Construction method for suspension scaffolding for bridges

Info

Publication number
JPH0681844B2
JPH0681844B2 JP5977589A JP5977589A JPH0681844B2 JP H0681844 B2 JPH0681844 B2 JP H0681844B2 JP 5977589 A JP5977589 A JP 5977589A JP 5977589 A JP5977589 A JP 5977589A JP H0681844 B2 JPH0681844 B2 JP H0681844B2
Authority
JP
Japan
Prior art keywords
bridge girder
frame
protective member
unit length
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP5977589A
Other languages
Japanese (ja)
Other versions
JPH02240309A (en
Inventor
和彦 坂野
英幸 夏井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YOKOKAWA KOJI KK
Original Assignee
YOKOKAWA KOJI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YOKOKAWA KOJI KK filed Critical YOKOKAWA KOJI KK
Priority to JP5977589A priority Critical patent/JPH0681844B2/en
Publication of JPH02240309A publication Critical patent/JPH02240309A/en
Publication of JPH0681844B2 publication Critical patent/JPH0681844B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、例えば使用中の道路上を横断して架設した橋
桁に対して更に床版等を付加する工事を行う場合等に、
安全上架設する吊足場の架設工法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION (Industrial field of application) The present invention is applicable to, for example, a case where a work such as a floor slab is added to a bridge girder installed across a road in use.
The present invention relates to a construction method of a suspension scaffold to be erected for safety.

(従来の技術) 例えば、第1図〜第9図に示すような使用中の道路1上
を横断して架設した橋桁2に対して、第19図に示すよう
に鉄筋コンクリート床版3を付加する工事を行う場合、
下の道路1上の交通を妨げないため、および前記付加工
事における作業の安全を図るために、橋桁2の下面およ
び両側面を完全に覆うことができる防護部材を設ける必
要がある。
(Prior Art) For example, as shown in FIG. 19, a reinforced concrete floor slab 3 is added to a bridge girder 2 installed across a road 1 in use as shown in FIGS. When performing construction,
In order not to obstruct the traffic on the lower road 1 and to ensure the safety of the work in the additional work, it is necessary to provide a protective member capable of completely covering the lower surface and both side surfaces of the bridge girder 2.

この防護部材を設けるため従来は、道路1上の交通規制
をして、例えば夜間に一時交通止めをして、橋桁2の下
からステージ足場等を架設していた。
In order to provide this protection member, conventionally, traffic control on the road 1 was performed, for example, temporary traffic was stopped at night, and a stage scaffold or the like was erected from under the bridge girder 2.

(発明が解決しようとする課題) しかしながら上述した従来の方法では、作業時間が制約
されて、主に夜間作業となるため安全上の問題が多くな
る上に、作業能率も低下するから、工期が長びくと共
に、経費も嵩むという問題点があった。
(Problems to be Solved by the Invention) However, in the above-mentioned conventional method, the work time is limited, and mainly night work is performed, so that there are many safety problems and the work efficiency is lowered, so that the construction period is shortened. There is a problem that the cost is increased as it is prolonged.

(課題を解決するための手段) 上述の問題点を解決するため本発明においては、架設し
た橋桁の一方の端部側において、橋桁上に単位長さの枠
組を載置し、この枠組の下面にキャスターを設けると共
に、枠組の両側に橋桁の側縁と摺動するガイド部材を突
設し、橋桁の下面および両側面を前記単位長にわたって
覆う防護部材を前記枠組より吊下し、この枠組および防
護部材を橋桁に沿って前記一単位長分移動させて後、再
び橋桁の一方の端部側において、前記枠組および防護部
材を橋桁に対して移動自在に組み付ける操作を繰り返し
行なうことにより、橋桁のほぼ全長に防護部材を位置さ
せた後、前記枠組と接続した吊部材を橋桁に継ぎ変えて
前記枠組を取り外すようにする。
(Means for Solving the Problems) In order to solve the above problems, in the present invention, a frame of unit length is placed on the bridge girder on one end side of the bridge girder, and the lower surface of the frame is placed. In addition to providing casters on both sides, a guide member that slides on the side edge of the bridge girder is projected on both sides of the frame, and a protective member that covers the lower surface and both side surfaces of the bridge girder over the unit length is hung from the frame, and this frame and After moving the protection member along the bridge girder by the one unit length, by repeating the operation of movably assembling the frame and the protection member to the bridge girder again on one end side of the bridge girder, After arranging the protection member over substantially the entire length, the suspension member connected to the framework is rejoined to the bridge girder so that the framework can be removed.

(作 用) 上述のように本発明によれば、架設した橋桁の一方の端
部側において、単位長の枠組をキャスターおよびガイド
部材を介して橋桁上に移動自在に載置したから、この枠
組を移動させる場合にガイド部材により脱輪の心配がな
く、また首振り自在なキャスターの作用によって橋桁上
面に突出するボルト等の間を無理なく通過することがで
きる。
(Operation) As described above, according to the present invention, a frame of unit length is movably placed on the bridge girder via casters and guide members on one end side of the bridge girder. When moving the vehicle, there is no fear of derailment due to the guide member, and the action of the swingable caster allows the vehicle to easily pass between the bolts and the like protruding to the upper surface of the bridge girder.

また本発明によれば、下方の道路を交通規制することな
く、昼間における作業によって橋桁全体を防護部材によ
って能率よくカバーすることができるから、作業の安全
性を向上すると共に、作業能率を向上し、工期を短縮す
る上に、経費も軽減することができる。
Further, according to the present invention, the entire bridge girder can be efficiently covered by the protective member by the work in the daytime without traffic regulation on the lower road, so that the work safety is improved and the work efficiency is improved. In addition to shortening the construction period, costs can also be reduced.

(実施例) 以下、図面について本発明の一実施例を説明する。Embodiment An embodiment of the present invention will be described below with reference to the drawings.

第1図〜第9図は本発明工法の工程説明図で、図中1は
現在使用中の導路(鉄道、または交通量の多い河川等の
場合もある。)2はその道路1上を横断して架設した橋
桁である。
1 to 9 are process explanatory views of the method of the present invention, in which 1 is a currently used guideway (which may be a railway or a river with a lot of traffic) 2 is on the road 1 It is a bridge girder laid across.

本発明は、この橋桁2に対して例えば、第19図に示すよ
うに鉄筋コンクリート床版3を付加する工事を行う場
合、下の道路1上の交通を妨げないようにすると共に、
前記付加工事における作業の安全を図るために、橋桁2
の下面および両側面を完全に覆うことができる防護部材
を取り付ける吊足場架設工法である。
According to the present invention, for example, when the construction for adding a reinforced concrete floor slab 3 to the bridge girder 2 as shown in FIG.
Bridge girder 2 to ensure the safety of the work in the additional work
This is a construction method of suspending scaffolding that attaches a protective member that can completely cover the lower surface and both side surfaces of the.

本実施例においては、道路1に架設した橋桁2の図にお
ける右側の端部の下方にあたる空地4上の橋桁2の上面
において、第1,10,15,16図に示すように、まず橋桁2の
長手方向に沿って2本のH形鋼5,5を、そのフランジ面
を上下方向に向けて平行に並設し、これらのH形鋼5,5
の上面に適当な間隔をおいて、橋桁2の幅よりもやや長
い形鋼6を、前記形鋼5と直交するように配置してそれ
ぞれ固着し、さらにこれら形鋼6の上面の左右両側端部
上において、前記形鋼5とそれぞれ平行に形鋼7を配置
すると共に、重合する形鋼6と固着して単位長さの枠組
8を一体的に形成し、前記形鋼5の下面に、第11図に示
すようなキャスター9を適当な間隔をおいて配設し、ま
た前記形鋼6の両側端部の下面に、第12図に示すような
ガイド部材10を突設し、枠組8を橋桁2上に載置した
際、これらのガイド部材10が橋桁2の外側に位置して前
記キャスター9が脱輪しないように案内するように構成
する。
In this embodiment, on the upper surface of the bridge girder 2 on the open space 4, which is below the right end of the bridge girder 2 installed on the road 1, as shown in FIGS. The two H-section steels 5,5 are arranged in parallel along the longitudinal direction of the
Shaped steels 6 slightly longer than the width of the bridge girders 2 are arranged at right angles to the upper surface of the bridges and are fixed so as to be orthogonal to the shaped steels 5. On the part, the shaped steels 7 are arranged in parallel with the shaped steels 5, respectively, and the framed shape 8 having a unit length is integrally formed by being fixed to the overlapping shaped steels 6, and on the lower surface of the shaped steels 5, The casters 9 as shown in FIG. 11 are arranged at appropriate intervals, and the guide members 10 as shown in FIG. When placed on the bridge girder 2, these guide members 10 are located outside the bridge girder 2 so as to guide the casters 9 so as not to derail.

また前記左右両側の形鋼7の下面には、第13図に示すよ
うなチエーン取付金具11を、それぞれ適当な間隔おきに
配置して形鋼7に固着する。そして上述のようにして一
体に形成した枠組8を橋桁2上に載置する。
Further, chain attachments 11 as shown in FIG. 13 are arranged at appropriate intervals on the lower surface of the shaped steel 7 on both the left and right sides and fixed to the shaped steel 7. Then, the frame 8 integrally formed as described above is placed on the bridge girder 2.

なお第11図中の9aは車輪、9bは軸、9cはブラケット、9d
は取付座板で、この座板9dとブラケット9cは回転自在に
連結されている。
In FIG. 11, 9a is a wheel, 9b is a shaft, 9c is a bracket, and 9d.
Is a mounting seat plate, and the seat plate 9d and the bracket 9c are rotatably connected.

また第12図中の10aは取付座板、10bは前後方向板、10c
はリブ、10dはガイドロッドである。
Further, in FIG. 12, 10a is a mounting seat plate, 10b is a front-rear direction plate, and 10c.
Is a rib and 10d is a guide rod.

また第13図中の11aは取付座板、11bは垂直板、11cはチ
エーン連結孔である。
Further, in FIG. 13, 11a is a mounting seat plate, 11b is a vertical plate, and 11c is a chain connecting hole.

また第14図〜18図に示すように、橋桁2の下面および両
側面を前記単位長にわたって覆う防護部材12を、パイプ
13により骨組を形成すると共に、合板14をその骨組の内
側に添設して溝形に形成し、このように形成した防護部
材12を橋桁2を下方から包むように嵌合すると共に、チ
エーン15により前記枠組8より吊り下げる。
Further, as shown in FIGS. 14 to 18, a protective member 12 for covering the lower surface and both side surfaces of the bridge girder 2 over the unit length is provided with a pipe.
A frame is formed by 13, and a plywood 14 is attached to the inside of the frame to form a groove, and the protective member 12 thus formed is fitted so as to wrap the bridge girder 2 from below, and the chain 15 is used. It is suspended from the frame 8.

第1図はこのようにして橋桁2の右側の端部に、単位長
の枠組8と防護部材12を取り付けた状態を示すものであ
る。
FIG. 1 shows a state in which the frame 8 having a unit length and the protective member 12 are attached to the right end portion of the bridge girder 2 in this manner.

つぎにこの枠組8および防護部材12を橋桁2に沿って第
1の矢印Aのように、前記一単位長分移動させて第2図
の位置にした後、再び橋桁2の一方の端部側の空地4上
において、第3図に示すように、枠組8および防護部材
12を橋桁2に対して移動自在に組み付け、ついで第4図
に示すように移動させ、また第5図に示すよう、新たに
枠組8と防護部材12を組み付け、さらにこれを第6図に
示すように移動させ、第7図に示すように、新たに枠組
8と防護部材12を組み付け、第8図に示すように移動さ
せて後、第9図に示すように、新たに枠組み8と防護部
材12を組み付けることにより、橋桁2のほぼ全長にわた
って枠組8と防護部材12を位置させることができる。こ
のようにした後、前記枠組8とチエーン取付金具11を介
して接続した吊部材であるチェーン15を第18図に示すよ
うに、橋桁2に設けたチエーン取付金具16に継ぎ変えて
後、前記枠組8を取り外す。
Next, after moving the frame 8 and the protection member 12 along the bridge girder 2 by the one unit length as shown by the first arrow A to the position shown in FIG. As shown in FIG. 3, the frame 8 and the protective member on the open space 4 of
12 is movably attached to the bridge girder 2, then moved as shown in FIG. 4, and as shown in FIG. 5, a frame 8 and a protective member 12 are newly attached, which is further shown in FIG. As shown in FIG. 7, the frame 8 and the protective member 12 are newly assembled, and after moving as shown in FIG. 8, the frame 8 and the protective member 12 are newly protected as shown in FIG. By assembling the member 12, the frame 8 and the protection member 12 can be positioned over substantially the entire length of the bridge girder 2. After doing this, as shown in FIG. 18, the chain 15 which is a suspension member connected to the frame 8 via the chain mounting bracket 11 is spliced to the chain mounting bracket 16 provided on the bridge girder 2 and then the Remove the framework 8.

第18図は、その枠組8を取り外した状態を示すものであ
る。
FIG. 18 shows a state in which the frame 8 is removed.

このようにすれば、橋桁2の上面に邪魔物がなくなるか
ら、前記した付加工事を支障なく行うことができる。し
かもこの場合橋桁2の下および両側面側が防護部材12に
よって確実にカバーされているため、作業中も下方の道
路1上の交通を落下等によって妨げるおそれはないと共
に、付加工事作業者の安全も確保される。
In this way, there is no obstacle on the upper surface of the bridge girder 2, so that the additional work described above can be performed without any trouble. Moreover, in this case, since the underside and both side surfaces of the bridge girder 2 are surely covered by the protective member 12, there is no fear that the traffic on the lower road 1 will be obstructed by a fall or the like even during the work, and the safety of the additional construction worker is also improved. Reserved.

(発明の効果) 上述のように本発明によれば、架設した橋桁の一方の端
部側において、単位長の枠組をキャスターおよびガイド
部材を介して橋桁上に移動自在に載置したから、この枠
組を移動させる場合にガイド部材により脱輪の心配がな
く、また首振り自在なキャスターの作用によって橋桁上
面に突出するボルト等の間を無理なく通過することがで
きる。
(Effect of the Invention) According to the present invention as described above, since the frame of unit length is movably mounted on the bridge girder via the caster and the guide member on one end side of the bridge girder, When the frame is moved, there is no concern about derailment due to the guide member, and the action of the swingable caster allows the frame to pass smoothly between the bolts and the like protruding to the upper surface of the bridge girder.

また本発明によれば、下方の道路を交通規制することな
く、昼間における作業によって橋梁全体を防護部材によ
って能率よくカバーすることができるから、作業の安全
性を向上すると共に、作業能率を向上し、工期を短縮す
る上に、経費も軽減することができるというすぐれた効
果が得られる。
Further, according to the present invention, since the entire bridge can be efficiently covered by the protective member by the work in the daytime without traffic regulation on the lower road, work safety is improved and work efficiency is improved. In addition to shortening the construction period, the excellent effect that the cost can be reduced is obtained.

【図面の簡単な説明】[Brief description of drawings]

第1図〜第9図は本発明工法の工程を示す説明図、 第10図は枠組の斜視図、 第11図(a)はキャスターの立面図、 同図(b)はその側面図、 同図(c)は同図(a)の平面図、 第12図(a)はガイド部材の立面図、 同図(b)はその側面図、 同図(c)は同図(a)の下面図、 第13図(a)はチエーン取付金具の立面図、 同図(b)はその側面図、 同図(c)は同図(a)の下面図、 第14図は防護部材の斜視図、 第15図は橋桁に枠組と防護部材を取り付けた状態を一部
省略して示す側面図、 第16図はその断面図、 第17図は枠組を取り外した状態の橋桁と防護部材を示す
側面図、 第18図はその断面図、 第19図は橋桁上に鉄筋コンクリート床版を付した状態を
示す断面図である。 1……使用中の道路、2……橋桁 5,6,7……形鋼、8……枠組 9……キャスター、10……ガイド部材 11……チエーン取付金具、12……防護部材 13……パイプ、14……合板 15……チエーン(吊部材)、16……チエーン取付金具
1 to 9 are explanatory views showing the steps of the method of the present invention, FIG. 10 is a perspective view of a frame, FIG. 11 (a) is an elevation view of a caster, and FIG. 11 (b) is a side view thereof. 12C is a plan view of FIG. 12A, FIG. 12A is an elevation view of the guide member, FIG. 12B is a side view thereof, and FIG. Fig. 13 (a) is an elevation view of the chain mounting bracket, Fig. 13 (b) is its side view, Fig. 13 (c) is the bottom view of Fig. 14 (a), and Fig. 14 is a protective member. Fig. 15 is a side view of the bridge girder with the frame and protection members partially omitted, Fig. 16 is its sectional view, and Fig. 17 is the bridge girder and protection member with the frame removed. Fig. 18 is a side view showing Fig. 18, and Fig. 18 is a sectional view showing the same. Fig. 19 is a sectional view showing a state in which a reinforced concrete floor slab is attached on the bridge girder. 1 …… Road in use 2 …… Bridge girder 5,6,7 …… Shaped steel, 8 …… Frame 9 …… Caster, 10 …… Guide member 11 …… Chain mounting bracket, 12 …… Protective member 13… … Pipe, 14 …… Plywood 15 …… Chain (hanging member), 16 …… Chain mounting bracket

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】架設した橋桁の一方の端部側において、橋
桁上に単位長さの枠組を載置し、この枠組の下面にキャ
スターを設けると共に、枠組の両側に橋桁の側縁と摺動
するガイド部材を突設し、橋桁の下面および両側面を前
記単位長さにわたって覆う防護部材を前記枠組より吊下
し、この枠組および防護部材を橋桁に沿って前記一単位
長分移動させて後、再び橋桁の一方の端部側において、
前記枠組および防護部材を橋桁に対して移動自在に組み
付ける操作を繰り返し行うことにより、橋桁のほぼ全長
に防護部材を位置させた後、前記枠組と接続した吊部材
を橋桁に継ぎ変えて前記枠組を取り外すようにしたこと
を特徴とする橋梁用の吊足場架設工法。
1. A frame of unit length is placed on the bridge girder at one end of the bridge girder, casters are provided on the lower surface of the frame, and slides on both sides of the frame with side edges of the bridge girder. A guide member to be protruded, and a protective member for covering the lower surface and both side surfaces of the bridge girder over the unit length is hung from the frame, and the frame and the protective member are moved along the bridge girder for the unit length, and , Again at one end of the bridge girder,
By repeating the operation of movably assembling the frame and the protective member with respect to the bridge girder, after positioning the protective member over substantially the entire length of the bridge girder, the suspension member connected to the frame is spliced to the bridge girder to form the frame. A suspension scaffolding construction method for bridges characterized by being removed.
JP5977589A 1989-03-14 1989-03-14 Construction method for suspension scaffolding for bridges Expired - Fee Related JPH0681844B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5977589A JPH0681844B2 (en) 1989-03-14 1989-03-14 Construction method for suspension scaffolding for bridges

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5977589A JPH0681844B2 (en) 1989-03-14 1989-03-14 Construction method for suspension scaffolding for bridges

Publications (2)

Publication Number Publication Date
JPH02240309A JPH02240309A (en) 1990-09-25
JPH0681844B2 true JPH0681844B2 (en) 1994-10-19

Family

ID=13123004

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5977589A Expired - Fee Related JPH0681844B2 (en) 1989-03-14 1989-03-14 Construction method for suspension scaffolding for bridges

Country Status (1)

Country Link
JP (1) JPH0681844B2 (en)

Also Published As

Publication number Publication date
JPH02240309A (en) 1990-09-25

Similar Documents

Publication Publication Date Title
JP3954869B2 (en) Bridge girder replacement method
JP6793542B2 (en) Floor slab erection method and floor slab erection equipment
JPH021943B2 (en)
JP2824684B2 (en) Bridge pier inspection and repair scaffold
JP5484983B2 (en) Method for assembling and dismantling bridge moving work device
JP2017053190A (en) How to assemble a suspended scaffold using a slide frame
JPH0681844B2 (en) Construction method for suspension scaffolding for bridges
JP2580734Y2 (en) Mobile hanging scaffolding equipment
JP4098581B2 (en) Overpass bridge construction method
JPH0312172B2 (en)
JPH05311617A (en) How to build an elevated structure
JPH0689527B2 (en) Construction work vehicle for PC cable-stayed bridge
JPH0668217B2 (en) Temporary roof for curing
JPS59130904A (en) Bridge inspection scaffolding
JPH0330671B2 (en)
JP3214407B2 (en) Connection method of beam members and scaffolding equipment for work at height
JP2005090109A (en) Bridge erection method and bridge superstructure unit
JP3031694U (en) General sleeper set for temporary rail installation in tunnels
JP2019116730A (en) Steel bridge widening installation device and steel bridge widening installation method
JPS6335053Y2 (en)
JPH09184110A (en) Sound absorbing member used also for scaffold of elevated bridge
JP2959442B2 (en) Work scaffold erection structure
JPS598875A (en) Construction of building roof
JPS6018508Y2 (en) Hanging scaffolding device
JPH049901B2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees