Cap concrete block for steel sheet pile wall

Info

Publication number
JPH0625408B2
JPH0625408B2 JP1139622A JP13962289A JPH0625408B2 JP H0625408 B2 JPH0625408 B2 JP H0625408B2 JP 1139622 A JP1139622 A JP 1139622A JP 13962289 A JP13962289 A JP 13962289A JP H0625408 B2 JPH0625408 B2 JP H0625408B2
Authority
JP
Japan
Prior art keywords
steel sheet
sheet pile
concrete block
pile wall
shade
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP1139622A
Other languages
Japanese (ja)
Other versions
JPH035508A (en
Inventor
運治 諸橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KITANIPPON BUROTSUKU KOGYO KK
Original Assignee
KITANIPPON BUROTSUKU KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KITANIPPON BUROTSUKU KOGYO KK filed Critical KITANIPPON BUROTSUKU KOGYO KK
Priority to JP1139622A priority Critical patent/JPH0625408B2/en
Publication of JPH035508A publication Critical patent/JPH035508A/en
Publication of JPH0625408B2 publication Critical patent/JPH0625408B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Revetment (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は鋼矢板壁用笠コンクリートブロックに関する。The present invention relates to a shade concrete block for steel sheet pile wall.

(従来技術) 従来海、河川等の岸壁あるいは地上における擁壁等とし
て一般に鋼矢板が連続打設されてなる鋼矢板壁が使用さ
れる。この鋼矢板壁の上部は体裁をよくするなどのため
に笠コンクリートブロックが設けられている。この笠コ
ンクリートブロックは鋼矢板壁の上部に鉄筋を配筋しそ
の外周にコンクリート枠をセットした後コンクリートを
打設して形成するものであった。
(Prior Art) Conventionally, a steel sheet pile wall in which steel sheet piles are continuously cast is used as a quay wall of a sea, a river or the like or a retaining wall on the ground. A cap concrete block is provided on the upper part of the steel sheet pile wall to improve the appearance. This shade concrete block was formed by arranging reinforcing bars on the upper part of a steel sheet pile wall, setting a concrete frame on the outer circumference of the reinforcing bars, and then placing concrete.

しかし、このように、鋼矢板壁の上部にコンクリート型
枠をセットした後、コンクリート型枠内にコンクリート
を打設する場合、そのコンクリート型枠の配筋工事およ
び複雑な形状をしたコンクリート型枠の取付け、取りは
ずしに手間がかかる欠点があった。
However, in this way, after setting the concrete formwork on the top of the steel sheet pile wall, when placing concrete in the concrete formwork, the reinforcement work of the concrete formwork and the concrete formwork of complicated shape There was a drawback that it took a lot of time to install and remove.

そこで、このような欠点を解消するために、特開昭52
−154227号公報には、鋼矢板壁の上端部に取り付
ける笠コンクリートブロックを内面にスペーサーを一体
的に突設した2枚の平板状のプレキャスト版で構成し、
これを予め成型し、この各々のプレキャスト版を施工現
場で締結ボルトによって組み付け、この後、各プレキャ
スト版間にコンクリートを打設して各プレキャスト版と
鋼矢板壁とを一体化することで、コンクリート型枠の取
付けおよび施工後における撤去を省略できる擁壁の構築
方法が提案されている。
Then, in order to eliminate such a defect, Japanese Patent Laid-Open No.
In Japanese Patent No. 154227, a cap concrete block to be attached to the upper end of a steel sheet pile wall is composed of two flat plate-shaped precast plates integrally provided with spacers on the inner surface.
This is pre-molded, each precast plate is assembled at the construction site with fastening bolts, then concrete is placed between each precast plate to integrate each precast plate and the steel sheet pile wall, A method of constructing a retaining wall has been proposed, which can omit mounting of the formwork and removal after construction.

[発明が解決しようとする課題] 前記従来の擁壁の構築方法においては、各プレキャスト
版のスペーサーを突き合わせて各プレキャスト版間の間
隙を鋼矢板壁の巾より広く設定した状態で締結ボルトで
一体化し、このように一体化した笠コンクリートブロッ
クを吊り上げてプレキャスト版の下部間隙内に鋼矢板壁
の上端部が納まるように挿入して、各プレキャスト版間
の間隙にコンクリートを打設して鋼矢板壁とコンクリー
トブロックとを一体化するから、構造的に笠コンクリー
トブロックの下部が開口し、プレキャスト版間にコンク
リートを打設する前に笠コンクリートブロックの下側開
口部をシール材によって塞ぐ必要があるとともに、例え
ば、笠コンクリートブロックの老朽化などによって、笠
コンクリートブロックを部分的に補修したい場合、プレ
キャスト版間に充填されたコンクリートで鋼矢板壁と一
体化され、プレキャスト版を必要に応じて交換できな
い。
[Problems to be Solved by the Invention] In the above-described conventional method for constructing a retaining wall, the spacers of the precast plates are abutted against each other and the gaps between the precast plates are set to be wider than the width of the steel sheet pile wall by using fastening bolts. Then, the integrated concrete block is lifted up and inserted so that the upper end of the steel sheet pile wall fits into the lower gap of the precast plate, and concrete is placed in the gap between the precast plates to make the steel sheet pile. Since the wall and the concrete block are integrated, the lower part of the cap concrete block is structurally opened, and it is necessary to close the lower opening of the cap concrete block with a sealing material before placing concrete between the precast plates. At the same time, partially repair the shade concrete block by, for example, aging the shade concrete block. If desired, the concrete filled between the precast plates is integrated with the steel sheet pile wall and the precast plates cannot be replaced as needed.

また、各プレキャスト版の内面に突設するスペーサーを
突き合わせて各プレキャスト版間の間隙を鋼矢板壁の巾
より広く設定することから、鋼矢板壁に対してプレキャ
スト版の前後の位置が定まらず、施工に際し、連設する
各笠コンクリートブロックを揃えるように位置調整しな
がら個々の笠コンクリートブロックを組み付ける必要も
あり、このような手間の掛かる笠コンクリートブロック
の位置決め作業により、施工性に劣るという課題が残さ
れている。
Also, since the spacers protruding from the inner surface of each precast plate are set to make the gap between the precast plates wider than the width of the steel sheet pile wall, the positions before and after the precast plate with respect to the steel sheet pile wall are not fixed, At the time of construction, it is also necessary to assemble the individual shade concrete blocks while adjusting the positions so that the consecutive shade concrete blocks are aligned, and due to such troublesome positioning work of the shade concrete blocks, there is a problem of poor workability. It is left.

本発明は前記問題点を解決して、現場での配筋コンクリ
ートなどの作業を一掃し、また必要に応じて笠コンクリ
ートブロックを着脱可能としてメンテナンス性に優れた
鋼矢板壁用笠コンクリートブロックを提供することを目
的とする。
The present invention solves the above-mentioned problems, wipes out work such as reinforced concrete at the site, and provides a shade concrete block for steel sheet pile wall with excellent maintainability by allowing the shade concrete block to be detached as required. The purpose is to do.

(課題を解決するための手段) 本発明は、両端部に形成する爪部を相互に係合させて多
数の鋼矢板を連続打設し、これら鋼矢板が凹凸状に連続
する鋼矢板壁を構成し、この鋼矢板壁の上部に笠コンク
リートブロックを取り付ける鋼矢板壁用笠コンクリート
ブロックにおいて、前記鋼矢板壁を介在してプレキャス
トから成る笠コンクリートブロック一側部と笠コンクリ
ートブロック他側部とを対向させて配置し、これら各笠
コンクリートブロックは、前記鋼矢板壁の上端部に載置
可能な天板部とこの天板部から下方に一体に垂設され前
記鋼矢板壁の凹凸面にほぼ沿わせる凹所と凸所を有する
側板部を形成するとともに、各笠コンクリートブロック
と鋼矢板壁とを組付け固定する固定手段を設けたもので
ある。
(Means for Solving the Problem) The present invention is to continuously strike a large number of steel sheet piles by mutually engaging the claw portions formed on both end portions, and a steel sheet pile wall in which these steel sheet piles are continuously formed in an uneven shape. In a steel sheet pile wall shade concrete block configured to attach a shade concrete block to the upper portion of the steel sheet pile wall, a shade concrete block one side portion and a shade concrete block other side portion consisting of precast with the steel sheet pile wall interposed Arranged to face each other, each of these shade concrete blocks, a top plate portion that can be placed on the upper end portion of the steel sheet pile wall and a downwardly downwardly integrated downwardly from the top sheet portion, almost the uneven surface of the steel sheet pile wall. A side plate portion having a concave portion and a convex portion along which it is formed is formed, and fixing means for assembling and fixing each cap concrete block and a steel sheet pile wall are provided.

(作用) 鋼矢板壁の両側に笠コンクリートブロック一側部および
笠コンクリートブロック他側部を配置し、これら各笠コ
ンクリートブロックの天板部を鋼矢板壁の上部に載置
し、また側板部の凸所と凹所を鋼矢板壁の凹凸面に合わ
せるように組み付ける。このようにして鋼矢板壁に各笠
コンクリートブロックを組み付けると、鋼矢板壁と各笠
コンクリートブロックが密着し、この状態で固定手段に
よって各笠コンクリートブロックと鋼矢板壁とが一体化
される。
(Operation) Place one side of the shade concrete block and the other side of the shade concrete block on both sides of the steel sheet pile wall, and place the top plate portion of each of these shade concrete blocks on the upper part of the steel sheet pile wall. Assemble the projections and recesses so that they match the uneven surface of the steel sheet pile wall. When each cap concrete block is assembled to the steel sheet pile wall in this manner, the steel sheet pile wall and each cap concrete block come into close contact with each other, and in this state, each cap concrete block and the steel sheet pile wall are integrated by the fixing means.

(実施例) 第1図ないし第3図は第1実施例を示しており、1は鋼
矢板であり、相互の爪部2を係合させて連続打設して凹
凸面3が連続する鋼矢板壁4が形成されている。尚この
鋼矢板壁4の上部5はほぼ水面6と略同一高さに設定さ
れる。7は前記鋼矢板壁4の上部5に設けられる笠コン
クリートブロックであり、この笠コンクリートブロック
7は鋼矢板壁4の一側に設けられる笠コンクリートブロ
ック一側部8と笠コンクリートブロック他側部9からな
り、これらは工場等でプレキャストにより各々形成され
る。前記笠コンクリートブロック一側部8は鋼矢板壁4
の一側に添着する側板部8Aとこの側板部8Aの上方に
横設される天板部8Bからなる。そして前記側板部8A
には前記凹凸面3に対応して凸所8Cと凸所8Dが連続
して形成されている。また笠コンクリートブロック他側
部9は前記笠コンクリートブロック一側部8と同様、鋼
矢板壁4の他側に添着する凸所9Cと凸所9Dとを有す
る側板部9A、この側板部9Aの上部に横設された天板
部9Bとから構成されている。
(Embodiment) FIGS. 1 to 3 show a first embodiment, in which 1 is a steel sheet pile, and steel having a concavo-convex surface 3 which is continuously cast by engaging mutual claw portions 2 with each other. A sheet pile wall 4 is formed. The upper portion 5 of the steel sheet pile wall 4 is set at substantially the same height as the water surface 6. Reference numeral 7 denotes a shade concrete block provided on the upper portion 5 of the steel sheet pile wall 4, and the shade concrete block 7 includes one side portion 8 of the shade concrete block provided on one side of the steel sheet pile wall 4 and the other side portion 9 of the shade concrete block. , Which are each formed by precasting in a factory or the like. One side 8 of the shade concrete block is a steel sheet pile wall 4
It is composed of a side plate portion 8A attached to one side and a top plate portion 8B provided above the side plate portion 8A. And the side plate portion 8A
A convex portion 8C and a convex portion 8D are continuously formed on the surface corresponding to the uneven surface 3. The other side portion 9 of the shade concrete block is, like the one side portion 8 of the shade concrete block, a side plate portion 9A having a protrusion 9C and a protrusion 9D attached to the other side of the steel sheet pile wall 4, and an upper portion of this side plate portion 9A. And a top plate portion 9B that is horizontally installed.

10,11は前記笠コンクリートブロック一側部8の天板部
8Bおよび笠コンクリートブロック他側部9の天板部9
Bに横設した上部貫通孔であり、この上部貫通孔10,11
には上部螺子棒12が貫挿されるとともに、この上部螺子
棒12の両端には弾性材などの座金13を介してナット14が
締着される。15,16は前記笠コンクリートブロック一側
部8および笠コンクリートブロック他側部9の側板部8
A,9Aに横設した下部貫通孔である。そして前記鋼矢
板壁4に形成した貫通孔17が形成されており、前記下部
貫通孔15,16および貫通孔17を貫挿した螺子棒18の両端
に座金19を介してナット20が緊締している。このような
上部貫通孔10,11、螺子棒12、ナット14および下部貫通
孔15,16、螺子棒18、ナット20により固定手段21が形成
される。尚22は一端を前記鋼矢板壁4に連結したタイロ
ッド、23はモルタル等の目地材である。
Reference numerals 10 and 11 denote a top plate portion 8B of the one side portion 8 of the shade concrete block and a top plate portion 9 of the other side portion 9 of the shade concrete block.
It is an upper through hole that is horizontally provided in B.
An upper screw rod 12 is inserted into the upper screw rod 12, and nuts 14 are fastened to both ends of the upper screw rod 12 via washers 13 such as elastic members. Reference numerals 15 and 16 denote side plate portions 8 on one side portion 8 of the shade concrete block and the other side portion 9 of the shade concrete block.
It is a lower through hole that is provided laterally in A and 9A. A through hole 17 formed in the steel sheet pile wall 4 is formed, and nuts 20 are tightened via washers 19 at both ends of the lower through holes 15, 16 and the screw rod 18 inserted through the through hole 17. There is. The upper through holes 10 and 11, the screw rod 12, the nut 14 and the lower through holes 15 and 16, the screw rod 18 and the nut 20 form a fixing means 21. Reference numeral 22 is a tie rod whose one end is connected to the steel sheet pile wall 4, and 23 is a joint material such as mortar.

次に前記構成につきその作用を説明する。Next, the operation of the above configuration will be described.

予め上部5を水面6と略同一レベルになるように鋼矢板
1を連続打設して鋼矢板壁4を形成する。次にクレーン
(図示せず)等で笠コンクリートブロック一側部8を吊
り下げて鋼矢板壁4の一側に当接し、また笠コンクリー
トブロック他側部9を同様に鋼矢板壁4の他側に当接す
る。この際、天板部8B,9Bを鋼矢板壁4の上部5に
載置し、また凸所8C,9Cおよび凹所8D,9Dを鋼
矢板壁4の凹凸面3に合わせる。そして螺子棒12を上部
貫通孔10,11に貫挿してナット14で緊締し、また下部貫
通孔15,16および貫通孔17に螺子棒18を貫挿しナット20
で堅締して、鋼矢板壁4と笠コンクリートブロック一側
部8および笠コンクリートブロック他側部9を一体に固
定する。この後これらの隙間にモルタル等目地等23を充
填する。尚この目地材23は必要に応じて設けられる。ま
た上部部5と天板8B,9B間にゴム等弾性板を介在し
てもよい。
The steel sheet pile 1 is continuously cast in advance so that the upper portion 5 is at substantially the same level as the water surface 6 to form the steel sheet pile wall 4. Next, the cap concrete block one side portion 8 is hung by a crane (not shown) or the like to abut against one side of the steel sheet pile wall 4, and the cap concrete block other side portion 9 is also similarly attached to the other side of the steel sheet pile wall 4. Abut. At this time, the top plate portions 8B and 9B are placed on the upper portion 5 of the steel sheet pile wall 4, and the protrusions 8C and 9C and the recesses 8D and 9D are aligned with the uneven surface 3 of the steel sheet pile wall 4. Then, the screw rod 12 is inserted into the upper through holes 10 and 11 and tightened with the nut 14, and the screw rod 18 is inserted into the lower through holes 15 and 16 and the through hole 17 and the nut 20.
Then, the steel sheet pile wall 4, the shade concrete block one side portion 8 and the shade concrete block other side portion 9 are integrally fixed. After this, joints 23 such as mortar are filled in these gaps. The joint material 23 is provided as needed. Further, an elastic plate such as rubber may be interposed between the upper portion 5 and the top plates 8B and 9B.

以上のように、笠コンクリートブロック一側部および他
側部8,9をプレスキャストにより予め製作し、これを
鋼矢板壁4にセットした後、螺子棒12,18により両者を
固定することにより、笠コンクリートブロック7を設置
することができるため、現場での配筋、コンクリート打
設などを一掃して短時間で作業を完了でき、また現場で
の養生期間を無くして工期の短縮化を図ることができ
る。また現場での配筋工事および複雑な形状をしたコン
クリート型枠の取付け、取外しの手間を無くしたため、
工事費の低減を図ることができるとともに施工が天候の
影響を受けることはない。
As described above, the one side portion and the other side portions 8 and 9 of the shade concrete block are manufactured in advance by press casting, set on the steel sheet pile wall 4, and then fixed to each other by the screw rods 12 and 18. Since the shade concrete block 7 can be installed, work can be completed in a short time by eliminating the bar arrangement and concrete placement on the site, and the curing period on the site can be eliminated to shorten the construction period. You can Also, since the work of rebar construction on site and the installation and removal of concrete formwork with a complicated shape have been eliminated,
The construction cost can be reduced and the construction will not be affected by the weather.

さらに笠コンクリートブロック一側部および他側部8,
9はプレキャスト製のために水中部でも施工でき、した
がって鋼矢板壁4の上部5を水面6と略同一高さに設定
できる。このため鋼矢板1の長さを短くできコストダウ
ンを図ることができるとともに笠コンクリートブロック
7の品質の向上を図ることができる。また補修時には螺
子棒12,18を弛めることによって笠コンクリートブロッ
ク7の入替えを簡単に行うことができるため、メンテナ
ンス性にも優れた効果を発揮できる。
Furthermore, one side and the other side of the shade concrete block 8,
Since 9 is made of precast, it can be installed even in an underwater portion, so that the upper portion 5 of the steel sheet pile wall 4 can be set at substantially the same height as the water surface 6. Therefore, the length of the steel sheet pile 1 can be shortened, the cost can be reduced, and the quality of the shade concrete block 7 can be improved. Further, at the time of repairing, the cap concrete block 7 can be easily replaced by loosening the screw rods 12 and 18, so that an excellent effect on maintainability can be exhibited.

しかも笠コンクリートブロック7は、笠コンクリートブ
ロック一側部および他側部8,9に分割され、これを鋼
矢板壁4に固定手段21により一体化したことによって、
鋼矢板壁4の両面の体裁を向上できるとともに、笠コン
クリートブロック一側部および他側部8,9の各側板部
8A,9Aに鋼矢板壁4の凹凸面3と対応する凸所8
C,9Cおよび凹所8D,9Dを形成することで、各側
板部8A,9Aと鋼矢板壁4とを合わせるように笠コン
クリートブロック一側部8と笠コンクリートブロック他
側部9を鋼矢板壁4に組み付けることで、鋼矢板壁4に
対する笠コンクリートブロック一側部8および笠コンク
リートブロック他側部9の位置合わせが容易であり、施
工性にも優れる。
Moreover, the shade concrete block 7 is divided into one side portion and the other side portions 8 and 9 of the shade concrete block, which is integrated with the steel sheet pile wall 4 by the fixing means 21,
The appearance of both sides of the steel sheet pile wall 4 can be improved, and the projections 8 corresponding to the uneven surface 3 of the steel sheet pile wall 4 on the side plate portions 8A, 9A of the one side portion and the other side portions 8, 9 of the shade concrete block.
By forming C and 9C and recesses 8D and 9D, one side portion 8 of the shade concrete block and the other side portion 9 of the shade concrete block are connected to the steel sheet pile wall so that the side plate portions 8A and 9A and the steel sheet pile wall 4 are aligned with each other. By assembling to the steel sheet pile wall 4, the one side portion 8 and the other side portion 9 of the shade concrete block can be easily aligned with the steel sheet pile wall 4, and the workability is also excellent.

尚本発明は前記第1実施例に限定されるものではなく、
例えば第4図および第5図に示すように笠コンクリート
ブロック一側部8にタイロッド22を連結するための連結
座24を設けたり、あるいは隣設する笠コンクリートブロ
ック相互間の漏水を防止するために笠コンクリートブロ
ックの両端面をテーパ面とし、このテーパ面間に止水パ
ッキンを介在させたりするなど種々の変形が可能であ
る。
The present invention is not limited to the first embodiment,
For example, as shown in FIG. 4 and FIG. 5, in order to prevent water leakage between adjacent shade concrete blocks, a connecting seat 24 for connecting the tie rods 22 is provided on one side portion 8 of the shade concrete blocks. Various modifications are possible such that both end surfaces of the shade concrete block are tapered surfaces, and water blocking packing is interposed between the tapered surfaces.

(発明の効果) 本発明は、両端部に形成する爪部を相互に係合させて多
数の鋼矢板を連続打設し、これら鋼矢板が凹凸状に連続
する鋼矢板壁を構成し、この鋼矢板壁の上部に笠コンク
リートブロックを取り付ける鋼矢板壁用笠コンクリート
ブロックにおいて、前記鋼矢板壁を介在してプレキャス
トから成る笠コンクリートブロック一側部と笠コンクリ
ートブロック他側部とを対向させて配置し、これら各笠
コンクリートブロックは、前記鋼矢板壁の上端部に載置
可能な天板部とこの天板部から下方に一体に垂設され前
記鋼矢板壁の凹凸面にほぼ沿わせる凹所と凸所を有する
側板部を形成するとともに、各笠コンクリートブロック
と鋼矢板壁とを組付け固定する固定手段を設けたことに
より、現場での配筋コンクリートなどの作業を一掃し、
また必要に応じて笠コンクリートブロックを着脱可能と
してメンテナンス性に優れた鋼矢板壁用笠コンクリート
ブロックを提供することができる。
(Effects of the Invention) The present invention is a steel sheet pile wall in which a plurality of steel sheet piles are continuously struck by mutually engaging the claw portions formed at both end portions, and these steel sheet piles are formed in a concavo-convex shape. In a shade concrete block for a steel sheet pile wall that attaches a shade concrete block to an upper portion of a steel sheet pile wall, one side portion of the shade concrete block made of precast and the other side portion of the shade concrete block are arranged to face each other with the steel sheet pile wall interposed. However, each of these shade concrete blocks is a top plate portion that can be placed on the upper end portion of the steel sheet pile wall and a recess that is integrally hung downward from the top plate portion and that substantially follows the uneven surface of the steel sheet pile wall. By forming a side plate portion having a convex portion and a fixing means for assembling and fixing each shade concrete block and steel sheet pile wall, the work such as reinforced concrete on site is wiped out,
Further, it is possible to provide a shade concrete block for a steel sheet pile wall, which has an excellent maintainability by allowing the shade concrete block to be detached as required.

【図面の簡単な説明】[Brief description of drawings]

第1図ないし第3図は第1実施例を示しており、第1図
は分解斜視図、第2図は縦断面図、第3図は平断面図、
第4図は第2実施例の縦断面図、第5図は同平面図であ
る。 1……鋼矢板 2……爪部 3……凹凸面 4……鋼矢板壁 5……上部 7……笠コンクリートブロック 8……笠コンクリートブロック一側部 9……笠コンクリートブロック他側部 8B,9B……天板部 8A,9A……側板部 8C,9C……凸所 8D,9D……凹所 21……固定手段
1 to 3 show a first embodiment, FIG. 1 is an exploded perspective view, FIG. 2 is a vertical sectional view, and FIG. 3 is a plan sectional view.
FIG. 4 is a longitudinal sectional view of the second embodiment, and FIG. 5 is a plan view of the same. 1 ... Steel sheet pile 2 ... Claw portion 3 ... Uneven surface 4 ... Steel sheet pile wall 5 ... Upper part 7 ... Shade concrete block 8 ... Shade concrete block one side 9 ... Shade concrete block other side 8B , 9B ... Top plate 8A, 9A ... Side plate 8C, 9C ... Convex portion 8D, 9D ... Recess 21 ... Fixing means

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】両端部に形成する爪部を相互に係合させて
多数の鋼矢板を連続打設し、これら鋼矢板が凹凸状に連
続する鋼矢板壁を構成し、この鋼矢板壁の上部に笠コン
クリートブロックを取り付ける鋼矢板壁用笠コンクリー
トブロックにおいて、前記鋼矢板壁を介在してプレキャ
ストから成る笠コンクリートブロック一側部と笠コンク
リートブロック他側部とを対向させて配置し、これら各
笠コンクリートブロックは、前記鋼矢板壁の上端部に載
置可能な天板部とこの天板部から下方に一体に垂設され
前記鋼矢板壁の凹凸面にほぼ沿わせる凹所と凸所を有す
る側板部を形成するとともに、各笠コンクリートブロッ
クと鋼矢板壁とを組付け固定する固定手段を設けたこと
を特徴とする鋼矢板壁用笠コンクリートブロック。
1. A plurality of steel sheet piles are continuously driven by engaging claw portions formed at both end portions with each other to form a steel sheet pile wall in which these steel sheet piles are continuous in a concavo-convex shape. In a hat concrete block for a steel sheet pile wall that attaches a hat concrete block to the upper portion, one side portion of the hat concrete block composed of precast and the other side portion of the hat concrete block are arranged to face each other with the steel sheet pile wall interposed therebetween, and each of these The shade concrete block has a top plate portion that can be placed on the upper end portion of the steel sheet pile wall and a recess and a protrusion that are integrally hung downward from the top plate portion and that substantially follow the uneven surface of the steel sheet pile wall. A shade concrete block for a steel sheet pile wall, characterized in that it has a side plate portion and has fixing means for assembling and fixing each shade concrete block and a steel sheet pile wall.
JP1139622A 1989-05-31 1989-05-31 Cap concrete block for steel sheet pile wall Expired - Fee Related JPH0625408B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1139622A JPH0625408B2 (en) 1989-05-31 1989-05-31 Cap concrete block for steel sheet pile wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1139622A JPH0625408B2 (en) 1989-05-31 1989-05-31 Cap concrete block for steel sheet pile wall

Publications (2)

Publication Number Publication Date
JPH035508A JPH035508A (en) 1991-01-11
JPH0625408B2 true JPH0625408B2 (en) 1994-04-06

Family

ID=15249573

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1139622A Expired - Fee Related JPH0625408B2 (en) 1989-05-31 1989-05-31 Cap concrete block for steel sheet pile wall

Country Status (1)

Country Link
JP (1) JPH0625408B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08303064A (en) * 1995-05-02 1996-11-19 Sato Ringyo:Kk Fence structure for building or the like

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2516717Y2 (en) * 1992-08-12 1996-11-13 共和コンクリート工業株式会社 Concrete cap installation device for steel sheet pile
JP6431218B2 (en) * 2017-03-07 2018-11-28 明和工業株式会社 Repair method for existing waterways

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52154227A (en) * 1976-06-18 1977-12-21 Shinkouzou Gijiyutsu Kk Method of building breast wall
JPS56156304A (en) * 1980-05-06 1981-12-03 Toyo Giken Consultant Kk Construction of revetment with composite structure consisting of steel sheet pile and concrete

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08303064A (en) * 1995-05-02 1996-11-19 Sato Ringyo:Kk Fence structure for building or the like

Also Published As

Publication number Publication date
JPH035508A (en) 1991-01-11

Similar Documents

Publication Publication Date Title
US5311629A (en) Deck replacement system with improved haunch lock
KR100362993B1 (en) Precast Reinforced Concrete Slab, Composite Continuous Bridge Having Such Slab, and Constructing Method thereof
JP2599885B2 (en) Precast railing and method of joining precast railing and floor slab
JPH0625408B2 (en) Cap concrete block for steel sheet pile wall
JPH0625410B2 (en) Cap concrete block for steel sheet pile wall
JPH0310166Y2 (en)
JP3824242B2 (en) Viaduct-free support construction method
JP3530656B2 (en) Construction method of the bottom inspection corridor at the fill dam
KR102181539B1 (en) Easily replaceable extension joint device for slab and how to replace expansion joints
KR0140407Y1 (en) Expansion joint for bridges
JP3211228B2 (en) Shaft concrete block for steel sheet pile wall
KR102181535B1 (en) Easily replaceable extension joint device and how to replace expansion joints
KR100278118B1 (en) Cross beam construction method of concrete beam bridge
JP3142180B2 (en) Concrete construction method
JP6941761B1 (en) Grating receiving frame and its installation method
JP2950393B2 (en) Side groove
JPH0625409B2 (en) Cap concrete block for steel sheet pile wall
KR200376197Y1 (en) Composition structure of integral abutment bridge
JP2001140237A (en) Construction method for coping concrete to revetment steel pipe sheet pile and coping concrete block
JPH047268Y2 (en)
JPH061954Y2 (en) Fixed structure between floor slab and cement form plate
KR200319045Y1 (en) Concrete deck plate
JPH0841893A (en) Manufacture of caisson bottom slab section and bottom slab section structure of caisson
JPS60181421A (en) Casting-in-place method for slope protecting concrete block and forms therefor
JPH09242040A (en) Revetment slope covering structure

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees