JP7417838B2 - Projection system and projection method - Google Patents
[go: Go Back, main page]

JP7417838B2 - Projection system and projection method - Google Patents

Projection system and projection method Download PDF

Info

Publication number
JP7417838B2
JP7417838B2 JP2019155608A JP2019155608A JP7417838B2 JP 7417838 B2 JP7417838 B2 JP 7417838B2 JP 2019155608 A JP2019155608 A JP 2019155608A JP 2019155608 A JP2019155608 A JP 2019155608A JP 7417838 B2 JP7417838 B2 JP 7417838B2
Authority
JP
Japan
Prior art keywords
work
guide
location
projection
projection device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019155608A
Other languages
Japanese (ja)
Other versions
JP2021034957A (en
Inventor
勇樹 林
哲也 西
啓介 原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Intellectual Property Management Co Ltd
Original Assignee
Panasonic Intellectual Property Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Intellectual Property Management Co Ltd filed Critical Panasonic Intellectual Property Management Co Ltd
Priority to JP2019155608A priority Critical patent/JP7417838B2/en
Publication of JP2021034957A publication Critical patent/JP2021034957A/en
Application granted granted Critical
Publication of JP7417838B2 publication Critical patent/JP7417838B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Projection Apparatus (AREA)
  • Transforming Electric Information Into Light Information (AREA)
  • Video Image Reproduction Devices For Color Tv Systems (AREA)

Description

本発明は、投影システム及び投影方法に関する。 The present invention relates to a projection system and a projection method.

従来、スクリーンなどに画像を投影することができる投影装置が知られている。投影装置に関連する技術として、特許文献1には、設計案のオブジェクトを部屋の境界壁面に表示する方法が開示されている。 2. Description of the Related Art Projection devices that can project images onto a screen or the like are conventionally known. As a technology related to a projection device, Patent Document 1 discloses a method of displaying an object of a design proposal on a boundary wall surface of a room.

特表2016-522905号公報Special Publication No. 2016-522905

しかしながら、上記従来技術では、作業箇所が多い場合に作業者に作業を効率良く行わせることができない。 However, with the above-mentioned conventional technology, it is not possible to have the worker perform the work efficiently when there are many work areas.

そこで、本発明は、作業者に効率良く作業を行わせることができ、工期の短縮及び作業者の負担を軽減することができる投影システム及び投影方法を提供することを目的とする。 SUMMARY OF THE INVENTION Therefore, an object of the present invention is to provide a projection system and a projection method that allow workers to work efficiently, shorten the construction period, and reduce the burden on the workers.

上記目的を達成するため、本発明の一態様に係る投影システムは、作業現場に設置され、前記作業現場における複数の作業箇所の各々に図面を投影する投影装置を備え、前記投影装置は、さらに、作業者を前記複数の作業箇所の少なくとも1つである対象箇所に、又は、前記投影装置が次に設置される設置予定場所に誘導するためのガイド図形を投影する。 In order to achieve the above object, a projection system according to one aspect of the present invention includes a projection device that is installed at a work site and projects a drawing onto each of a plurality of work locations at the work site, and the projection device further includes: , projecting a guide graphic for guiding a worker to at least one of the plurality of work locations, or to a planned installation location where the projection device will be installed next;

また、本発明の一態様に係る投影方法は、作業現場に設置された投影装置が、前記作業現場における複数の作業箇所の各々に図面を投影するステップと、作業者を前記複数の作業箇所の少なくとも1つである対象箇所に、又は、前記投影装置が次に設置される設置予定場所に誘導するためのガイド図形を投影するステップとを含む。 Further, the projection method according to one aspect of the present invention includes a step in which a projection device installed at a work site projects a drawing onto each of a plurality of work locations at the work site, and a step in which a worker is directed to each of the plurality of work locations. The method further includes the step of projecting a guide figure for guiding the projection device to at least one target location or to a planned installation location where the projection device will be installed next.

また、本発明の一態様は、上記投影方法をコンピュータに実行させるプログラムとして実現することができる。あるいは、当該プログラムを格納したコンピュータ読み取り可能な非一時的な記録媒体として実現することもできる。 Further, one embodiment of the present invention can be realized as a program that causes a computer to execute the above projection method. Alternatively, the program can be realized as a computer-readable non-transitory recording medium storing the program.

本発明によれば、作業者に効率良く作業を行わせることができ、工期の短縮及び作業者の負担を軽減することができる。 According to the present invention, it is possible to have a worker perform the work efficiently, and it is possible to shorten the construction period and reduce the burden on the worker.

図1は、実施の形態1に係る投影システムが利用される作業現場を示す斜視図である。FIG. 1 is a perspective view showing a work site where the projection system according to the first embodiment is used. 図2は、実施の形態1に係る投影システムを構成する装置の外観図である。FIG. 2 is an external view of a device constituting the projection system according to the first embodiment. 図3は、実施の形態1に係る投影システムの機能構成を示すブロック図である。FIG. 3 is a block diagram showing the functional configuration of the projection system according to the first embodiment. 図4Aは、実施の形態1に係る投影システムによってガイド図形の一例が投影された作業現場を示す斜視図である。FIG. 4A is a perspective view showing a work site on which an example of a guide figure is projected by the projection system according to the first embodiment. 図4Bは、実施の形態1に係る投影システムによってガイド図形の別の一例が投影された作業現場を示す斜視図である。FIG. 4B is a perspective view showing a work site on which another example of a guide figure is projected by the projection system according to the first embodiment. 図5は、実施の形態1に係る投影システムの動作を示すフローチャートである。FIG. 5 is a flowchart showing the operation of the projection system according to the first embodiment. 図6は、実施の形態1の変形例1に係る投影システムの動作を示すフローチャートである。FIG. 6 is a flowchart showing the operation of the projection system according to the first modification of the first embodiment. 図7Aは、実施の形態1の変形例1に係る投影システムによってガイド図形の一例が投影された作業現場を示す斜視図である。FIG. 7A is a perspective view showing a work site on which an example of a guide figure is projected by the projection system according to Modification 1 of Embodiment 1. 図7Bは、実施の形態1の変形例1に係る投影システムによってガイド図形の別の一例が投影された作業現場を示す斜視図である。FIG. 7B is a perspective view showing a work site on which another example of a guide figure is projected by the projection system according to Modification 1 of Embodiment 1. 図8は、実施の形態1の変形例2に係る投影システムが投影するガイド図形の一例を示す斜視図である。FIG. 8 is a perspective view showing an example of a guide figure projected by the projection system according to the second modification of the first embodiment. 図9は、実施の形態1の変形例3に係る投影システムが投影するガイド図形の一例を示す斜視図である。FIG. 9 is a perspective view showing an example of a guide figure projected by the projection system according to the third modification of the first embodiment. 図10は、実施の形態2に係る投影システムの動作を示すフローチャートである。FIG. 10 is a flowchart showing the operation of the projection system according to the second embodiment. 図11Aは、実施の形態2に係る投影システムによってガイド図形の一例が投影された作業現場を示す斜視図である。FIG. 11A is a perspective view showing a work site on which an example of a guide figure is projected by the projection system according to the second embodiment. 図11Bは、実施の形態2に係る投影システムによってガイド図形の別の一例が投影された作業現場を示す斜視図である。FIG. 11B is a perspective view showing a work site on which another example of a guide figure is projected by the projection system according to the second embodiment. 図11Cは、実施の形態2に係る投影システムによってガイド図形の別の一例が投影された作業現場を示す斜視図である。FIG. 11C is a perspective view showing a work site on which another example of a guide figure is projected by the projection system according to the second embodiment. 図11Dは、実施の形態2に係る投影システムによってガイド図形の別の一例が投影された作業現場を示す斜視図である。FIG. 11D is a perspective view showing a work site on which another example of a guide figure is projected by the projection system according to the second embodiment. 図11Eは、実施の形態2に係る投影システムによってガイド図形の別の一例が投影された作業現場を示す斜視図である。FIG. 11E is a perspective view showing a work site on which another example of a guide figure is projected by the projection system according to the second embodiment. 図11Fは、実施の形態2に係る投影システムによってガイド図形の別の一例が投影された作業現場を示す斜視図である。FIG. 11F is a perspective view showing a work site on which another example of a guide figure is projected by the projection system according to the second embodiment. 図12は、実施の形態3に係る投影システムの動作を示すフローチャートである。FIG. 12 is a flowchart showing the operation of the projection system according to the third embodiment. 図13は、実施の形態3に係る投影システムによってガイド図形が投影された作業現場を示す斜視図である。FIG. 13 is a perspective view showing a work site on which guide figures are projected by the projection system according to the third embodiment.

以下では、本発明の実施の形態に係る投影システム及び投影方法について、図面を用いて詳細に説明する。なお、以下に説明する実施の形態は、いずれも本発明の一具体例を示すものである。したがって、以下の実施の形態で示される数値、形状、材料、構成要素、構成要素の配置及び接続形態、ステップ、ステップの順序などは、一例であり、本発明を限定する趣旨ではない。よって、以下の実施の形態における構成要素のうち、独立請求項に記載されていない構成要素については、任意の構成要素として説明される。 Below, a projection system and a projection method according to an embodiment of the present invention will be described in detail using the drawings. Note that all of the embodiments described below are specific examples of the present invention. Therefore, the numerical values, shapes, materials, components, arrangement and connection forms of the components, steps, order of steps, etc. shown in the following embodiments are merely examples, and are not intended to limit the present invention. Therefore, among the constituent elements in the following embodiments, constituent elements that are not described in the independent claims will be described as arbitrary constituent elements.

また、各図は、模式図であり、必ずしも厳密に図示されたものではない。したがって、例えば、各図において縮尺などは必ずしも一致しない。また、各図において、実質的に同一の構成については同一の符号を付しており、重複する説明は省略又は簡略化する。 Furthermore, each figure is a schematic diagram and is not necessarily strictly illustrated. Therefore, for example, the scales and the like in each figure do not necessarily match. Further, in each figure, substantially the same configurations are denoted by the same reference numerals, and overlapping explanations will be omitted or simplified.

(実施の形態1)
[概要]
まず、実施の形態1に係る投影システムの概要について、図1及び図2を用いて説明する。図1は、本実施の形態に係る投影システムが利用される作業現場100を示す斜視図である。図2は、本実施の形態に係る投影システム10を構成する装置の外観図である。
(Embodiment 1)
[overview]
First, an overview of the projection system according to Embodiment 1 will be explained using FIGS. 1 and 2. FIG. 1 is a perspective view showing a work site 100 where a projection system according to the present embodiment is used. FIG. 2 is an external view of a device that constitutes the projection system 10 according to this embodiment.

図2に示されるように、投影システム10は、投影装置20を備える。図1に示されるように、投影装置20は、建築中の建物内の作業現場100に設置される。作業現場100には、複数の作業箇所101及び102が含まれている。 As shown in FIG. 2, the projection system 10 includes a projection device 20. As shown in FIG. 1, the projection device 20 is installed at a work site 100 in a building under construction. The work site 100 includes a plurality of work locations 101 and 102.

投影装置20は、作業現場100に含まれる作業箇所101及び102に図面111を投影する。具体的には、投影装置20は、作業現場100を構成する構造物に図面111を投影する。構造物は、例えば、床、壁、柱又は天井などである。 The projection device 20 projects the drawing 111 onto the work sites 101 and 102 included in the work site 100. Specifically, the projection device 20 projects the drawing 111 onto the structures that make up the work site 100. The structure is, for example, a floor, wall, column, or ceiling.

図面111は、例えば、作業現場100における作業箇所101に投影される図面である。なお、図1では、作業箇所101を破線で示しているが、実際の作業現場100には作業箇所101が示されていない。このため、図面111が投影されていない場合には、作業者120は、作業箇所101の正確な位置を認識することができない。図面111が投影されることによって、作業者120は作業箇所101を認識することができる。作業者120は、図面111に従って作業を行うことで、容易かつ正確に作業を行うことができる。 The drawing 111 is, for example, a drawing projected onto the work location 101 at the work site 100. Note that in FIG. 1, the work location 101 is shown by a broken line, but the work location 101 is not shown in the actual work site 100. Therefore, if the drawing 111 is not projected, the worker 120 cannot recognize the exact position of the work location 101. By projecting the drawing 111, the worker 120 can recognize the work location 101. The worker 120 can perform the work easily and accurately by working according to the drawing 111.

作業は、例えば、墨出し作業である。例えば、投影される図面111は、墨出し線を作業者120が描くべき位置に設計通りの長さで投影される光の線又は図形である。作業者120は、図面111が示す光の線又は図形をなぞるだけで容易に墨出し線を描くことができる。なお、光の線又は図形が墨出し線を描くためのガイドとして使用されることは必須ではない。光の線又は図形そのものが墨出し線として用いられてもよい。また、作業は、墨出し作業でなくてもよく、穴を開ける作業であってもよく、特に限定されない。 The work is, for example, marking work. For example, the projected drawing 111 is a line of light or a figure projected at a position where the operator 120 is to draw a marking line with a designed length. The operator 120 can easily draw a marking line by simply tracing the light lines or figures shown in the drawing 111. Note that it is not essential that the light line or figure be used as a guide for drawing the marking line. A line of light or a figure itself may be used as the marking line. Further, the work does not have to be marking work, but may be drilling work, and is not particularly limited.

作業現場100には、目標物などが少なく、かつ、広い場合が多い。このため、例えば、図面111が小さい図形である場合には、図面111が投影されたとしても、作業者120が図面111を見つけるのに時間がかかる。このため、作業者120による作業効率が低くなる。 The work site 100 often has few targets and is spacious. Therefore, for example, if the drawing 111 is a small figure, it takes time for the operator 120 to find the drawing 111 even if the drawing 111 is projected. Therefore, the work efficiency of the worker 120 decreases.

これに対して、本実施の形態に係る投影システム10は、作業者120を作業箇所101に誘導するためのガイド図形(例えば、図4Aに示されるガイド図形130)を投影する。これにより、作業者120を作業箇所101に誘導することができ、図面111を見つける時間を短縮することができる。したがって、作業者120に効率良く作業を行わせることができ、工期の短縮及び作業者の負担を軽減することができる。 In contrast, the projection system 10 according to the present embodiment projects a guide figure (for example, the guide figure 130 shown in FIG. 4A) for guiding the worker 120 to the work location 101. Thereby, the worker 120 can be guided to the work location 101, and the time required to find the drawing 111 can be shortened. Therefore, the worker 120 can be made to work efficiently, and the construction period can be shortened and the burden on the worker can be reduced.

[構成]
次に、本実施の形態に係る投影システム10の具体的な機能構成について、図2及び図3を用いて説明する。図3は、本実施の形態に係る投影システム10の機能構成を示すブロック図である。
[composition]
Next, a specific functional configuration of the projection system 10 according to the present embodiment will be described using FIGS. 2 and 3. FIG. 3 is a block diagram showing the functional configuration of the projection system 10 according to this embodiment.

図2及び図3に示されるように、投影システム10は、投影装置20と、データ処理装置30と、端末装置40とを備える。以下では、投影システム10を構成する各装置の具体的な構成について順に説明する。 As shown in FIGS. 2 and 3, the projection system 10 includes a projection device 20, a data processing device 30, and a terminal device 40. Below, the specific configuration of each device that makes up the projection system 10 will be explained in order.

[投影装置]
投影装置20は、例えば、図1及び図2に示されるように、三脚に取り付けられて作業現場100の床の所定の場所に設置される。あるいは、投影装置20は、作業現場100の壁又は天井に設置されてもよい。図3に示されるように、投影装置20は、通信部21と、測距部22と、投影部23と、制御部24と、記憶部25と、駆動部26とを備える。
[Projection device]
For example, as shown in FIGS. 1 and 2, the projection device 20 is attached to a tripod and installed at a predetermined location on the floor of the work site 100. Alternatively, the projection device 20 may be installed on the wall or ceiling of the work site 100. As shown in FIG. 3, the projection device 20 includes a communication section 21, a distance measurement section 22, a projection section 23, a control section 24, a storage section 25, and a drive section 26.

通信部21は、投影装置20がデータ処理装置30及び端末装置40と通信を行うための通信インタフェースである。通信部21は、データ処理装置30及び端末装置40の各々と無線通信を行うが、有線通信を行ってもよい。通信部21が行う通信の規格については、特に限定されない。 The communication unit 21 is a communication interface through which the projection device 20 communicates with the data processing device 30 and the terminal device 40. The communication unit 21 performs wireless communication with each of the data processing device 30 and the terminal device 40, but may also perform wired communication. There are no particular limitations on the standard of communication performed by the communication unit 21.

測距部22は、投影装置20から作業現場100を構成する構造物までの距離を測定する。測距部22は、例えば、TOF(Time Of Flight)センサなどの距離画像センサである。距離画像センサは、距離の測定結果として、距離画像を生成する。距離画像を構成する複数の画素の各々の画素値は、測距部22からの距離を示している。なお、測距部22は、位相差検出方式を用いた測距センサ、又は、三角測距方式を用いた測距センサなど、その他の測距センサであってもよい。図3に示されるように、測距部22は、測距用光源22aと、検知部22bとを備える。 The distance measuring unit 22 measures the distance from the projection device 20 to the structures that make up the work site 100. The distance measuring unit 22 is, for example, a distance image sensor such as a TOF (Time Of Flight) sensor. The distance image sensor generates a distance image as a result of distance measurement. The pixel value of each of the plurality of pixels constituting the distance image indicates the distance from the distance measuring section 22. Note that the distance measuring section 22 may be any other distance measuring sensor, such as a distance measuring sensor using a phase difference detection method or a distance measuring sensor using a triangular distance measuring method. As shown in FIG. 3, the distance measurement section 22 includes a distance measurement light source 22a and a detection section 22b.

測距用光源22aは、構造物に向けて光を発する光源である。測距用光源22aは、例えば、赤外光を発する発光素子である。あるいは、測距用光源22aは、可視光を発する発光素子であってもよい。なお、測距用光源22aは、投影部23が有する光源23aと別体である必要はなく、投影部23が有する光源23aが測距用光源22aとして用いられてもよい。つまり、測距部22は、測距用光源22aを有していなくてもよく、検知部22bのみを有するセンサであってもよい。 The distance measuring light source 22a is a light source that emits light toward a structure. The distance measuring light source 22a is, for example, a light emitting element that emits infrared light. Alternatively, the distance measuring light source 22a may be a light emitting element that emits visible light. Note that the light source 22a for distance measurement does not need to be separate from the light source 23a included in the projection section 23, and the light source 23a included in the projection section 23 may be used as the light source 22a for distance measurement. That is, the distance measuring section 22 does not need to have the distance measuring light source 22a, and may be a sensor having only the detecting section 22b.

検知部22bは、測距用光源22aが発した光の構造物による反射光を検知する受光素子である。検知部22bは、例えば、フォトダイオードアレイによって構成されるイメージセンサである。 The detection unit 22b is a light receiving element that detects light reflected by a structure of light emitted by the ranging light source 22a. The detection unit 22b is, for example, an image sensor configured with a photodiode array.

投影部23は、図面111を投影面に投影するための投影モジュールである。投影部23は、光源23aと、走査部23bとを備える。なお、図示されていないが、投影部23は、レンズ及びミラーなどの光学部品を備えていてもよい。 The projection unit 23 is a projection module for projecting the drawing 111 onto a projection surface. The projection section 23 includes a light source 23a and a scanning section 23b. Although not shown, the projection unit 23 may include optical components such as lenses and mirrors.

光源23aは、例えば、可視光を出射する半導体レーザ素子である。あるいは、光源23aは、LED(Light Emitting Diode)であってもよい。光源23aは、発光色を変更できる構成を有してもよい。例えば、光源23aは、発光色が異なる複数の発光素子を含んでもよい。複数の発光素子には、例えば、青色発光素子、緑色発光素子及び赤色発光素子が含まれる。 The light source 23a is, for example, a semiconductor laser element that emits visible light. Alternatively, the light source 23a may be an LED (Light Emitting Diode). The light source 23a may have a configuration in which the color of emitted light can be changed. For example, the light source 23a may include a plurality of light emitting elements that emit light of different colors. The plurality of light emitting elements include, for example, a blue light emitting element, a green light emitting element, and a red light emitting element.

走査部23bは、光源23aが発する光を構造物上で走査する。走査部23bは、例えば、MEMS(Micro Electro Mechanical Systems)ミラー、又はガルバノスキャナなどである。 The scanning unit 23b scans the structure with light emitted from the light source 23a. The scanning unit 23b is, for example, a MEMS (Micro Electro Mechanical Systems) mirror or a galvano scanner.

本実施の形態では、投影部23は、複数の作業箇所101及び102のうち、データ処理装置30によって決定された作業箇所である対象箇所に、当該対象箇所に投影する図面である対象図面を投影する。例えば、図1に示される例では、投影部23は、作業箇所101に図面111を投影している。 In the present embodiment, the projection unit 23 projects a target drawing, which is a drawing to be projected onto the target location, onto a target location, which is a work location determined by the data processing device 30, among the plurality of work locations 101 and 102. do. For example, in the example shown in FIG. 1, the projection unit 23 projects a drawing 111 onto the work location 101.

また、投影部23は、ガイド図形を投影する。ガイド図形は、作業者120を複数の作業箇所の少なくとも1つである対象箇所に誘導するための図形である。ガイド図形の具体的な形状及び機能については、図4A及び図4Bを用いて後で説明する。 Further, the projection unit 23 projects a guide figure. The guide graphic is a graphic for guiding the worker 120 to a target location that is at least one of a plurality of work locations. The specific shape and function of the guide figure will be explained later using FIGS. 4A and 4B.

なお、投影部23によって投影可能な投影範囲110には制限がある。図1には、投影範囲110を一点鎖線で模式的に表している。例えば、投影範囲110は、投影装置20が水平面に設置された場合において、水平方向に約40°で、かつ、垂直方向に約20°の範囲に投影が可能である。投影範囲110の外に位置する作業箇所に図面を投影するためには、投影装置20の姿勢を変更する必要がある。あるいは、投影装置20の設置場所を変更する必要がある。本実施の形態では、駆動部26によって投影装置20の姿勢が変更されることにより、投影部23による投影方向及び投影可能な範囲が変更される。 Note that there is a limit to the projection range 110 that can be projected by the projection unit 23. In FIG. 1, the projection range 110 is schematically represented by a dashed line. For example, when the projection device 20 is installed on a horizontal surface, the projection range 110 is capable of projecting in a range of approximately 40 degrees in the horizontal direction and approximately 20 degrees in the vertical direction. In order to project a drawing onto a work location located outside the projection range 110, it is necessary to change the attitude of the projection device 20. Alternatively, it is necessary to change the installation location of the projection device 20. In this embodiment, by changing the attitude of the projection device 20 by the drive unit 26, the projection direction and the projectable range by the projection unit 23 are changed.

制御部24は、投影面に図面111を投影するために、測距部22、投影部23及び駆動部26を制御する制御装置である。制御部24は、例えば、集積回路(IC:Integrated Circuit)であるLSI(Large Scale Integration)によって実現される。なお、集積回路はLSIに限られず、専用回路又は汎用プロセッサで実現されてもよい。例えば、制御部24は、マイクロコンピュータによって実現されてもよい。また、制御部24には、プログラム可能なFPGA(Field Programmable Gate Array)、又は、LSI内部の回路セルの接続及び設定が再構成可能なリコンフィギュラブルプロセッサが利用されてもよい。 The control unit 24 is a control device that controls the distance measuring unit 22, the projection unit 23, and the drive unit 26 in order to project the drawing 111 on the projection plane. The control unit 24 is realized by, for example, an LSI (Large Scale Integration) that is an integrated circuit (IC). Note that the integrated circuit is not limited to LSI, and may be realized by a dedicated circuit or a general-purpose processor. For example, the control unit 24 may be realized by a microcomputer. Further, the control unit 24 may use a programmable FPGA (Field Programmable Gate Array) or a reconfigurable processor in which connections and settings of circuit cells inside the LSI can be reconfigured.

記憶部25は、制御部24によって実行される、図面111を投影するための制御プログラムが記憶された記憶装置である。記憶部25は、例えば、不揮発性メモリであり、半導体メモリなどによって実現される。 The storage unit 25 is a storage device that stores a control program for projecting the drawing 111, which is executed by the control unit 24. The storage unit 25 is, for example, a nonvolatile memory, and is realized by a semiconductor memory or the like.

駆動部26は、投影装置20の姿勢を変更するための駆動機構である。駆動部26は、投影装置20の姿勢を変更することで、投影可能な方向を変更する。例えば、駆動部26は、投影装置20の姿勢を、パン(水平方向)、チルト(垂直方向)及びロール(回転方向)の各々に対して変更することができる。駆動部26は、例えば、ステッピングモータなどによって実現される。なお、投影装置20は、駆動部26を備えなくてもよい。 The drive unit 26 is a drive mechanism for changing the attitude of the projection device 20. The drive unit 26 changes the direction in which projection can be performed by changing the attitude of the projection device 20. For example, the drive unit 26 can change the attitude of the projection device 20 in each of pan (horizontal direction), tilt (vertical direction), and roll (rotational direction). The drive unit 26 is realized by, for example, a stepping motor. Note that the projection device 20 does not need to include the drive section 26.

本実施の形態では、投影装置20は、作業現場100に含まれる複数の作業箇所に対して、所定の順序で図面を投影する。これにより、図面が投影される順序で作業者120に作業を行わせることができる。図面の投影順序は、例えば、データ処理装置30によって決定される。 In this embodiment, projection device 20 projects drawings onto a plurality of work locations included in work site 100 in a predetermined order. This allows the operator 120 to perform the work in the order in which the drawings are projected. The projection order of the drawings is determined by the data processing device 30, for example.

例えば、投影装置20は、図面を投影している対象箇所における作業が終了したと判定した場合に、決定された順序に従って次の作業箇所に図面を投影する。作業の終了は、例えば、作業者120が操作する端末装置40から送信される信号に基づいて、制御部24によって判定される。あるいは、制御部24は、図示しないカメラによって撮影された画像に基づいて作業の終了を判定してもよい。カメラは、作業者120の作業の様子、又は、対象箇所における作業結果を撮影する。なお、検知部22bが可視光画像を生成する場合には、制御部24は、カメラで撮影された画像の代わりに、検知部22bの検知結果を用いてもよい。 For example, when the projection device 20 determines that the work at the target location on which the drawing is being projected has been completed, it projects the drawing onto the next work location in accordance with the determined order. The end of the work is determined by the control unit 24, for example, based on a signal transmitted from the terminal device 40 operated by the worker 120. Alternatively, the control unit 24 may determine the end of the work based on an image taken by a camera (not shown). The camera photographs the state of work of the worker 120 or the work result at the target location. In addition, when the detection part 22b generates a visible light image, the control part 24 may use the detection result of the detection part 22b instead of the image photographed by the camera.

[データ処理装置]
次に、データ処理装置30について説明する。データ処理装置30は、投影装置20が投影する図面に関する処理を行う装置である。データ処理装置30は、例えば、コンピュータ機器である。データ処理装置30は、図3に示されるように、通信部31と、データ処理部32と、制御部33と、記憶部34と、入力部35と、表示部36とを備える。
[Data processing device]
Next, the data processing device 30 will be explained. The data processing device 30 is a device that performs processing related to drawings projected by the projection device 20. The data processing device 30 is, for example, a computer device. The data processing device 30 includes a communication section 31, a data processing section 32, a control section 33, a storage section 34, an input section 35, and a display section 36, as shown in FIG.

通信部31は、データ処理装置30が投影装置20及び端末装置40と通信を行うための通信インタフェースである。通信部31は、投影装置20及び端末装置40の各々と無線通信を行うが、有線通信を行ってもよい。通信部31が行う通信の通信規格については、特に限定されない。 The communication unit 31 is a communication interface through which the data processing device 30 communicates with the projection device 20 and the terminal device 40. The communication unit 31 performs wireless communication with each of the projection device 20 and the terminal device 40, but may also perform wired communication. The communication standard for communication performed by the communication unit 31 is not particularly limited.

データ処理部32は、例えば、マイクロコンピュータ又はプロセッサである。データ処理部32は、建築設計データに基づいて、作業者120に作業を行わせる少なくとも1つの作業箇所である対象箇所と、当該対象箇所に投影される対象図面とを決定する。対象箇所は、例えば、投影装置20が所定の場所に設置された場合に、投影装置20の投影範囲110内に含まれる作業箇所の少なくとも1つである。例えば、データ処理部32は、投影範囲110内に含まれる全ての作業箇所を1つずつ順番に対象箇所として決定する。決定される作業箇所の順序は、作業者120に作業を行わせる作業順序であり、図面が投影される投影順序である。 The data processing unit 32 is, for example, a microcomputer or a processor. Based on the architectural design data, the data processing unit 32 determines a target location, which is at least one work location on which the worker 120 is to perform work, and a target drawing to be projected onto the target location. The target location is, for example, at least one of the work locations included within the projection range 110 of the projection device 20 when the projection device 20 is installed at a predetermined location. For example, the data processing unit 32 sequentially determines all the work locations included in the projection range 110 as target locations one by one. The determined order of the work locations is the order in which the worker 120 is to perform the work, and the order in which the drawings are projected.

なお、データ処理部32は、投影範囲110内に含まれる作業箇所を、N箇所(Nは、2以上の自然数)ずつ順番に対象箇所として決定してもよい。つまり、N箇所の作業箇所に対して、同じ順序が決定されてもよい。これにより、N箇所の作業箇所に対応する図面が同時に投影される。 Note that the data processing unit 32 may sequentially determine N work locations included in the projection range 110 (N is a natural number of 2 or more) as target locations. In other words, the same order may be determined for N work locations. As a result, drawings corresponding to N work locations are simultaneously projected.

データ処理部32は、例えば、作業順序(すなわち、図面の投影順序)を作業者120又は管理者に入力させるための入力画面を生成し、表示部36に表示させる。入力画面は、例えば、作業現場100と、作業現場100に含まれる全ての作業箇所とを二次元又は三次元で表す画像を含み、全ての作業箇所を順に選択可能な選択画面である。データ処理部32は、選択された順序を作業順序(すなわち、図面の投影順序)として決定する。決定された順序で投影装置20が図面を投影することにより、決定された順序で作業者120に作業を行わせることができる。データ処理部32は、決定した投影順序と、各作業箇所に投影される図面とを示す順序情報を、通信部31及び通信部21を介して投影装置20の制御部24に送信する。 The data processing unit 32 generates, for example, an input screen for allowing the worker 120 or the administrator to input the work order (that is, the projection order of drawings), and causes the display unit 36 to display the input screen. The input screen is a selection screen that includes, for example, an image representing the work site 100 and all the work places included in the work site 100 in two or three dimensions, and allows all the work places to be selected in order. The data processing unit 32 determines the selected order as the work order (that is, the drawing projection order). By projecting the drawings by the projection device 20 in the determined order, it is possible to have the worker 120 perform the work in the determined order. The data processing unit 32 transmits order information indicating the determined projection order and the drawings to be projected onto each work location to the control unit 24 of the projection device 20 via the communication unit 31 and the communication unit 21.

建築設計データは、複数の作業箇所を示すデータである。具体的には、建築設計データは、作業現場100の大きさ、及び、形状を示す三次元データである。例えば、建築設計データは、三次元CAD(Computer Aided Design)データである。建築設計データには、作業現場100の間取りを示す二次元データ、及び、複数の作業箇所を示す二次元データも含まれる。建築設計データでは、複数の作業箇所の各々と、投影される図面とが対応付けられている。作業箇所が対象箇所として決定されることにより、建築設計データを参照することで、対象箇所に投影される対象図面が決定される。 Architectural design data is data indicating multiple work locations. Specifically, the architectural design data is three-dimensional data indicating the size and shape of the work site 100. For example, the architectural design data is three-dimensional CAD (Computer Aided Design) data. The architectural design data also includes two-dimensional data indicating the floor plan of the work site 100 and two-dimensional data indicating a plurality of work locations. In the architectural design data, each of a plurality of work locations is associated with a projected drawing. By determining the work location as the target location, a target drawing to be projected onto the target location is determined by referring to the architectural design data.

データ処理部32は、例えば、建築設計データと実際の作業現場100との対応付けを行う。実際の作業現場100は、例えば、投影装置20が作業現場100に設置された後、周囲の構造物までの距離を測距することにより得られた空間データによって示される。対応付けを行うことにより、建築設計データ上での投影装置20の設置位置及び姿勢(向き)が特定される。なお、作業者120又は作業の管理者などのユーザが、設置された投影装置20の設計データ上での位置を入力してもよい。つまり、作業現場100の測距が行われなくてもよい。 The data processing unit 32, for example, associates architectural design data with the actual work site 100. The actual work site 100 is shown, for example, by spatial data obtained by measuring distances to surrounding structures after the projection device 20 is installed at the work site 100. By making the correspondence, the installation position and posture (orientation) of the projection device 20 on the architectural design data are specified. Note that a user such as the worker 120 or a work manager may input the position of the installed projection device 20 on the design data. In other words, distance measurement of the work site 100 may not be performed.

制御部33は、入力画面の生成、並びに、作業順序及び図面の決定を行うために、通信部31、データ処理部32、記憶部34、入力部35及び表示部36を制御する制御装置である。制御部33は、例えば、集積回路であるLSIによって実現される。なお、集積回路はLSIに限られず、専用回路又は汎用プロセッサで実現されてもよい。例えば、制御部33は、マイクロコンピュータによって実現されてもよい。また、制御部33には、プログラム可能なFPGA、又は、LSI内部の回路セルの接続及び設定が再構成可能なリコンフィギュラブルプロセッサが利用されてもよい。 The control unit 33 is a control device that controls the communication unit 31, the data processing unit 32, the storage unit 34, the input unit 35, and the display unit 36 in order to generate an input screen and determine the work order and drawings. . The control unit 33 is realized by, for example, an LSI that is an integrated circuit. Note that the integrated circuit is not limited to LSI, and may be realized by a dedicated circuit or a general-purpose processor. For example, the control unit 33 may be realized by a microcomputer. Further, the control unit 33 may use a programmable FPGA or a reconfigurable processor in which connections and settings of circuit cells inside the LSI can be reconfigured.

記憶部34は、データ処理部32及び制御部33で実行される、入力画面の生成、並びに、作業順序及び図面の決定を行うための制御プログラムが記憶された記憶装置である。記憶部34は、例えば、不揮発性メモリであり、半導体メモリなどによって実現される。記憶部34は、さらに、建築設計データ、及び、投影される図面を示す図面データを記憶している。 The storage unit 34 is a storage device that stores a control program executed by the data processing unit 32 and the control unit 33 for generating an input screen and determining the work order and drawings. The storage unit 34 is, for example, a nonvolatile memory, and is realized by a semiconductor memory or the like. The storage unit 34 further stores architectural design data and drawing data indicating a drawing to be projected.

入力部35は、作業順序の入力を受け付ける受付部の一例である。入力部35は、作業者120又は作業の管理者などから作業順序の入力を受け付ける。入力部35は、例えば、キーボード又はマウスなどの入力装置であるが、タッチセンサ又は物理的なボタンであってもよい。 The input unit 35 is an example of a reception unit that receives input of a work order. The input unit 35 receives input of the work order from the worker 120 or the work manager. The input unit 35 is, for example, an input device such as a keyboard or a mouse, but may also be a touch sensor or a physical button.

表示部36は、作業順序を入力させるための入力画面を表示する。表示部36は、例えば、液晶表示パネル又は有機EL(Electro Luminescence)表示パネルである。 The display unit 36 displays an input screen for inputting the work order. The display unit 36 is, for example, a liquid crystal display panel or an organic EL (Electro Luminescence) display panel.

なお、作業順序の入力及び入力画面の表示は、端末装置40で行われてもよい。すなわち、データ処理装置30は、入力部35及び表示部36を備えなくてもよい。 Note that the input of the work order and the display of the input screen may be performed on the terminal device 40. That is, the data processing device 30 does not need to include the input section 35 and the display section 36.

[端末装置]
次に、端末装置40について説明する。端末装置40は、作業者120が投影装置20を遠隔操作するためのリモートコントローラとしても機能する。例えば、端末装置40は、投影装置20の専用リモートコントローラである。あるいは、端末装置40は、専用のアプリケーションプログラムがインストールされたスマートフォン又はタブレット端末などの携帯端末であってもよい。図3に示されるように、端末装置40は、通信部41と、操作受付部42と、表示部43と、制御部44と、記憶部45とを備える。
[Terminal device]
Next, the terminal device 40 will be explained. The terminal device 40 also functions as a remote controller for the operator 120 to remotely control the projection device 20. For example, the terminal device 40 is a dedicated remote controller for the projection device 20. Alternatively, the terminal device 40 may be a mobile terminal such as a smartphone or a tablet terminal in which a dedicated application program is installed. As shown in FIG. 3, the terminal device 40 includes a communication section 41, an operation reception section 42, a display section 43, a control section 44, and a storage section 45.

通信部41は、端末装置40が投影装置20及びデータ処理装置30と通信を行うための通信インタフェースである。通信部41は、投影装置20及びデータ処理装置30の各々と無線通信を行うが、有線通信を行ってもよい。通信部41が行う通信の通信規格については、特に限定されない。 The communication unit 41 is a communication interface through which the terminal device 40 communicates with the projection device 20 and the data processing device 30. The communication unit 41 performs wireless communication with each of the projection device 20 and the data processing device 30, but may also perform wired communication. The communication standard for communication performed by the communication unit 41 is not particularly limited.

操作受付部42は、作業者120の操作を受け付けるユーザインタフェース装置である。操作受付部42は、例えば、1つ以上の物理的なボタンによって実現されるが、タッチパネルなどであってもよい。 The operation reception unit 42 is a user interface device that receives operations from the worker 120. The operation reception unit 42 is realized by, for example, one or more physical buttons, but may also be a touch panel or the like.

表示部43は、投影装置20の動作状況などを示す画像を表示する。表示部43は、例えば、液晶表示パネル又は有機EL表示パネルである。 The display unit 43 displays an image showing the operating status of the projection device 20 and the like. The display section 43 is, for example, a liquid crystal display panel or an organic EL display panel.

制御部44は、通信部41、操作受付部42、表示部43及び記憶部45を制御する制御装置である。制御部44は、集積回路であるLSIによって実現される。なお、集積回路はLSIに限られず、専用回路又は汎用プロセッサで実現されてもよい。例えば、制御部44は、マイクロコンピュータによって実現されてもよい。また、制御部44には、プログラム可能なFPGA、又は、LSI内部の回路セルの接続及び設定が再構成可能なリコンフィギュラブルプロセッサが利用されてもよい。 The control unit 44 is a control device that controls the communication unit 41, the operation reception unit 42, the display unit 43, and the storage unit 45. The control unit 44 is realized by an LSI that is an integrated circuit. Note that the integrated circuit is not limited to LSI, and may be realized by a dedicated circuit or a general-purpose processor. For example, the control unit 44 may be realized by a microcomputer. Further, the control unit 44 may use a programmable FPGA or a reconfigurable processor in which connections and settings of circuit cells inside the LSI can be reconfigured.

具体的には、制御部44は、操作受付部42によって受け付けられた操作に応じて投影装置20を動作させるための信号を通信部41に投影装置20へ送信させる。例えば、制御部44は、作業終了の指示を受け付ける操作を作業者120から操作受付部42が受け付けた場合に、作業終了を示す終了信号を通信部41に投影装置20へ送信させる。 Specifically, the control unit 44 causes the communication unit 41 to transmit, to the projection device 20, a signal for operating the projection device 20 in accordance with the operation accepted by the operation reception unit 42. For example, when the operation reception unit 42 receives an operation to accept an instruction to end the work from the worker 120, the control unit 44 causes the communication unit 41 to transmit a completion signal indicating the end of the work to the projection device 20.

記憶部45は、制御部44によって実行される制御プログラムが記憶された記憶装置である。記憶部45は、例えば、不揮発性メモリであり、半導体メモリなどによって実現される。記憶部45は、端末装置40に固有の識別情報を記憶していてもよい。 The storage unit 45 is a storage device in which a control program executed by the control unit 44 is stored. The storage unit 45 is, for example, a nonvolatile memory, and is realized by a semiconductor memory or the like. The storage unit 45 may store identification information unique to the terminal device 40.

[ガイド図形]
続いて、本実施の形態に係る投影システム10が投影するガイド図形について、図4A及び図4Bを用いて説明する。
[Guide shape]
Next, guide figures projected by the projection system 10 according to this embodiment will be explained using FIGS. 4A and 4B.

図4A及び図4Bはそれぞれ、本実施の形態に係る投影システム10によってガイド図形が投影された作業現場100を示す斜視図である。なお、図4A及び図4Bでは、作業箇所101が対象箇所、すなわち、作業者120が次に作業を行う予定の作業箇所である場合を示している。すなわち、図4Aに示されるガイド図形130及び図4Bに示されるガイド図形131のいずれも、作業者120を作業箇所101に誘導するためのガイド図形である。 FIGS. 4A and 4B are perspective views showing a work site 100 on which guide figures are projected by the projection system 10 according to the present embodiment. Note that FIGS. 4A and 4B show a case where the work location 101 is a target location, that is, the work location where the worker 120 is scheduled to work next. That is, both the guide figure 130 shown in FIG. 4A and the guide figure 131 shown in FIG. 4B are guide figures for guiding the worker 120 to the work location 101.

ガイド図形130又は131は、例えば、作業箇所101に投影される図面111の外形よりも大きい図形である。あるいは、ガイド図形130又は131は、作業箇所101よりも作業者120に近い位置に、少なくとも一部が投影される図形である。例えば、ガイド図形130又は131の少なくとも一部は、作業箇所101の直前の作業箇所の近くに投影される。作業箇所101の直前の作業箇所には、作業者120が存在する可能性が高いので、作業者120が容易にガイド図形130又は131を見つけることができる。 The guide figure 130 or 131 is, for example, a figure larger than the outline of the drawing 111 projected onto the work location 101. Alternatively, the guide figure 130 or 131 is a figure that is at least partially projected at a position closer to the worker 120 than the work location 101. For example, at least a portion of the guide figure 130 or 131 is projected near the work location immediately before the work location 101. Since there is a high possibility that the worker 120 is present at the work location immediately before the work location 101, the worker 120 can easily find the guide figure 130 or 131.

このように、ガイド図形130又は131が投影されることによって、作業者120はガイド図形130又は131を容易に見つけることができ、作業箇所101に容易に誘導される。つまり、ガイド図形130又は131は、作業者120を作業箇所101に誘導することができる。このため、作業者120による次の作業箇所101の探索時間を削減することができ、作業効率を高めることができる。なお、ガイド図形130又は131は、作業箇所101を強調表示する図形と言うこともできる。 By projecting the guide figure 130 or 131 in this way, the worker 120 can easily find the guide figure 130 or 131 and be easily guided to the work location 101. That is, the guide figure 130 or 131 can guide the worker 120 to the work location 101. Therefore, the time taken by the worker 120 to search for the next work location 101 can be reduced, and work efficiency can be improved. Note that the guide figure 130 or 131 can also be said to be a figure that highlights the work area 101.

ガイド図形130は、図4Aに示されるように、複数の矢印を含んでいる。複数の矢印はそれぞれ、作業箇所101とは異なる位置から作業箇所101に向かう方向の矢印である。ガイド図形130に含まれる複数の矢印は、互いに長さが異なっている。複数の矢印は、作業箇所101に近づくにつれて、その長さが短くなっている。なお、複数の矢印は、互いに同じ長さであってもよい。 Guide figure 130 includes a plurality of arrows, as shown in FIG. 4A. Each of the plurality of arrows points in a direction toward the work place 101 from a position different from the work place 101. The plurality of arrows included in the guide figure 130 have different lengths. The lengths of the plurality of arrows become shorter as they approach the work location 101. Note that the plurality of arrows may have the same length.

複数の矢印は、一直線に並んでいる。一直線に並んだ複数の矢印のうち、作業箇所101から最も離れた矢印(最後方の矢印)の始点は、作業者120の近傍に位置している。具体的には、最後方の矢印の始点(すなわち、ガイド図形130の一部)は、作業箇所101の直前の作業箇所を中心とする所定の半径(例えば、1m~数m)の円形の範囲内に位置している。最後方の矢印の始点は、作業箇所101の直前の作業箇所であってもよい。これにより、作業者120に矢印を見つけやすくすることができ、かつ、矢印の先端側に作業箇所101が存在していることを作業者120に直感的に分かりやすくすることができる。 Multiple arrows are lined up in a straight line. Among the plurality of arrows arranged in a straight line, the starting point of the arrow farthest from the work location 101 (the rearmost arrow) is located near the worker 120. Specifically, the starting point of the rearmost arrow (that is, a part of the guide figure 130) is a circular range of a predetermined radius (for example, 1 m to several meters) centered on the work place immediately before the work place 101. Located within. The starting point of the rearmost arrow may be the work location immediately before the work location 101. This allows the operator 120 to easily find the arrow, and also allows the operator 120 to intuitively understand that the work location 101 exists on the tip end side of the arrow.

また、ガイド図形131は、図4Bに示されるように、複数の環形状を含んでいる。複数の環形状はそれぞれ、作業箇所101を囲んでいる。例えば、複数の環形状は、作業箇所101を中心とする同心円である。なお、複数の環形状はそれぞれ、円形でなくてもよく、楕円形であってもよく、正方形又は長方形であってもよい。あるいは、複数の環形状は、作業箇所101に投影する図面111の輪郭を拡大した図形であってもよい。 Further, the guide figure 131 includes a plurality of ring shapes, as shown in FIG. 4B. Each of the plurality of ring shapes surrounds the work location 101. For example, the plurality of ring shapes are concentric circles centered on the work location 101. Note that each of the plurality of annular shapes does not have to be circular, and may be oval, square, or rectangular. Alternatively, the plurality of annular shapes may be figures obtained by enlarging the outline of the drawing 111 projected onto the work area 101.

複数の環形状のうち、最も外側の環形状の一部は、作業者120の近傍に位置している。具体的には、最も外側の環形状の一部(すなわち、ガイド図形131の一部)は、作業箇所101の直前の作業箇所を中心とする所定の半径(例えば、1m~数m)の円形の範囲内に位置している。最も外側の環形状の一部は、作業箇所101の直前の作業箇所であってもよい。 Among the plurality of annular shapes, a part of the outermost annular shape is located near the worker 120. Specifically, a part of the outermost annular shape (that is, a part of the guide figure 131) is a circular shape with a predetermined radius (for example, 1 m to several meters) centered on the work place immediately before the work place 101. It is located within the range of A part of the outermost annular shape may be a work place immediately before work place 101.

なお、ガイド図形は、矢印又は環形状に限定されない。例えば、ガイド図形は、作業箇所101を中心として外側に延びる放射形状であってもよい。また、ガイド図形に含まれる環形状又は放射形状は、作業箇所101の全周に亘って設けられていなくてもよく、作業者120側(直前の作業箇所側)のみに設けられていてもよい。 Note that the guide figure is not limited to an arrow or ring shape. For example, the guide figure may have a radial shape that extends outward from the work location 101 . Further, the annular shape or radial shape included in the guide figure does not have to be provided all around the work location 101, and may be provided only on the worker 120 side (the immediately previous work location side). .

[動作]
続いて、本実施の形態に係る投影システム10の動作について、図5を用いて説明する。
[motion]
Next, the operation of the projection system 10 according to this embodiment will be explained using FIG. 5.

図5は、本実施の形態に係る投影システム10の動作を示すフローチャートである。図5に示されるように、まず、作業者120が投影装置20を作業現場100に設置する(S10)。最初に設置される場所は、作業者120が任意に定めた場所であってもよく、データ処理装置30が決定した場所であってもよい。投影装置20が設置された後、データ処理装置30は、実際の作業現場100と建築設計データとの対応付けを行う。 FIG. 5 is a flowchart showing the operation of the projection system 10 according to this embodiment. As shown in FIG. 5, first, the worker 120 installs the projection device 20 at the work site 100 (S10). The first installation location may be a location arbitrarily determined by the operator 120 or may be a location determined by the data processing device 30. After the projection device 20 is installed, the data processing device 30 correlates the actual work site 100 with architectural design data.

投影装置20は、作業者120を作業箇所101に誘導するためのガイド図形を投影する(S20)。例えば、投影装置20は、図4A又は図4Bに示されるように、データ処理装置30によって決定された対象箇所である作業箇所101に作業者120を誘導するためのガイド図形130又は131を投影する。このとき、作業箇所101には、図面111が投影されていない。 The projection device 20 projects a guide figure for guiding the worker 120 to the work location 101 (S20). For example, as shown in FIG. 4A or 4B, the projection device 20 projects a guide figure 130 or 131 for guiding the worker 120 to the work location 101, which is the target location determined by the data processing device 30. . At this time, the drawing 111 is not projected onto the work location 101.

ガイド図形130又は131の投影は、例えば、作業者120が投影装置20の設置を完了した後、端末装置40を操作することにより、図面の投影の開始を指示した場合に行われる。あるいは、投影装置20が設置された後、自動的にガイド図形130又は131の投影が行われてもよい。 Projection of the guide figure 130 or 131 is performed, for example, when the operator 120 instructs to start projecting a drawing by operating the terminal device 40 after completing the installation of the projection device 20. Alternatively, the guide figure 130 or 131 may be automatically projected after the projection device 20 is installed.

本実施の形態に係る投影システム10では、ガイド図形を投影した後、投影装置20が図面111を作業箇所101に投影する(S30)。例えば、ガイド図形130又は131を投影してから所定期間が経過した後に、投影装置20が図面111を作業箇所101に投影する。所定期間は、予め定められた固定の時間であってもよく、あるいは、作業者120の移動に要する時間に基づいて定められた時間であってもよい。例えば、作業者120の現在位置(又は、作業箇所101の直前の作業箇所)から作業箇所101までの距離と、作業者120の歩行速度とに基づいて推定された時間であってもよい。また、作業者120から図面111の投影の指示を受け付けた後、投影装置20が図面111を投影してもよい。投影装置20は、図面111を投影する時にガイド図形130又は131の投影を終了する。 In the projection system 10 according to the present embodiment, after projecting the guide figure, the projection device 20 projects the drawing 111 onto the work location 101 (S30). For example, the projection device 20 projects the drawing 111 onto the work location 101 after a predetermined period of time has elapsed since the guide figure 130 or 131 was projected. The predetermined period may be a predetermined fixed time, or may be a time determined based on the time required for the worker 120 to move. For example, the time may be estimated based on the distance from the current position of the worker 120 (or the work location immediately before the work location 101) to the work location 101 and the walking speed of the worker 120. Further, the projection device 20 may project the drawing 111 after receiving an instruction to project the drawing 111 from the operator 120. The projection device 20 finishes projecting the guide figure 130 or 131 when projecting the drawing 111.

作業箇所101に図面111が投影されることにより、作業者120は、投影された図面111に基づいて墨出し作業などの作業を行うことができる。作業が終了した後、作業者120は、端末装置40を操作することで、作業終了を指示する。作業終了が指示されるまで(S40でNo)、作業箇所101には図面111が投影され続ける。 By projecting the drawing 111 onto the work location 101, the worker 120 can perform work such as marking work based on the projected drawing 111. After the work is completed, the worker 120 instructs the end of the work by operating the terminal device 40. The drawing 111 continues to be projected onto the work area 101 until the end of the work is instructed (No in S40).

作業終了が指示された後(S40でYes)、次の作業箇所が存在する場合(S50でYes)、ステップS20に戻り、投影装置20が、作業者120を次の作業箇所に誘導するためのガイド図形を投影する。 After the end of the work is instructed (Yes in S40), if the next work location exists (Yes in S50), the process returns to step S20, and the projection device 20 performs a process to guide the worker 120 to the next work location. Project a guide shape.

以降、作業現場100に含まれる全ての作業箇所での作業が終了するまで(S50でNo)、上述したステップS20~S50の処理が繰り返される。 Thereafter, the processes of steps S20 to S50 described above are repeated until the work at all work locations included in the work site 100 is completed (No in S50).

[効果など]
以上のように、本実施の形態に係る投影システム10は、作業現場100に設置され、作業現場100における複数の作業箇所の各々に図面を投影する投影装置20を備える。投影装置20は、さらに、作業者120を複数の作業箇所の少なくとも1つである対象箇所に誘導するためのガイド図形130又は131を投影する。
[Effects etc.]
As described above, the projection system 10 according to the present embodiment includes the projection device 20 that is installed at the work site 100 and projects a drawing onto each of a plurality of work locations at the work site 100. The projection device 20 further projects a guide figure 130 or 131 for guiding the worker 120 to a target location that is at least one of the plurality of work locations.

これにより、作業者120を作業箇所101に誘導することができるので、作業者120に効率良く作業を行わせることができ、工期の短縮及び作業者の負担を軽減することができる。 This allows the worker 120 to be guided to the work location 101, allowing the worker 120 to work efficiently, thereby shortening the construction period and reducing the burden on the worker.

また、例えば、投影装置20は、対象箇所に図面111を投影する前に、作業者120を対象箇所に誘導するためのガイド図形130又は131を投影する。 Furthermore, for example, before projecting the drawing 111 onto the target location, the projection device 20 projects a guide figure 130 or 131 for guiding the worker 120 to the target location.

これにより、作業者120が次の作業箇所を見つけるのに要する時間を短くすることができるので、作業効率を高めることができる。 Thereby, the time required for the worker 120 to find the next work location can be shortened, so work efficiency can be improved.

また、例えば、投影装置20は、ガイド図形130又は131の少なくとも一部を対象箇所とは異なる位置に投影する。 Furthermore, for example, the projection device 20 projects at least a portion of the guide figure 130 or 131 to a position different from the target location.

これにより、作業箇所101から離れた位置にガイド図形を投影することで、作業者120にガイド図形を見つけやすくすることができる。例えば、作業者120の近くにガイド図形の少なくとも一部を投影することにより、作業者120が容易にガイド図形を見つけることができ、ガイド図形によって作業箇所101に誘導されやすくすることができる。 Thereby, by projecting the guide figure at a position away from the work location 101, it is possible to make it easier for the worker 120 to find the guide figure. For example, by projecting at least a portion of the guide figure near the worker 120, the worker 120 can easily find the guide figure and be easily guided to the work location 101 by the guide figure.

また、例えば、ガイド図形130は、対象箇所とは異なる位置から対象箇所に向かう方向の矢印である。また、ガイド図形131は、対象箇所を囲む環形状である。 Further, for example, the guide figure 130 is an arrow pointing toward the target location from a position different from the target location. Further, the guide figure 131 has a ring shape surrounding the target location.

これにより、矢印又は環形状によって作業箇所101の位置を作業者120に認識させやすくすることができる。 This allows the operator 120 to easily recognize the position of the work location 101 using the arrow or ring shape.

また、例えば、本実施の形態に係る投影方法は、作業現場100に設置された投影装置20が、作業現場100における複数の作業箇所の各々に図面を投影するステップと、作業者120を複数の作業箇所の少なくとも1つである対象箇所に誘導するためのガイド図形130又は131を投影するステップとを含む。 Further, for example, the projection method according to the present embodiment includes a step in which the projection device 20 installed at the work site 100 projects a drawing onto each of a plurality of work locations on the work site 100, and and projecting a guide figure 130 or 131 for guiding the user to a target location, which is at least one of the work locations.

これにより、作業者120を作業箇所101に誘導することができるので、作業者120に効率良く作業を行わせることができ、工期の短縮及び作業者の負担を軽減することができる。 This allows the worker 120 to be guided to the work location 101, allowing the worker 120 to work efficiently, thereby shortening the construction period and reducing the burden on the worker.

[変形例]
続いて、実施の形態1の変形例について説明する。
[Modified example]
Next, a modification of the first embodiment will be described.

実施の形態1の変形例に係る投影システムでは、実施の形態1と比較して、ガイド図形を投影するタイミング又はガイド図形の色若しくは種類などが相違している。以下では、実施の形態1との相違点を中心に説明し、共通点の説明を省略又は簡略化する。なお、実施の形態1の変形例に係る投影システムの構成は、実施の形態1に係る投影システム10の構成と同じであるので、以下では、図2及び図3に示される投影システム10の構成を用いて説明を行う。 The projection system according to the modification of the first embodiment differs from the first embodiment in the timing of projecting the guide figure, the color or type of the guide figure, and the like. In the following, differences from Embodiment 1 will be mainly described, and descriptions of common features will be omitted or simplified. Note that the configuration of the projection system according to the modification of the first embodiment is the same as the configuration of the projection system 10 according to the first embodiment, so the configuration of the projection system 10 shown in FIGS. 2 and 3 will be described below. I will explain using.

[変形例1]
まず、変形例1に係る投影システムについて、図6、図7A及び図7Bを用いて説明する。図6は、本変形例に係る投影システム10の動作を示すフローチャートである。図7A及び図7Bはそれぞれ、本変形例に係る投影システム10によってガイド図形130又は131が投影された作業現場100を示す斜視図である。
[Modification 1]
First, a projection system according to Modification 1 will be described using FIGS. 6, 7A, and 7B. FIG. 6 is a flowchart showing the operation of the projection system 10 according to this modification. 7A and 7B are perspective views showing a work site 100 on which a guide figure 130 or 131 is projected by the projection system 10 according to this modification, respectively.

図6に示されるように、まず、実施の形態1と同様に、作業者120が投影装置20を作業現場100の所定の場所に設置する(S10)。 As shown in FIG. 6, first, similarly to Embodiment 1, worker 120 installs projection device 20 at a predetermined location on work site 100 (S10).

次に、投影装置20は、作業者120を作業箇所101に誘導するためのガイド図形と、作業箇所101に対応する図面111とを同時に投影する(S21)。例えば、投影装置20は、図7A又は図7Bに示されるように、ガイド図形130又は131と、図面111とを同時に投影する。以降の処理は、実施の形態1と同じである。 Next, the projection device 20 simultaneously projects a guide figure for guiding the worker 120 to the work location 101 and the drawing 111 corresponding to the work location 101 (S21). For example, the projection device 20 projects the guide figure 130 or 131 and the drawing 111 simultaneously, as shown in FIG. 7A or 7B. The subsequent processing is the same as in the first embodiment.

以上のように、本変形例に係る投影システム10では、投影装置20は、対象箇所に図面111を投影すると同時に、作業者120を対象箇所に誘導するためのガイド図形130又は131を投影する。 As described above, in the projection system 10 according to the present modification, the projection device 20 projects the drawing 111 onto the target location and at the same time projects the guide figure 130 or 131 for guiding the worker 120 to the target location.

このように、ガイド図形130又は131と図面111とが同時に投影されるので、作業者120は、ガイド図形130又は131によって作業箇所101に誘導された後、速やかに図面111に沿って作業を行うことができる。つまり、作業箇所101に移動した後に図面111の投影を待つ必要もなく、図面111の投影の指示を行う必要もないので、より効率良く作業を行うことができる。 In this way, the guide figure 130 or 131 and the drawing 111 are projected at the same time, so the worker 120 quickly works along the drawing 111 after being guided to the work location 101 by the guide figure 130 or 131. be able to. In other words, there is no need to wait for the projection of the drawing 111 after moving to the work location 101, and there is no need to instruct the projection of the drawing 111, so that the work can be performed more efficiently.

[変形例2]
次に、変形例2に係る投影システムについて、図8を用いて説明する。
[Modification 2]
Next, a projection system according to modification 2 will be described using FIG. 8.

図8は、本変形例に係る投影システムが投影するガイド図形の一例を示す斜視図である。図8の(a)~(d)はそれぞれ、作業現場100に投影されるガイド図形の時間変化を順に示している。 FIG. 8 is a perspective view showing an example of a guide figure projected by the projection system according to this modification. (a) to (d) of FIG. 8 each sequentially show the change over time of the guide figure projected onto the work site 100.

本変形例では、投影装置20は、動的に変化する図形をガイド図形として投影する。図8の(a)~(d)に示されるように、投影装置20は、矢印132a、132b、132c及び132dの順に投影する。矢印132a~132dはそれぞれ、例えば、図4Aに示されるガイド図形130に含まれる各矢印に対応している。 In this modification, the projection device 20 projects a dynamically changing figure as a guide figure. As shown in FIGS. 8A to 8D, the projection device 20 projects in the order of arrows 132a, 132b, 132c, and 132d. Arrows 132a to 132d each correspond to, for example, each arrow included in guide figure 130 shown in FIG. 4A.

具体的には、投影装置20は、矢印132aを所定の時間投影した後、矢印132bを投影する。投影装置20は、矢印132bを所定の時間投影した後、矢印132cを投影する。投影装置20は、矢印132cを所定の時間投影した後、矢印132dを投影する。投影装置20は、矢印132dを投影した後、再び、矢印132aを投影してもよい。投影装置20は、矢印132a~132dの投影を繰り返してもよい。 Specifically, the projection device 20 projects the arrow 132b for a predetermined period of time, and then projects the arrow 132b. After projecting the arrow 132b for a predetermined period of time, the projection device 20 projects the arrow 132c. After projecting the arrow 132c for a predetermined time, the projection device 20 projects the arrow 132d. After projecting the arrow 132d, the projection device 20 may project the arrow 132a again. The projection device 20 may repeatedly project the arrows 132a to 132d.

矢印132a~132dの各々の投影時間は、例えば、予め定められた時間(例えば、1秒~数秒)であり、互いに同じ時間であるが、異なる時間であってもよい。あるいは、投影装置20は、作業者120の位置を検出し、検出した位置に合わせて各矢印の投影するタイミングを決定し、決定したタイミングで矢印を投影してもよい。 The projection time of each of the arrows 132a to 132d is, for example, a predetermined time (eg, 1 second to several seconds), and may be the same time, but may be different times. Alternatively, the projection device 20 may detect the position of the worker 120, determine the timing of projecting each arrow according to the detected position, and project the arrow at the determined timing.

以上のように、本変形例に係る投影システム10では、投影装置20は、動的に変化する図形をガイド図形として投影する。 As described above, in the projection system 10 according to this modification, the projection device 20 projects a dynamically changing figure as a guide figure.

これにより、ガイド図形が動的に変化するので、作業者120に視覚的な刺激を与えることができ、ガイド図形を容易に見つけやすくすることができる。 As a result, the guide figure changes dynamically, providing visual stimulation to the operator 120 and making it easier to find the guide figure.

なお、図8では、投影装置20がガイド図形として複数の矢印132a~132dを投影する例を示したが、これに限らない。例えば、投影装置20は、図4Bに示される複数の環形状を1つずつ順に投影してもよい。 Although FIG. 8 shows an example in which the projection device 20 projects a plurality of arrows 132a to 132d as guide figures, the present invention is not limited to this. For example, the projection device 20 may sequentially project the plurality of annular shapes shown in FIG. 4B one by one.

また、投影装置20は、矢印132a~132dと図面111とを同時に投影しているが、これに限らない。投影装置20は、矢印132dを投影した後、図面111を投影してもよい。 Further, although the projection device 20 projects the arrows 132a to 132d and the drawing 111 at the same time, the present invention is not limited thereto. The projection device 20 may project the drawing 111 after projecting the arrow 132d.

[変形例3]
次に、変形例3に係る投影システムについて、図9を用いて説明する。
[Modification 3]
Next, a projection system according to modification 3 will be described using FIG. 9.

図9は、本変形例に係る投影システムが投影するガイド図形133を示す斜視図である。本変形例では、投影装置20は、図面111を投影する色とは異なる色でガイド図形133を投影する。すなわち、図9に示されるガイド図形133の色は、作業箇所101に投影される図面111とは異なる色である。例えば、図面111の色が赤色である場合には、ガイド図形133の色は青色又は緑色などの赤色とは異なる色である。作業者120が違いを認識できる程度に色の差があればよく、図面111とガイド図形133とに用いられる色の種類は、特に限定されない。 FIG. 9 is a perspective view showing a guide figure 133 projected by the projection system according to this modification. In this modification, the projection device 20 projects the guide figure 133 in a color different from the color in which the drawing 111 is projected. That is, the color of the guide figure 133 shown in FIG. 9 is a different color from the color of the drawing 111 projected onto the work location 101. For example, when the color of the drawing 111 is red, the color of the guide figure 133 is a color different from red, such as blue or green. The types of colors used for the drawing 111 and the guide figure 133 are not particularly limited, as long as there is a difference in color to the extent that the operator 120 can recognize the difference.

なお、図9では、色の違いを示すため、ガイド図形133に含まれる矢印を点線で表しているが、ガイド図形133は、実線の矢印を含んでいる。なお、ガイド図形133は、図9に示される通り、点線の矢印であってもよい。 In FIG. 9, the arrows included in the guide figure 133 are shown as dotted lines to show the difference in color, but the guide figure 133 includes solid arrows. Note that the guide figure 133 may be a dotted arrow as shown in FIG. 9 .

以上のように、本変形例に係る投影システム10では、投影装置20は、図面111を投影する色とは異なる色でガイド図形133を投影する。 As described above, in the projection system 10 according to this modification, the projection device 20 projects the guide figure 133 in a color different from the color in which the drawing 111 is projected.

これにより、ガイド図形133と図面111とが異なる色で投影されるので、ガイド図形133と図面111とが同時に投影された場合であっても、ガイド図形133と図面111とを作業者120が混同するのを抑制することができる。したがって、作業ミスの発生を抑制することができ、作業効率を高めることができる。 As a result, the guide figure 133 and the drawing 111 are projected in different colors, so even if the guide figure 133 and the drawing 111 are projected at the same time, the operator 120 may confuse the guide figure 133 and the drawing 111. It is possible to prevent this from happening. Therefore, the occurrence of work errors can be suppressed, and work efficiency can be improved.

(実施の形態2)
続いて、実施の形態2について説明する。
(Embodiment 2)
Next, Embodiment 2 will be described.

実施の形態2に係る投影システムでは、実施の形態1と比較して、投影装置が複数の作業箇所に同時に複数の図面を投影する点が相違している。以下では、実施の形態1との相違点を中心に説明し、共通点の説明を省略又は簡略化する。なお、実施の形態2に係る投影システムの構成は、実施の形態1に係る投影システム10の構成と同じであるので、以下では、図2及び図3に示される投影システム10の構成を用いて説明を行う。 The projection system according to the second embodiment is different from the first embodiment in that the projection device projects a plurality of drawings onto a plurality of work locations at the same time. In the following, differences from Embodiment 1 will be mainly described, and descriptions of common features will be omitted or simplified. Note that the configuration of the projection system according to the second embodiment is the same as the configuration of the projection system 10 according to the first embodiment, so the configuration of the projection system 10 shown in FIGS. 2 and 3 will be used below. Give an explanation.

図10は、本実施の形態に係る投影システム10の動作を示すフローチャートである。図10に示されるように、まず、実施の形態1と同様に、作業者120が投影装置20を作業現場100に設置する(S10)。 FIG. 10 is a flowchart showing the operation of the projection system 10 according to this embodiment. As shown in FIG. 10, first, similarly to Embodiment 1, worker 120 installs projection device 20 at work site 100 (S10).

次に、投影システム10では、投影装置20が複数の作業箇所に同時に複数の図面を投影するか否かが判定される(S60)。当該判定は、例えば、データ処理装置30によって行われる。具体的には、データ処理部32は、投影装置20の設置位置に基づいて、投影範囲110に複数の作業箇所が含まれるか否かを判定する。 Next, in the projection system 10, it is determined whether the projection device 20 projects a plurality of drawings onto a plurality of work locations at the same time (S60). The determination is made by the data processing device 30, for example. Specifically, the data processing unit 32 determines whether the projection range 110 includes a plurality of work locations based on the installation position of the projection device 20.

例えば、投影範囲110に複数の作業箇所が含まれる場合、データ処理部32は、これらの作業箇所に同時に複数の図面を投影すると判定する。投影範囲110に作業箇所が1つのみ含まれる場合、データ処理部32は、同時に複数の図面を投影しないと判定する。また、投影範囲110に複数の作業箇所が含まれる場合であっても、作業者120又は作業の管理者からの指示に基づいて、データ処理部32は、同時に複数の図面を投影しないと判定してもよい。例えば、作業者120又は作業の管理者は、データ処理装置30の入力部35又は端末装置40の操作受付部42を介して、同時に複数の図面を投影するか否か、又は、同時に投影する図面の枚数(作業箇所数)を入力してもよい。 For example, if the projection range 110 includes a plurality of work locations, the data processing unit 32 determines to project a plurality of drawings onto these work locations at the same time. If the projection range 110 includes only one work location, the data processing unit 32 determines not to project multiple drawings at the same time. Furthermore, even if the projection range 110 includes multiple work locations, the data processing unit 32 determines not to project multiple drawings at the same time based on instructions from the worker 120 or the work manager. You can. For example, the worker 120 or the work manager determines whether or not multiple drawings are to be projected simultaneously, or which drawings are to be projected simultaneously, via the input unit 35 of the data processing device 30 or the operation reception unit 42 of the terminal device 40. You may also enter the number of sheets (number of work areas).

複数の作業箇所に同時に複数の図面を投影する場合(S60でYes)、データ処理装置30は、複数の作業箇所をまとめたガイド図形を生成する(S70)。投影装置20は、生成されたガイド図形を投影する(S20)。複数の作業箇所をまとめたガイド図形の具体例については、図11A~図11Fを用いて後で説明する。なお、ステップS60の判定及びステップS70の生成は、投影装置20によって行われてもよい。 When projecting multiple drawings onto multiple work locations at the same time (Yes at S60), the data processing device 30 generates a guide figure that summarizes the multiple work locations (S70). The projection device 20 projects the generated guide figure (S20). A specific example of a guide figure that summarizes a plurality of work locations will be described later using FIGS. 11A to 11F. Note that the determination in step S60 and the generation in step S70 may be performed by the projection device 20.

複数の作業箇所に同時に複数の図面を投影しない場合(S60でNo)、投影装置20は、作業者120を1つの作業箇所に誘導するためのガイド図形を投影する(S20)。ガイド図形の投影が行われた以降の処理は、実施の形態1と同じである。 If multiple drawings are not projected onto multiple work locations at the same time (No in S60), the projection device 20 projects a guide figure for guiding the worker 120 to one work location (S20). The processing after the projection of the guide figure is the same as in the first embodiment.

次に、複数の作業箇所をまとめたガイド図形の具体例について、図11A~図11Fを用いて説明する。図11A~図11Fはそれぞれ、本実施の形態に係る投影システムによってガイド図形の一例が投影された作業現場100を示す斜視図である。 Next, specific examples of guide figures that summarize a plurality of work locations will be described using FIGS. 11A to 11F. 11A to 11F are perspective views each showing a work site 100 on which an example of a guide figure is projected by the projection system according to the present embodiment.

図11A~図11Fの各々では、投影装置20の投影範囲110に3つの作業箇所101、102及び103が含まれている。本実施の形態に係る投影装置20は、3つの作業箇所101、102及び103の各々に同時に図面111、112及び113(図11C及び図11Dを参照)を投影する。 In each of FIGS. 11A to 11F, the projection range 110 of the projection device 20 includes three work locations 101, 102, and 103. Projection device 20 according to this embodiment projects drawings 111, 112, and 113 (see FIGS. 11C and 11D) onto each of three work locations 101, 102, and 103 simultaneously.

図11A及び図11Cに示されるガイド図形230、図11B及び図11Dに示されるガイド図形231、並びに、図11Eに示されるガイド図形232はいずれも、作業者120を複数の作業箇所101~103に誘導するためのガイド図形である。また、図11Fに示されるガイド図形233は、作業者120を複数の作業箇所101~104に誘導するためのガイド図形である。 The guide figure 230 shown in FIGS. 11A and 11C, the guide figure 231 shown in FIGS. 11B and 11D, and the guide figure 232 shown in FIG. This is a guide figure for guidance. Further, a guide figure 233 shown in FIG. 11F is a guide figure for guiding the worker 120 to the plurality of work locations 101 to 104.

具体的には、ガイド図形230~233は、作業範囲201に誘導する。作業範囲201は、図11A~図11Fに示されるように、複数の作業箇所101~103、又は、複数の作業箇所101~104を含む範囲である。例えば、作業範囲201は、複数の作業箇所101~103を含む円形又は楕円形の範囲である。一例として、作業範囲201は、複数の作業箇所101~103又は複数の作業箇所101~104の各々の一部が内接するように定められた円形又は楕円形の範囲である。 Specifically, the guide figures 230 to 233 guide the user to the work range 201. As shown in FIGS. 11A to 11F, the work range 201 is a range that includes a plurality of work locations 101 to 103 or a plurality of work locations 101 to 104. For example, the work range 201 is a circular or elliptical range that includes a plurality of work locations 101 to 103. As an example, the work range 201 is a circular or elliptical range defined so that a portion of each of the plurality of work points 101 to 103 or the plurality of work points 101 to 104 is inscribed.

図11A及び図11Cに示されるように、ガイド図形230は、複数の矢印を含んでいる。複数の矢印は、例えば互いに平行である。あるいは、複数の矢印は、作業範囲201の中心に向かって収束する方向(中心からの放射方向とは反対向き)の矢印であってもよい。複数の矢印のうちの少なくとも1つの始点は、作業者120の近傍に位置している。具体的には、当該始点は、作業範囲201での作業の直前の作業箇所を中心とする所定の半径(例えば、1m~数m)の円形の範囲内に位置している。 As shown in FIGS. 11A and 11C, guide figure 230 includes a plurality of arrows. For example, the plurality of arrows are parallel to each other. Alternatively, the plurality of arrows may be arrows in a direction converging toward the center of the work range 201 (opposite to the radial direction from the center). At least one starting point of the plurality of arrows is located near the worker 120. Specifically, the starting point is located within a circular range of a predetermined radius (for example, 1 m to several meters) centered on the work location immediately before the work in the work range 201.

また、ガイド図形231は、図11B及び図11Dに示されるように、作業範囲201を囲む環形状である。ガイド図形231は、作業範囲201の輪郭と一致していてもよい。なお、ガイド図形231は、作業範囲201を含む複数の環形状を含んでもよい。各作業箇所よりも大きな環形状のガイド図形231が投影されることで、作業者120がガイド図形231を見つけやすくなり、作業範囲201に誘導されやすくなる。 Further, the guide figure 231 has a ring shape surrounding the working range 201, as shown in FIGS. 11B and 11D. The guide figure 231 may match the outline of the work range 201. Note that the guide figure 231 may include a plurality of ring shapes that include the working range 201. By projecting a ring-shaped guide figure 231 larger than each work location, the worker 120 can easily find the guide figure 231 and be guided to the work range 201.

なお、図11A及び図11Bでは、各作業箇所101~103には、図面が投影されていない。これに対して、図11C及び図11Dでは、各作業箇所101~103にはそれぞれ、対応する図面111~113が投影されている。すなわち、本実施の形態においても、ガイド図形230又は231と、各作業箇所に投影される図面111~113とは同時に投影されてもよい。 Note that in FIGS. 11A and 11B, no drawings are projected onto each of the work locations 101 to 103. On the other hand, in FIGS. 11C and 11D, corresponding drawings 111 to 113 are projected onto each work location 101 to 103, respectively. That is, in this embodiment as well, the guide figure 230 or 231 and the drawings 111 to 113 projected onto each work location may be projected at the same time.

図11Eに示されるガイド図形232は、作業範囲201を囲む環の一部である。ガイド図形232は、作業範囲201の輪郭の一部と一致していてもよい。ガイド図形232は、図面を同時に投影する対象箇所である複数の作業箇所101~103を包含するように描かれている。例えば、ガイド図形232の長さは、複数の作業箇所101~103のうち最も離れた作業箇所同士の距離よりも長い。ガイド図形232は、円弧又は楕円弧であるが、これらに限定されない。 The guide figure 232 shown in FIG. 11E is part of a ring surrounding the working range 201. The guide figure 232 may coincide with a part of the outline of the work range 201. The guide figure 232 is drawn so as to include a plurality of work points 101 to 103, which are target points on which drawings are simultaneously projected. For example, the length of the guide figure 232 is longer than the distance between the farthest working points among the plurality of working points 101 to 103. The guide figure 232 is a circular arc or an elliptical arc, but is not limited thereto.

図11Fに示されるガイド図形233は、図面を同時に投影する対象箇所である複数の作業箇所101~104を結ぶ線である。具体的には、ガイド図形233は、作業箇所101と作業箇所102とを結ぶ線と、作業箇所102と作業箇所103とを結ぶ線と、作業箇所103と作業箇所104とを結ぶ線と、作業箇所104と作業箇所101とを結ぶ線との4つの線からなる。 The guide figure 233 shown in FIG. 11F is a line connecting a plurality of work locations 101 to 104, which are target locations on which drawings are simultaneously projected. Specifically, the guide figure 233 includes a line that connects the work area 101 and the work area 102, a line that connects the work area 102 and the work area 103, a line that connects the work area 103 and the work area 104, and a line that connects the work area 101 and the work area 102. It consists of four lines, including a line connecting the location 104 and the work location 101.

なお、ガイド図形233を構成する線の数は、これに限らない、例えば、ガイド図形233は、さらに、作業箇所101と作業箇所103とを結ぶ線と、作業箇所102と作業箇所104とを結ぶ線とを含んでもよい。すなわち、ガイド図形233は、作業箇所101~104の各々を頂点とする四角形の4辺及び2本の対角線からなる図形であってもよい。あるいは、ガイド図形233は、作業箇所101~104の各々を頂点とする四角形であってもよい。また、ガイド図形233は、作業箇所101~104をこの順に結ぶ折れ線であってもよい。 Note that the number of lines that make up the guide figure 233 is not limited to this. For example, the guide figure 233 further includes a line that connects the work area 101 and the work area 103, and a line that connects the work area 102 and the work area 104. It may also include a line. That is, the guide figure 233 may be a figure consisting of four sides and two diagonals of a rectangle whose vertices are each of the work locations 101 to 104. Alternatively, the guide figure 233 may be a rectangle having vertices at each of the work locations 101 to 104. Further, the guide figure 233 may be a polygonal line connecting the work locations 101 to 104 in this order.

なお、対象箇所が2つの作業箇所のみを含む場合、ガイド図形233は、当該2つの作業箇所を結ぶ1本の線であってもよい。また、複数の作業箇所を結ぶ線は、直線(線分)であるが、曲線であってもよい。例えば、複数の作業箇所を結ぶ線は、波線であってもよい。 Note that when the target location includes only two work locations, the guide figure 233 may be a single line connecting the two work locations. Further, although the line connecting the plurality of work locations is a straight line (line segment), it may be a curved line. For example, the line connecting multiple work locations may be a wavy line.

以上のように、本実施の形態に係る投影システム10では、投影装置20は、複数の作業箇所101~103の各々に同時に複数の図面111~113を投影する場合、同時に投影される全ての作業箇所である対象箇所に作業者120を誘導するためのガイド図形230又は231を投影する。 As described above, in the projection system 10 according to the present embodiment, when projecting a plurality of drawings 111 to 113 simultaneously onto each of a plurality of work locations 101 to 103, the projection device 20 can A guide figure 230 or 231 is projected to guide the worker 120 to the target location.

これにより、同時に図面を投影する複数の作業箇所に対して作業者120を誘導することができる。作業者120は、自身に近い作業箇所から順に作業を進めていくことができるので、作業効率を高めることができる。 Thereby, the worker 120 can be guided to a plurality of work locations where drawings are projected at the same time. Since the worker 120 can proceed with the work in order starting from the work location closest to him/her, the work efficiency can be improved.

また、例えば、ガイド図形230は、対象箇所とは異なる位置から対象箇所に向かう方向の矢印である。また、ガイド図形231は、対象箇所を囲む環形状である。また、ガイド図形232は、対象箇所を囲む環の少なくとも一部である。また、ガイド図形233は、対象箇所である複数の作業箇所101~104を結ぶ線である。 Further, for example, the guide figure 230 is an arrow pointing toward the target location from a position different from the target location. Further, the guide figure 231 has a ring shape surrounding the target location. Further, the guide figure 232 is at least a part of a ring surrounding the target location. Further, the guide figure 233 is a line connecting a plurality of target work locations 101 to 104.

これにより、矢印、環形状、環の少なくとも一部、又は、複数の作業箇所を結ぶ線によって作業箇所101~104の位置を作業者120に認識させやすくすることができる。 This makes it possible for the operator 120 to easily recognize the positions of the work areas 101 to 104 using arrows, ring shapes, at least part of the ring, or lines connecting multiple work areas.

図11C及び図11Dでは、作業範囲201に含まれる全ての作業箇所101~103に図面111~113がガイド図形230又は231と同時に投影されているが、これに限らない。具体的には、ガイド図形230又は231と、作業範囲201に含まれる一部の作業箇所のみに対応する図面とが同時に投影されてもよい。例えば、投影装置20は、ガイド図形230又は231と、作業箇所103に対応する図面113のみとを同時に投影してもよい。あるいは、投影装置20は、ガイド図形230又は231と、図面112及び113とを同時に投影し、図面112及び113の投影が終了した後に、図面111を投影してもよい。図面111の投影時には、ガイド図形230又は231の投影を終了していてもよい。 In FIGS. 11C and 11D, the drawings 111 to 113 are simultaneously projected onto the guide figures 230 or 231 at all the work locations 101 to 103 included in the work range 201, but the invention is not limited thereto. Specifically, the guide figure 230 or 231 and a drawing corresponding only to a part of the work area included in the work range 201 may be projected at the same time. For example, the projection device 20 may project only the guide figure 230 or 231 and the drawing 113 corresponding to the work location 103 at the same time. Alternatively, the projection device 20 may project the guide figure 230 or 231 and the drawings 112 and 113 at the same time, and may project the drawing 111 after the projection of the drawings 112 and 113 is completed. When the drawing 111 is projected, the projection of the guide figure 230 or 231 may be finished.

また、図11E及び図11Fに示される例では、投影装置20は、ガイド図形232及び233と同時に図面111~113を投影してもよい。このとき、ガイド図形233と図面111~113と重なりうるため、変形例3で示したように、投影装置20は、ガイド図形233と図面111~113とを互いに異なる色で投影してもよい。 Furthermore, in the example shown in FIGS. 11E and 11F, the projection device 20 may project the drawings 111 to 113 simultaneously with the guide figures 232 and 233. At this time, the guide figure 233 and the drawings 111 to 113 may overlap, so as shown in the third modification, the projection device 20 may project the guide figure 233 and the drawings 111 to 113 in different colors.

(実施の形態3)
続いて、実施の形態3について説明する。
(Embodiment 3)
Next, Embodiment 3 will be described.

実施の形態3に係る投影システムでは、実施の形態1と比較して、作業現場での作業途中で投影装置の設置場所を変更させる必要がある点が相違する。投影装置は、作業者を次の設置場所に誘導するためのガイド図形を投影する。以下では、実施の形態1との相違点を中心に説明し、共通点の説明を省略又は簡略化する。なお、実施の形態3に係る投影システムの構成は、実施の形態1に係る投影システム10の構成と同じであるので、以下では、図2及び図3に示される投影システム10の構成を用いて説明を行う。 The projection system according to the third embodiment differs from the first embodiment in that it is necessary to change the installation location of the projection device during the work at the work site. The projection device projects a guide figure for guiding the worker to the next installation location. In the following, differences from Embodiment 1 will be mainly described, and descriptions of common features will be omitted or simplified. Note that the configuration of the projection system according to the third embodiment is the same as the configuration of the projection system 10 according to the first embodiment, so the configuration of the projection system 10 shown in FIGS. 2 and 3 will be used below. Give an explanation.

図12は、本実施の形態に係る投影システム10の動作を示すフローチャートである。図12に示されるように、投影装置20を設置してから次の作業箇所の有無の判定までの処理(S10~S50)については、実施の形態1と同じである。なお、実施の形態1の変形例1と同じように、投影装置20は、ガイド図形と図面とを同時に投影してもよい。また、実施の形態2と同様に、投影装置20は、複数の作業箇所をまとめたガイド図形を投影してもよい。 FIG. 12 is a flowchart showing the operation of the projection system 10 according to this embodiment. As shown in FIG. 12, the processes (S10 to S50) from installing the projection device 20 to determining the presence or absence of the next work location are the same as in the first embodiment. Note that, similarly to the first modification of the first embodiment, the projection device 20 may project the guide figure and the drawing at the same time. Further, similarly to the second embodiment, the projection device 20 may project a guide figure that summarizes a plurality of work locations.

次の作業箇所が存在する場合(S50でYes)、投影システム10では、次の作業箇所が投影装置20の投影範囲110内であるか否かが判定される(S80)。当該判定は、例えば、データ処理装置30によって行われる。具体的には、データ処理部32は、投影装置20の設置位置に基づいて、次の作業箇所が投影範囲110に含まれるか否かを判定する。 If the next work location exists (Yes in S50), the projection system 10 determines whether the next work location is within the projection range 110 of the projection device 20 (S80). The determination is made by the data processing device 30, for example. Specifically, the data processing unit 32 determines whether the next work location is included in the projection range 110 based on the installation position of the projection device 20.

次の作業箇所が投影範囲110に含まれる場合(S80でYes)、ステップS20に戻り、投影装置20が、作業者120を次の作業箇所に誘導するためのガイド図形を投影する。 If the next work location is included in the projection range 110 (Yes in S80), the process returns to step S20, and the projection device 20 projects a guide figure for guiding the worker 120 to the next work location.

次の作業箇所が投影範囲110に含まれない場合(S80でNo)、投影装置20は、作業者120を投影装置20の設置予定場所に誘導するためのガイド図形を投影する(S90)。 If the next work location is not included in the projection range 110 (No in S80), the projection device 20 projects a guide figure for guiding the worker 120 to the planned installation location of the projection device 20 (S90).

図13は、本実施の形態に係る投影システム10によってガイド図形が投影された作業現場300を示す斜視図である。図13に示される作業現場300は、図1に示される作業現場100よりも広い。このため、投影装置20が設置された場所では、作業現場300の中には投影装置20の投影範囲に含まれない作業箇所301が含まれる。このため、投影装置20を作業箇所301に近づけることにより、作業箇所301を投影範囲110内に含める必要がある。 FIG. 13 is a perspective view showing a work site 300 on which guide figures are projected by the projection system 10 according to the present embodiment. The worksite 300 shown in FIG. 13 is larger than the worksite 100 shown in FIG. Therefore, at the location where the projection device 20 is installed, the work site 300 includes a work location 301 that is not included in the projection range of the projection device 20. Therefore, it is necessary to bring the projection device 20 closer to the work area 301 to include the work area 301 within the projection range 110 .

このとき、作業者120は、作業現場300のどこに投影装置20を設置すべきかを判定することが難しい。例えば、まだ作業を終えていない複数の作業箇所が作業現場300に残っている場合、適切な設置場所(図13の(a)に示される設置予定場所321)に投影装置20を設置すれば、残りの作業箇所の全てを投影範囲110内に入れることができる場合がある。一方で、不適切な設置場所に投影装置20を設置した場合には、一部の作業箇所が投影範囲110から外れてしまい、もう一度投影装置20を設置し直す必要が出てくる。 At this time, it is difficult for the worker 120 to determine where in the work site 300 the projection device 20 should be installed. For example, if there are multiple unfinished work locations remaining at the work site 300, if the projection device 20 is installed at an appropriate installation location (planned installation location 321 shown in FIG. 13(a)), In some cases, all of the remaining work locations can be included within the projection range 110. On the other hand, if the projection device 20 is installed in an inappropriate installation location, some work areas will be outside the projection range 110, and it will be necessary to install the projection device 20 again.

本実施の形態に係る投影システム10では、図13の(b)に示されるように、投影装置20は、設置予定場所321にガイド図形330を投影する。例えば、投影装置20は、設置済みの場所で図面を投影できる範囲に含まれる作業箇所での作業者120の作業が終了した後、作業者120を設置予定場所321に誘導するためのガイド図形330を投影する。 In the projection system 10 according to the present embodiment, the projection device 20 projects a guide figure 330 onto the planned installation location 321, as shown in FIG. 13(b). For example, the projection device 20 uses a guide figure 330 to guide the worker 120 to the planned installation location 321 after the worker 120 finishes working at a work location included in the range where the drawing can be projected at the already installed location. to project.

設置予定場所321は、例えば、データ処理装置30によって決定される。具体的には、データ処理部32が、まだ作業を終えていない複数の作業箇所のうち、投影範囲110内に含まれる作業箇所の数が最大となる場所を設置予定場所321として決定する。なお、設置予定場所321の決定方法は、特に限定されない。 The planned installation location 321 is determined by the data processing device 30, for example. Specifically, the data processing unit 32 determines, as the planned installation location 321, the location where the number of work locations included in the projection range 110 is the largest among the multiple work locations for which work has not yet been completed. Note that the method for determining the planned installation location 321 is not particularly limited.

ガイド図形330は、例えば、設置予定場所321を中心とする円である。投影装置20は、円の輪郭だけでなく、内部にも光を投影している。なお、ガイド図形330は、設置予定場所321とは異なる位置に投影されてもよい。例えば、ガイド図形330は、実施の形態1に係るガイド図形130と同様に、設置予定場所321を指し示す矢印であってもよい。あるいは、ガイド図形330は、ガイド図形131と同様に、設置予定場所321を囲む複数の環形状であってもよい。 The guide figure 330 is, for example, a circle centered on the planned installation location 321. The projection device 20 projects light not only on the outline of the circle but also on the inside. Note that the guide figure 330 may be projected at a position different from the planned installation location 321. For example, the guide graphic 330 may be an arrow pointing to the planned installation location 321, similar to the guide graphic 130 according to the first embodiment. Alternatively, the guide figure 330 may be in the shape of a plurality of rings surrounding the planned installation location 321, similar to the guide figure 131.

設置予定場所321がガイド図形330によって表されることで、作業者120は、設置予定場所321に目印を置く、又は、印をつけることができる。これにより、図13の(c)に示されるように、作業者120は、投影装置20を移動させて設置予定場所321に設置することができる(図12のステップS10)。以降、作業現場300における全ての作業が終了されるまで、図12に示されるステップS10~S90の処理が繰り返される。新たな場所に設置した後の投影装置20の投影範囲110に作業箇所301が含まれるので、図13の(c)に示されるように、投影装置20は、図面311を設置予定場所321に投影することができる。 Since the planned installation location 321 is represented by the guide graphic 330, the operator 120 can place a mark or mark on the planned installation location 321. Thereby, as shown in FIG. 13C, the operator 120 can move the projection device 20 and install it at the planned installation location 321 (Step S10 in FIG. 12). Thereafter, the processes of steps S10 to S90 shown in FIG. 12 are repeated until all the work at the work site 300 is completed. Since the work area 301 is included in the projection range 110 of the projection device 20 after installation at the new location, the projection device 20 projects the drawing 311 onto the planned installation location 321, as shown in FIG. 13(c). can do.

以上のように、本実施の形態に係る投影システム10は、作業現場100に設置され、作業現場100における複数の作業箇所の各々に図面を投影する投影装置20を備える。投影装置20は、さらに、作業者120を、投影装置20が次に設置される設置予定場所321に誘導するためのガイド図形330を投影する。 As described above, the projection system 10 according to the present embodiment includes the projection device 20 that is installed at the work site 100 and projects a drawing onto each of a plurality of work locations at the work site 100. The projection device 20 further projects a guide figure 330 for guiding the worker 120 to the planned installation location 321 where the projection device 20 will be installed next.

これにより、作業者120を設置予定場所321に誘導するガイド図形330が投影されるので、作業者120は、投影装置20を適切な場所に容易に設置することができる。このため、投影装置20の移動に要する時間を短くすることができ、作業効率を高めることができる。 Thereby, the guide figure 330 that guides the worker 120 to the planned installation location 321 is projected, so the worker 120 can easily install the projection device 20 at an appropriate location. Therefore, the time required to move the projection device 20 can be shortened, and work efficiency can be improved.

また、例えば、投影装置20は、作業現場300の所定の場所に設置され、当該所定の場所で図面を投影できる範囲に含まれる作業箇所での作業者120の作業が終了した後、作業者120を設置予定場所321に誘導するためのガイド図形330を投影する。 Further, for example, the projection device 20 is installed at a predetermined location of the work site 300, and after the worker 120 finishes work at a work location included in the range where the drawing can be projected at the predetermined location, the projection device 20 A guide figure 330 is projected to guide the user to the planned installation location 321.

これにより、投影範囲110内の作業箇所での作業が終了した後に、ガイド図形330が投影されるので、設置予定場所321に投影装置20を速やかに設置することができる。このため、投影装置20の移動に要する時間を短くすることができ、作業効率を高めることができる。 Thereby, the guide figure 330 is projected after the work at the work location within the projection range 110 is completed, so that the projection device 20 can be quickly installed at the planned installation location 321. Therefore, the time required to move the projection device 20 can be shortened, and work efficiency can be improved.

また、例えば、投影装置20は、作業者120を設置予定場所321に誘導するためのガイド図形330を設置予定場所321に投影する。 Further, for example, the projection device 20 projects a guide figure 330 for guiding the worker 120 to the planned installation location 321 onto the planned installation location 321 .

これにより、ガイド図形330を設置予定場所321に投影することにより、作業者120は、設置予定場所321をより正確に把握することができる。このため、投影装置20が適切な場所に設置されやすくなる。 Thereby, by projecting the guide figure 330 onto the planned installation location 321, the operator 120 can grasp the planned installation location 321 more accurately. Therefore, the projection device 20 can be easily installed at an appropriate location.

また、例えば、本実施の形態に係る投影方法は、作業現場100に設置された投影装置20が、作業現場100における複数の作業箇所の各々に図面を投影するステップと、作業者120を、投影装置20が次に設置される設置予定場所321に誘導するためのガイド図形330を投影するステップとを含む。 Further, for example, the projection method according to the present embodiment includes a step in which the projection device 20 installed at the work site 100 projects a drawing onto each of a plurality of work locations at the work site 100, and a step in which the projection device 20 installed at the work site 100 The method includes a step of projecting a guide figure 330 for guiding the device 20 to a planned installation location 321 where the device 20 will be installed next.

これにより、作業者120を設置予定場所321に誘導するガイド図形330が投影されるので、作業者120は、投影装置20を適切な場所に容易に設置することができる。このため、投影装置20の移動に要する時間を短くすることができ、作業効率を高めることができる。 Thereby, the guide figure 330 that guides the worker 120 to the planned installation location 321 is projected, so the worker 120 can easily install the projection device 20 at an appropriate location. Therefore, the time required to move the projection device 20 can be shortened, and work efficiency can be improved.

なお、本実施の形態に係る投影システム10は、作業者120を次の作業箇所に誘導するためのガイド図形を投影しなくてもよい。すなわち、図12に示される投影システム10の動作において、ガイド図形の投影(S20)が行われなくてもよい。この場合であっても、投影装置20の設置場所の変更に要する時間を短くすることができるので、作業効率を高めることができる。 Note that the projection system 10 according to the present embodiment does not need to project a guide figure for guiding the worker 120 to the next work location. That is, in the operation of the projection system 10 shown in FIG. 12, the projection of the guide figure (S20) may not be performed. Even in this case, the time required to change the installation location of the projection device 20 can be shortened, so work efficiency can be improved.

(その他)
以上、本発明に係る投影システム及び投影方法について、上記の実施の形態及びその変形例に基づいて説明したが、本発明は、上記の実施の形態に限定されるものではない。
(others)
Although the projection system and projection method according to the present invention have been described above based on the above-described embodiments and modifications thereof, the present invention is not limited to the above-described embodiments.

例えば、上記の各実施の形態及び各変形例では、投影装置20と、データ処理装置30と、端末装置40とが別体である例を示したが、これらが一体化されていてもよい。すなわち、投影システム10は、各構成要素が物理的に1つの筐体の内部又は外部にまとめて含まれた一体的な装置であってもよい。 For example, in each of the embodiments and modifications described above, the projection device 20, the data processing device 30, and the terminal device 40 are separate units, but they may be integrated. That is, the projection system 10 may be an integrated device in which each component is physically included inside or outside one housing.

なお、投影システム10を構成する全ての構成要素が一体化されていなくてもよい。例えば、投影装置20と端末装置40とのみが一体化されていてもよい。あるいは、投影装置20とデータ処理装置30とのみが一体化されていてもよい。 Note that all the components constituting the projection system 10 do not have to be integrated. For example, only the projection device 20 and the terminal device 40 may be integrated. Alternatively, only the projection device 20 and the data processing device 30 may be integrated.

また、上記実施の形態で説明した装置間の通信方法については特に限定されるものではない。装置間で無線通信が行われる場合、無線通信の方式(通信規格)は、例えば、ZigBee(登録商標)、Bluetooth(登録商標)、又は、無線LAN(Local Area Network)などの近距離無線通信である。あるいは、無線通信の方式(通信規格)は、インターネットなどの広域通信ネットワークを介した通信でもよい。また、装置間においては、無線通信に代えて、有線通信が行われてもよい。有線通信は、具体的には、電力線搬送通信(PLC:Power Line Communication)又は有線LANを用いた通信などである。 Further, the communication method between devices described in the above embodiment is not particularly limited. When wireless communication is performed between devices, the wireless communication method (communication standard) is, for example, ZigBee (registered trademark), Bluetooth (registered trademark), or short-range wireless communication such as wireless LAN (Local Area Network). be. Alternatively, the wireless communication method (communication standard) may be communication via a wide area communication network such as the Internet. Furthermore, wired communication may be performed between the devices instead of wireless communication. Specifically, the wired communication is communication using power line communication (PLC) or a wired LAN.

また、上記実施の形態において、特定の処理部が実行する処理を別の処理部が実行してもよい。例えば、投影装置20は、データ処理装置30が備える処理部(例えば、データ処理部32、入力部35及び表示部36など)を備え、各処理部が実行する処理を行ってもよい。また、例えば、投影装置20は、端末装置40が備える処理部(例えば、操作受付部42及び表示部43など)を備え、各処理部が実行する処理を行ってもよい。 Further, in the above embodiments, the processing executed by a specific processing unit may be executed by another processing unit. For example, the projection device 20 may include processing units included in the data processing device 30 (for example, the data processing unit 32, the input unit 35, the display unit 36, etc.), and perform the processing executed by each processing unit. Furthermore, for example, the projection device 20 may include a processing section (for example, an operation receiving section 42, a display section 43, etc.) included in the terminal device 40, and perform processing executed by each processing section.

また、複数の処理の順序が変更されてもよく、あるいは、複数の処理が並行して実行されてもよい。また、投影システムが備える構成要素の複数の装置への振り分けは、一例である。例えば、一の装置が備える構成要素を他の装置が備えてもよい。また、投影システムは、単一の装置として実現されてもよい。 Further, the order of the plurality of processes may be changed, or the plurality of processes may be executed in parallel. Furthermore, the distribution of components included in the projection system to a plurality of devices is just one example. For example, components included in one device may be included in another device. The projection system may also be implemented as a single device.

例えば、上記実施の形態において説明した処理は、単一の装置(システム)を用いて集中処理することによって実現してもよく、又は、複数の装置を用いて分散処理することによって実現してもよい。また、上記プログラムを実行するプロセッサは、単数であってもよく、複数であってもよい。すなわち、集中処理を行ってもよく、又は分散処理を行ってもよい。 For example, the processing described in the above embodiments may be realized by centralized processing using a single device (system), or may be realized by distributed processing using multiple devices. good. Furthermore, the number of processors that execute the above program may be a single processor or a plurality of processors. That is, centralized processing or distributed processing may be performed.

また、上記実施の形態において、制御部などの構成要素の全部又は一部は、専用のハードウェアで構成されてもよく、あるいは、各構成要素に適したソフトウェアプログラムを実行することによって実現されてもよい。各構成要素は、CPU(Central Processing Unit)又はプロセッサなどのプログラム実行部が、HDD(Hard Disk Drive)又は半導体メモリなどの記録媒体に記録されたソフトウェアプログラムを読み出して実行することによって実現されてもよい。 Furthermore, in the above embodiments, all or part of the components such as the control unit may be configured with dedicated hardware, or may be realized by executing a software program suitable for each component. Good too. Each component may be realized by a program execution unit such as a CPU (Central Processing Unit) or a processor reading and executing a software program recorded on a recording medium such as an HDD (Hard Disk Drive) or semiconductor memory. good.

また、制御部などの構成要素は、1つ又は複数の電子回路で構成されてもよい。1つ又は複数の電子回路は、それぞれ、汎用的な回路でもよいし、専用の回路でもよい。 Furthermore, components such as the control unit may be configured with one or more electronic circuits. Each of the one or more electronic circuits may be a general-purpose circuit or a dedicated circuit.

1つ又は複数の電子回路には、例えば、半導体装置、IC(Integrated Circuit)又はLSI(Large Scale Integration)などが含まれてもよい。IC又はLSIは、1つのチップに集積されてもよく、複数のチップに集積されてもよい。ここでは、IC又はLSIと呼んでいるが、集積の度合いによって呼び方が変わり、システムLSI、VLSI(Very Large Scale Integration)、又は、ULSI(Ultra Large Scale Integration)と呼ばれるかもしれない。また、LSIの製造後にプログラムされるFPGA(Field Programmable Gate Array)も同じ目的で使うことができる。 The one or more electronic circuits may include, for example, a semiconductor device, an IC (Integrated Circuit), or an LSI (Large Scale Integration). An IC or LSI may be integrated into one chip or into multiple chips. Here, it is called an IC or LSI, but the name changes depending on the degree of integration, and may be called a system LSI, VLSI (Very Large Scale Integration), or ULSI (Ultra Large Scale Integration). Furthermore, an FPGA (Field Programmable Gate Array) that is programmed after the LSI is manufactured can also be used for the same purpose.

また、本発明の全般的又は具体的な態様は、システム、装置、方法、集積回路又はコンピュータプログラムで実現されてもよい。あるいは、当該コンピュータプログラムが記憶された光学ディスク、HDD若しくは半導体メモリなどのコンピュータ読み取り可能な非一時的記録媒体で実現されてもよい。また、システム、装置、方法、集積回路、コンピュータプログラム及び記録媒体の任意な組み合わせで実現されてもよい。 Further, general or specific aspects of the invention may be implemented in a system, apparatus, method, integrated circuit, or computer program product. Alternatively, the computer program may be implemented in a computer-readable non-transitory recording medium such as an optical disk, HDD, or semiconductor memory. Further, the present invention may be realized by any combination of a system, an apparatus, a method, an integrated circuit, a computer program, and a recording medium.

その他、各実施の形態に対して当業者が思いつく各種変形を施して得られる形態や、本発明の趣旨を逸脱しない範囲で各実施の形態における構成要素及び機能を任意に組み合わせることで実現される形態も本発明に含まれる。 In addition, forms obtained by applying various modifications to each embodiment that those skilled in the art can think of, or by arbitrarily combining the constituent elements and functions of each embodiment without departing from the spirit of the present invention. The form is also included in the present invention.

10 投影システム
20 投影装置
100、300 作業現場
101、102、103、104、301 作業箇所
111、112、113、311 図面
120 作業者
130、131、133、230、231、232、233、330 ガイド図形
132a、132b、132c、132d 矢印
201 作業範囲
321 設置予定場所
10 Projection system 20 Projection devices 100, 300 Work site 101, 102, 103, 104, 301 Work area 111, 112, 113, 311 Drawing 120 Workers 130, 131, 133, 230, 231, 232, 233, 330 Guide figure 132a, 132b, 132c, 132d Arrow 201 Work range 321 Planned installation location

Claims (11)

建築中の建物内の作業現場に設置され、前記作業現場における複数の作業箇所の各々に図面を投影する投影装置を備え、
前記投影装置は、さらに、作業者を前記複数の作業箇所の少なくとも1つである対象箇所に、又は、前記投影装置が次に設置される設置予定場所に誘導するためのガイド図形を投影し、
前記投影装置は、前記作業現場の所定の場所に設置され、前記所定の場所で前記図面を投影できる範囲に含まれる作業箇所での前記作業者の作業が終了した後、前記作業者を前記設置予定場所に誘導するための前記ガイド図形を投影する
投影システム。
A projection device installed at a work site in a building under construction and projecting a drawing onto each of a plurality of work locations at the work site,
The projection device further projects a guide figure for guiding a worker to a target location that is at least one of the plurality of work locations or to a planned installation location where the projection device will be installed next ;
The projection device is installed at a predetermined location of the work site, and after the worker finishes work at a work location included in a range where the drawing can be projected at the predetermined location, Project the guide shape to guide the user to the planned location.
projection system.
前記投影装置は、前記対象箇所に前記図面を投影する前に、前記作業者を前記対象箇所に誘導するための前記ガイド図形を投影する
請求項1に記載の投影システム。
The projection system according to claim 1, wherein the projection device projects the guide figure for guiding the worker to the target location before projecting the drawing onto the target location.
前記投影装置は、前記対象箇所に前記図面を投影すると同時に、前記作業者を前記対象箇所に誘導するための前記ガイド図形を投影する
請求項1に記載の投影システム。
The projection system according to claim 1, wherein the projection device projects the drawing onto the target location and simultaneously projects the guide figure for guiding the worker to the target location.
前記投影装置は、前記複数の作業箇所の各々に同時に複数の前記図面を投影する場合、同時に投影される全ての作業箇所である前記対象箇所に前記作業者を誘導するための前記ガイド図形を投影する
請求項2又は3に記載の投影システム。
When simultaneously projecting the plurality of drawings onto each of the plurality of work locations, the projection device projects the guide figure for guiding the worker to the target locations, which are all the work locations projected simultaneously. The projection system according to claim 2 or 3.
前記投影装置は、前記ガイド図形の少なくとも一部を前記対象箇所とは異なる位置に投影する
請求項2~4のいずれか1項に記載の投影システム。
The projection system according to any one of claims 2 to 4, wherein the projection device projects at least a part of the guide figure to a position different from the target location.
前記ガイド図形は、前記対象箇所とは異なる位置から前記対象箇所に向かう方向の矢印、前記対象箇所を囲む環の少なくとも一部、又は、前記対象箇所である複数の作業箇所を結ぶ線である
請求項2~5のいずれか1項に記載の投影システム。
The guide figure is an arrow pointing toward the target location from a position different from the target location, at least a part of a ring surrounding the target location, or a line connecting a plurality of work locations that are the target locations. The projection system according to any one of items 2 to 5.
前記投影装置は、前記図面を投影する色とは異なる色で前記ガイド図形を投影する
請求項1~6のいずれか1項に記載の投影システム。
The projection system according to any one of claims 1 to 6, wherein the projection device projects the guide figure in a color different from a color in which the drawing is projected.
前記投影装置は、動的に変化する図形を前記ガイド図形として投影する
請求項1~7のいずれか1項に記載の投影システム。
The projection system according to any one of claims 1 to 7, wherein the projection device projects a dynamically changing figure as the guide figure.
作業現場に設置され、前記作業現場における複数の作業箇所の各々に図面を投影する投影装置を備え、
前記投影装置は、さらに、作業者を前記複数の作業箇所の少なくとも1つである対象箇所に、又は、前記投影装置が次に設置される設置予定場所に誘導するためのガイド図形を投影し、
前記投影装置は、前記作業現場の所定の場所に設置され、前記所定の場所で前記図面を投影できる範囲に含まれる作業箇所での前記作業者の作業が終了した後、前記作業者を前記設置予定場所に誘導するための前記ガイド図形を投影する
投影システム。
comprising a projection device installed at a work site and projecting a drawing onto each of a plurality of work locations at the work site,
The projection device further projects a guide figure for guiding a worker to a target location that is at least one of the plurality of work locations or to a planned installation location where the projection device will be installed next;
The projection device is installed at a predetermined location of the work site, and after the worker finishes work at a work location included in a range where the drawing can be projected at the predetermined location, A projection system that projects the guide figure for guiding to a scheduled location.
前記投影装置は、前記作業者を前記設置予定場所に誘導するための前記ガイド図形を前記設置予定場所に投影する
請求項9に記載の投影システム。
The projection system according to claim 9, wherein the projection device projects the guide figure for guiding the worker to the planned installation location onto the planned installation location.
建築中の建物内の作業現場に設置された投影装置が、前記作業現場における複数の作業箇所の各々に図面を投影するステップと、
作業者を前記複数の作業箇所の少なくとも1つである対象箇所に、又は、前記投影装置が次に設置される設置予定場所に誘導するためのガイド図形を投影するステップとを含み、
前記ガイド図形を投影するステップでは、前記作業現場の所定の場所に設置され、前記所定の場所で前記図面を投影できる範囲に含まれる作業箇所での前記作業者の作業が終了した後、前記作業者を前記設置予定場所に誘導するための前記ガイド図形を投影する
投影方法。
A projection device installed at a work site in a building under construction projects a drawing onto each of a plurality of work locations at the work site;
projecting a guide figure for guiding a worker to at least one of the plurality of work locations or to a planned installation location where the projection device will be installed next ;
In the step of projecting the guide figure, the guide figure is installed at a predetermined location of the work site, and after the worker finishes working at a work location included in a range where the drawing can be projected at the predetermined location, projecting the guide figure for guiding the person to the planned installation location;
Projection method.
JP2019155608A 2019-08-28 2019-08-28 Projection system and projection method Active JP7417838B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019155608A JP7417838B2 (en) 2019-08-28 2019-08-28 Projection system and projection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019155608A JP7417838B2 (en) 2019-08-28 2019-08-28 Projection system and projection method

Publications (2)

Publication Number Publication Date
JP2021034957A JP2021034957A (en) 2021-03-01
JP7417838B2 true JP7417838B2 (en) 2024-01-19

Family

ID=74676769

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019155608A Active JP7417838B2 (en) 2019-08-28 2019-08-28 Projection system and projection method

Country Status (1)

Country Link
JP (1) JP7417838B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7790119B2 (en) * 2021-12-08 2025-12-23 株式会社大林組 Construction methods for buildings
JP7828809B2 (en) * 2022-03-30 2026-03-12 株式会社竹中工務店 Display system and display program
CN115928988B (en) * 2022-12-27 2026-04-07 东宁晟(北京)数字科技有限公司 An adaptive prefabricated wall system and its digital assembly method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008224516A (en) 2007-03-14 2008-09-25 Seiko Epson Corp Construction support device and construction support method
JP2012189433A (en) 2011-03-10 2012-10-04 Takenaka Komuten Co Ltd Surface formation supporting system, surface formation supporting device, and surface formation supporting program
JP2015149011A (en) 2014-02-07 2015-08-20 セイコーエプソン株式会社 Display system, display apparatus and display method
WO2016132731A1 (en) 2015-02-16 2016-08-25 日本電気株式会社 Work assistance device, work assistance system, work assistance method, and recording medium storing work assistance program
WO2016207948A1 (en) 2015-06-22 2016-12-29 富士機械製造株式会社 Guide device and guide system
JP2017181342A (en) 2016-03-31 2017-10-05 前田建設工業株式会社 Summing-out support device and summing-out support method
WO2019188989A1 (en) 2018-03-29 2019-10-03 日本電気株式会社 Guidance control device and guidance control method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3274290B2 (en) * 1994-09-19 2002-04-15 三菱電機株式会社 Video display device and video display system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008224516A (en) 2007-03-14 2008-09-25 Seiko Epson Corp Construction support device and construction support method
JP2012189433A (en) 2011-03-10 2012-10-04 Takenaka Komuten Co Ltd Surface formation supporting system, surface formation supporting device, and surface formation supporting program
JP2015149011A (en) 2014-02-07 2015-08-20 セイコーエプソン株式会社 Display system, display apparatus and display method
WO2016132731A1 (en) 2015-02-16 2016-08-25 日本電気株式会社 Work assistance device, work assistance system, work assistance method, and recording medium storing work assistance program
WO2016207948A1 (en) 2015-06-22 2016-12-29 富士機械製造株式会社 Guide device and guide system
JP2017181342A (en) 2016-03-31 2017-10-05 前田建設工業株式会社 Summing-out support device and summing-out support method
WO2019188989A1 (en) 2018-03-29 2019-10-03 日本電気株式会社 Guidance control device and guidance control method

Also Published As

Publication number Publication date
JP2021034957A (en) 2021-03-01

Similar Documents

Publication Publication Date Title
JP6013505B2 (en) Method and apparatus for controlling a laser tracker using a gesture
JP7417838B2 (en) Projection system and projection method
US10824312B2 (en) Method and system for assisting installation of elements in a construction work
US20060095170A1 (en) System and method for identifying objects in a space
US20150091446A1 (en) Lighting control console and lighting control system
CN114342363B (en) Projection method, projection device and projection system
JP7149506B2 (en) Projection system, projection apparatus and projection method
JP6602139B2 (en) Measuring method and program
EP4007269B1 (en) Projection system and projection method
JP7702682B2 (en) Monitoring device, setting support device, area setting method, and setting support method
JP7296551B2 (en) Projection system, projection apparatus and projection method
JP2020096243A (en) Projection apparatus, projection system, and projection method
WO2026048404A1 (en) Projection device, projection system, and projection method
JP6454524B2 (en) Area monitoring sensor
JP2023007148A (en) Information processing device
JP2024141927A (en) Surveying equipment and methods
JP2025119205A (en) Installation simulation method
JP2016004343A (en) Image projection system
JP2023148007A (en) Display system and display program
JP2002196994A (en) Position information setting device and method of equipment connected with network

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220520

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20230220

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230228

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230406

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20230718

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20231018

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20231026

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20231121

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20231220

R151 Written notification of patent or utility model registration

Ref document number: 7417838

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151