JPH0796804B2 - How to build a building - Google Patents
How to build a buildingInfo
- Publication number
- JPH0796804B2 JPH0796804B2 JP27035086A JP27035086A JPH0796804B2 JP H0796804 B2 JPH0796804 B2 JP H0796804B2 JP 27035086 A JP27035086 A JP 27035086A JP 27035086 A JP27035086 A JP 27035086A JP H0796804 B2 JPH0796804 B2 JP H0796804B2
- Authority
- JP
- Japan
- Prior art keywords
- floor
- work
- lower floor
- beams
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000000034 method Methods 0.000 claims description 9
- 239000011178 precast concrete Substances 0.000 claims description 3
- 238000010276 construction Methods 0.000 description 22
- 239000004567 concrete Substances 0.000 description 8
- 238000009434 installation Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 3
- 238000009415 formwork Methods 0.000 description 3
- 230000002093 peripheral effect Effects 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000004904 shortening Methods 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【発明の詳細な説明】 (産業上の利用分野) 本発明は、上階作業の早期確保により床躯体構築施工の
合理化、短縮化を図りうる建築物の構築方法に関する。TECHNICAL FIELD The present invention relates to a building construction method capable of rationalizing and shortening a floor skeleton construction construction by early securing upper floor work.
(従来の技術) 一般に建設構造物の構築に際しては、揚重機作業、鉄筋
配筋、型枠建込、コンクリート打設等の各工程を可及的
に効率良く行うことが建設工期を短縮化する上で重要と
なる。(Prior Art) Generally, in constructing a construction structure, it is possible to shorten the construction period by carrying out each process such as lifting machine work, reinforcing bar arrangement, form laying, concrete placing, etc. as efficiently as possible. Will be important above.
しかして、従来の現場打ちコンクリート作業では、第6
図に示すようにある特定のN階の壁、柱、梁等の構造躯
体と、N+1階の床とを同時に打設するのが一般的であ
る。In conventional cast-in-place concrete work,
As shown in the figure, it is general that a specific structural body such as a wall, a pillar or a beam on the Nth floor and a floor on the N + 1th floor are simultaneously cast.
(発明が解決しようとする問題点) ところが、現場打ちコンクリートについては、打設後所
定の強度を発現するまではその部分について次の作業を
進めることができないため、上記例では、N+1階の床
コンクリート打設後直ちに該床を作業床として利用して
該N+1階の壁、柱、梁の鉄筋組、型枠組等の作業を行
うことが不可能であり、工期短縮化の上で最大の障害に
なっていた。(Problems to be solved by the invention) However, as for the cast-in-place concrete, the next work cannot be carried out for that portion until the predetermined strength is exhibited after the casting, so in the above example, the floor on the N + 1 floor Immediately after placing concrete, it is not possible to use the floor as a work floor to perform work on the N + 1 floor walls, columns, beams, reinforcing bars, formwork, etc., which is the biggest obstacle to shortening the construction period. It was.
そこで、床をPC板(プレキャストコンクリート板)にて
成形して、現場では所定位置に揚重載架するだけで直ち
に作業床として利用しようとする工法が提案されてい
る。Therefore, a construction method has been proposed in which the floor is molded from a PC board (precast concrete board), and it is used as a work floor immediately by simply hoisting it at a predetermined position on the site.
しかして、かかる工法では、従来下階の柱、梁等が少な
くとも上階PC床を支持しうる状態まで完成されていなけ
ればならなかった。However, in this construction method, conventionally, the pillars and beams on the lower floor had to be completed to a state where at least the upper floor PC floor could be supported.
ところが、柱、梁が現場打ちのRC構造(鉄筋コンクリー
ト構造)の場合、該柱、梁の配筋作業や、型枠組を構築
現場で行う場合には、下階床を作業床とするため、高所
での作業を伴ない、足場等を組んで作業を行なう必要が
あり、また、上向きの作業状態が多いため作業性が劣悪
となり、安全面でも問題があった。However, when the pillars and beams have a cast-in-place RC structure (reinforced concrete structure), the lower floor is used as the working floor when the pillars and beams are reinforced and the formwork is performed at the construction site. It is necessary to work on a scaffold, etc., while working at a place, and since there are many upward working states, workability is poor and there is a safety problem.
さらに、上階に何もない状態での作業であるため、雨天
などの場合には作業が中断してしまういう欠点も有して
いた。Further, since the work is performed in a state where there is nothing on the upper floor, there is a drawback that the work is interrupted in case of rain.
本発明はかかる従来の問題に鑑み、いずれの工法を採用
する場合であっても、構築現場での上階作業床を早期に
確保し、作業効率、安全性を格段に高めうる、建築物の
構築方法を提供することを目的とするものである。In view of such a conventional problem, the present invention can secure an upper floor work floor at a construction site at an early stage regardless of which construction method is adopted, which can significantly improve work efficiency and safety. The purpose is to provide a construction method.
(問題点を解決するための手段) 上記目的を達成するため、本発明に係る建築物の構築方
法は、あらかじめ構築された下階床上に所定の支保工を
設置し、該支保工により上階床を支持して、当該上階床
を下階の柱、梁、壁等の構造躯体より先に構築し、しか
る後に前記下階床及び上階床を作業床として前記下階の
柱、梁、壁等の構造躯体を構築するようにしたことを特
徴とするものである。(Means for Solving Problems) In order to achieve the above-mentioned object, the method for constructing a building according to the present invention is such that a predetermined supporting work is installed on a lower floor constructed in advance, and the upper support is provided by the supporting work. The floor is supported, and the upper floor is constructed prior to the structural frames such as columns, beams, and walls of the lower floor, and then the lower floor and upper floor are used as working floors, and the columns and beams of the lower floor are used. It is characterized in that a structural body such as a wall is constructed.
(実施例) 以下、本発明の好適な実施例を図面により説明する。(Examples) Hereinafter, preferred examples of the present invention will be described with reference to the drawings.
第1図乃至第3図は本発明の一実施例を示す概念図であ
り、第1図及び第2図は各々本実施例に係る建築物の構
築方法を示す工程説明図及び概念斜視図である。1 to 3 are conceptual views showing an embodiment of the present invention, and FIGS. 1 and 2 are process explanatory views and conceptual perspective views showing a method of constructing a building according to the present embodiment, respectively. is there.
しかして、本実施例においては、まず、第1図(a)に
示すようにあらかじめ構築された下階床1上に所定の支
保工2を設置し、該支保工により上階床3を支持して、
下階の柱4、梁5、壁(図示せず)等の構造躯体よりも
先に構築し、しかる後に第1図(b)に示すように該上
階床3を作業床として前記下階の柱4、梁5、壁等の構
造躯体を構築し、次に間仕切壁、設備類等のいわゆる2
次部材(図示せず)を取付けるようにしたものである。Therefore, in the present embodiment, first, as shown in FIG. 1 (a), a predetermined supporting work 2 is installed on the lower floor 1 that is built in advance, and the upper support 3 is supported by the supporting work. do it,
The lower floor is constructed prior to the structural frame such as pillars 4, beams 5, walls (not shown) on the lower floor, and then the upper floor 3 is used as a working floor as shown in FIG. 1 (b). Pillars, beams 5, walls, and other structural frames, and then so-called partition walls, equipment, etc.
The next member (not shown) is attached.
本実施例では床1、3はいずれもPC床板(プレキャスト
コンクリート床板)を使用しており、よって、上階床3
を設置後直ちに該床3を作業床として下階の構築作業に
移行することができる。In this embodiment, the floors 1 and 3 are both PC floorboards (precast concrete floorboards).
Immediately after the installation, the floor 3 can be used as a work floor to shift to the construction work on the lower floor.
前記支保工2としては、相当の重量物であるPC床板3を
他の支持部材のない状態で確実に支持する必要があるた
め、本実施例では第3図に示すような支持治具を使用し
ている。As the supporting work 2, it is necessary to surely support the PC floor plate 3 which is a considerable weight without any other supporting member. Therefore, in this embodiment, a supporting jig as shown in FIG. 3 is used. is doing.
該支持治具2は、4本の床支持部21と、該各床支持部21
を相互に緊結する上下一対のフレーム22と、ブレース材
23とから概略構成されている。The support jig 2 includes four floor support parts 21 and each floor support part 21.
A pair of upper and lower frames 22 that tightly connect the
It is composed of 23 and.
該床支持部21は、本実施例では公知のいわゆる強力サポ
ートで構成されており、上下端に配設された支持板21a
及び載置板21bは本体21cに螺合されており、ねじ込み位
置を変化させることによりレベル調整が可能となってい
る。The floor support portion 21 is composed of a so-called strong support known in the present embodiment, and is a support plate 21a disposed at the upper and lower ends.
The mounting plate 21b is screwed to the main body 21c, and the level can be adjusted by changing the screwing position.
しかして、上階PC床板3の支持にあたっては第2図に示
すように、まず複数個の支持治具2を下階床1上に所定
間隔を保って各々所定位置に設置する。Then, in supporting the upper floor PC floor plate 3, as shown in FIG. 2, first, a plurality of supporting jigs 2 are installed at predetermined positions on the lower floor 1 at predetermined intervals.
次に、各上階PC床板3をクレーン等の揚重機械で地上の
ストック場所等から所定の設置位置まで揚重移動し、各
支持治具2上にあらかじめ位置決め等を行なって順次載
架してゆけばよい。Next, each upper floor PC floor plate 3 is hoisted and moved from a stock position on the ground to a predetermined installation position by a lifting machine such as a crane, and is preliminarily positioned on each supporting jig 2 and sequentially mounted. Just go.
なお、支持治具2は中間位置にあらかじめ作業者が乗っ
て作業の行なえる作業台等を設けておけば、前期2次部
材の取付作業等の際に簡易足場としても利用しうるもの
である。The support jig 2 can also be used as a simple scaffold at the time of attaching the secondary member in the previous period by providing a work table or the like on which the worker can ride in advance at the intermediate position. .
また、各階のPC床板1、3、……は、第2図に示す各単
位PC板6相互の一体化をより強固にするため、該単位PC
板6を第4図及び第5図に示すようないわゆる半PC板と
して成形しておいてもよい。In addition, the PC floor boards 1, 3, ... On each floor are designed so that the unit PC boards 6 shown in FIG.
The plate 6 may be formed as a so-called semi-PC plate as shown in FIGS. 4 and 5.
即ち、該半PC板6は、周辺部に少なくとも1個所以上の
現場接合部7が設けられ、他の周辺部及び中央部8には
完成された所定厚さの床部分が形成されたものであり、
所定位置に設置後は、完成された床部分を直ちに作業床
として利用でき、その後に現場接合部7を隣接する他の
半PC板6の現場接合部7と現場打ちコンクリート等によ
り一体化するようになっている。That is, the half-PC board 6 is provided with at least one or more on-site joints 7 in the peripheral portion, and the completed floor portion having a predetermined thickness is formed in the other peripheral portion and the central portion 8. Yes,
After installation in place, the completed floor can be used immediately as a work floor, after which the on-site joint 7 and the adjacent on-site joint 7 of the other half-PC board 6 can be integrated by in-situ concrete or the like. It has become.
かかる構成からなる本実施例においては、支持治具2を
利用することにより、下階の柱、梁等の構築前に上階床
3を構築することができ、該上階床3を直ちに作業床と
して利用し、下階の柱、梁壁等の構築準備に入れるた
め、RC構造では従来不可能であった上階作業床の早期確
保が可能となり、作業効率が高まり、さらに天候の影響
を受けないため工期の大幅な短縮化が達成しうるもので
ある。In this embodiment having such a configuration, by using the support jig 2, the upper floor 3 can be constructed before the pillars, beams, etc. on the lower floor can be constructed, and the upper floor 3 can be immediately worked. Since it will be used as a floor and will be put into preparations for building the pillars, beam walls, etc. on the lower floor, it will be possible to secure an upper floor work floor earlier than previously possible with the RC structure, which will increase work efficiency and further affect the weather. Since it does not receive it, the construction period can be greatly shortened.
しかして、前記下階の柱、梁、壁等は、上階床3を作業
床として、該上階床3上から現場打ちコンクリートの打
設作業が可能であるため、従来のように下階床1上で別
途に煩雑で危険な足場組作業を行なう必要が全くなくな
り、上階床3からの下向きの作業が能率的かつ安全確実
に行なえることとなる。As for the pillars, beams, walls, etc. of the lower floor, since the upper floor 3 is used as a working floor, it is possible to perform the pouring work of the cast-in-place concrete from the upper floor 3, so that the lower floor can be placed as in the conventional case. There is no need to separately perform complicated and dangerous scaffolding work on the floor 1, and the downward work from the upper floor 3 can be performed efficiently, safely and reliably.
また、支持治具2を複数層分に必要な個数だけあらかじ
め用意しておき、上記下階の柱、梁及び壁等の構築作業
前に、前記上階よりもさらに上階にも上記したと同様の
方法で上階床3を順次配設していき、これを繰返すこと
により、複数層分の床の仮構築作業を先に進めるように
することもでき、この場合は各階の柱、梁、壁の配筋、
型枠組、コンクリート打設等の作業を完全に別個の工程
として計画することができ、より合理的な施工計画によ
り現場作業をより省力化することが可能となる。In addition, the required number of support jigs 2 are prepared in advance for a plurality of layers, and before the construction work of the pillars, beams, walls, etc. on the lower floor, the above-mentioned upper floors are also arranged above. By arranging the upper floors 3 sequentially in the same manner and repeating this, it is possible to advance the temporary construction work of the floors for a plurality of layers. In this case, the columns and beams on each floor , Wall reinforcement,
It is possible to plan work such as formwork and concrete placement as completely separate processes, and it becomes possible to save labor on site by a more rational construction plan.
なお、この際、支持治具2は上階の躯体重量を安全に支
持しうるだけの強度を有するものとすることは言うまで
もない。At this time, it goes without saying that the supporting jig 2 has a strength sufficient to safely support the weight of the upper body.
また、支持治具2は分解組立可能な構成とすることによ
り、下層部分の不要となった支持治具2を順次上層へと
転用していくこともできる。In addition, the supporting jig 2 can be disassembled and assembled, so that the supporting jig 2 that has become unnecessary in the lower layer can be diverted to the upper layer in sequence.
しかして、上記実施例は柱、梁等がRC構造の建築物の例
を示し、かかる場合に特に顕著な効果を発揮しうるもの
であるが、これに限定されるものではなく、上階床3に
加え、柱、梁等もPC部材としたPC工法の場合あるいはSR
C工法の場合等にも適用しうるのは勿論であり、この場
合も上記RC構造の例に準じた作用効果を奏しうるもので
ある。In addition, the above embodiment shows an example of a building having an RC structure with columns, beams and the like, and in such a case, a particularly remarkable effect can be exhibited, but the present invention is not limited to this, and the upper floor In addition to 3, in the case of the PC construction method where columns, beams, etc. are PC members, or SR
It is needless to say that it can be applied to the case of the C construction method and the like, and in this case as well, it is possible to obtain the operational effects according to the example of the RC structure.
また、上記実施例では、支保工として上記構成の支持治
具2を使用する例を示したが、これ以外にも他の適宜支
保工を利用でき、その構成は限定されない。Further, in the above-described embodiment, an example in which the support jig 2 having the above-described configuration is used as the support work has been described, but other suitable support work can be used, and the configuration is not limited.
さらに、上階床3は設置後直ちに作業床として使用しう
る点からしてPC床板もしくは半PC床板とするのが望まし
いが、施工計画等によっては現場打ちのコンクリート床
とすることもできる等、本発明の要旨を逸脱しない範囲
内で種々の変形例が可能であることは言うまでもない。Furthermore, the upper floor 3 is preferably a PC floorboard or a semi-PC floorboard from the viewpoint that it can be used as a work floor immediately after installation, but depending on the construction plan, it can also be a cast-in-place concrete floor, etc. It goes without saying that various modifications are possible without departing from the gist of the present invention.
(発明の効果) 本発明は上述した如く構成されており、あらかじめ構築
された下階床上に所定の支保工を設置し、該支保工によ
り上階床を支持して、当該上階床を下階の柱、梁、壁等
の構造躯体より先に構築し、しかる後に前記下階床及び
上階床を作業床として利用して前記下階の柱、梁、壁等
の構造躯体を構築するようにしたものであるため、いず
れの構造方式の建築物においても上階作業床の早期確保
が可能となり、よって現場構築作業の合理化、効率化を
図り、安全性を高めることができる極めて有用なもので
ある。(Effects of the Invention) The present invention is configured as described above, and a predetermined supporting work is installed on the lower floor constructed in advance, the upper floor is supported by the supporting work, and the upper floor is lowered. It is constructed before the structural frames such as columns, beams and walls on the floor, and then the lower floor and upper floor are used as working floors to construct the structural frames such as columns, beams and walls on the lower floor. This is because it is possible to secure the upper floor work floor early in any structure type building, thus rationalizing and improving the efficiency of site construction work and improving safety. It is a thing.
第1図は本発明に係る構築方法の一実施例を示す工程説
明図、第2図は上階床の設置態様を示す概略斜視図、第
3図は支保工としての支持治具の構成を示す概略斜視
図、第4図及び第5図は各々本発明に係る床の他の実施
例を示す概略斜視図、第6図は従来の構築方法を示す概
念図である。 1…下階床、2…支保工(支持治具)、3…上階床、4
…柱、5…梁、6…単位PC床板、7…現場接合部、8…
中央部。FIG. 1 is a process explanatory view showing an embodiment of a construction method according to the present invention, FIG. 2 is a schematic perspective view showing an installation mode of an upper floor, and FIG. 3 shows a structure of a support jig as a support work. 4 is a schematic perspective view showing another embodiment of the floor according to the present invention, and FIG. 6 is a conceptual diagram showing a conventional construction method. 1 ... Lower floor, 2 ... Support work (support jig), 3 ... Upper floor, 4
… Pillars, 5… Beams, 6… Unit PC floorboards, 7… Site joints, 8…
Center.
Claims (2)
保工を設置し、該支保工により上階床を支持して、当該
上階床を下階の柱、梁、壁等の構造躯体より先に構築
し、しかる後に前記下階床及び上階床を作業床として前
記下階の柱、梁、壁等の構造躯体を構築するようにした
ことを特徴とする建築物の構築方法。1. A structural frame such as a pillar, a beam or a wall of a lower floor, in which a predetermined supporting work is installed on a pre-constructed lower floor and the upper support is supported by the supporting work. A method for constructing a building, characterized in that the structure is constructed earlier, and then the lower floor and the upper floor are used as working floors to construct a structural body such as a pillar, a beam, and a wall on the lower floor.
形されている特許請求の範囲第1項記載の建築物の構築
方法。2. The method for constructing a building according to claim 1, wherein the floor is formed of a precast concrete plate.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP27035086A JPH0796804B2 (en) | 1986-11-13 | 1986-11-13 | How to build a building |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP27035086A JPH0796804B2 (en) | 1986-11-13 | 1986-11-13 | How to build a building |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS63125744A JPS63125744A (en) | 1988-05-28 |
| JPH0796804B2 true JPH0796804B2 (en) | 1995-10-18 |
Family
ID=17485036
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP27035086A Expired - Lifetime JPH0796804B2 (en) | 1986-11-13 | 1986-11-13 | How to build a building |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0796804B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6449637B2 (en) * | 2014-12-08 | 2019-01-09 | 三井住友建設株式会社 | Building construction method |
-
1986
- 1986-11-13 JP JP27035086A patent/JPH0796804B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPS63125744A (en) | 1988-05-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US4023315A (en) | Prefabricated buildings | |
| JPH0796804B2 (en) | How to build a building | |
| JPH0681463A (en) | Building method for stair | |
| JP3187618B2 (en) | How to assemble beam reinforcement | |
| KR0141462B1 (en) | Method of prefabricating stairway | |
| JP2928002B2 (en) | Column formwork structure | |
| JPH0642184A (en) | Method of constructing a skeleton using half-PC floorboard | |
| EP1111143B1 (en) | Lifting of horizontally cast on-site wall panels | |
| JPH03197734A (en) | Lift up method by replacement of scaffold body | |
| JPH108725A (en) | Constructing method for building frame | |
| JPH0437893B2 (en) | ||
| JPH08193422A (en) | How to build a building | |
| JP3098107B2 (en) | Underground beam construction method | |
| JPH0470458B2 (en) | ||
| JP2717142B2 (en) | Construction method of suspended structure | |
| JP2761527B2 (en) | How to build structures | |
| JP2649057B2 (en) | How to build stairs in buildings | |
| JPS63125743A (en) | Construction of building | |
| JPH0745779B2 (en) | Jig for building the skeleton of a building | |
| JPH0715177B2 (en) | How to build a reinforced concrete structure | |
| JPH05179694A (en) | Construction method of building | |
| JP2003064875A (en) | Assembling method for column reinforcement and beam reinforcement | |
| JPH0623514B2 (en) | Construction method of reinforced steel frame composite building frame | |
| JPH0672500B2 (en) | Steel frame reinforced concrete high-rise building frame construction method | |
| JPS621954A (en) | Construction of housing of building |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |