品質が不均一となるのを防止し、信頼性
の高い造成くい3が得られる。またグラフに示さ
れるように、硬化材2の注入量を一定とし、ケー
シング11の上昇を抑えた(駆動モーター24を
停止させる)状態では注入圧力が上昇し、この部
分に拡大部3′が形成される。
In addition, when pulling up the casing 11, the pulling speed is adjusted based on the relationship between the injection amount (l/min) of the hardening material 2 and the injection pressure (Kgf/cm 2 ), and a predetermined downward pressing force is applied to the casing 11. In this state, the hardening material 2 can be injected. In this way, the hardening material 2 is sufficiently distributed, and the pile 3
This prevents non-uniformity in performance and quality, and provides a highly reliable pile 3. Furthermore, as shown in the graph, when the injection amount of the hardening material 2 is kept constant and the rise of the casing 11 is suppressed (the drive motor 24 is stopped), the injection pressure increases and an enlarged part 3' is formed in this part. be done.

第5図a〜hは他の実施例における施工の様子
を示したもので、次のような手順で作業を行な
う。
Figures 5a to 5h show the construction in another embodiment, and the work is carried out in the following steps.

(a) 油圧シリンダ27を縮め、ケーシング11と
内管12とを固定し、くい芯にセツトして鉛直
の確認をする。
(a) Retract the hydraulic cylinder 27, fix the casing 11 and the inner pipe 12, set it on the pile core, and check the verticality.

(b) ケーシング11を回転させ、押圧力を加え、
先端土砂を側方へ強制的に移動させ、沈設す
る。
(b) Rotate the casing 11 and apply pressing force,
The soil at the tip is forcibly moved to the side and deposited.

(c) ケーシング11が所定深度に到達したら、ケ
ーシング11を固定し、内管12先端からモル
タル等の硬化材2を圧送注入し、硬化材2の注
入量に等しい長さ(0.5〜1.0m)だけ内管12
を引上げる。
(c) When the casing 11 reaches a predetermined depth, fix the casing 11 and inject the hardening material 2 such as mortar under pressure from the tip of the inner tube 12 to a length (0.5 to 1.0 m) equal to the amount of hardening material 2 injected. Only inner tube 12
pull up.

(d)、(e) 硬化材2は定められた量を連続注入す
る。また、ケーシング11の引上げ速度は注入
体積よりも小さい量となる速度とし、注入した
硬化材2に対し、下向きの押圧力がかかるよう
にする。また、施工管理は注入圧力によつて行
なう。
(d), (e) The hardening material 2 is continuously injected in a predetermined amount. Further, the pulling speed of the casing 11 is set to be a speed smaller than the injection volume, so that a downward pressing force is applied to the injected hardening material 2. In addition, construction management will be conducted using injection pressure.

(f)、(g) 硬化材2の注入完了後、必要に応じ、鉄
筋籠4あるいはH形鋼、L形鋼等を挿入する。
(f), (g) After completing the injection of the hardening material 2, reinforcing bar cages 4, H-shaped steel, L-shaped steel, etc. are inserted as necessary.

(h) 硬化材2の硬化によりくい3の造成が完了す
る。
(h) Creation of the pile 3 is completed by hardening of the hardening material 2.

第7図は上記実施例における施工管理のための
グラフを概念的に示したものである。
FIG. 7 conceptually shows a graph for construction management in the above embodiment.

ケーシング11の沈設時については前述の実施
例の場合と同様の施工管理が行なわれる。
When the casing 11 is sunk, construction management is carried out in the same manner as in the previous embodiment.

ケーシング11の引上げについては速度を一定
とし、拡大部3′は設けない。また、第7図のグ
ラフには油圧シリンダー27により内管12の先
端をケーシング11内へ引上げた状態での最初の
注入に関しては注入圧力が低く、注入の深度が浅
くなるにつれて、注入圧力が低くなつて行く様子
が示されている。
The casing 11 is pulled up at a constant speed, and the enlarged portion 3' is not provided. In addition, the graph in FIG. 7 shows that the injection pressure is low for the first injection when the tip of the inner tube 12 is pulled up into the casing 11 by the hydraulic cylinder 27, and as the injection depth becomes shallower, the injection pressure decreases. It shows how it grows.

第10図および第12図は他の実施例として、
ケーシング11を地中に残置するようにする場合
のくい打設装置を示したものである。この実施例
では既製のオーガーマシン50を支持フレーム2
0′によつて支持し、穿孔時は内管12とケーシ
ング11との間に介在させた拡径部材51をケー
シング内面に押し付け、内管12とケーシング1
1を一体として回転させながら穿孔を行ない、引
抜き時は拡径部材51を内管12側へ引寄せ、ケ
ーシング11は地盤1中に残置し、ケーシング1
1内へ硬化材2を注入するようにしたものである
(実願昭59−185216号参照)。この場合も穿孔時に
駆動モーター21′,24にかかる負荷、装置の
沈設速度等を測定し、また引抜き時には硬化材2
の注入圧、注入量、装置の引上げ速度等を測定
し、施工管理を行なう。
FIGS. 10 and 12 show other embodiments,
This figure shows a pile driving device for leaving the casing 11 underground. In this embodiment, a ready-made auger machine 50 is mounted on a supporting frame 2.
0', and when drilling, the expanding member 51 interposed between the inner tube 12 and the casing 11 is pressed against the inner surface of the casing, and the inner tube 12 and the casing 1 are
1 is rotated as one unit, and when pulling out, the expanding member 51 is pulled toward the inner pipe 12, the casing 11 is left in the ground 1, and the casing 1 is
The hardening material 2 is injected into the inside of the hardening material 1 (see Utility Model Application No. 185216/1983). In this case as well, the load on the drive motors 21' and 24 and the sinking speed of the device are measured during drilling, and the hardening material 2 is
Measures injection pressure, injection volume, equipment lifting speed, etc., and performs construction management.

〔発明の効果〕〔Effect of the invention〕

この発明の工法では、従来単に吊支持されてい
た穿孔装置をリーダーマストに沿つて所定の速度
で押し下げて沈設し、内管およびケーシングにか
かる押圧力および回転抵抗を連続的に測定し、こ
れらからそれぞれのくいについて、地盤各深さで
の概略的な支持強度が施工中に確認でき、信頼性
の高いくいが造成される。また、このことは従来
造成くいの施工では困難であつた施工管理を可能
としたものである。
In the construction method of this invention, the drilling device, which was conventionally simply suspended, is pushed down at a predetermined speed along the leader mast, and the pressing force and rotational resistance applied to the inner pipe and casing are continuously measured. For each pile, the approximate support strength at each depth in the ground can be confirmed during construction, resulting in highly reliable piles. Additionally, this makes it possible to manage construction work, which was difficult in conventional construction using piles.

【図面の簡単な説明】[Brief explanation of drawings]

第1図はこの発明の実施例におけるくい打設装
置の正面図、第2図はその右側面図、第3図は第
2図の−断面図、第4図a〜iは一実施例に
おけるくいの施工手順を示す断面図、第5図a〜
hは他の実施例における施工手順を示す断面図、
第6図は第4図a〜iに対応する施工管理のため
のグラフ、第7図は第5図a〜hに対応する施工
管理のためのグラフ、第8図a,b,c,d,e
はそれぞれくい打設装置先端部の正面図、底面
図、横断面図、スタビライザーの正面図、同じく
横断面図、第9図a,bはそれぞれ内管先端の一
例を示す正面図、縦断面図、第10図は他の実施
例におけるくい打設装置の右側面図、第11図は
第10図の−断面図である。 1……地盤、2……硬化材、3……くい、4…
…鉄筋籠、10……穿孔装置、11……ケーシン
グ、12……内管、13……スタビライザー、1
4……先端開閉シユー、15……角形チユーブ、
16……連結チユーブ、17……ヘツド、18…
…ビツト、20……支持フレーム、21……回転
用駆動動モーター、22……リングギヤーボツク
ス、23……ローラー、24……昇降用駆動モー
ター、25……ピニオン、26……スイベルボツ
クス、27……油圧シリンダー、30……リーダ
ーマスト、31……ラツク、32……ガイド溝、
41……ヒンジ、42……係止部、43……係止
溝、44……連結片、45……ポイント。
Fig. 1 is a front view of a pile driving device according to an embodiment of the present invention, Fig. 2 is a right side view thereof, Fig. 3 is a cross-sectional view taken from Fig. 2, and Figs. Cross-sectional view showing the construction procedure of piles, Figure 5 a~
h is a sectional view showing the construction procedure in another example,
Fig. 6 is a graph for construction management corresponding to Fig. 4 a to i, Fig. 7 is a graph for construction management corresponding to Fig. 5 a to h, and Fig. 8 a, b, c, d. ,e
9A and 9B are respectively a front view, a bottom view, and a cross-sectional view of the tip of the pile driving device, a front view of the stabilizer, and a cross-sectional view, and FIGS. , FIG. 10 is a right side view of a pile driving device in another embodiment, and FIG. 11 is a cross-sectional view taken along the line shown in FIG. 10. 1...ground, 2...hardened material, 3...pile, 4...
... Rebar cage, 10 ... Perforation device, 11 ... Casing, 12 ... Inner pipe, 13 ... Stabilizer, 1
4...Tip opening/closing shoe, 15...Square tube,
16...Connection tube, 17...Head, 18...
... Bit, 20 ... Support frame, 21 ... Rotation drive motor, 22 ... Ring gear box, 23 ... Roller, 24 ... Lifting drive motor, 25 ... Pinion, 26 ... Swivel box, 27 ... Hydraulic cylinder, 30 ... Leader mast, 31 ... Rack, 32 ... Guide groove,
41... Hinge, 42... Locking portion, 43... Locking groove, 44... Connecting piece, 45... Point.

Claims (1)

【特許請求の範囲】 1 外管としてのケーシングと注入を兼ねた内管
とを、一体として回転させながら、リーダーマス
トに沿つて所定深度まで沈設させ、引抜き時に前
記内管先端より硬化材を圧入して、硬化材の硬化
によりくいを造成する造成くい工法において、沈
設時前記内管または内管およびケーシング上部を
支持する支持フレームをリーダーマストに沿つて
所定の速度で下向きに強制的に走行させ、このと
きの内管およびケーシングにかかる押圧力と回転
抵抗を連続的に測定することにより、くい造成位
置における支持力を算定することを特徴とする造
成くい工法。 2 硬化材はモルタルである特許請求の範囲第1
項記載の造成くい工法。
[Scope of Claims] 1. While rotating the casing as an outer tube and the inner tube that also serves as an injection tube, the casing is sunk along the leader mast to a predetermined depth while being rotated as a unit, and when pulled out, a hardening material is press-fitted from the tip of the inner tube. In the construction pile construction method in which piles are created by hardening of hardened material, the inner pipe or a support frame supporting the inner pipe and the upper part of the casing is forcibly moved downward at a predetermined speed along the leader mast during sinking. A pile construction method characterized in that the supporting force at the pile construction position is calculated by continuously measuring the pressing force and rotational resistance applied to the inner pipe and casing at this time. 2 The first claim that the hardening material is mortar
The pile construction method described in section.
JP27916684A 1984-12-28 1984-12-28 Pile constructing method Granted JPS61158520A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP27916684A JPS61158520A (en) 1984-12-28 1984-12-28 Pile constructing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP27916684A JPS61158520A (en) 1984-12-28 1984-12-28 Pile constructing method

Publications (2)

Publication Number Publication Date
JPS61158520A JPS61158520A (en) 1986-07-18
JPH0130972B2 true JPH0130972B2 (en) 1989-06-22

Family

ID=17607369

Family Applications (1)

Application Number Title Priority Date Filing Date
JP27916684A Granted JPS61158520A (en) 1984-12-28 1984-12-28 Pile constructing method

Country Status (1)

Country Link
JP (1) JPS61158520A (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5950797B2 (en) * 2012-11-07 2016-07-13 日本基礎技術株式会社 Reinforcement method for embankment slope and drilling tool used therefor
CN111395320A (en) * 2020-03-23 2020-07-10 江西基业科技有限公司 Construction method of multiple-bottom-expanding type immersed tube cast-in-place pile

Also Published As

Publication number Publication date
JPS61158520A (en) 1986-07-18

Similar Documents

Publication Publication Date Title
JP5265500B2 (en) Pile digging method, foundation pile structure
JP2009036010A (en) Method for constructing settlement settlement pile and settlement settlement pile
JP4974364B2 (en) Pile burying method
JPS5985028A (en) Steel pipe pile and laying work thereof
CN111519612A (en) Construction method of full-casing follow-up long spiral drilling pressure-grouting secant pile
JP3760343B2 (en) Drilling bottom stabilization method and construction method of underground building
JPH0130972B2 (en)
CN119373136A (en) A water-stop curtain construction technology for gravel and pebble strata
JP2000008372A (en) Underground wall construction method
JP2008002114A (en) Independent foundation and method of constructing the same
JPS5827366B2 (en) Head reinforcement pile construction equipment
JP4517236B2 (en) Pile hole drilling method
JP3514183B2 (en) Embedded pile and its construction method
JPH0133606B2 (en)
JPS64532B2 (en)
JP6035355B2 (en) Low strength pipe burial method and excavation head used for it
CN116255155B (en) Methods for protecting ancient buildings when tunnel boring machines pass through them
JP3810882B2 (en) Construction method of cast-in-place pile in confined groundwater zone
JPS61254716A (en) Setting of in-place concrete pile
JP2008031772A (en) Construction method of ready-made piles and lid used for the construction method
JPH0627405B2 (en) Ready-made pile burying method
GB2048999A (en) Improvements relating to the construction of in situ piles
JPH08209687A (en) Partial casing pile method
JP2000017658A (en) Pitching-of-pile method of ready-made pile and its device
JP2001073367A (en) Embedding construction method for steel pipe pile