Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0718170B2 - Construction method of impermeable membrane wall - Google Patents
[go: Go Back, main page]

JPH0718170B2 - Construction method of impermeable membrane wall - Google Patents

Construction method of impermeable membrane wall

Info

Publication number
JPH0718170B2
JPH0718170B2 JP1193790A JP1193790A JPH0718170B2 JP H0718170 B2 JPH0718170 B2 JP H0718170B2 JP 1193790 A JP1193790 A JP 1193790A JP 1193790 A JP1193790 A JP 1193790A JP H0718170 B2 JPH0718170 B2 JP H0718170B2
Authority
JP
Japan
Prior art keywords
water
sheet
band
groove
weight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP1193790A
Other languages
Japanese (ja)
Other versions
JPH03217517A (en
Inventor
正 吉川
信行 松井
昇 坂田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP1193790A priority Critical patent/JPH0718170B2/en
Publication of JPH03217517A publication Critical patent/JPH03217517A/en
Publication of JPH0718170B2 publication Critical patent/JPH0718170B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、地下ダム、廃棄物処理場の遮水壁、ダムの遮
水壁等の施工で、遮水シートを使用する遮水膜壁の施工
法に関する。
DETAILED DESCRIPTION OF THE INVENTION [Industrial field of application] The present invention relates to an impermeable membrane wall that uses an impermeable sheet in the construction of an underground dam, an impermeable wall of a waste treatment plant, an impermeable wall of a dam, etc. Regarding the construction method.

〔従来の技術〕[Conventional technology]

遮水壁の構築には従来、薬液注入工法、コンクリート置
換工法、原位置攪拌混合工法などが用いられる。
Conventionally, a chemical injection method, a concrete replacement method, an in-situ agitation mixing method, etc. are used to construct the impermeable wall.

しかし、薬液注入工法や原位置攪拌混合工法等ではその
構築面積(容積)が広くなるため、施工性やコスト面で
不利であり、コンクリート置換工法にしてもひび割れ等
を考慮してやはりその構築面積を広くする必要がある。
However, the construction area (volume) of the chemical injection method and the in-situ agitation mixing method is wide, which is disadvantageous in terms of workability and cost. Need to be wide.

この問題を解決するものとして、近年では遮水シートを
溝に挿入して遮水壁を構築する遮水膜壁工法が行われて
いる。この工法によれば、遮水シートにより、構築面積
を小さくしても高い遮水性が確保できる。
In order to solve this problem, in recent years, a water-impervious membrane wall construction method has been performed in which a water-impermeable sheet is inserted into a groove to construct an impermeable wall. According to this construction method, a high water-blocking property can be secured by the water-blocking sheet even if the construction area is reduced.

第8図はかかる遮水膜壁工法の概要を示すもので、特開
昭64-80624号公報や特開平1-121491号公報にあるような
チェーンカッターでトレンチ掘削して帯状溝1を形成
し、この帯状溝1内に遮水シート2を挿入し、その隙間
にモルタル等の充填材3を流し込む。
FIG. 8 shows an outline of such a water-blocking film wall construction method, in which the band-shaped groove 1 is formed by trench excavating with a chain cutter as disclosed in JP-A-64-80624 and JP-A-1-121491. The water-blocking sheet 2 is inserted into the band-shaped groove 1, and a filler 3 such as mortar is poured into the gap.

該遮水シート2としては、不織布を芯材としてこれにゴ
ムアスファルトをコーティングした数mm厚さのシートが
最適であり、図示のごとくロール状になっている状態か
ら帯状溝1に引き出していく。
As the water-blocking sheet 2, a sheet having a thickness of several mm in which a non-woven fabric is used as a core material and coated with rubber asphalt is optimal, and the sheet is pulled out from the roll-shaped groove 1 from the roll-shaped state as shown in the drawing.

また、図示は省略するが、モルタル等の充填材3の充填
はトレミー管等で行えばよい。
Although not shown, the filling material 3 such as mortar may be filled with a tremie tube or the like.

〔発明が解決しようとする課題〕[Problems to be Solved by the Invention]

ところで、遮水シート2は深度の浅い場合においては棒
状のガイドローラに沿って繰り出すようにしており、図
示は省略するが、深度が深くなると下端に沿って鋼材バ
ー等の重りを平行に取り付けて降すようにしている。
By the way, the water-impervious sheet 2 is adapted to be fed along a rod-shaped guide roller when the depth is shallow, and although not shown in the figure, when the depth becomes deep, a weight such as a steel bar is attached in parallel along the lower end. I'm trying to drop it.

しかし、帯状溝1は幅の狭いものであり、かつ深度が大
きくなると曲がりなども生じ易いので、シート2の先端
が溝1の孔壁に接触したり、あるいは水平方向にずれた
りして精度よく挿入できない。
However, since the band-shaped groove 1 has a narrow width and is likely to be bent when the depth is increased, the tip of the sheet 2 may come into contact with the hole wall of the groove 1 or may be displaced in the horizontal direction with high accuracy. I can't insert it.

さらに、遮水シート2は水平方向に連続性を持たせるた
めに継手部2aを設け、この継手部2a同士を接合する必要
があるが、この継手部2aのラップ幅の確保や管理が困難
となる。
Further, the water-impervious sheet 2 needs to be provided with a joint portion 2a in order to have continuity in the horizontal direction, and the joint portions 2a need to be joined to each other, but it is difficult to secure or manage the wrap width of the joint portion 2a. Become.

本発明の目的は前記従来例の不都合を解消し、遮水シー
トを帯状溝の所定の深さまでスムーズにかつ精度良く挿
入できる遮水膜壁工法を提供することにある。
An object of the present invention is to eliminate the disadvantages of the conventional example, and to provide a water shield film wall construction method capable of smoothly and accurately inserting a water shield sheet to a predetermined depth of a band-shaped groove.

〔課題を解決するための手段〕[Means for Solving the Problems]

本発明は前記目的を達成するため、帯状溝内に遮水シー
トを挿入し、その周囲隙間に充填材を充填する遮水膜壁
の施工法において、帯状溝の底部に上部にフックまたは
滑車を有する重りを置き、かつコンクリートを帯状溝の
底部に打設して該フックまたは滑車が顕出する状態でこ
の重りを根固めし、遮水シート下端に連結した索条を前
記フックまたは滑車に挿通して、該索条の牽引で遮水シ
ート下端を帯状溝底部に引き込むことを要旨とするもの
である。
In order to achieve the above object, the present invention is a method of constructing an impermeable membrane wall in which a waterproof sheet is inserted into a strip groove, and a gap around the sheet is filled with a hook or pulley at the top of the bottom portion of the strip groove. Place the weight that you have and place concrete on the bottom of the strip groove to consolidate this weight with the hook or pulley exposed, and insert the rope connected to the lower end of the impermeable sheet into the hook or pulley. Then, the gist is to pull the lower end of the water-blocking sheet to the bottom of the band-shaped groove by pulling the cord.

〔作用〕[Action]

本発明によれば、索条を牽引することにより、遮水シー
ト端は帯状溝の底部のフックまたは滑車を反力として下
方に引かれ、そのまま帯状溝底部まで引き込むことがで
きる。
According to the present invention, by pulling the cord, the end of the water-impervious sheet is pulled downward by the hook or pulley at the bottom of the band-shaped groove as a reaction force, and can be pulled as it is to the bottom of the band-shaped groove.

〔実施例〕〔Example〕

以下、図面について本発明の実施例を詳細に説明する。 Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.

第1図〜第5図は本発明の遮水膜壁工法の1実施例を示
す側面図である。
1 to 5 are side views showing an embodiment of the water-permeable film wall construction method of the present invention.

先ず、地盤に従来と同じく特開昭64-80624号公報や特開
平1-121491号公報にあるようなチェーンカッターでトレ
ンチ掘削して帯状溝1を不透水層(透水層と不透水層の
境界α以下)まで形成するが、後述の遮水シート2の挿
入に先立ち、第6図に示すような上部にフック4を設け
た重り5を帯状溝1の底部に置く。この場合重り5のフ
ック4には予め索条6の途中を挿通しておき、そのまま
吊り降すようにしてもよい。
First, as in the conventional case, trenches are excavated on the ground with a chain cutter as disclosed in JP-A-64-80624 and JP-A-1-121491, and the strip-shaped groove 1 is formed in the impermeable layer (the boundary between the impermeable layer and the impermeable layer). However, prior to the insertion of the water-impervious sheet 2 described later, a weight 5 having a hook 4 on the upper portion as shown in FIG. 6 is placed on the bottom of the band-shaped groove 1. In this case, the rope 4 may be previously inserted through the hook 4 of the weight 5 and then suspended.

なお、重り5は帯状溝1の底部に適宜間隔に配置する
が、その位置が遮水シート2の継手部2aがくるべき個所
の場合はこの位置に合わせるものとする。
The weights 5 are arranged on the bottom of the band-shaped groove 1 at appropriate intervals, but if the position is a place where the joint portion 2a of the water-impervious sheet 2 should come, it should be adjusted to this position.

このように重り5を配置してから、第2図に示すように
帯状溝1の底部に根固め用のコンクリート7を打設し、
該重り5をフック4が顕出する状態でこのコンクリート
7中に埋め込み固定する。
After arranging the weight 5 in this way, as shown in FIG. 2, concrete 7 for root consolidation is placed on the bottom of the band-shaped groove 1,
The weight 5 is embedded and fixed in the concrete 7 with the hook 4 exposed.

次いで第3図に示すように遮水シート2を帯状溝1内に
挿入するが、その際、遮水シート2の下端に、ロープ、
ピアノ線、ワイヤー等の索条6の一端を結合し、っこの
索条6の途中をフック4に挿通した状態で索条6の他の
端を地上で牽引する。
Next, as shown in FIG. 3, the water-impervious sheet 2 is inserted into the strip-shaped groove 1. At that time, a rope,
One end of the cord 6 such as a piano wire or a wire is connected, and the other end of the cord 6 is pulled on the ground while the hook 6 is inserted through the hook 4.

フック4は重り5がコンクリート7で固定されているの
で、該索条6の引込みはこのフック4を反力として行う
ことができ、第4図に示すように遮水シート2の下端を
そのまま帯状溝1の底部まで引き込むことができる。
Since the weight 5 of the hook 4 is fixed by the concrete 7, the rope 6 can be pulled in by the hook 4 as a reaction force, and as shown in FIG. It can be pulled up to the bottom of the groove 1.

このようにして、先行する遮水シート2を帯状溝1に吊
り降したならば、次いで第5図に示すようにこの遮水シ
ート2を接合する隣の遮水シート2′を同様に帯状溝1
に吊り込む。
In this way, if the preceding water-impervious sheet 2 is suspended in the band-shaped groove 1, then the adjacent water-impermeable sheet 2'to which the water-impermeable sheet 2 is joined is also similarly wound in the band-shaped groove as shown in FIG. 1
Hang on.

その際、遮水シート2と2′の隣接個所の引き込みは同
一のフック4を使用するようにすれば、あとは索条6の
遮水シート2′への結合個所を選定するだけで、継手部
2aのラップを確実にすることができる。
At that time, if the same hook 4 is used to pull in the adjoining portions of the water-impervious sheets 2 and 2 ', the joints can be simply selected by selecting the connecting portion of the rope 6 to the water-impermeable sheet 2'. Department
You can ensure the wrap of 2a.

さらに、他の実施例として第7図に示すように重り5の
上部に設けるものをフック4に代えて滑車8とすること
もできる。
Further, as another embodiment, as shown in FIG. 7, a pulley 8 may be used instead of the hook 4 provided on the upper portion of the weight 5.

このように滑車8にすればこれに途中を巻回する索条6
の引込みは該滑車8との摩擦抵抗が少なく、スムーズに
行なえる。
If the pulley 8 is used in this way, the rope 6 around which the pulley 6 is wound
The frictional resistance with the pulley 8 is small and can be smoothly drawn in.

なお、このように遮水シート2,2′をセットし、かつ継
手部2a同士を相互に遮水シート2,2′の外周と帯状溝1
との隙間にモルタル等の充填材3を充填するのは前記従
来例と同じである。
In addition, the impermeable sheets 2 and 2'are set in this way, and the joint portions 2a are mutually connected to the outer periphery of the impermeable sheet 2 and 2'and the band-shaped groove 1.
The filling of the filler 3 such as mortar into the gap between and is the same as in the conventional example.

〔発明の効果〕〔The invention's effect〕

以上述べたように本発明の遮水膜壁工法は、帯状溝内に
遮水シートを挿入し、その周囲隙間をモルタル等の充填
材で充填する場合において、遮水シートを帯状溝の所定
の深さまで簡単かつスムーズにしかも適正位置に精度良
く挿入できるものである。
As described above, the water-permeable membrane wall construction method of the present invention, when the water-impermeable sheet is inserted into the band-shaped groove, and when the surrounding gap is filled with a filler such as mortar, the water-impermeable sheet has a predetermined width of the band-shaped groove. It can be inserted easily and smoothly up to the depth and with high accuracy.

【図面の簡単な説明】[Brief description of drawings]

第1図〜第5図は本発明の遮水膜壁工法の1実施例を示
す各工程の側面図、第6図は使用するフック付き重りの
斜視図、第7図は本発明の他の実施例で使用する滑車付
き重りの斜視図、第8図は従来例を示す斜視図である。 1……帯状溝 2,2′……遮水シート、2a……継手部 3……充填材、4……フック 5……重り、6……索条 7……コンクリート、8……滑車
1 to 5 are side views of each step showing one embodiment of the water-permeable membrane wall construction method of the present invention, FIG. 6 is a perspective view of a weight with a hook to be used, and FIG. 7 is another of the present invention. FIG. 8 is a perspective view of a pulley-equipped weight used in the embodiment, and FIG. 8 is a perspective view showing a conventional example. 1 ... Band-shaped groove 2,2 '... water-proof sheet, 2a ... joint part 3 ... filling material, 4 ... hook 5 ... weight, 6 ... filament 7 ... concrete, 8 ... pulley

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】帯状溝内に遮水シートを挿入し、その周囲
隙間に充填材を充填する遮水膜壁の施工法において、帯
状溝の底部に上部にフックを有する重りを置き、かつコ
ンクリートを帯状溝の底部に打設して該フックが顕出す
る状態でこの重りを根固めし、遮水シート端に連結した
索条を前記フックに挿通して、該索条の牽引で遮水シー
トを帯状溝底部に引き込むことを特徴とする遮水膜壁の
施工法。
1. A method of constructing a water-impervious membrane wall in which a water-impermeable sheet is inserted into a strip groove, and a gap is surrounded by a filler, in which a weight having a hook at the top is placed at the bottom of the strip groove, and concrete is used. The weight is fixed in a state where the hook is exposed at the bottom of the belt-like groove and the weight is solidified, and the cord connected to the end of the water-blocking sheet is inserted into the hook, and the water is shielded by pulling the cord. A method of constructing a water-permeable membrane wall, characterized in that the sheet is drawn into the bottom of the band-shaped groove.
【請求項2】帯状溝内に遮水シートを挿入し、その周囲
隙間に充填材を充填する遮水膜壁の施工法において、帯
状溝の底部に上部に滑車を有する重りを置き、かつコン
クリートを帯状溝の底部に打設して該滑車が顕出する状
態でこの重りを根固めし、遮水シート端に連結した索条
を前記滑車に巻回して、該索条の牽引で遮水シートを帯
状溝底部に引き込むことを特徴とする遮水膜壁の施工
法。
2. A method of constructing a water-impervious membrane wall, wherein a water-impermeable sheet is inserted into a band-like groove and a gap is surrounded by a filler, and a weight having a pulley at the top thereof is placed at the bottom of the band-like groove, and concrete is used. This weight is fixed in a state where the pulley is exposed to the bottom of the belt-like groove, and the rope connected to the end of the water-impervious sheet is wound around the pulley, and water is pulled by pulling the rope. A method of constructing a water-permeable membrane wall, characterized in that the sheet is drawn into the bottom of the band-shaped groove.
JP1193790A 1990-01-23 1990-01-23 Construction method of impermeable membrane wall Expired - Fee Related JPH0718170B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1193790A JPH0718170B2 (en) 1990-01-23 1990-01-23 Construction method of impermeable membrane wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1193790A JPH0718170B2 (en) 1990-01-23 1990-01-23 Construction method of impermeable membrane wall

Publications (2)

Publication Number Publication Date
JPH03217517A JPH03217517A (en) 1991-09-25
JPH0718170B2 true JPH0718170B2 (en) 1995-03-01

Family

ID=11791571

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1193790A Expired - Fee Related JPH0718170B2 (en) 1990-01-23 1990-01-23 Construction method of impermeable membrane wall

Country Status (1)

Country Link
JP (1) JPH0718170B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11350469A (en) * 1998-06-03 1999-12-21 Nishimatsu Constr Co Ltd Waterproof sheet insertion method and watertight sheet insertion device
CO6330166A1 (en) * 2011-06-22 2011-10-20 Figueroa Pablo Poch PROCEDURE FOR REINFORCEMENT AND REGULATION OF THE FILTRATIONS OF THE JARILLONES OF THE LAGOON AND LAKE RIVERS

Also Published As

Publication number Publication date
JPH03217517A (en) 1991-09-25

Similar Documents

Publication Publication Date Title
JPH0718170B2 (en) Construction method of impermeable membrane wall
US3968658A (en) Method and apparatus for introducing water-proof sheeting into the ground in a vertical position
JPH11217824A (en) Execution method of underground impervious wall
JPH09119128A (en) Method for promoting consolidation of soft ground
JPH10219680A (en) Construction method of cast-in-place concrete pile
JP2002201623A (en) Double sheet pile type revetment and construction method
JP4614217B2 (en) Tubing burial method
JP3248146B2 (en) Construction method of impermeable wall
JP3508875B2 (en) Continuous wall method
JP2540372B2 (en) Construction method of large depth impermeable wall
JP3395995B2 (en) Wall construction method
JP4049306B2 (en) Subsidence method of underground structure
JPH0525828A (en) Floating prevention structure for grounded floor
JP3434011B2 (en) Wall construction method
JP3169694U (en) Cement-based hardened product with fiber grid belt
JP2709433B2 (en) Horizontal embedding method of strip-shaped sheet material in the ground
JP2515038B2 (en) Construction method of underground wall with variable cross section
JPH07127050A (en) Water stop method for underground wall
JPH0657954B2 (en) Construction method of impermeable membrane wall
JPH0452813B2 (en)
JPH0696862B2 (en) Water-stopping material and water-stopping method using the same
JPS58164822A (en) Construction work of banking levee
JP3021081U (en) Permeation sheet for installation construction
JPH04302613A (en) Structure of water-barrier material and its underground insertion
JPH09228378A (en) Water-stop wall construction method and excavation equipment used in the method

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees