JPH0625409B2 - Cap concrete block for steel sheet pile wall - Google Patents
Cap concrete block for steel sheet pile wallInfo
- Publication number
- JPH0625409B2 JPH0625409B2 JP1139623A JP13962389A JPH0625409B2 JP H0625409 B2 JPH0625409 B2 JP H0625409B2 JP 1139623 A JP1139623 A JP 1139623A JP 13962389 A JP13962389 A JP 13962389A JP H0625409 B2 JPH0625409 B2 JP H0625409B2
- Authority
- JP
- Japan
- Prior art keywords
- steel sheet
- sheet pile
- pile wall
- concrete block
- top plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims description 49
- 239000010959 steel Substances 0.000 title claims description 49
- 239000004567 concrete Substances 0.000 title claims description 45
- 210000000078 claw Anatomy 0.000 claims description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 12
- 230000000903 blocking effect Effects 0.000 description 6
- 238000010276 construction Methods 0.000 description 5
- 238000009415 formwork Methods 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 238000012856 packing Methods 0.000 description 3
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000005266 casting Methods 0.000 description 1
- 239000013013 elastic material Substances 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Revetment (AREA)
Description
【発明の詳細な説明】 [産業上の利用分野] 本発明は鋼矢板壁用笠コンクリートブロックに関する。TECHNICAL FIELD The present invention relates to a shade concrete block for steel sheet pile wall.
[従来技術] 従来、海,河川等の岸壁あるいは地上における擁壁等と
して一般に鋼矢板が互いにその爪部を係合して連続打設
されてなる鋼矢板壁が使用される。この鋼矢板壁の上部
は体裁をよくし、岸壁の場合には防舷材などの取付構造
体とするため、第6図に示すように笠コンクリートブロ
ック1が施される。この笠コンクリートブロック1は例
えば鋼矢板壁の上部に縦,横の鉄筋3を篭状に配筋固着
し、その外周にコンクリート型枠をセットした後、コン
クリート型枠内にコンクリート4を打設し、硬化後型枠
をはずして上述のように笠コンクリートブロック1を形
成している。[Prior Art] Conventionally, a steel sheet pile wall in which steel sheet piles are continuously cast with their claw portions engaged with each other is generally used as a quay wall of the sea, rivers, etc. or a retaining wall on the ground. The upper portion of the steel sheet pile wall is well-shaped, and in the case of a quay wall, a cap concrete block 1 is applied as shown in FIG. 6 in order to form a mounting structure such as a fender. In this concrete cap block 1, for example, vertical and horizontal reinforcing bars 3 are fixed to the upper part of a steel sheet pile wall in a cage shape, a concrete formwork is set on the outer periphery thereof, and then concrete 4 is placed in the concrete formwork. After hardening, the mold is removed and the shade concrete block 1 is formed as described above.
[発明が解決しようとする課題] 従来技術においては、鋼矢板2を設けた岸壁などに材料
を持込んで配筋,コンクリートの打設などを行うもので
あるため、すなわち現場打ちのためその作業に長時間を
要し、また打設したコンクリートには養生時間が必要で
ある。さらにコンクリートの現場打ちのために笠コンク
リートブロックの位置を水面より上方に配置する必要が
あり、また前記配筋工事及び複雑な形状をしたコンクリ
ートブロック型枠の取付け,取外しに手間がかかる問題
点があった。このような問題を解決するものとして特開
昭52−154227号公報には、2枚のプレキャスト
版と天蓋ブロック内にコンクリートを打設して一体化す
るものが公知であるが、現場でコンクリートを打設する
ものであるために、工費、工期を大幅に短縮することは
できない。[Problems to be Solved by the Invention] In the prior art, since the material is brought into the quay or the like provided with the steel sheet pile 2 to carry out the bar arrangement and the concrete pouring, that is, the work for the on-site casting. It takes a long time, and the concrete placed requires curing time. Furthermore, in order to cast concrete in-situ, it is necessary to position the shade concrete block above the water surface, and it is troublesome to carry out the above-mentioned reinforcing work and to install and remove the concrete block formwork having a complicated shape. there were. As a means for solving such a problem, Japanese Patent Laid-Open No. 52-154227 discloses a method in which two precast plates and a canopy block are cast and integrated with concrete. Since it is placed, the construction cost and construction period cannot be significantly reduced.
本発明は前記問題点を解決して短時間に簡単に鋼矢板壁
に設けることができる鋼矢板壁の笠コンクリートブロッ
クを提供することを目的とする。SUMMARY OF THE INVENTION It is an object of the present invention to solve the above problems and provide a cap concrete block for a steel sheet pile wall that can be easily provided on the steel sheet pile wall in a short time.
[課題を解決するための手段] 本発明は爪部を係合して鋼矢板が連続打設される鋼矢板
壁の上部に設けられる笠コンクリートブロックにおい
て、鋼矢板壁の上部に沿って載置される天板部の一側に
前記鋼矢板壁に沿って設けられる側板部を連接すると共
に、これら天板部と側板部をプレキャストにより一体に
形成し、かつ隣接する前記天板部の対向する側面には相
互に係合する段部を形成したものである。[Means for Solving the Problem] In the present invention, a cap concrete block provided on an upper portion of a steel sheet pile wall in which claw portions are engaged and steel sheet piles are continuously cast is placed along the upper portion of the steel sheet pile wall. The side plate part provided along the steel sheet pile wall is connected to one side of the top plate part to be formed, and the top plate part and the side plate part are integrally formed by precasting, and the adjacent top plate parts face each other. The side surfaces are formed with step portions that engage with each other.
[作用] 予めプレキャストコンクリートブロックで一体形成され
た天板部を鋼矢板壁の上部に載置し、また側板部を鋼矢
板壁に沿わせてセットした後、笠コンクリートブロック
を鋼矢板壁に固定するものである。[Operation] The top plate part that is integrally formed with the precast concrete block is placed on top of the steel sheet pile wall, and the side plate part is set along the steel sheet pile wall, and then the shade concrete block is fixed to the steel sheet pile wall. To do.
[実施例] 次に本発明の一実施例を添付図面を参照して説明する。[Embodiment] Next, an embodiment of the present invention will be described with reference to the accompanying drawings.
11は鋼矢板であり、相互の爪部12を係合させて連続打設
して鋼矢板壁13が形成されている。尚、この鋼矢板壁13
の上部14はほぼ水面15と同一高さに設定されている。Reference numeral 11 is a steel sheet pile, and a steel sheet pile wall 13 is formed by engaging the mutual claw portions 12 and continuously driving. In addition, this steel sheet pile wall 13
The upper part 14 of the is set at almost the same height as the water surface 15.
16は笠コンクリートブロックであり、この笠コンクリー
トブロック16は前記鋼矢板壁13の上部14に載置する天板
部17が形成され、この天板部17の一側である前側の下方
には前記鋼矢板壁13側に沿って側板部18が垂設してい
る。これら天板部17側板部18を一体形成した笠コンクリ
ートブロック16はプレキャストによって予め工場で製造
されたものである。そしてこの笠コンクリートブロック
13の側板部18には固定用の貫通孔19が形成されており、
この貫通孔19及び該貫通孔19に対向して前記鋼矢板壁13
に形成された貫通孔20に螺子棒21を貫挿してこの両端に
ナット22を螺着して笠コンクリートブロック16を鋼矢板
13に固定できるようになっている。さらに前記天板部17
の下面後端には固定用の取付孔23が縦設しており、また
鋼矢板13の背面側の上端にはアングル状の取付座24が固
着しており、そしてこの取付座24に挿入したボルト25が
前記取付孔23に螺着している。尚、前記取付孔23を縦設
した貫通孔とし、螺子棒を貫挿するとともに、この螺子
棒の両端にナットを螺着して両者を固定してもよい。26
は一端を前記鋼矢板壁13に連結したタイロッド、27はゴ
ム板からなるワッシャーである。28は前記上部14と天板
部17に介在するゴム等弾性板である。尚、前記笠コンク
リートブロック16は、鋼矢板壁13の上部14に沿って天板
部17が載置され、その隣接する天板部17の対向する側面
には、相互に係合する段部29が形成され、この段部29に
より止水がなされる。16 is a shade concrete block, the shade concrete block 16 is formed with a top plate portion 17 to be placed on the upper portion 14 of the steel sheet pile wall 13, and the front side below the front side which is one side of the top plate portion 17 is A side plate portion 18 is vertically provided along the steel sheet pile wall 13 side. The cap concrete block 16 in which the top plate portion 17 and the side plate portion 18 are integrally formed is manufactured in advance in a factory by precasting. And this shade concrete block
A through hole 19 for fixing is formed in the side plate portion 18 of 13.
The through hole 19 and the steel sheet pile wall 13 facing the through hole 19
A screw rod 21 is inserted into the through hole 20 formed in the and the nuts 22 are screwed to both ends of the screw rod 21 to attach the cap concrete block 16 to the steel sheet pile.
It can be fixed to 13. Further, the top plate portion 17
A mounting hole 23 for fixing is vertically provided at the rear end of the lower surface of the, and an angled mounting seat 24 is fixed to the upper end on the back side of the steel sheet pile 13, and the mounting seat 24 is inserted into the mounting seat 24. The bolt 25 is screwed into the mounting hole 23. Alternatively, the mounting hole 23 may be a vertically provided through hole, a screw rod may be inserted therethrough, and nuts may be screwed on both ends of the screw rod to fix the both. 26
Is a tie rod whose one end is connected to the steel sheet pile wall 13, and 27 is a washer made of a rubber plate. 28 is an elastic plate such as rubber interposed between the upper portion 14 and the top plate portion 17. The cap concrete block 16 has a top plate portion 17 placed along the upper portion 14 of the steel sheet pile wall 13, and the side surfaces of the adjacent top plate portions 17 facing each other have step portions 29 that engage with each other. Is formed, and water is stopped by this step portion 29.
次に前記構成につきその作用を説明する。Next, the operation of the above configuration will be described.
予め上部14を水面15と略同一レベルになるように鋼矢板
11を連続して鋼矢板壁13を形成する。次にクレーン(図
示せず)等で笠コンクリートブロック16を吊り下げて側
板部18を鋼矢板壁13に沿わせ、また天板部17を鋼矢板壁
13の上部14に載置した後、貫通孔19,20に螺子棒21を貫
挿し、そしてこの螺子棒21の両端にナット22を螺合して
鋼矢板壁13に笠コンクリートブロック13を固定する。次
に取付座24にボルト25を挿入して鋼矢板壁13と天板部17
を固着するものである。A steel sheet pile so that the upper part 14 is approximately at the same level as the water surface 15 in advance.
A steel sheet pile wall 13 is formed by connecting 11 continuously. Next, the cap concrete block 16 is suspended by a crane (not shown) or the like so that the side plate portion 18 is along the steel sheet pile wall 13 and the top plate portion 17 is the steel sheet pile wall.
After mounting on the upper part 14 of 13, the screw rod 21 is inserted into the through holes 19 and 20, and nuts 22 are screwed on both ends of the screw rod 21 to fix the shade concrete block 13 to the steel sheet pile wall 13. . Next, insert the bolt 25 into the mounting seat 24 and insert the steel sheet pile wall 13 and the top plate 17
Is to be fixed.
以上のように笠コンクリートブロック16をプレキャスト
により予め製作しこれを鋼矢板壁13にセットした後、螺
子棒21,ボルト25により両者を固定することにより、笠
コンクリートブロック16を固定することができるため、
現場での配筋,コンクリート打設などを一掃して短時間
で作業を完了でき、また現場での養生期間を無くして工
期の短縮化を図ることができる。また現場での配筋工事
および複雑形状をしたコンクリートブロック型枠の取付
け、取外しの手間を無くしたため工事費の低減を図るこ
とができるとともに施工は天候の影響を受けることがな
い。As described above, since the shade concrete block 16 is manufactured in advance by precasting and set on the steel sheet pile wall 13, the shade concrete block 16 can be fixed by fixing the both with the screw rod 21 and the bolt 25. ,
The work can be completed in a short time by eliminating the bar arrangement and concrete placement on the site, and the work period can be shortened by eliminating the curing period on site. In addition, the work cost can be reduced and the construction is not affected by the weather because there is no need for the on-site reinforcement work and the installation and removal of complicated concrete block formwork.
さらに、笠コンクリートブロック16はプレキャスト製の
ために水中部でも施工でき、したがって鋼矢板壁13の上
部14を水面と略同一高さに設定できる。このため鋼矢板
11の長さを短くできコストダウンを図ることができる。
また笠コンクリートブロック16の品質の向上を図ること
ができる。さらに補修時には螺子棒21,ボルト25を弛め
ることによって笠コンクリートブロック16の入れ替えを
簡単に行うことができる。Further, since the shade concrete block 16 is made of precast, it can be installed even in an underwater portion, so that the upper portion 14 of the steel sheet pile wall 13 can be set at substantially the same height as the water surface. For this reason steel sheet pile
The length of 11 can be shortened and the cost can be reduced.
Further, the quality of the shade concrete block 16 can be improved. Further, at the time of repair, the cap concrete block 16 can be easily replaced by loosening the screw rod 21 and the bolt 25.
しかも笠コンクリートブロック16は天板部17と側板部18
を一体形成してL形をなしているため、簡単に製作でき
るとともに鋼矢板壁13の上部の体裁を良くすることがで
きる。また天板部17が鋼矢板壁13の上部14に載置するた
め安定性に優れる。さらに笠コンクリートブロック16の
側面には段部29を形成したことによって、隣接する笠コ
ンクリートブロック16との接触面積を増大でき、この結
果止水効果を向上することができると共に、前記段部29
相互の係合によって、設置時の位置合せ等を簡単に行う
ことができる。Moreover, the shade concrete block 16 includes a top plate portion 17 and a side plate portion 18.
Since it is integrally formed into an L shape, it can be easily manufactured and the appearance of the upper part of the steel sheet pile wall 13 can be improved. Further, since the top plate portion 17 is placed on the upper portion 14 of the steel sheet pile wall 13, the stability is excellent. Further, by forming the step portion 29 on the side surface of the shade concrete block 16, the contact area with the adjacent shade concrete block 16 can be increased, and as a result, the water blocking effect can be improved and the step portion 29 can be formed.
Due to the mutual engagement, alignment and the like at the time of installation can be easily performed.
第4図および第5図は第2実施例および第3実施例を示
しており、前記第1実施例と同一部分には同一符号を付
しその詳細な説明を省略する。4 and 5 show a second embodiment and a third embodiment, the same parts as those of the first embodiment are designated by the same reference numerals, and detailed description thereof will be omitted.
第2実施例においては、一方の笠コンクリートブロック
16Aの一側面には平坦面31,段部たるテーパ面32,平坦
面33,段部たる凸所34および平坦面35が形成され、また
前記一側面に対向する他方の笠コンクリートブロック16
Bの他側面には、平坦面31A,段部たるテーパ面32A,
平坦面31A,段部たる凹所24Aおよび平坦面35Aが形成
されており、これらは突き合わされて笠コンクリートブ
ロック16A,16Bが並設されている。そして前記テーパ
面32,32A間にはゴム等弾性材からなる止水パッキン36
が設けられている。In the second embodiment, one cap concrete block
A flat surface 31, a tapered surface 32 as a step portion, a flat surface 33, a convex portion 34 as a step portion and a flat surface 35 are formed on one side surface of 16A, and the other cap concrete block 16 facing the one side surface 16A.
On the other side surface of B, a flat surface 31A, a tapered surface 32A that is a step,
A flat surface 31A, a stepped recess 24A, and a flat surface 35A are formed, and these are abutted to each other to form the shade concrete blocks 16A and 16B in parallel. A water blocking packing 36 made of an elastic material such as rubber is provided between the tapered surfaces 32, 32A.
Is provided.
したがって前記テーパ面32,32A等の突き合わせ部およ
び止水パッキン36によって漏水等を防止することができ
る。Therefore, water leakage and the like can be prevented by the abutting portions of the tapered surfaces 32 and 32A and the water blocking packing 36.
第3実施例においては、一方の笠コンクリートブロック
16Aの一側面に平坦面37,段部たるテーパ面38,平坦面
39,段部たる円状凸所40および平坦面41が形成され、ま
た前記一側面に対向する他方の笠コンクリートブロック
16Bの他側面には、平坦面37A,段部たるテーパ面38
A,平坦面39A,段部たる円状凹所40Aおよび平坦面41
Aが形成され、そして前記テーパ面38,38Aには止水パ
ッキン42が設けられて止水処理が施工されている。In the third embodiment, one cap concrete block
Flat surface 37 on one side of 16A, tapered surface 38 that is a step, flat surface
39, a circular convex portion 40 as a step and a flat surface 41 are formed, and another shade concrete block facing the one side surface
On the other side of 16B, a flat surface 37A and a tapered surface 38 that is a step
A, flat surface 39A, stepped circular recess 40A and flat surface 41
A is formed, and a water blocking packing 42 is provided on the tapered surfaces 38, 38A to perform water blocking treatment.
尚、本発明は前記実施例に限定されるものではなく、例
えば笠コンクリートブロック側にアングルなどの取付座
を固着し、この取付座を介して鋼矢板壁に固定するなど
の種々の変形が可能である。Note that the present invention is not limited to the above-described embodiment, and various modifications such as fixing a mounting seat such as an angle to the shade concrete block side and fixing the mounting seat to the steel sheet pile wall through the mounting seat are possible. Is.
[発明の効果] 本発明は爪部を係合して鋼矢板が連続打設される鋼矢板
壁の上部に設けられる笠コンクリートブロックにおい
て、鋼矢板壁の上部に沿って載置される天板部の一側に
前記鋼矢板壁に沿って設けられる側板部を連設すると共
に、これら天板部と側板部をプレキャストにより一体に
形成し、かつ隣接する前記天板部の対向する側面には相
互に係合する段部を形成したことにより、現場での作業
を低減して工費、工期の短縮を図ることができると共
に、天板部の側面には段部を形成したことによって、天
板部の側面における接触面積を増大して止水効果を向上
することができると共に、設置時の位置合せ等を簡単に
行うことができる。[Advantages of the Invention] The present invention relates to a cap concrete block provided on an upper portion of a steel sheet pile wall in which steel sheet piles are continuously cast by engaging claw portions, and a ceiling plate placed along the upper portion of the steel sheet pile wall. A side plate part provided along the steel sheet pile wall is provided continuously on one side of the part, and these top plate part and side plate part are integrally formed by precasting, and on the opposite side surfaces of the adjacent top plate part. By forming the step portions that engage with each other, it is possible to reduce the work at the site and shorten the construction cost and construction period, and by forming the step portions on the side surface of the top plate, The contact area on the side surface of the part can be increased to improve the water blocking effect, and the alignment at the time of installation can be easily performed.
第1図は第1実施例を示す斜視図、第2図は同平断面
図、第3図は縦断面図、第4図は第2実施例の平面図、
第5図は第3実施例の平面図、第6図は従来例の断面図
である。 11……鋼矢板、12……爪部 13……鋼矢板壁、14……上部 16……笠コンクリートブロック 17……天板部、18……側板部 29……段部 32,32A,38,38A……テーパ面(段部) 34,40……凸所(段部) 24A,40A……凹所(段部)FIG. 1 is a perspective view showing the first embodiment, FIG. 2 is the same plane sectional view, FIG. 3 is a longitudinal sectional view, and FIG. 4 is a plan view of the second embodiment.
FIG. 5 is a plan view of the third embodiment, and FIG. 6 is a sectional view of a conventional example. 11 …… Steel sheet pile, 12 …… Claw part 13 …… Steel sheet pile wall, 14 …… Upper part 16 …… Shape concrete block 17 …… Top plate part, 18 …… Side plate part 29 …… Step part 32, 32A, 38 , 38A ... Tapered surface (step) 34, 40 ... Convex (step) 24A, 40A ... Recess (step)
Claims (1)
矢板壁の上部に設けられる笠コンクリートブロックにお
いて、鋼矢板壁の上部に沿って載置される天板部の一側
に前記鋼矢板壁に沿って設けられる側板部を連設すると
共に、これら天板部と側板部をプレキャストにより一体
に形成し、かつ隣接する前記天板部の対向する側面には
相互に係合する段部を形成したことを特徴とする鋼矢板
壁用笠コンクリートブロック。1. A cap concrete block provided on an upper portion of a steel sheet pile wall in which steel sheet piles are continuously cast by engaging a claw portion, and a top plate portion placed along the upper portion of the steel sheet pile wall. A side plate portion provided along the steel sheet pile wall is continuously provided on the side, and the top plate portion and the side plate portion are integrally formed by precasting, and the side surfaces facing each other of the adjacent top plate portions are mutually engaged. A cap concrete block for a steel sheet pile wall, which is characterized in that a step portion is formed.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1139623A JPH0625409B2 (en) | 1989-05-31 | 1989-05-31 | Cap concrete block for steel sheet pile wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1139623A JPH0625409B2 (en) | 1989-05-31 | 1989-05-31 | Cap concrete block for steel sheet pile wall |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH035509A JPH035509A (en) | 1991-01-11 |
| JPH0625409B2 true JPH0625409B2 (en) | 1994-04-06 |
Family
ID=15249595
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP1139623A Expired - Fee Related JPH0625409B2 (en) | 1989-05-31 | 1989-05-31 | Cap concrete block for steel sheet pile wall |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0625409B2 (en) |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS52154227A (en) * | 1976-06-18 | 1977-12-21 | Shinkouzou Gijiyutsu Kk | Method of building breast wall |
-
1989
- 1989-05-31 JP JP1139623A patent/JPH0625409B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH035509A (en) | 1991-01-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH0625409B2 (en) | Cap concrete block for steel sheet pile wall | |
| JPH0625408B2 (en) | Cap concrete block for steel sheet pile wall | |
| JP2000034734A (en) | Foundation method with lath formwork | |
| JP3211228B2 (en) | Shaft concrete block for steel sheet pile wall | |
| JPH06220839A (en) | Guide wall for excavator in underground cotinuous wall construction method | |
| JP2639636B2 (en) | Seawall revetment method using Kasagi block and Kasagi block | |
| JP2003082680A (en) | Construction method for structural body using solidifying agent and formwork forming method | |
| JP2002047660A (en) | Foundation execution method for house or the like and foundation form panel | |
| JP3399924B2 (en) | Seawall protection structure | |
| JP3027215U (en) | Concrete Kasagi block | |
| JP3013207U (en) | Concrete Kasagi block | |
| JPH0625410B2 (en) | Cap concrete block for steel sheet pile wall | |
| JP2003253648A (en) | Shading concrete construction method for sheet pile wall for revetment, shading concrete block and height adjusting bolt | |
| JPH11323912A (en) | Mounting structure of front panel and coping of steel sheet pile wall | |
| JPH0545744B2 (en) | ||
| JP2730772B2 (en) | Installation method of fender | |
| JPH05280127A (en) | Shuttering serving as permanent form, and dead form method therewith | |
| JPH0752285Y2 (en) | Sheath tube set jig | |
| JP3027932U (en) | Concrete Kasagi block | |
| JPH084514Y2 (en) | Concrete formwork | |
| JPH0118710Y2 (en) | ||
| JPH0754371A (en) | Method of fitting and temporary-fitting concrete placing form to steel structure revetment wall | |
| JP2704610B2 (en) | Seawall revetment method using Kasagi block and Kasagi block | |
| JP3865484B2 (en) | Sound insulation body, sound insulation wall and sound insulation wall construction method | |
| JPH07224438A (en) | Stable constructing method for large-sized precast retaining wall |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |