JPS5833155B2 - How to build offshore structures - Google Patents
[go: Go Back, main page]

JPS5833155B2 - How to build offshore structures - Google Patents

How to build offshore structures

Info

Publication number
JPS5833155B2
JPS5833155B2 JP54083891A JP8389179A JPS5833155B2 JP S5833155 B2 JPS5833155 B2 JP S5833155B2 JP 54083891 A JP54083891 A JP 54083891A JP 8389179 A JP8389179 A JP 8389179A JP S5833155 B2 JPS5833155 B2 JP S5833155B2
Authority
JP
Japan
Prior art keywords
concrete
block
internal frame
construction
central
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP54083891A
Other languages
Japanese (ja)
Other versions
JPS568788A (en
Inventor
英雄 芦田
正己 村山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui Engineering and Shipbuilding Co Ltd
Original Assignee
Mitsui Engineering and Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui Engineering and Shipbuilding Co Ltd filed Critical Mitsui Engineering and Shipbuilding Co Ltd
Priority to JP54083891A priority Critical patent/JPS5833155B2/en
Publication of JPS568788A publication Critical patent/JPS568788A/en
Publication of JPS5833155B2 publication Critical patent/JPS5833155B2/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B75/00Building or assembling floating offshore structures, e.g. semi-submersible platforms, SPAR platforms or wind turbine platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Revetment (AREA)

Description

【発明の詳細な説明】 本発明は、鋼とコンクリートとが併用されている合成海
洋構造物を建造する建造方法に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a construction method for constructing composite marine structures using a combination of steel and concrete.

たとえば化学プラント、発電プラントなどの各種プラン
ト施設を搭載する浮遊式海洋構造物として知られるパー
ジにあっては、その側部および底部がコンクリート製の
外板によって覆われ、またその内部空間には補強用とし
ての鋼製の内部フレームが適宜配置され、いわゆる鋼と
コンクリートとの合成構造物となっている。
For example, the Purge, known as a floating offshore structure that houses various plant facilities such as chemical plants and power generation plants, has its sides and bottom covered with concrete outer panels, and its interior space is reinforced. A steel internal frame for general use is placed as appropriate, making it a so-called composite structure of steel and concrete.

したがって、このような合成海洋構造物を建造する場合
には、鋼製の内部フレームを所望の状態で組立てて配置
させた後その周囲に順次コンクリートを打設してコンク
リート製の外板を成形するわけであるが、この場合、こ
の種の構造物自体の大きさがかなりのものであることか
ら、そのコンクリート製の外板は通常ドックあるいは船
台などにおいて場所打ち工法により施工されている場合
が多く、このために、その建造時に作業が面倒で、また
工事期間が長期にわたり、これにより工事費用が嵩むも
のであり、しかもこの種の構造物の外板において必要な
強度および水密性等を得ることが難しいという不具合が
あった。
Therefore, when constructing such a composite marine structure, the steel inner frame is assembled and arranged in the desired condition, and then concrete is successively poured around it to form a concrete outer panel. However, in this case, since the size of this type of structure itself is quite large, the concrete shell is usually constructed using the cast-in-place method at a dock or ship's slipway. Therefore, the construction work is troublesome and the construction period is long, which increases the construction cost.Moreover, it is difficult to obtain the necessary strength and watertightness for the outer panel of this type of structure. There was a problem that it was difficult to

すなわち、前記コンクリート製の外板を構成する底部コ
ンクリートを成形する場合には、前述した鋼製の内部フ
レームを何等かの建造用支持治具を用いてその成形用型
枠上に吊下げ、内部フレームの下側にコンクリート打設
空間を確保する必要があり、その作業が面倒であるばか
りでなく、内部フレーム等の重量から支持治具がかなり
犬がかりなものとなり、さらにその取付け、取外しが繁
雑で、その工事費用が嵩むという不具合があった。
That is, when forming the bottom concrete that constitutes the concrete outer panel, the steel internal frame described above is suspended above the forming formwork using some kind of construction support jig, and the internal It is necessary to secure space for pouring concrete under the frame, which is not only a tedious task, but also requires a considerable amount of effort to support the jig due to the weight of the internal frame, and furthermore, its installation and removal are complicated. However, there was a problem in that the construction costs increased.

そして、このような支持治具を用いる方法では、海洋構
造物が大型化すると、その内部フレームの大きさ、重量
等の問題から建造することがほとんど不可能であった。
With the method of using such a support jig, it is almost impossible to construct a large offshore structure due to problems such as the size and weight of the internal frame.

また、前述したコンクリート製の外板を場所打ち工法に
より施工した場合に、その打設面積等の問題から全面に
わたってコンクリートを均質なものとすることが難しく
、これは垂直に立ち上がった側部コンクリートを成形す
る場合に、その打設面積に比べて打設高さが十分に高い
ことから、特に顕著なものであった。
Furthermore, when constructing the aforementioned concrete exterior panels using the cast-in-place method, it is difficult to make the concrete homogeneous over the entire surface due to issues such as the pouring area. In the case of molding, this was particularly noticeable because the casting height was sufficiently high compared to the casting area.

そして、上述した場所打ちによる外板の成形作業は構造
物の大きさ等により長期間にわたってしまうもので、こ
れは側部コンクリートを成形する場合に特に顕著で、こ
れによりその期間中ドック、船台等を全面的に占有し、
工事費用が嵩むばかりでなく、他の工事に支障をきたす
等の不具合があった。
Furthermore, the above-mentioned cast-in-place exterior panel forming work takes a long time depending on the size of the structure, and this is especially noticeable when forming the side concrete. fully occupy the
Not only did the construction cost increase, but there were also problems such as interfering with other construction work.

さらに、上述した外板はプレストレストコンクリートま
たは鉄筋が密に入った鉄筋コンクリートとすることが一
般的なもので、これによりコンクリート打設空間内に鉄
筋、シース等を配置させる必要があり、その工事が面倒
で、特に工事期間等に及ぼす影響が大きなものであった
Furthermore, the above-mentioned outer panels are generally made of prestressed concrete or reinforced concrete with dense reinforcing bars, which requires placing reinforcing bars, sheaths, etc. within the concrete pouring space, making the construction work cumbersome. This had a particularly large impact on the construction period.

また、このような合成海洋構造物としては例が少なく、
さらに本格的な大型構造物は皆無に等しいもので、在来
の工法をそのまま適用することには無理があり、この種
の構造物に対する新たな建造方法の出現が要望されてい
る。
In addition, there are few examples of such synthetic marine structures,
Furthermore, since there are almost no full-scale large-scale structures, it is impossible to apply conventional construction methods as they are, and there is a demand for new construction methods for these types of structures.

本発明は上述した事情に鑑みなされたものであり、海洋
構造物における鋼製の内部フレームを適宜ブロック化し
、これらを底部コンクリート成形用の型枠上に一定間隔
おいて順次支持し、かつ各ブロックを溶接などにより一
体化するとともに、その下方にコンクリートを打設して
底部コンクリートを成形し、一方側部コンクリートを複
数のプレキャストパネルとして予め分割成形し、さらに
これらを前記内部フレームに接合させるとともに、各プ
レキャストパネル間に設けた空隙部にコンクリートを打
設して一体化するように構成し、これにより簡単な建造
作業で海洋構造物を建造することができ、しかもその工
事期間を大幅に短縮し、さらに工事費用を低減すること
ができるようにした海洋構造物の建造方法を提供する。
The present invention has been made in view of the above-mentioned circumstances, and consists of appropriately forming a steel internal frame of a marine structure into blocks, supporting these blocks sequentially at regular intervals on a formwork for forming bottom concrete, and are integrated by welding or the like, concrete is poured below it to form the bottom concrete, one side concrete is divided and formed into a plurality of precast panels in advance, and these are joined to the internal frame, Concrete is poured into the gaps created between each precast panel to integrate them, making it possible to construct an offshore structure with simple construction work, while significantly shortening the construction period. To provide a method for constructing a marine structure that further reduces construction costs.

以下、本発明を図面に示した実施例を用いて詳細に説明
する。
Hereinafter, the present invention will be explained in detail using embodiments shown in the drawings.

第1図ないし第4図は本発明に係る海洋構造物の建造方
法の一実施例を示すものであり、本実施例ではたとえば
パージなどのような全体略直方体状をなす大型の海洋構
造物であって、側部および底部がコンクリート製の外板
で、また甲板が鋼製の外板により覆われ、一方その内側
に鋼製の内部フレームが適宜配置されてなる構造物を建
造する場合を示している。
Figures 1 to 4 show an embodiment of the method for constructing a marine structure according to the present invention, and in this embodiment, a large marine structure having a generally rectangular parallelepiped shape, such as a purge, is constructed. This refers to the case where a structure is constructed in which the sides and bottom are covered with a concrete outer plate, the deck is covered with a steel outer plate, and a steel internal frame is appropriately placed inside. ing.

さて、本発明において、その特徴とすべき点は、構造物
全体をブロック化し、これらを順次連結するとともに、
それぞれに対応する底部コンクリートを順次成形し、さ
らに側部コンクリートを複数の側部プレキャストパネル
により構成したことにあり、これらを第1図ないし第3
図においてCI)ないしくVI)工程で示す建造順序に
したがって以下に説明する。
Now, the feature of the present invention is that the entire structure is made into blocks, and these are sequentially connected.
The bottom concrete corresponding to each was formed in sequence, and the side concrete was composed of a plurality of side precast panels.
The following description will be made in accordance with the construction order shown in steps CI) to VI) in the figure.

第1図は構造物の中央部を建造する工程を示す図であっ
て、符号1で示すものは、鋼製の内部フレーム2とこれ
に対応する鋼製の甲板3とを予め組立ててなる中央部ブ
ロックで、この中央部ブロック1は初め図中(I−A)
で示すように甲板3を下側に配置させた状態で組立て多
数用意され、これをCI−B)で示すように反転させて
構造物の建造現場であるドック、船台等に運搬し、クレ
ーン4等により図中CI)で示すように、底部コンクリ
ート成形用の型枠5上の所定個所に順次載置する。
FIG. 1 is a diagram showing the process of constructing the central part of a structure, and the one designated by reference numeral 1 is a central part made by assembling a steel internal frame 2 and a corresponding steel deck 3 in advance. This central block 1 is initially shown as (I-A) in the figure.
As shown in , a large number of assembled units are prepared with the deck 3 placed on the lower side, and as shown in CI-B), these are inverted and transported to the dock, berth, etc. where the structure will be constructed, and the crane 4 As shown by CI) in the figure, they are sequentially placed at predetermined locations on the formwork 5 for forming the bottom concrete.

このとき、これらの中央部ブロック1の下側に支持台6
を並べ、これにより第4図(I)に示すように、底部コ
ンクリート7の打設空間8を確保している。
At this time, a support stand 6 is placed below these central blocks 1.
are lined up, thereby securing a casting space 8 for the bottom concrete 7, as shown in FIG. 4(I).

なお、支持台6が支持する中央部ブロック1の重量は十
分に小さく、これにより簡単な構造のものを用いること
ができ、たとえば高さ調整機能を備えた支持台でもよい
Note that the weight of the center block 1 supported by the support stand 6 is sufficiently small, so that a simple structure can be used, for example, a support stand with a height adjustment function may be used.

また、型枠5上に並べられた中央部ブロック1の各接合
部は順次溶接などにより連結して中央部ブロック連結体
Xとして固底され、さらに前記打設空間8にコンクリー
トを打設し、第1図(If)および第4図〔■〕で示す
ように、この中央部ブロック連結体Xに対応する底部コ
ンクIJ−1−7を成形する。
In addition, each joint of the central blocks 1 arranged on the formwork 5 is sequentially connected by welding or the like to form a solid-bottomed central block connected body X, and furthermore, concrete is poured into the pouring space 8, As shown in FIG. 1 (If) and FIG. 4 [■], a bottom concavity IJ-1-7 corresponding to this central block connected body X is molded.

このとき、底部コンクリート7内に鉄筋、シース等を埋
設し、これをプレストレスを導入した鉄筋コンクリート
とする場合に、中央部ブロック1の内部フレーム2下部
に予めロンド等を突設して張架させるようにしておくと
、底部コンクリート7の施工が迅速化され、工事期間の
短縮化を図ることができる。
At this time, if reinforcing bars, sheaths, etc. are buried in the bottom concrete 7 and this is to be prestressed reinforced concrete, a rond etc. is provided in advance to protrude from the lower part of the internal frame 2 of the central block 1 and stretched. By doing so, the construction of the bottom concrete 7 can be speeded up, and the construction period can be shortened.

第2図は前記中央部ブロック連結体Xの両側に側部ブロ
ック9を連結する建造順序を示すものであって、図中(
1−A)ないしく1−D、lに側部ブロック9の組立て
状態を示している。
FIG. 2 shows the construction order for connecting the side blocks 9 to both sides of the central block connector X, and in the figure (
1-A) to 1-D, 1 shows the assembled state of the side block 9.

すなわち、側部ブロック9は、側部コンクIJ−NOを
分離して成形されてなる複数の側部プレキャストパネル
11とこれに対応する内部フレーム2と甲板3との一部
を一体的に組合わせたものである。
That is, the side block 9 is an integral combination of a plurality of side precast panels 11 formed by separating and molding the side concrete IJ-NO, and a portion of the corresponding internal frame 2 and deck 3. It is something that

前記側部プレキャストパネル11は、図中(1−A)に
示す内部フレーム2の外側部2aとこれら間に配置させ
た型枠11とによって他の工事現場で製作されるもので
あって、この場合その下側部には底部コンクリート7の
一部が屈折部11aとして一体に設けられ、これにより
自立できる構成とされ、また上側部には甲板3の一部が
予め設けられている。
The side precast panel 11 is manufactured at another construction site using the outer part 2a of the inner frame 2 shown in (1-A) in the figure and the formwork 11 placed between them. In this case, a part of the bottom concrete 7 is integrally provided as a bent part 11a on the lower side, thereby making it self-supporting, and a part of the deck 3 is previously provided on the upper side.

なお、この側部プレキャストパネル11は場所打ちされ
る側部コンクリートよりその均質性が良く、また強度も
十分に期待できるものである。
The side precast panel 11 has better homogeneity than cast-in-place side concrete, and can be expected to have sufficient strength.

また、側部プレキャストパネル11の内側に予め内部フ
レーム2と甲板3の外側部2a 、 3aを接合させて
いるため、第2図および第4図〔ローD)に示すように
、これに内部フレーム2と甲板3との一部を溶接して側
部ブロック9を組立てる際にその鋼製の外側部2a 、
3aの張出し構造により熱影響がコンクリートに及ぶこ
とはなく、その品質を向上させることができる。
In addition, since the internal frame 2 and the external parts 2a and 3a of the deck 3 are joined in advance to the inside of the side precast panel 11, as shown in FIGS. 2 and 4 (low D), the internal frame is attached to this. 2 and a part of the deck 3 to assemble the side block 9, the steel outer part 2a,
Due to the overhanging structure of 3a, the concrete is not affected by heat, and its quality can be improved.

この場合、側部プレキャストパネル11の成形およびそ
の組立てを前記中央部ブロック1の建造に合わせて同時
に他の現場で行なうことにより、工事期間の短縮化を図
ることができる。
In this case, the construction period can be shortened by simultaneously performing the molding of the side precast panels 11 and their assembly at another site in conjunction with the construction of the central block 1.

そして、上述したようにして組立てられる側部ブロック
9は次のようにして中央部ブロック連結体Xに連結され
る。
The side blocks 9 assembled as described above are connected to the central block connector X in the following manner.

すなわち、側部ブロック9を第2図および第4図(1)
に示すように、中央部ブロック連結体Xの側方にクレー
ン4により運んで順次型枠5上に載置させる。
That is, the side block 9 is shown in FIGS. 2 and 4 (1).
As shown in FIG. 2, the blocks are carried by a crane 4 to the side of the central block connector X and placed on the formwork 5 one after another.

このとき、側部ブロック9は側部プレキャストパネル1
1側ではその屈折部11aにより自立し、一方向部フレ
ーム2の他端は中央部ブロック1を支持する支持台6に
兼用させて支持することにより、第4図〔口〕に示すご
とく底部コンクIJ−1−12の打設空間13を確保し
ている。
At this time, the side block 9 is the side precast panel 1
One side of the one-way frame 2 is self-supporting by its bent portion 11a, and the other end of the one-way frame 2 is also supported by the support stand 6 that supports the center block 1, so that the bottom concrete is supported as shown in FIG. 4 (opening). A placement space 13 for IJ-1-12 is secured.

そして、この側部ブロック9の配設作業時に順次その内
部フレーム2と甲板3とを中央部ブロック1側に溶接し
て連結し、さらに支持台6を取り除いた後打設空間13
にコンクリートを打設し、第2図および第4図(IV)
に示すように底部コンクリート12を成形し、中央側の
底部コンクリート7に接合させて一体化する。
Then, during the installation work of the side block 9, the internal frame 2 and the deck 3 are sequentially welded and connected to the central block 1 side, and after the support base 6 is removed, the casting space 13 is
Concrete was poured into the
As shown in the figure, the bottom concrete 12 is formed and joined to the bottom concrete 7 on the center side to be integrated.

一方、側部ブロック9の側部プレキャストパネル11間
には所望の空隙部14を設けておくものとし、この空隙
部14にコンクリートを順次打設してこれらを一体化し
、この打設コンクリート15により側部コンクリート1
0を構成させるようにする。
On the other hand, a desired gap 14 is provided between the side precast panels 11 of the side block 9, and concrete is successively poured into this gap 14 to integrate them. Side concrete 1
0 is configured.

なお、側部ブロック9の甲板3は、第2図(1−D)お
よび(1)に示すように、側部プレキャストパネル11
よりも両側に突出するように構成され、他の甲板3と順
次溶接して一体化され、前述した側部コンクリート10
とともに側部ブロック連結体Yを構成する。
Incidentally, the deck 3 of the side block 9 has side precast panels 11 as shown in FIGS. 2(1-D) and (1).
The side concrete 10 is configured to protrude from both sides of the deck, and is sequentially welded and integrated with the other deck 3, and is integrated with the side concrete 10 described above.
Together, they form a side block connector Y.

また、側部ブロック9の内部フレーム2下部に、中央部
ブロック1と同様に、鉄筋、シース等を予め配設し、こ
れにより工事期間の短縮化を図ることは自由である。
Furthermore, similar to the central block 1, reinforcing bars, sheaths, etc. may be provided in advance at the lower part of the internal frame 2 of the side blocks 9, thereby shortening the construction period.

第3図は前述した中央部および側部ブロック連結体X、
Yの両端を側端部コンクIJ−N6によって密封する最
終工程を示し、符号17で示すものは、前記側部ブロッ
ク9を構成する側部プレキャストパネル11と同様に成
形されている側端部プレキャストパネルで、また18は
構造物の隅部に配置される隅部プレキャスト部材で、こ
れらは予め他の現場で組立て成形され、クレーン4によ
り前述した中央部および側部ブロック1,9と同様に型
枠上に運ばれて載置される。
FIG. 3 shows the aforementioned central and side block connection body X,
The final step of sealing both ends of Y with side end concrete IJ-N6 is shown, and what is indicated by the reference numeral 17 is a side end precast panel formed similarly to the side precast panel 11 constituting the side block 9. 18 are corner precast members to be placed at the corners of the structure, which are previously assembled and formed at another site and cast by crane 4 in the same manner as the central and side blocks 1, 9 described above. It is carried and placed on the frame.

このとき、これらの側端部プレキャストパネル17およ
び隅部プレキャスト部材18には内部フレーム2と甲板
3の外側部2a 、3aが接合されており、これにより
本体側に溶接して連結される。
At this time, the inner frame 2 and the outer parts 2a, 3a of the deck 3 are joined to these side end precast panels 17 and corner precast members 18, and are thereby welded and connected to the main body side.

また、これらはそれぞれ屈折部17a、18aを有し、
型枠5上に自立するものであり、これらの屈折部17a
Moreover, these each have bending parts 17a and 18a,
These bent portions 17a stand independently on the formwork 5.
.

18aと底部コンクリート7.12との間隙にコンクリ
ートを打設してこれらを底部コンクリートと一体化して
いる。
Concrete is placed in the gap between 18a and the bottom concrete 7.12 to integrate them with the bottom concrete.

さらに、これらの側端部プレキャストパネル17と隅部
プレキャスト部材18の間には前記側部プレキャストパ
ネル11と同様に空隙部19が形成されており、これら
の空隙部19にコンクリートを順次打設して一体化し、
この打設コンクリート20により側端部コンクリート1
6が成形され、これにより側端部連結体2が構成される
Furthermore, voids 19 are formed between these side end precast panels 17 and corner precast members 18, similar to the side precast panels 11, and concrete is sequentially poured into these voids 19. integrated,
By this poured concrete 20, the side end concrete 1
6 is molded, thereby forming the side end connecting body 2.

そして、上述した建造作業により中央部、側部ブロック
連結体X、Yと側端部連結体2とが一体化され、これに
より第3図(Vl)に示す海洋構造物が完成する。
Then, through the above-described construction work, the central part, side block connectors X, Y, and side end connectors 2 are integrated, thereby completing the marine structure shown in FIG. 3 (Vl).

したがって、上述した海洋構造物の建造方法では、構造
物の各部をブロック化し、これらをそれぞれ他の場所で
成形するようにし、さらにこれらをドック、船台等に運
んで順次連結して一体化しているため、その建造が簡単
となり、ドック、船台等においての工事期間を大幅に短
縮することができ、さらに構造物全体の工期も短縮し、
これによりその工事費用も大幅に削減できるものである
Therefore, in the above-mentioned method of constructing an offshore structure, each part of the structure is made into blocks, each part is molded at a different location, and then these parts are transported to a dock, a berth, etc., and sequentially connected and integrated. Therefore, its construction is easy, and the construction period for docks, berths, etc. can be significantly shortened, and the construction period for the entire structure can also be shortened.
This will greatly reduce construction costs.

なお、前述した実施例では、本発明に係る建造方法を、
たとえばパージなどのような直方体状の海洋構造物に適
用した場合を説明したが、これに限定されるものではな
く、種々の海二:孟:に応用できるもので、これに合わ
せてそ を適宜変更すればよい。
In addition, in the above-mentioned embodiment, the construction method according to the present invention is
For example, the case where it is applied to a rectangular parallelepiped marine structure such as a purge has been explained, but it is not limited to this, and can be applied to various marine structures, and it can be applied as appropriate. Just change it.

要するに、構造物の各部をブロック化し、これを順次組
立てて建造すればよいものである。
In short, each part of the structure can be made into blocks and assembled in sequence.

以上説明したように、本発明に係る海洋構造物の建造方
法では、コンクリート製の外板内に配置される鋼製の内
部フレームを適宜分割してブロック化し、これらを順次
組立てて内部フレームを構成するとともに、これに対応
してその下側に底部コンクリートを成形するようにし、
一方側部コンクリートは予め複数の側部プレキャストパ
ネルとして分割して成形し、かつこれらを順次内部フレ
ームに接合させるとともに、それぞれの空隙部にコンク
リートを打設して側部プレキャストパネルを一体化させ
、これにより側部コンクリートを成形するように構成し
たので、簡単な方法により内部フレーム、底部コンクリ
ートおよび側部コンクリートを容易に組立てて成形する
ことができ、これにより海洋構造物の建造が簡単となり
、そのドック、船台などにおいての工事工数を減らして
その工事期間を大幅に短縮し、さらにその工事費用を大
幅に削減できる等の優れた効果がある。
As explained above, in the method for constructing a marine structure according to the present invention, the steel internal frame placed inside the concrete outer plate is appropriately divided into blocks, and these blocks are sequentially assembled to form the internal frame. At the same time, the bottom concrete is formed on the underside accordingly,
On the other hand, the side concrete is divided and formed into multiple side precast panels in advance, and these are sequentially joined to the internal frame, and concrete is poured into each gap to integrate the side precast panels. Since this is configured to form the side concrete, the inner frame, bottom concrete and side concrete can be easily assembled and formed by a simple method, which simplifies the construction of offshore structures and It has excellent effects such as reducing the number of man-hours required for construction work on docks, docks, etc., significantly shortening the construction period, and further reducing construction costs.

また、本発明によれば、内部フレームをブロック化シテ
順次型枠上に簡単な支持台により支持させる構造である
ために、従来のような大規模な支持治具を必要とせず、
簡単な支持台でよく、さらに側部プレキャストパネルに
底部コンクリートの一部を構成する屈折部を設けること
によりそれ自身で型枠上に自立させることができ、これ
により特別な治具等を用いることなく、組立て時に有利
である等の効果がある。
Further, according to the present invention, since the internal frame is supported by a simple support stand on the block-forming formwork, there is no need for a large-scale support jig as in the past.
A simple support stand is sufficient, and by providing the side precast panel with a bent part that forms part of the bottom concrete, it can stand on its own on the formwork, making it unnecessary to use special jigs, etc. This has advantages such as being advantageous during assembly.

また、本発明によれば、側部プレキャストパネルに予め
内部フレームの一部を接合して設け、これを内部フレー
ムの他の部分に十分な張出しをもって溶接して一体化す
るようにしたので、コンクリートに熱影響が及ぶことは
なく、簡単に連結することができ、さらに側部コンクリ
ートを側部プレキャストパネルにより構成したので、そ
の成形が簡単で、しかもその均質性を向上させることが
でき、内部フレームとの接合度も良好とすることができ
る等の利点がある。
Further, according to the present invention, a part of the internal frame is joined to the side precast panel in advance, and this is welded to other parts of the internal frame with sufficient overhang to integrate it. There is no heat effect on the concrete and it can be easily connected.Furthermore, since the side concrete is composed of side precast panels, it is easy to form and its homogeneity can be improved. There are advantages such as a good degree of bonding with the material.

なお、本発明によれば、ブロック化された内部フレーム
の下側に、予め底部コンクリートに埋設する鉄筋、シー
ス等を配設保持させることによって、その建造をより簡
単に行なえ、工事期間を大幅に短縮できるという利点が
ある。
In addition, according to the present invention, by placing and retaining reinforcing bars, sheaths, etc. buried in the bottom concrete in advance on the underside of the block-shaped internal frame, the construction can be performed more easily and the construction period can be significantly reduced. It has the advantage of being shortened.

【図面の簡単な説明】[Brief explanation of drawings]

図は本発明に係る海洋構造物の建造方法の一実施例を示
し、第1図はその中央部ブロックの建造順序を説明する
ための概略図、第2図および第3図は同じく側部ブロッ
クの建造順序を説明するための概略図、第4図は底部コ
ンクリートの打設状態を説明するための横断側面図であ
る。
The figures show an embodiment of the method for constructing a marine structure according to the present invention, in which Figure 1 is a schematic diagram for explaining the construction order of the central block, and Figures 2 and 3 are side blocks. FIG. 4 is a schematic diagram for explaining the construction order of the construction, and FIG. 4 is a cross-sectional side view for explaining the state of pouring the bottom concrete.

Claims (1)

【特許請求の範囲】[Claims] 1 コンクリート製の外板を有し、かつその内側に鋼製
の内部フレームを適宜配置させてなる海洋構造物を建造
する方法であって、前記内部フレームの中央部をブロッ
ク化し、その中央部ブロックを前記外板を構成する底部
コンクリート成形用の型枠上に支持台により一定間隔お
いて支持するようにして複数個を順次並べて配置させ、
しかる後各中央部ブロックの接合部を溶接して一体化す
るとともに、その下側の打設空間にコンクリートを打設
しこの内部フレームの中央部に対応する底部コンクリー
トを成形する工程と、前記外板を構成する側部コンクリ
ートの一部とこれに対応する内部フレームの外側部およ
び底部コンクリートの一部とを一体的に組合わせてなる
側部プレキャスト部材と、これに対応する前記内部フレ
ームの側部とによって側部ブロックを構成し、この側部
ブロックを前記中央部ブロックの側方に所定間隙おいて
順次並べて配置させるとともに、それぞれの内部フレー
ムの接合部を溶接して一体化し、さらにこれらの側部ブ
ロックの下側にコンクリートを打設し、これに対応する
底部コンクリートを成形し、かつ前記各側部プレキャス
ト部材間の空隙部にコンクリートを打設し側部コンクリ
ートを一体化させる工程とから構成したことを特徴とす
る海洋構造物の建造方法。
1. A method of constructing a marine structure having a concrete outer plate and a steel inner frame appropriately arranged inside the outer plate, the center part of the inner frame being made into a block, and the center block A plurality of pieces are sequentially arranged side by side on a formwork for forming the bottom concrete constituting the outer panel so as to be supported at regular intervals by a support stand,
Thereafter, the joints of each central block are welded and integrated, and concrete is poured into the casting space below the central block to form a bottom concrete corresponding to the central part of the internal frame. A side precast member formed by integrally combining a part of the side concrete constituting the plate and a corresponding part of the outer part and bottom concrete of the internal frame, and the corresponding side of the internal frame. The side blocks are arranged side by side with a predetermined gap on the sides of the central block, and the joints of the respective internal frames are welded to form a single body. pouring concrete on the lower side of the side blocks, forming a corresponding bottom concrete, and pouring concrete into the gaps between the respective side precast members to integrate the side concrete; A method of constructing a marine structure characterized by comprising:
JP54083891A 1979-07-04 1979-07-04 How to build offshore structures Expired JPS5833155B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP54083891A JPS5833155B2 (en) 1979-07-04 1979-07-04 How to build offshore structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP54083891A JPS5833155B2 (en) 1979-07-04 1979-07-04 How to build offshore structures

Publications (2)

Publication Number Publication Date
JPS568788A JPS568788A (en) 1981-01-29
JPS5833155B2 true JPS5833155B2 (en) 1983-07-18

Family

ID=13815258

Family Applications (1)

Application Number Title Priority Date Filing Date
JP54083891A Expired JPS5833155B2 (en) 1979-07-04 1979-07-04 How to build offshore structures

Country Status (1)

Country Link
JP (1) JPS5833155B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020059482A1 (en) 2018-09-19 2020-03-26 住友ゴム工業株式会社 Pneumatic tire

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2621985B2 (en) * 1989-07-05 1997-06-18 川崎重工業株式会社 Hydrofoil ship steering system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020059482A1 (en) 2018-09-19 2020-03-26 住友ゴム工業株式会社 Pneumatic tire

Also Published As

Publication number Publication date
JPS568788A (en) 1981-01-29

Similar Documents

Publication Publication Date Title
KR20190089646A (en) Pylon of Long Span Bridge and its Construction Method by Applying Hybrid Structure
JPS5833155B2 (en) How to build offshore structures
JP3973577B2 (en) Bridge, bridge structure and bridge construction method
US4406102A (en) Precast concrete silo complex and a method of constructing it
JP2920490B2 (en) Method of manufacturing panel-joined caisson and panel-joined caisson
JPS596495A (en) Turbine support frame
JPH07292828A (en) Precast synthetic void slab and its structure
JP3322701B2 (en) Prefabricated piers and concrete blocks for piers
JPS5853626B2 (en) How to build synthetic marine structures
JPH0334967Y2 (en)
JP2944448B2 (en) Steel plate concrete composite structure unit
JPS5853625B2 (en) How to build offshore structures
JPH09254868A (en) Method for building floating caisson
JPS61290137A (en) Construction of columnar pillar
JP2000266244A (en) Service pipe structure body and constructing method for the service pipe
JPH0784092A (en) Lining tank and its construction method
JP3020874B2 (en) Module structure of nuclear power plant and diaphragm floor and method of constructing nuclear power plant
JPH0227104Y2 (en)
JP2843880B2 (en) Wall construction method
JP2574630Y2 (en) Half PC beam structure
JPS61233132A (en) Construction method for underwater structures
JPH03295496A (en) Reactor containment vessel top slab construction method and reactor containment vessel
JPH0746152B2 (en) Structure of containment vessel wall
JPH0642171A (en) Bending type semiprecast beam form
JPS6015763B2 (en) How to erect a concrete arch structure