To provide a method and device for carrying out removed earth in tunnel excavation that prevents blocking in an earth removal pipe by converting the mixture of high-concentration removed earth and slurry to low concentration before sending to the earth, decreases the load of a pump, and performing discharge efficiently, and separating the removed earth and slurry after discharge easily and reusing the slurry easily.例文帳に追加
高濃度の排土と泥水の混合物を低濃度に変換して地上に送って、排土管内の詰まりを防ぎ、ポンプの負荷を減らし、排出を効率よく行うことができ、排出後の排土と泥水の分離を行いやすくし泥水の再利用を容易に行えるトンネル掘削の排土搬出方法及び装置を提供することにある。 - 特許庁
To provide a design method for designing an earth pressure type shield machine that meets the specification of an agitating mechanism in an optimum plastic flow state for excavation, and input conditions in making a flow analysis based on the specification of the agitating mechanism by grasping, through the flow analysis, the plastic flow state of excavated sediment based on the specification of the agitating mechanism of the earth pressure type shield machine.例文帳に追加
土圧式シールド機の撹拌機構の仕様に基づいた掘削土砂の塑性流動状態を流動解析にて把握し、掘進に最適な塑性流動状態の撹拌機構の仕様及びこの撹拌機構の仕様に基づいた流動解析の際の入力条件を満たすような土圧式シールド機を設計するための設計方法を提供する。 - 特許庁
To provide a protection method where a construction for protecting a buried tube from the damage from the upper face and side faces is simple and economical to non-excavation pipeline installation technique in a buried tube construction, particularly, to a drilling technique using a drill bit clad with a super hard material, and to provide an inexpensive steel sheet having excellent bending workability and drilling resistance used therefor.例文帳に追加
埋設管工事の非開削工法、特に超硬材料を肉盛りした削進ビットを用いる削進工法に対して、上面および側面からの損傷から埋設管を防護するための工事が簡便で経済的な防護方法と、それに用いる曲げ加工性と耐穴あけ性に優れた廉価な鋼板を提供する。 - 特許庁
To provide a method for cleaning a contaminated ground is characterized by using a biodegradable underground pipe upon cleaning a contaminated ground to be left buried permanently allowing it to decompose by virtue of microbes in the ground into harmless substances such as carbon dioxide so as not to hinder future ground excavation, which makes it possible to use the ground effectively.例文帳に追加
汚染地盤の浄化処理を施すに当って、微生物で分解される土中埋設管を用い、この埋設管を地盤中に埋め殺しにすることにより、該埋設管が土中微生物によって分解されて炭酸ガス等の無害な物質となり、地盤の掘削工事に際してじゃまにならず、土地の有効利用を可能にする。 - 特許庁
To provide a synthetic resin pipe embedding guide device used in non-excavation embedding works for a synthetic resin pipe to be drawn from the insert position into a leader hole bored in the ground previously capable of smooth embedding of the pipe with the prolongation of the construction period minimized for guiding the pipe to the insert position.例文帳に追加
予め地中に穿設してある先進導孔20への挿入位置22から先進導孔20内に引き込む、合成樹脂製管18の非開削埋設工事において、合成樹脂製管18を挿入位置22に誘導するのに、工事影響延長を最小限に留めながら、合成樹脂製管を円滑に埋設することを可能とする。 - 特許庁
According to the results of the excavation and research, the design of Saikon-do Hall included an open front (without any fittings or walls) just like the existing main hall of Toshodai-ji Temple, and Chukon-do Hall was a building of very open design with two pillars in front and one on each side, and eaves which descend over all four sides of the main building. 例文帳に追加
発掘調査の結果によれば、西金堂は現存する唐招提寺金堂と同様に正面を吹き放ち(建具や壁を入れずに開放とする)とした建築であり、中金堂は正面三間×側面二間(「間」は柱間の数を意味する)の母屋の四方に吹き放ちの庇をめぐらした開放的な建物であったことがわかっている。 - Wikipedia日英京都関連文書対訳コーパス
Also, unlike earthwares and stone tools, few dotaku were excavated from dwelling sites and, unlike other copper items such as doken (bronze swords) and dohoko (bronze pikes), no dotaku used as burial goods in tombs were discovered (One example exists of excavation at a groove surrounding the grave mound in the Yayoi period.), which indicates that dotaku were not private belongings but property of village communities. 例文帳に追加
土器や石器と違い、住居跡からの出土はほとんど無く、また銅剣や銅矛など他の銅製品と異なり、墓からの副葬品としての出土例は一度もないため(弥生時代の墓制墳丘墓の周濠部からの出土は一例ある)、個人の持ち物ではなく、村落共同体全体の所有物であったとされている。 - Wikipedia日英京都関連文書対訳コーパス
However, the more cases of excavation of bronze wares there were naturally along with increased excavations of ruins, the more situations where dohoko and doken were found in 'the dotaku cultural area' and where dotaku were discovered in 'the dohoko cultural area' (well-known example: the Yoshinogari Ruins) there were, which proved the hypothesis was not true as it was less and less often discussed. 例文帳に追加
しかし、発掘される遺跡の増加に伴い当然のことながら青銅器の出土例も増え、「銅鐸文化圏」の地域で銅矛や銅剣が、「銅矛文化圏」内で銅鐸が出土するといったこと(特に有名な例が吉野ヶ里での出土)が多くなり、この仮説は成り立たなくなり次第に論じられる事は少なくなった。 - Wikipedia日英京都関連文書対訳コーパス
This battle is famous for the first record of the use of the gun, and it is said that the evidence of rapidly established horse-blocking fence is being revealed by an excavation and research, but, even though guns were used, they were very few and the fact and effect of the use of guns still remain to be proven. 例文帳に追加
この戦いは火砲の使用が初めて記録された戦いとしても有名であり、また馬防柵を急造設置したらしい痕跡が現在発掘調査で明らかになりつつあると言われているが、火砲は使用されたとしても極少数であり、使用の事実及び効果に付いてはまだ今後の研究を待つ所が大きい。 - Wikipedia日英京都関連文書対訳コーパス
A plurality of compressive breakage edges 3 rotatably supported at the foremost end of a head excavation disk 2 rotatably supported through a bearing 10 at the front end of a tunnel boring machine body 1 are at first brought into contact with natural ground 15 in a shaft 15 and strongly pressed on the bed rock surface while rolling to generated linear compressive breakage and form a small diameter leading hole.例文帳に追加
坑道掘削機本体1の前端部にベアリング10を介して回転自在に支持された頭部掘削盤2の最先端部に回転自在に支持された複数の圧壊破砕刃3は立坑内の地山に最初に当接し、転動しながら岩盤表面を強く押圧して線状の圧壊破砕を生じさせ、小径の先導孔を形成する。 - 特許庁
As a result, the flowability is made high to facilitate the filling work or the forcible sending to the excavation groove or the slit without leaving space, the quick strength exhibition and the sufficiently high strength in the hardening, particularly the initial strength are attained and then, the quick setting cement concrete is suitable for the pre-lining process in a super large cross section, flat cross section and high depth tunnel.例文帳に追加
本発明のプレライニング用急結セメントコンクリートは、流動性が高く、掘削溝やスリットへの隙間ない充填作業や圧送等が容易であり、強度発現が速やかで、しかも硬化した際の強度、特に初期強度が十分高いので、超大断面、扁平断面、高深度トンネルにおけるプレライニング工法に適する。 - 特許庁
Since the bucket 20 can surely and mechanically excavate the corner part of an execution part by means of the normal bucket for excavating and transporting a flat ground face down to a desired depth without any exchange of the machine itself in accordance with an excavation condition, for instance, it can be applied for a power shovel or the like provided with an offset boom right or left offset by an offset mechanism.例文帳に追加
前記バケット(20)は、掘削条件に応じて機械そのものを交換せずに平坦な地盤面を所望の深さまで掘削及び運搬する通常のバケットを用いて施工面の隅部を確実に機械的に掘削できるため、例えばオフセット機構により左又は右にオフセットするオフセットブーム(50)を備えたパワーショベル等に適用される。 - 特許庁
When the measured temperature comes to a reference temperature or more, a voltage value of a voltage impressed to the sample S for carrying out the excavation work is reduced to reduce a heat value supplied to the sample S, and deterioration such as melting is prevented from being generated even when the sample S is a thermally weak material, to form a sample face favorable for observation.例文帳に追加
測定した温度が基準温度以上になった場合は、掘削加工を行うために試料Sへ印加する電圧の電力値を低下させて、試料Sに与えられる熱量を低下し、試料Sが熱に弱い材料であっても溶融などの変質が生じることを防止して、観察に良好な試料面を形成する。 - 特許庁
In a tunnel construction method, an inside mold 5 is assembled along the inner surface of a level on the rear of a shield excavator and concretes are placed into the inner mold 5, so that the lining wall 4 is formed on the inner surface of the level as excavation proceeds.例文帳に追加
シールド掘削機の後方で坑内面に沿わせて内型枠5を組み立て、その内型枠5内にコンクリートを打設することにより坑内面に覆工壁4を形成しつつ掘進していくトンネル施工方法において、内型枠5を組み立てる際にその内側に鋼製セグメント11を組み立てることにより、その鋼製セグメント11を覆工壁4中に埋設せしめていく。 - 特許庁
To provide a steel segment enabling a construction period to be shortened by easily positioning steel segments in a tunnel depth direction and tunnel circumferential direction though screws such as bolts and nuts are used as joining devices so that an excavation in the tunnel depth direction can be performed parallel with a joining operation while quickly performing the joining operation.例文帳に追加
ボルト・ナット等のネジ類を連結具として用いたものでありながら、トンネル奥行き方向とトンネル周方向に対する鋼製セグメント同士の位置決めを容易に行うことができ、よって迅速な連結作業を行いつつトンネル奥行き方向の掘削作業を並行して行うことが可能となり、よって、工期の短縮化を実現することができる鋼製セグメントを提供する。 - 特許庁
When resuming excavation work, only the first casing 4A is first rotated and driven to start a ground excavator and isolate the first casing from the ground, then the first casing 4A and the second casing 4B are mutually connected by using the connection means 20, and then the first casing 4A and the second casing 4B are integrally rotated and driven to isolate the second casing 4B from the ground.例文帳に追加
掘削作業を再開するときは、まず最初に第1のケーシング4Aのみを回転駆動して起動させることにより第1のケーシングと地盤との縁切りを行った後、接続手段20を用いて第1および第2のケーシング4A,4Bを相互に接続した後、第1および第2のケーシング4A,4Bを一体に回転駆動して第2のケーシング4Bと地盤との縁切りを行う。 - 特許庁
This concrete sheet pile 1 is used for a retaining wall when building a structure; a main body 2 of the sheet pile is formed by precast concrete; and a protection plate 10 (cover member) covering an inner side surface 5 in the inner side surface 5 so arranged as to face the excavation zone is installed in a detachable manner at the main body 2 of the sheet pile.例文帳に追加
構造体の構築において、土留め壁として用いられるコンクリート矢板1であって、プレキャストコンクリートによって矢板本体2が構成されており、矢板本体2において、掘削領域に向けて配置される内方側面5には、内方側面5を覆う防護板10(被覆部材)が取り外し可能な状態で取り付けられていることを特徴としている。 - 特許庁
To provide a construction method of a tunnel entrance branch/confluent width expanding part, capable of securing maintenance of a social environment and a surrounding environment by restraining excavation surplus soil to a necessary minimum, capable of performing safety construction by minimizing influence on the surrounding ground, and capable of simplifying joining work by shortening a joining distance between a main track tunnel and an entrance tunnel.例文帳に追加
掘削残土を必要最少限に抑制して社会環境、周辺環境の保全を確保することができ、しかも、周辺地盤への影響を最小限とした安全施工を行うことができ、さらには、本線トンネルと出入り口トンネルの接合距離の短縮化による接合工の簡素化を図ることのできるトンネルの出入り口分岐・合流拡幅部の構築方法を提供する。 - 特許庁
In this shield tunneling method to implement the excavation in which the mud additive material is poured in a chamber of a shield machine, and the mud with this mud additive mixed with the excavated earth is discharged from the chamber, sodium alginate is fed in the chamber together with or separate from the mud additive material, and the polyvalent metal salt except magnesium salt is blended in the mud discharged from the chamber.例文帳に追加
シールド機のチャンバー内に加泥材を注入し,この加泥材と掘削土砂が混合した泥土を該チャンバー内から排出しながら掘進するシールド工法において,該チャンバー内に前記の加泥材と共にまたは加泥材とは別途にアルギン酸ナトリウムを供給し,該チャンバーから排出する泥土に,マグネシウム塩を除く多価金属塩を配合することを特徴とするシールド工法。 - 特許庁
Although the continuous soil cement wall 1 for the soil retention and the water shutoff provided in the soil 11 adjacent to the building is not used for the building after constructed, the need for separate excavation is eliminated in installing the underground heat exchanger 2 by embedding the underground heat exchanger 2 in the soil cement wall 1 and the soil cement wall 1 in no use can be effectively utilized.例文帳に追加
建築物に隣接する地盤11に土留め用や止水用の連続したソイルセメント壁1は、建築物の施工後、建築物には使用されないが、そのソイルセメント壁1内に地中熱交換器2を埋設することにより、地中熱交換器2の設置に別途に掘削などを行う必要がないと共に、使われていないソイルセメント壁1の有効利用を図ることができる。 - 特許庁
To easily obtain good working efficiency to each of excavation work and load hanging work without loosing one's hold of a control lever in the case set pressure is adjusted by automatically varying the set pressure of a variable overload relief valve in accordance with an arm pulling manipulated variable.例文帳に追加
作業内容の異なる荷吊り作業と掘削作業を、同一の前記油圧ショベルで効率良く行うには、ブーム用方向切換弁とブームシリンダヘッド側油室を連絡する油路から分岐して、タンクと連通する油路に介設されるオーバーロードリリーフ弁の設定圧力を、荷吊り作業においては所定の高圧に、掘削作業においては所定の低圧に調整する事が望ましい。 - 特許庁
To positively eliminate a space part where backfilling cannot be performed, in a tunnel, to improve safety against plug collapse in block piling construction of a cut-off plug and to eliminate high-lift excavation work at the upper part of a widened recess of a loose area.例文帳に追加
放射性廃棄物の地層処分の処分坑道等の止水プラグを用いた止水構造において、坑道内の埋め戻し処理のできない空間部を確実に無くすことができ、また止水プラグのブロック積上げ施工におけるプラグ崩壊に対する安全性を向上させることができ、さらにゆるみ域の拡幅凹部の上部における高所の掘削作業を無くすことができるようにする。 - 特許庁
Article 362 (1) The employer shall, in the case of carrying out the work of open-cut excavation at a place adjacent to underground-installed objects, etc., or buildings of brick walls, concrete block walls, retaining walls, etc., and when it is liable to cause dangers to workers due to their collapse, not carry out the work unless measures to prevent dangers have been taken, such as reinforcing and removing them. 例文帳に追加
第三百六十二条 事業者は、埋設物等又はれんが壁、コンクリートブロック塀、擁壁等の建設物に近接する箇所で明り掘削の作業を行なう場合において、これらの損壊等により労働者に危険を及ぼすおそれのあるときは、これらを補強し、移設する等当該危険を防止するための措置が講じられた後でなければ、作業を行なつてはならない。 - 日本法令外国語訳データベースシステム
For constructing a following wall element to be jointed with a preceding wall element to compose the continuous underground wall, this spacer 6 for a construction joint part in the continuous underground wall to be crushed by cutting to be buried in the construction joint part C of the preceding wall element cut as excavation work for constructing the following wall element proceeds for securing cutting thickness is formed of a thin plate of FRP material.例文帳に追加
先行壁エレメントに後行壁エレメントを打ち継いで一連に連続地中壁を構築するために後行壁エレメントを築造する掘削作業に伴って切削される先行壁エレメントの打ち継ぎ部Cに切削厚さを確保すべく埋設され、切削により破砕される連続地中壁の打ち継ぎ部用スペーサ6を、FRP材で薄板状に形成する。 - 特許庁
To provide a turbid/muddy water treatment method and system for removing suspended solids, such as soil particles, from washing muddy water of contaminated soil, various kinds of muddy water used in a muddy water excavation method, waste water and spring water in other civil engineering-construction work, and various kinds of turbid/muddy water from turbid water treatment and the like in rivers, the sea, reservoirs, and dams.例文帳に追加
汚染土壌の洗浄泥水、泥水掘削工法において使用される各種の泥水、その他の土木・建設工事における排水や湧水、河川,湖沼,海,貯水池,ダムにおける濁水処理等の各種の濁・泥水から土粒子等の懸濁物質を除去するための濁・泥水の処理方法及びその処理システムを提供することを目的とする。 - 特許庁
A tunnel 1 is constructed by a step for excavating a ground G, a step for assembling segments 20 inside a space formed by the excavation of the ground G and a step for filling gaps K2, K3 formed between the ground G and the segments 20 with the filler 10 which is a mixture of a liquid A comprising water glass and water with a liquid B of a suspension containing calcium hydroxide.例文帳に追加
地山Gを掘削する工程と、地山Gの掘削より形成された空間の内部においてセグメント20を組み立てる工程と、地山Gとセグメント20との間に形成された空隙K2,K3に水ガラスと水とからなるA液と、水酸化カルシウムを含む懸濁液であるB液との混合体である充填材10を充填する工程とによりトンネル1を構築する。 - 特許庁
(ii) A woman over 18 years of age other than those listed in the preceding item; excavation manually performed by humans and other underground work specified by Ordinance of the Ministry of Health, Labor and Welfare as hazardous to women The works specified by Ordinance of the Ministry of Health, Labor and Welfare provided for in Article 64-2 item 2 of the Labor Standards Act (hereinafter referred to as the "Act") shall be as follows:例文帳に追加
二 前号に掲げる女性以外の満十八歳以上の女性坑内で行われる業務のうち人力によ り行われる掘削の業務その他の女性に有害な業務として厚生労働省令で定めるもの 労働基準法(以下「法」という。)第六十四条の二第二号の厚生労働省令で定める業 務は、次のとおりとする。 - 厚生労働省
This diameter measuring method for underground consolidated body for measuring the diameter D of a cylindrical underground consolidated body 2 buried in the ground comprises drilling an excavation hole 4 at a slant from a place P a prescribed distance S away from the center point of the consolidated body 2, and determining the position of the peripheral part of the consolidated body 2 to calculate the diameter D.例文帳に追加
本発明の地中固結体の直径計測方法は、地中に埋設されている円柱状の地中固結体(2)の直径(D)の計測方法において、前記固結体(2)の中心点から所定距離(S)を離れた場所(P)から傾斜して掘削孔(4)を穿孔し、前記固結体(2)の周縁部の位置を求め、直径(D)を算出する。 - 特許庁
This method of constructing a lining wall partitioning a tunnel cross section before the excavation of tunnel, includes pressing inner plates 14, 22 and outer plates 7, 21 defining the inner and outer surfaces of the lining wall into a natural ground, constructing a plate framework structure 32 inside the natural ground, discharging earth and sand inside the plate framework structure 32, placing concrete, and constructing the lining wall.例文帳に追加
トンネルの掘削に先立ち、トンネル断面を区画する覆工壁を構築する工法であって、覆工壁の内外面を規定する内側プレート14,22及び外側プレート7,21を地山に圧入して、地山内部にプレート枠組み構造体32を構築した後、プレート枠組み構造体32の内部の土砂を排出し、コンクリートを打設して覆工壁を構築する。 - 特許庁
The steel pipe column earth retaining wall construction method making use of a multi-spindle auger excavator is so constituted that the auger shaft executing the following excavation and stir is guided by a stabilizer guided by engaging with an O type joint of the steel pipe positioned in advance and that successively different lengths of steel pipes are alternately positioned in order of the short steel pipe and the long steel pipe.例文帳に追加
本発明は、多軸式オーガ掘削機を用いた鋼管柱列式山留壁構築工法において、既に建て込みされた鋼管のO型継手に係合して案内されるスタビライザーによって、次の掘削撹拌を行うオーガ軸が案内され、続いて短い鋼管、長い鋼管の順に、交互に異なる長さの鋼管の建て込みが行われることを特徴とする山留壁構築工法である。 - 特許庁
In a process of tunnel enlargement excavation for an existing tunnel originally excavated by means of shield process in an area specified to be enlarged, a portion is excavated, and the enlargement shield machine is assembled in order to excavate the portion around the tunnel area, while removing the tunnel lining, advance the enlargement shield machine along the existing tunnel, thereby enlarging the tunnel. 例文帳に追加
シールド工法により施工した既設トンネル内の拡大予定区域に対して、その一部を切り拡げて掘削を行い、当該切り拡げ部分に前記既設トンネルの外周部を掘削する拡大シールド機を組み立て設置し、既設のトンネル覆工を順次取り外しながら前記既設トンネルに沿って拡大シールド機を推進して拡大部を構築することを特徴とするトンネル拡大掘削工法。 - 特許庁
This work consists of excavating the ground polluted with volatile organic substances, adding a foaming agent and an alkalifying agent to the soil from excavation, mixing them to allow the soil to generate a hydrogen gas to improve its gas permeability, utilizing the heat of reaction to promote the gasification of pollutants from the soil, bringing the mixed soil with an improved gas permeability into contact with external air to remove the gasified pollutants from the polluted soil.例文帳に追加
揮発性有機物質に汚染された地盤を掘削し、その掘削土壌に発泡剤とアルカリ剤を添加して混合し、土壌中に水素ガスを発生させ、土壌の透気性を向上させ、反応熱により土壌からの汚染物質のガス化を促進し、透気性の上がった混合後の土壌に外気を接触させ、ガス化した汚染物質を汚染土壌中から除去することを特徴とする。 - 特許庁
Article 364 The employer shall, when carrying out the open-cut excavation work, determine in advance a travelling route for a transporting machine, a excavating machine and a loading machine (excluding a vehicle type construction machine and a vehicle type material handling machine, etc.; hereinafter referred to as "transporting machine, etc." in this Chapter), and the method for those machines of entering and leaving from the loading and unloading place of the earth and rocks, and make them known to the workers concerned. 例文帳に追加
第三百六十四条 事業者は、明り掘削の作業を行うときは、あらかじめ、運搬機械、掘削機械及び積込機械(車両系建設機械及び車両系荷役運搬機械等を除く。以下この章において「運搬機械等」という。)の運行の経路並びにこれらの機械の土石の積卸し場所への出入の方法を定めて、これを関係労働者に周知させなければならない。 - 日本法令外国語訳データベースシステム
To provide a mesh form providing cost reduction and construction period shortening effect by improvement in work efficiency in the form, and facilitating confirmation of fill-in of placing concrete and removal of air and bleeding remaining inside the form, even when constructing a circular closed conduit on a steep slope, in a circular top slab outer form used when constructing a circular underground waterway by an open excavation construction method.例文帳に追加
本発明は、開削工法により円形の地下水路を構築する場合に使用される円形頂版外型枠に係り、例え急傾斜地に円形暗渠を築造する場合においても、コンクリート打設中の充填の確認と型枠内部に残った空気やブリージングの除去を容易にし、型枠のコスト低減と施工性の向上による工期短縮効果が見込めるメッシュ型枠を提供することが課題である。 - 特許庁
To provide a dry excavation soil sampler capable of reducing resistance and the frictional calorific power of the rotary penetration in a condition that ground is excavated without use of mud or fresh water, sufficiently stretching a length in which the ground can be excavated and penetrated at a time to reduce a sampling work and enhance the working efficiency, and securely and efficiently taking a target high quality soil sample.例文帳に追加
泥水や清水などを使用しない無水状態で地盤を掘る条件下で、回転貫入の抵抗及び摩擦発熱量を低減し、一度に掘削貫入できる長さを十分に延長してサンプリング作業の作業量を低減し、且つ作業効率の向上が図れ、目標の土壌試料を確実に効率よく高品質に採取することが可能な無水掘り土壌サンプラーを提供する。 - 特許庁
A shield tunnel construction system comprises a shield machine 30 that excavates the ground and constructs a lining body, an ultrafine bubble water generating device 10 that generates ultrafine bubble water by making water contain a gas component that activates soil-resident microbes in an ultrafine bubble state, and an injection material producing part 20 that produces the injection material to be injected from the shield machine to the ground during excavation of the ground by using the ultrafine bubble water.例文帳に追加
シールドトンネル構築システムは、地盤を掘削して覆工体を構築するシールドマシン30と、地盤に存在する微生物を活性化する気体成分を、超微細気泡の状態で水に含ませることにより、超微細気泡水を生成する超微細気泡水生成装置10と、地盤の掘削時にシールドマシンから地盤に向けて注入される注入材を、超微細気泡水を用いて製造する注入材製造部20とを有している。 - 特許庁
This renovating apparatus and renovating method includes cutting a plurality of circumferential parts of the metallic collar beforehand with a cutting means, jetting an excavation liquid to the ground around the existing buried pipe to soften it, and then, while crushing the concrete portion of the existing buried pipe from the inner peripheral side with a conical crushing means, pushing the collar radially outward to displace it around the existing buried pipe and to leave it there.例文帳に追加
本発明の更新装置および更新方法は、金属製のカラーの円周方向の複数箇所を切断手段によって予め切断するとともに、既設埋設管の周囲の地盤に掘削液を噴射して軟化させた後、円錐状の破砕手段によって既設埋設管のコンクリート部分を内周側から破砕しつつ、カラーを半径方向外側に押動して既設埋設管の周囲に変位させてそこに放置する。 - 特許庁
Nagaoka-kyo had been called the 'phantom capital' until recently, but members led by Shuichi NAKAYAMA, a high school teacher, began to excavate the area in 1954, and the following year, they found the site of the gate of the Daidairi Chodoin (a large hall at the front in the palace); more excavation and research have been done to date (partly because research on the land has been required to meet the increased demand of land for industrial use and housing), and the site has been designated as a National Historical Site since 1964. 例文帳に追加
なお、近年まで「幻の都」とされていたが、1954年(昭和29年)より、高校教員であった中山修一を中心として発掘が開始され、翌1955年(昭和30年)、大内裏朝堂院の門跡が発見されたのを皮切りとして、今日までにかなり発掘調査が進み(当該地域で急速な宅地化、工業地化が進み、緊急調査を強いられ続けた側面もあるのだが)、1964年に国の史跡に指定された。 - Wikipedia日英京都関連文書対訳コーパス
The scope of 'ancient structural remnant' that is recognized worth as a cultural property buried under the ground and 'relic' that is estimated to be worth as a tangible cultural property, or the legal scope of 'buried cultural property,' was defined by the 'notice concerning the protection of buried cultural properties and facilitation of their excavation researches, etc.,' issued by the Deputy Commissioner for Cultural Affairs to the Directors of the Prefectural Boards of Education as of September 29, 1998, or the so-called 'notice for facilitation' of 1998. 例文帳に追加
土地に埋蔵されている文化財としての価値が認められる「遺構」、および、有形文化財としての価値が推定される「遺物」の範囲、すなわち、法的に「埋蔵文化財」として取り扱うことのできる範囲は、1998年(平成10年)9月29日付文化庁次長による都道府県教育委員会教育長あての「埋蔵文化財の保護と発掘調査の円滑化等について(通知)」、いわゆる平成10年の「円滑化通知」によって定義された。 - Wikipedia日英京都関連文書対訳コーパス
(1) A person must be a graduate of a university, etc. who completed a civil engineering, architecture or mining course (an architecture course shall be excluded for the skill training courses for operations chiefs of tunnel excavation, etc. and tunnel lining, and a shipbuilding course shall be included for the skill training course for operations chiefs of scaffolding erection; hereinafter referred to as "specified courses" in this table); and, after graduation, must have three years or more of experience in construction work (construction work for the skill training courses for operations chiefs of tunnel excavation, etc. and tunnel lining shall be limited to tunnel construction; that for the skill training course for operations chiefs of scaffolding erection shall include shipbuilding; and that for the skill training course for operations chiefs of demolition, etc. of concrete structures shall be limited to demolition, etc. of concrete structures; hereinafter referred to as "specified work" in this table). 例文帳に追加
一 大学等において土木、建築又は採鉱に関する学科(ずい道等の掘削等作業主任者技能講習及びずい道等の覆工作業主任者技能講習にあつては建築に関する学科を除き、足場の組立て等作業主任者技能講習にあつては造船に関する学科を含む。以下この表において「特定学科」という。)を修めて卒業した者で、その後三年以上建設の作業(ずい道等の掘削等作業主任者技能講習及びずい道等の覆工作業主任者技能講習にあつてはずい道等の建設の作業に限り、足場の組立て等作業主任者技能講習にあつては造船の作業を含み、コンクリート造の工作物の解体等作業主任者技能講習にあつてはコンクリート造の工作物の解体等の作業に限る。以下この表において「特定作業」という。)に従事した経験を有するものであること。 - 日本法令外国語訳データベースシステム
Article 355 The employer shall, in the case of carrying out an excavating work of natural ground, and when it is liable to cause dangers to workers due to collapse of natural ground, broken underground-installed objects, etc., investigate in advance the natural ground of the work place and its surroundings as to the following matters by boring or other suitable methods, and determine the time and procedures of excavation on the in conformity with what is known by the investigation and carry out by the determinations thereof: 例文帳に追加
第三百五十五条 事業者は、地山の掘削の作業を行う場合において、地山の崩壊、埋設物等の損壊等により労働者に危険を及ぼすおそれのあるときは、あらかじめ、作業箇所及びその周辺の地山について次の事項をボーリングその他適当な方法により調査し、これらの事項について知り得たところに適応する掘削の時期及び順序を定めて、当該定めにより作業を行わなければならない。 - 日本法令外国語訳データベースシステム
(4) Skill training courses for operations chiefs of excavating natural ground and shoring; skill training course for operations chiefs of tunnel excavation, etc.; skill training course for operations chiefs of tunnel lining; skill training course for operations chiefs of concrete form shoring work; skill training course for operations chiefs of scaffolding erection; skill training course for operations chiefs of erection, etc. of steel structures; skill training course for operations chiefs of construction, etc. of steel bridges; skill training course for operations chiefs of demolition, etc. of concrete structures; and skill training course for operations chiefs of construction, etc. of concrete bridges 例文帳に追加
四 地山の掘削及び土止め支保工作業主任者技能講習、ずい道等の掘削等作業主任者技能講習、ずい道等の覆工作業主任者技能講習、型枠支保工の組立て等作業主任者技能講習、足場の組立て等作業主任者技能講習、建築物等の鉄骨の組立て等作業主任者技能講習、鋼橋架設等作業主任者技能講習、コンクリート造の工作物の解体等作業主任者技能講習及びコンクリート橋架設等作業主任者技能講習 - 日本法令外国語訳データベースシステム
Article 109 (1) If others are damaged by excavation of land to mine minerals, discharge of mine water or waste water, heaps of waste rock or slag, or discharge of metallurgical smoke, such damage shall be compensated by the holder of mining right in the mining area concerned at the time of occurrence of damage (or the holder of mining lease right, if a mining lease right is created in the mining area concerned). If the right of mining has already become extinct at the time of occurrence of damage, such damage shall be compensated by the holder of mining right in the mining area concerned at the time of extinction of the mining right (or the holder of mining lease right, if a mining lease right was created in the mining area concerned at the time of extinction of the mining right). 例文帳に追加
第百九条 鉱物の掘採のための土地の掘さく、坑水若しくは廃水の放流、捨石若しくは鉱さいのたい積又は鉱煙の排出によつて他人に損害を与えたときは、損害の発生の時における当該鉱区の鉱業権者(当該鉱区に租鉱権が設定されているときは、その租鉱区については、当該租鉱権者)が、損害の発生の時既に鉱業権が消滅しているときは、鉱業権の消滅の時における当該鉱区の鉱業権者(鉱業権の消滅の時に当該鉱業権に租鉱権が設定されていたときは、その租鉱区については、当該租鉱権者)が、その損害を賠償する責に任ずる。 - 日本法令外国語訳データベースシステム
Article 643-8 The provisions of Article 643 shall apply mutatis mutandis to the designation as pursuant to the provision of paragraph (2) of Article 30 of the Act, which is applied mutatis mutandis pursuant to paragraph (2) of Article 30-3 of the Act. In this case, the phrase "the place set forth in paragraph (2) of Article 30", "the work of specified undertaking (meaning the specified undertaking set forth in paragraph (1) of Article 15 of the Act)"and "construction work such as building frame construction" in item (i) of paragraph (1) of Article 643 shall be deemed to be replaced with "the place set forth in paragraph (2) of Article 30 of the Act which is applied mutatis mutandis pursuant to paragraph (2) of Article 30-3 of the Act", "the work prescribed by paragraph (1) of Article 25-2 of the Act" and "excavation, etc., in tunneling work" respectively; and the term "the specified principal employer" in paragraph (2) of the same Article shall be deemed to be replaced with "the principal employer." 例文帳に追加
第六百四十三条の八 第六百四十三条の規定は、法第三十条の三第二項において準用する法第三十条第二項の規定による指名について準用する。この場合において、第六百四十三条第一項第一号中「第三十条第二項の場所」とあるのは「第三十条の三第二項において準用する法第三十条第二項の場所」と、「特定事業(法第十五条第一項の特定事業をいう。)の仕事」とあるのは「法第二十五条の二第一項に規定する仕事」と、「建築工事における躯体工事等」とあるのは「ずい道等の建設の仕事における掘削工事等」と、同条第二項中「特定元方事業者」とあるのは「元方事業者」と読み替えるものとする。 - 日本法令外国語訳データベースシステム
※この記事は「日本法令外国語訳データベースシステム」の2010年9月現在の情報を転載しております。 |
Copyright © Japan Patent office. All Rights Reserved. |
Copyright © Ministry of Health, Labour and Welfare, All Right reserved. |
本サービスで使用している「Wikipedia日英京都関連文書対訳コーパス」はWikipediaの日本語文を独立行政法人情報通信研究機構が英訳したものを、Creative Comons Attribution-Share-Alike License 3.0による利用許諾のもと使用しております。詳細はhttp://creativecommons.org/licenses/by-sa/3.0/ および http://alaginrc.nict.go.jp/WikiCorpus/ をご覧下さい。 |
Copyright © Japan Patent office. All Rights Reserved. |
ログイン |
Weblio会員(無料)になると
|
ログイン |
Weblio会員(無料)になると
|