JPH0133606B2 - - Google Patents
[go: Go Back, main page]

JPH0133606B2 - - Google Patents

Info

Publication number
JPH0133606B2
JPH0133606B2 JP59282147A JP28214784A JPH0133606B2 JP H0133606 B2 JPH0133606 B2 JP H0133606B2 JP 59282147 A JP59282147 A JP 59282147A JP 28214784 A JP28214784 A JP 28214784A JP H0133606 B2 JPH0133606 B2 JP H0133606B2
Authority
JP
Japan
Prior art keywords
casing
hardening material
inner tube
injection
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP59282147A
Other languages
Japanese (ja)
Other versions
JPS61158522A (en
Inventor
Kazuharu Fujito
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daido Konkuriito Kogyo Kk
Original Assignee
Daido Konkuriito Kogyo Kk
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daido Konkuriito Kogyo Kk filed Critical Daido Konkuriito Kogyo Kk
Priority to JP28214784A priority Critical patent/JPS61158522A/en
Publication of JPS61158522A publication Critical patent/JPS61158522A/en
Publication of JPH0133606B2 publication Critical patent/JPH0133606B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は現場打ちの造成くい工法および同工
法に使用するための造成くい打設装置に関するも
ので、構造物の支持くいの施工等に利用する。
[Detailed Description of the Invention] [Field of Industrial Application] The present invention relates to a construction method for pouring on-site construction piles and a construction pile driving device for use in the method, and is applicable to the construction of support piles for structures, etc. do.

〔従来の技術〕[Conventional technology]

従来の造成くい工法としては、振動、騒音、あ
るいはベントナイト泥水等の廃棄物の出ない無公
害工法として、アースオーガーで所定深度まで掘
削し、ビツト先端よりモルタルを注入しながら、
注入管としての内管を引抜き、モルタルくいを造
成するPIP工法や、くい打設位置の土砂とビツト
先端から噴出されるセメントミルクとを混合して
ソイルセメントのくいを造成するMIP工法等が
広く知られている。
The conventional pile construction method is a non-polluting method that does not produce vibrations, noise, or waste such as bentonite mud, and excavates to a specified depth with an earth auger, and injects mortar from the tip of the bit.
Widely used methods include the PIP method, in which the inner pipe used as the injection pipe is pulled out to create a mortar pile, and the MIP method, in which soil cement piles are created by mixing the earth and sand at the pile placement location with cement milk spouted from the tip of the bit. Are known.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

しかし、従来の現場打ち造成くい工法において
は既製くいのような施工管理を行なうことが難し
いという問題がある。すなわち、既製くいの場合
は予めくいの強度が確認でき、またくい打ち機を
用いる場合は、打込み力と沈設量との関係等から
地盤およびくいの推定支持力を出すことも比較的
容易であるが、従来の造成くい工法では施工後の
調査により沈下量等をもとに推定するしか方法が
なく、またくい自体の強度も地上での配合試験で
は実際の強度が得られないため信頼性に乏しく、
無駄な使われ方をされている場合もある。
However, the conventional cast-on-site pile construction method has a problem in that it is difficult to perform construction management as with ready-made piles. In other words, in the case of ready-made piles, the strength of the piles can be confirmed in advance, and in the case of using a pile driver, it is relatively easy to calculate the estimated bearing capacity of the ground and piles from the relationship between the driving force and the amount of sinking. However, with the conventional pile pile construction method, the only way to estimate it is based on the amount of settlement, etc. through post-construction surveys, and the actual strength of the pile itself cannot be obtained through mixing tests on the ground, so it is not reliable. Scarce;
In some cases, it is being used wastefully.

また、施工管理が困難なことと関連して、注入
したモルタル等の硬化材の注入状況等が確認でき
ず、部分的に注入不足あるいは硬化材の流出等が
生じる場合がある。
Furthermore, in connection with the difficulty in construction management, it is not possible to check the injection status of the hardening material such as mortar, which may result in insufficient injection or outflow of the hardening material in some parts.

この発明の工法および装置は、このような問題
点を解決するために発明されたもので、造成くい
の施工にあたり、硬化材注入時に下向きに所定の
押圧力がかかるように、穿孔装置の引抜き速度を
制御することにより、硬化材の注入を確実なもの
とし、造成くいの施工においても十分な施工管理
を可能とし、信頼性の高い造成くいを得ることを
目的としている。
The construction method and device of the present invention were invented to solve these problems, and when constructing piles, the drawing speed of the drilling device is adjusted so that a predetermined downward pressing force is applied when hardening material is injected. By controlling this, the purpose is to ensure the injection of hardening material, to enable sufficient construction management during the construction of the reclamation piles, and to obtain highly reliable reclamation piles.

〔問題点を解決するための手段〕[Means for solving problems]

この発明の造成くい工法は、まず外管としての
ケーシング11と注入管を兼ねた内管12とを、
一体として回転させながら、リーダーマスト30
に沿つて所定深度まで沈設する。なお、通常内管
12先端に掘削用のビツト18を設け、土砂はヘ
ツド17により側方へ押しやる方式等を採用す
る。そして、引抜き時に内管12の先端よりモル
タル等の硬化材2を圧入して、硬化材2の硬化に
よりくい3を造成する。
In the pile construction method of this invention, first, a casing 11 serving as an outer pipe and an inner pipe 12 serving as an injection pipe are
While rotating as a unit, the leader mast 30
It will be sunk to a specified depth along the Note that a method is usually adopted in which a digging bit 18 is provided at the tip of the inner pipe 12 and earth and sand is pushed laterally by the head 17. Then, at the time of drawing out, a hardening material 2 such as mortar is press-fitted from the tip of the inner tube 12 to create a hardening material 3 due to hardening of the hardening material 2.

この引抜き時の硬化材2の注入に関しては硬化
材の注入量および注入圧力等を連続的に記録測定
しながら、内管12およびケーシング11の上昇
速度を調整し、硬化材2の注入圧に対抗して下向
きに所定の押圧力を加えた状態で注入を行なうも
のとする。なお、ケーシング11を地中に残置
し、内管12のみ引上げる場合もある。またくい
3の先端支持力あるいは周面摩擦力を高めるため
に拡大部3′を設ける場合があり、その場合、内
管12または内管12およびケーシング11の上
昇を止め、注入圧を高くする等の施工管理によ
り、任意の位置に拡大部3′を造成することもで
きる。
Regarding the injection of the hardening material 2 during this pulling out, while continuously recording and measuring the amount of hardening material injected and the injection pressure, etc., the rising speed of the inner tube 12 and the casing 11 is adjusted to counteract the injection pressure of the hardening material 2. The injection is performed while applying a predetermined downward pressing force. Note that there are cases where the casing 11 is left underground and only the inner pipe 12 is pulled up. In addition, an enlarged portion 3' may be provided to increase the support force at the tip of the pile 3 or the frictional force on the circumferential surface. With this construction management, it is also possible to create the enlarged portion 3' at an arbitrary position.

また、この発明における造成くい打設装置とし
ては、ケーシング11と内管12を上部に設けた
支持フレーム20によつて支持し、この支持フレ
ーム20をリーダーマスト30に沿つて任意の速
度で走行可能としている。任意の速度で走行させ
る方法としては、支持フレーム20に駆動モータ
ー24により連動するピニオン25を取り付け、
リーダーマスト30の上下方向に形成したラツク
31とかみ合わせ、支持フレーム20がリーダー
マスト30に反力をとつて昇降する形式としたも
のを用いることができる。なお、この場合、地盤
1中への押込み抵抗に応じ電流または電圧を変化
させることになり、その値を連続的に記録しなが
ら施工管理を行なう。その他、ラツク31とピニ
オン25の代わりに支持フレーム20をリーダー
マスト30に沿つて昇降させる油圧機構の利用も
考えられる。
In addition, the construction pile driving device according to the present invention supports the casing 11 and the inner pipe 12 by a support frame 20 provided at the upper part, and can run this support frame 20 at any speed along the leader mast 30. It is said that As a method for running at an arbitrary speed, a pinion 25 that is interlocked by a drive motor 24 is attached to the support frame 20,
A structure in which the support frame 20 engages with a rack 31 formed in the vertical direction of the leader mast 30 and moves up and down by applying a reaction force to the leader mast 30 can be used. In this case, the current or voltage will be changed depending on the resistance of pushing into the ground 1, and construction management will be performed while continuously recording the value. Alternatively, instead of the rack 31 and pinion 25, a hydraulic mechanism may be used to move the support frame 20 up and down along the leader mast 30.

〔実施例〕〔Example〕

以下、この発明の実施例を図面に基づいて説明
する。
Embodiments of the present invention will be described below based on the drawings.

第1図〜第3図は造成くい打設装置の一例を示
したもので、穿孔装置10を支持する支持フレー
ム20がリーダーマスト30に沿つて昇降するよ
うになつている。
1 to 3 show an example of a construction pile driving device, in which a support frame 20 supporting a drilling device 10 moves up and down along a leader mast 30.

この穿孔装置10は外管としてのケーシング1
1とモルタルの注入管を兼ねた内管12とを備
え、内管12の先端に第9図a,bまたは第10
図aに示すような開閉シユー14、掘削用ビツト
18等を取り付けてある。なお、図中13はスタ
ビライザー、17は掘削土砂を側方へ押しやるヘ
ツドである。
This perforation device 10 has a casing 1 as an outer pipe.
1 and an inner tube 12 which also serves as a mortar injection tube, and the tip of the inner tube 12 is provided with a
An opening/closing shoe 14, a drilling bit 18, etc. as shown in Figure a are attached. In the figure, 13 is a stabilizer, and 17 is a head that pushes the excavated earth and sand to the side.

穿孔は支持フレーム20に固定した駆動モータ
ー21の回転をリングギヤー(図中22がリング
ギヤーボツクスを示す)を介してケーシング11
に伝え、ケーシング11とケーシング11に固定
した内管12とを一体として回転させて行なう。
なお、内管12は上端が支持フレーム20に設け
た油圧シリンダー27を介して支持され、スベイ
ルボツクス26とともにケーシング11に対し、
上下方向に所定量移動可能とされている。また、
図中16は連結チユーブであり、モルタル等の硬
化材2を内管12に送り込み、内管12の先端よ
り地盤1あるいはケーシング11内へ注入するよ
うになつている。
The drilling is performed by transmitting the rotation of a drive motor 21 fixed to a support frame 20 to the casing 11 via a ring gear (22 in the figure indicates a ring gear box).
This is done by rotating the casing 11 and the inner tube 12 fixed to the casing 11 as one body.
Note that the upper end of the inner tube 12 is supported via a hydraulic cylinder 27 provided on the support frame 20, and the inner tube 12 is supported by a hydraulic cylinder 27 provided on the support frame 20, and is attached to the casing 11 together with the save box 26.
It is possible to move a predetermined amount in the vertical direction. Also,
In the figure, reference numeral 16 denotes a connecting tube, in which a hardening material 2 such as mortar is fed into the inner tube 12 and injected into the ground 1 or the casing 11 from the tip of the inner tube 12.

内管12は第11図bに示すように油圧シリン
ダー12を縮めると、支持フレーム20に対し下
方へ押し下げられ、第9図a〜eに示すように一
番下のスタビライザー13に設けた係止溝43と
ケーシング11下端の係止部42が係合し、内管
12がケーシング11に固定され、穿孔時一体と
して回転する。また、内管12の上部は、角形鋼
管等からなる角形チユーブ15としてあり、ケリ
ーバーの役目をするようになつている。
When the hydraulic cylinder 12 is retracted as shown in FIG. 11b, the inner tube 12 is pushed downward relative to the support frame 20, and as shown in FIGS. The groove 43 and the locking portion 42 at the lower end of the casing 11 engage, and the inner tube 12 is fixed to the casing 11 and rotates as one when drilling. Further, the upper part of the inner tube 12 is a square tube 15 made of a square steel pipe or the like, and serves as a kelly bar.

穿孔装置10の昇降は鉛直に保持されたリーダ
ーマスト30の長手方向に平歯すなわちラツク3
1を設け、これとかみ合うピニオン25を支持フ
レーム20の上部に取り付け、駆動モーター24
により行なつている。また支持フレーム20には
ローラー23が取り付けられており、昇降時、リ
ーダーマスト30に形成されたガイド溝32内を
走行するようになつている。
The perforation device 10 is raised and lowered by means of spur teeth or racks 3 in the longitudinal direction of a leader mast 30 held vertically.
1, a pinion 25 that meshes with the pinion 25 is attached to the upper part of the support frame 20, and a drive motor 24 is installed.
This is done by Further, a roller 23 is attached to the support frame 20, and is adapted to run within a guide groove 32 formed in the leader mast 30 when moving up and down.

また、内管12の先端はヒンジ41を中心に三
枚のシユー14が開閉する形式のものが一般的で
あるが、第10図bのように先端に取付けたポイ
ント45を硬化材2の注入の際、地中に残置する
形式のもの等も利用できる。
In addition, the tip of the inner tube 12 is generally of a type in which three shoes 14 are opened and closed around a hinge 41, but as shown in FIG. At this time, it is also possible to use a type that is left underground.

第4図a〜iはこの発明の工法における施工の
様子の一例を示したもので、次のような手順で作
業を行なう。
Figures 4a to 4i show an example of the construction process according to the construction method of the present invention, and the work is carried out in the following steps.

(a) 油圧シリンダー27を縮め、ケーシング11
と内管12とを固定し、くい芯にセツトして鉛
直の確認をする。
(a) Retract the hydraulic cylinder 27 and remove the casing 11.
and the inner pipe 12, set it on the stake and check the verticality.

(b) ケーシング11を回転させ、押圧力を加え、
先端土砂を側方へ強制的に移動させ、沈設す
る。
(b) Rotate the casing 11 and apply pressing force,
The soil at the tip is forcibly moved to the side and deposited.

(c) ケーシング11が所定深度に到達したら、ケ
ーシング11を固定し、内管12先端からモル
タル等の硬化材2を圧送注入し、硬化材の注入
量に等しい長さ(0.5〜1.0m)だけ内管12を
引上げる。なお、モルタル等の硬化材2は予め
混合して練つたものを圧送する。
(c) When the casing 11 reaches a predetermined depth, the casing 11 is fixed, and the hardening material 2 such as mortar is pumped and injected from the tip of the inner tube 12 to a length (0.5 to 1.0 m) equal to the amount of hardening material injected. Pull up the inner tube 12. Note that the hardening material 2 such as mortar is mixed and kneaded in advance and then pumped.

(d) 硬化材2を圧送し、注入圧力が定められた圧
力になるまで、ケーシング11と内管12を停
止させ、コブ状の拡大部3′を造成する。
(d) The hardening material 2 is pumped, the casing 11 and the inner tube 12 are stopped until the injection pressure reaches a predetermined pressure, and a knob-shaped enlarged portion 3' is created.

(e) 硬化材2を圧送するとともに注入量に等しい
長さだけケーシング11と内管12を引上げ
る。
(e) While pumping the hardening material 2, the casing 11 and inner tube 12 are pulled up by a length equal to the injection amount.

(f)、(g) 同様に(c)〜(e)の作業を繰り返し、くい3
の造成を行なつていく。
(f), (g) Repeat steps (c) to (e) in the same way, and
We will continue to create.

(h) 複数のコブ状の拡大部3′を有するくい3が
造成される。
(h) A pile 3 having a plurality of knob-like enlarged portions 3' is created.

(i) 硬化材2が硬化する前に、必要に応じ鉄筋籠
4を挿入する。
(i) Before the hardening material 2 hardens, reinforcing bar cages 4 are inserted as necessary.

なお、以上の作業において、拡大部3′の位置
および仕上がり径は土質の種類とケーシング11
の引上げ長さ(0.2〜1.0m)と硬化材2の注入量
と注入圧力によつて管理する。
In addition, in the above work, the position and finished diameter of the enlarged part 3' depend on the type of soil and the casing 11.
It is controlled by the pulling length (0.2 to 1.0 m), the amount of hardening material 2 injected, and the injection pressure.

第6図は上記実施例における施工管理のための
グラフを概念的に示したものである。
FIG. 6 conceptually shows a graph for construction management in the above embodiment.

ケーシング11の沈設時は、昇降用駆動モータ
ー24により、一定速度で支持フレーム20を降
下させ、このときの駆動モーター24の電流また
は電圧の変化から負荷が求まり、第6図のグラフ
に示すような形で各深さでの押圧力の変化がわか
る。また同様に回転用駆動モーター21における
電流または電圧の変化から回転抵抗がグラフの形
で示される。これら押圧力および回転抵抗から、
各深さでの地盤強度および土質が推定でき、施工
時に直ちにくい3の強度、性能を判断するための
データーとなる。
When sinking the casing 11, the support frame 20 is lowered at a constant speed by the lifting drive motor 24, and the load is determined from the change in current or voltage of the drive motor 24 at this time, and the load is determined as shown in the graph of FIG. The shape shows the change in pressing force at each depth. Similarly, the rotational resistance is shown in the form of a graph from changes in current or voltage in the rotational drive motor 21. From these pressing forces and rotational resistance,
The ground strength and soil quality at each depth can be estimated, providing data for immediately determining the strength and performance of pile 3 during construction.

またケーシング11の引上げ時は硬化材12の
注入量(/min)と注入圧力(Kgf/cm2)との
関係から引上げ速度を調節し、ケーシング11に
対し、下向きに所定の押圧力を加えた状態で硬化
材2の注入を行なうことができる。これにより、
硬化材2を十分に行きわたらせると共に、くい3
の性能、品質が不均一となるのを防止し、信頼性
の高い造成くい3が得られる。またグラフに示さ
れるように、硬化材2の注入量を一定とし、ケー
シング11の上昇を抑えた(駆動モーター24を
停止させる)状態では注入圧力が上昇し、この部
分に拡大部3′が形成される。
In addition, when pulling up the casing 11, the pulling speed was adjusted based on the relationship between the injection amount (/min) of the hardening material 12 and the injection pressure (Kgf/cm 2 ), and a predetermined downward pressing force was applied to the casing 11. In this state, the hardening material 2 can be injected. This results in
While sufficiently distributing the hardening material 2,
This prevents non-uniformity in performance and quality, and provides a highly reliable pile 3. Furthermore, as shown in the graph, when the injection amount of the hardening material 2 is kept constant and the rise of the casing 11 is suppressed (the drive motor 24 is stopped), the injection pressure increases and an enlarged part 3' is formed in this part. be done.

第8図a〜eは硬化材2の注入量と内管12お
よびケーシング11の引上長との関係を示したも
のである。
8a to 8e show the relationship between the injection amount of hardening material 2 and the pulling length of inner tube 12 and casing 11. FIG.

すなわちaは内管12を油圧シリンダー27に
より、所定高さ引上げた状態で、その引上げ高さ
に等しい量の硬化材2を注入した場合、bはさら
に内管12およびケーシング11を引上げなが
ら、引上長に等しい量の硬化材2を注入した場
合、c,dはそれぞれ引上長をbの80%、50%と
し、同量の硬化材2を注入した場合、eはケーシ
ング11を引上げずに、そのまま同量の硬化材2
を注入した場合である。
That is, a indicates that the inner tube 12 is pulled up to a predetermined height by the hydraulic cylinder 27, and an amount of hardening material 2 equal to the lifted height is injected, and b indicates that the inner tube 12 and the casing 11 are further pulled up and When the amount of hardening material 2 equal to the upper length is injected, c and d have a pulling length of 80% and 50% of b, respectively, and when the same amount of hardening material 2 is injected, e does not pull up the casing 11. Add the same amount of hardening agent 2 to
This is the case when injected.

第5図a〜hは他の実施例における施工の様子
を示したもので、次のような手順で作業を行な
う。
Figures 5a to 5h show the construction in another embodiment, and the work is carried out in the following steps.

(a) 油圧シリンダー27を縮め、ケーシング11
と内管12とを固定し、くい芯にセツトして鉛
直の確認をする。
(a) Retract the hydraulic cylinder 27 and remove the casing 11.
and the inner pipe 12, set it on the stake and check the verticality.

(b) ケーシング11を回転させ、押圧力を加え、
先端土砂を側方へ強制的に移動させ、沈設す
る。
(b) Rotate the casing 11 and apply pressing force,
The soil at the tip is forcibly moved to the side and deposited.

(c) ケーシング11が所定深度に到達したら、ケ
ーシング11を固定し、内管12先端からモル
タル等の硬化材2を圧送注入し、硬化材2の注
入量に等しい長さ(0.5〜1.0m)だけ内管12
を引上げる。
(c) When the casing 11 reaches a predetermined depth, fix the casing 11 and inject the hardening material 2 such as mortar under pressure from the tip of the inner tube 12 to a length (0.5 to 1.0 m) equal to the amount of hardening material 2 injected. Only inner tube 12
pull up.

(d)、(e) 硬化材2は定められた量を連続注入す
る。また、ケーシング11の引上げ速度は注入
体積よりも小さい量となる速度とし、注入した
硬化材2に対し、下向きの押圧力がかかるよう
にする。また、施工管理は注入圧力によつて行
なう。
(d), (e) The hardening material 2 is continuously injected in a predetermined amount. Further, the pulling speed of the casing 11 is set to be a speed smaller than the injection volume, so that a downward pressing force is applied to the injected hardening material 2. In addition, construction management will be conducted using injection pressure.

(f)、(g) 硬化材2の注入完了後、必要に応じ、鉄
筋籠4あるいはH形鋼、L形鋼等を挿入する。
(f), (g) After completing the injection of the hardening material 2, reinforcing bar cages 4, H-shaped steel, L-shaped steel, etc. are inserted as necessary.

(h) 硬化材2の硬化によりくい3の造成が完了す
る。
(h) Creation of the pile 3 is completed by hardening of the hardening material 2.

第7図は上記実施例における施工管理のための
グラフを概念的に示したものである。
FIG. 7 conceptually shows a graph for construction management in the above embodiment.

ケーシング11の沈設時については前述の実施
例の場合と同様の施工管理が行なわれる。
When the casing 11 is sunk, construction management is carried out in the same manner as in the previous embodiment.

ケーシング11の引上げについては速度を一定
とし、拡大部3′は設けない。また、第7図のグ
ラフには油圧シリンダー27により内管12の先
端をケーシング11内に引上げた状態での最初の
注入に関しては注入圧力が低くなつていく様子が
示されている。
The casing 11 is pulled up at a constant speed, and the enlarged portion 3' is not provided. Furthermore, the graph in FIG. 7 shows how the injection pressure decreases during the first injection when the tip of the inner tube 12 is pulled up into the casing 11 by the hydraulic cylinder 27.

第12図および第13図は他の実施例として、
ケーシング11を地中に残置するようにする場合
のくい打設装置を示したものである。この実施例
では既製のオーガーマシン50が支持フレーム2
0′によつて支持し、穿孔時は内管12とケーシ
ング11との間に介在させた拡径部材51をケー
シング内面に押し付け、内管12とケーシング1
1を一体として回転させながら穿孔を行ない、引
抜き時は拡径部材51を内管12側へ引寄せ、ケ
ーシング11は地盤1中に残置し、ケーシング1
1内へ硬化材2を注入するようにしたものである
(実願昭59−185216号参照)。この場合も穿孔時に
駆動モーター21′,24にかかる負荷、装置の
沈設速度等を測定し、また引抜き時には硬化材2
の注入圧、注入量、装置の引上げ速度等を測定
し、施工管理を行なう。
FIGS. 12 and 13 show other embodiments,
This figure shows a pile driving device for leaving the casing 11 underground. In this embodiment, a ready-made auger machine 50 is attached to the support frame 2.
0', and when drilling, the expanding member 51 interposed between the inner tube 12 and the casing 11 is pressed against the inner surface of the casing, and the inner tube 12 and the casing 1 are
1 is rotated as one unit, and when pulling out, the expanding member 51 is pulled toward the inner pipe 12, the casing 11 is left in the ground 1, and the casing 1 is
The hardening material 2 is injected into the inside of the hardening material 1 (see Utility Model Application No. 185216/1983). In this case as well, the load on the drive motors 21' and 24 and the sinking speed of the device are measured during drilling, and the hardening material 2 is
Measures injection pressure, injection volume, equipment lifting speed, etc., and performs construction management.

〔発明の効果〕〔Effect of the invention〕

この発明は上述のような構成からなり、モルタ
ル等の硬化材の注入が、ケーシングおよび内管の
上昇速度を調整し、上方からの押圧力を受けた状
態で行なわれるため、部分的な注入不足等によ
り、不均質なものとなるのを防ぎ、また注入圧、
注入量および引上げ速度について施工管理を行な
い、信頼性の高い造成くいが得られる。
This invention has the above-mentioned configuration, and the injection of hardening material such as mortar is performed while adjusting the rising speed of the casing and inner tube and receiving pressing force from above. etc., to prevent non-uniformity, and to reduce injection pressure,
By controlling the injection volume and pulling speed, highly reliable construction piles can be obtained.

また、くい打設装置は、リーダーマストに設け
たラツクとかみ合うピニオンの回転により、リー
ダーマストに反力をとつて昇降し、注入圧が大き
い場合にもかみ合わせ部分で注入圧に抵抗させ、
強制的に任意の速度で昇降させることができる。
すなわち、装置の引抜きを一定速度で行なつた
り、あるいは装置を停止させることが確実に行な
え、施工管理も容易となる。
In addition, the pile driving device uses the rotation of a pinion that engages with a rack provided on the leader mast to move up and down by applying a reaction force to the leader mast, and even when the injection pressure is large, the engaged part resists the injection pressure.
It can be forced to move up and down at any speed.
That is, it is possible to reliably pull out the device at a constant speed or to stop the device, and construction management is also facilitated.

その他、次のような利点、特徴を有する。 In addition, it has the following advantages and characteristics.

くいの強度を任意に設定でき、かつ施工過程
においてくいの強度を地上で確認することがで
きる。
The strength of the piles can be set arbitrarily, and the strength of the piles can be confirmed on the ground during the construction process.

硬化材は予め混練したものを用いるため、地
盤改良工法でみられるようにくいの強度が土質
に左右されることがない。
Because the hardening material is mixed in advance, the strength of the hardening material is not affected by soil quality, as is the case with soil improvement methods.

任意の深さでコブ状の拡大部を設けることが
可能である。
It is possible to provide a hump-like enlargement at any depth.

オーバーフローがなく硬化材も有効に使用さ
れるので経済的である。
It is economical because there is no overflow and the hardening material is used effectively.

【図面の簡単な説明】[Brief explanation of drawings]

第1図はこの発明の実施例におけるくい打設装
置の正面図、第2図はその右側面図、第3図は第
2図の−断面図、第4図a〜iは一実施例に
おけるくいの施工手順を示す断面図、第5図a〜
hは他の実施例における施工手順を示す断面図、
第6図は第4図a〜iに対応する施工管理のため
のグラフ、第7図は第5図a〜hに対応する施工
管理のためのグラフ、第8図a,b,c,d,e
は硬化材注入量とケーシング引上長との関係を示
す断面図、第9図a,b,c,d,eはそれぞれ
くい打設装置先端部の正面図、底面図、横断面
図、スタビライザーの正面図、同じく横断面図、
第10図a,bはそれぞれ内管先端の一例を示す
正面図、縦断面図、第11図a,bは内管の昇降
の機構を示す正面図、第12図は他の実施例にお
けるくい打設装置の右側面図、第13図は第12
図の−断面図である。 1……地盤、2……硬化材、3……くい、4…
…鉄筋籠、10……穿孔装置、11……ケーシン
グ、12……内管、13……スタビライザー、1
4……先端開閉シユー、15……角形チユーブ、
16……連結チユーブ、17……ヘツド、18…
…ビツト、20……支持フレーム、21……回転
用駆動モーター、22……リングギヤーボツク
ス、23……ローラー、24……昇降用駆動モー
ター、25……ピニオン、26……スイベルボツ
クス、27……油圧シリンダー、30……リーダ
ーマスト、31……ラツク、32……ガイド溝、
41……ヒンジ、42……係止部、43……係止
溝、44……連結片、45……ポイント。
Fig. 1 is a front view of a pile driving device according to an embodiment of the present invention, Fig. 2 is a right side view thereof, Fig. 3 is a cross-sectional view taken from Fig. 2, and Figs. Cross-sectional view showing the construction procedure of piles, Figure 5 a~
h is a sectional view showing the construction procedure in another example,
Fig. 6 is a graph for construction management corresponding to Fig. 4 a to i, Fig. 7 is a graph for construction management corresponding to Fig. 5 a to h, and Fig. 8 a, b, c, d. ,e
9 is a cross-sectional view showing the relationship between hardening material injection amount and casing pulling length, and Figures 9a, b, c, d, and e are front views, bottom views, cross-sectional views of the tip of the pile driving device, and the stabilizer, respectively. Front view, also cross-sectional view,
Figures 10a and 10b are a front view and a vertical cross-sectional view showing an example of the tip of the inner tube, respectively. Figures 11a and 11b are front views showing a mechanism for lifting and lowering the inner tube, and Figure 12 is a cross-sectional view of another embodiment. The right side view of the pouring device, Fig. 13 is the 12th
FIG. 1...ground, 2...hardened material, 3...pile, 4...
... Rebar cage, 10 ... Perforation device, 11 ... Casing, 12 ... Inner pipe, 13 ... Stabilizer, 1
4...Tip opening/closing shoe, 15...Square tube,
16...Connection tube, 17...Head, 18...
... Bit, 20 ... Support frame, 21 ... Rotation drive motor, 22 ... Ring gear box, 23 ... Roller, 24 ... Lifting drive motor, 25 ... Pinion, 26 ... Swivel box, 27 ... ... Hydraulic cylinder, 30 ... Leader mast, 31 ... Rack, 32 ... Guide groove,
41... Hinge, 42... Locking portion, 43... Locking groove, 44... Connecting piece, 45... Point.

Claims (1)

【特許請求の範囲】 1 外管としてのケーシングと注入管を兼ねた内
管とを、一体として回転させながら、リーダーマ
ストに沿つて所定深度まで沈設させ、引抜き時に
前記内管先端より硬化材を圧入して、硬化材の硬
化によりくいを造成する造成くい工法において、
引抜きの際、前記硬化材の注入量および注入圧を
連続的に測定し、該注入量および注入圧に応じ
て、前記内管または前記内管および前記ケーシン
グの上昇速度を制御することにより、注入した硬
化材にかかる前記内管または前記内管および前記
ケーシングからの下向きの押圧力を調整しながら
硬化材の注入を行うことを特徴とする造成くい工
法。 2 外管としてのケーシングと硬化材の注入管を
兼ねた内管とを有する穿孔装置をリーダーマスト
に沿つて昇降可能に支持した造成くい打設装置に
おいて、前記穿孔装置の内管およびケーシングの
上部に支持フレームを設け、該支持フレームには
前記リーダーマストの上下方向に形成したラツク
とかみ合い、駆動モーターにより駆動されるピニ
オンを取付け、前記支持フレームが前記リーダー
マストに反力をとつて任意の速度で昇降するよう
構成したことを特徴とする造成くい打設装置。
[Claims] 1. While rotating the casing as an outer tube and an inner tube that also serves as an injection tube, the casing is sunk along a leader mast to a predetermined depth while being rotated as a unit, and when pulled out, a hardening material is poured from the tip of the inner tube. In the construction pile construction method, in which piles are created by press-fitting and hardening of the hardened material,
During drawing, the injection amount and injection pressure of the hardening material are continuously measured, and the rising speed of the inner tube or the inner tube and the casing is controlled according to the injection amount and injection pressure. A pile construction method characterized in that the hardening material is injected while adjusting the downward pressing force applied to the hardened material from the inner pipe or the inner pipe and the casing. 2. In a construction pile driving device in which a drilling device having a casing as an outer pipe and an inner pipe that also serves as a hardening material injection pipe is supported so as to be movable up and down along a leader mast, the inner pipe of the drilling device and the upper part of the casing A support frame is provided on the support frame, and a pinion that engages with a rack formed in the vertical direction of the leader mast and is driven by a drive motor is attached to the support frame, and the support frame takes a reaction force against the leader mast to achieve an arbitrary speed. 1. A construction pile driving device characterized in that it is configured to move up and down at the same time.
JP28214784A 1984-12-29 1984-12-29 Method and device of constructing pile Granted JPS61158522A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28214784A JPS61158522A (en) 1984-12-29 1984-12-29 Method and device of constructing pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28214784A JPS61158522A (en) 1984-12-29 1984-12-29 Method and device of constructing pile

Publications (2)

Publication Number Publication Date
JPS61158522A JPS61158522A (en) 1986-07-18
JPH0133606B2 true JPH0133606B2 (en) 1989-07-14

Family

ID=17648712

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28214784A Granted JPS61158522A (en) 1984-12-29 1984-12-29 Method and device of constructing pile

Country Status (1)

Country Link
JP (1) JPS61158522A (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5071107A (en) * 1973-10-27 1975-06-12
JPS5847527B2 (en) * 1976-01-12 1983-10-22 成 河野 Anti-forming method using soil condensation

Also Published As

Publication number Publication date
JPS61158522A (en) 1986-07-18

Similar Documents

Publication Publication Date Title
JP5102187B2 (en) Pile construction method combined with ground improvement
JP4625896B2 (en) Pile digging method
JP2009036010A (en) Method for constructing settlement settlement pile and settlement settlement pile
AU2013351554B2 (en) Method for manufacturing a pile
JP3760343B2 (en) Drilling bottom stabilization method and construction method of underground building
JP3533981B2 (en) Construction method of screwed pile
JPH0133606B2 (en)
JP2673677B2 (en) Pile method
JPH0130972B2 (en)
JP3514183B2 (en) Embedded pile and its construction method
JP4811176B2 (en) Construction method of ready-made piles
JP2005188237A (en) Columnar ground improving device and columnar ground improving construction method
JPS64532B2 (en)
JP2000144728A (en) Construction method of screwed pile and screwed pile used for this
JP4872561B2 (en) Construction method of ready-made piles
JP4360745B2 (en) Construction method of ready-made piles
KR0123886B1 (en) Basic construction pile construction method and device
CN214993745U (en) Be applicable to artifical hole digging pile foundation pile week slip casting and consolidate subassembly
JP4481662B2 (en) Pile setting method and blade plate
JPH08209687A (en) Partial casing pile method
JP2000017658A (en) Pitching-of-pile method of ready-made pile and its device
GB2345715A (en) Composite auger piling with enlarged base footing
JP3710222B2 (en) Foundation mortar pile construction method
GB2048999A (en) Improvements relating to the construction of in situ piles
JPH0782740A (en) Inside cutting machine for steel pipe pile, excavation for steel pipe pile used for inside cutting machine and hollow excavation piling foot protection method by means thereof